CN102505965B - Method for identifying rock mass failure instability early warning - Google Patents
Method for identifying rock mass failure instability early warning Download PDFInfo
- Publication number
- CN102505965B CN102505965B CN 201110357858 CN201110357858A CN102505965B CN 102505965 B CN102505965 B CN 102505965B CN 201110357858 CN201110357858 CN 201110357858 CN 201110357858 A CN201110357858 A CN 201110357858A CN 102505965 B CN102505965 B CN 102505965B
- Authority
- CN
- China
- Prior art keywords
- rock mass
- early warning
- stress
- monitoring
- tangent modulus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011435 rock Substances 0.000 title claims abstract description 80
- 238000000034 method Methods 0.000 title claims abstract description 35
- 238000012544 monitoring process Methods 0.000 claims abstract description 34
- 238000006073 displacement reaction Methods 0.000 claims abstract description 25
- 238000009412 basement excavation Methods 0.000 claims description 10
- 238000006243 chemical reaction Methods 0.000 claims description 7
- 238000000280 densification Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 230000000737 periodic effect Effects 0.000 claims description 3
- 208000037656 Respiratory Sounds Diseases 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 238000007405 data analysis Methods 0.000 claims description 2
- 230000006641 stabilisation Effects 0.000 claims description 2
- 238000011105 stabilization Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 208000037805 labour Diseases 0.000 abstract 1
- 238000004904 shortening Methods 0.000 abstract 1
- 238000004891 communication Methods 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 229910052500 inorganic mineral Inorganic materials 0.000 description 2
- 239000011707 mineral Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002045 lasting effect Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Images
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The invention belongs to the field of mine safety, relating to a method for identifying rock mass failure instability early warning by utilizing stress displacement monitoring. The method is characterized by comprising the following steps of: determining a monitoring area in an excavated rock mass and numbering, monitoring stress and deformation changes of the rock mass by utilizing a borehole stressmeter and a multipoint position extensometer and monitoring in real time, converting a tangent modulus value of the rock mass, mastering a change trend of the tangent modulus value of the rock mass, and judging whether the rock mass failure instability early warning is carried out or not. The method disclosed by the invention is simple in construction, low in cost, good in effect, has better reliability and early warning accuracy, has the capabilities of shortening the time of the rock failure instability early warning, improving the safety environment of construction and avoiding the losses of labors and devices, and is suitable for the fields of mines, tunnels, side slopes, hydropower station chambers and the like formed by excavating the rock mass.
Description
Technical field
The invention belongs to the mine safety field, relate to a kind of method of utilizing the stress displacement monitoring to realize rock mass failure instability early warning identification, be applicable to the mine, power station chamber, side slope, tunnel of rock excavation etc.
Background technology
Along with the day by day exhaustion of earth's surface superficial part mineral resources, the mining degree of depth constantly increases, and the rock mass failure instability early warning seems more and more important.The rock mass failure instability early warning be a kind of rock mass in digging process, and in mineral building or the nugget recovery process, along with the propelling of stope, grasp rock mass stress, change in displacement situation, thereby reach underground pressure management, realize the purpose of disaster alarm.
In the ore body exploitation process, reinforcement stress, displacement monitoring are important process grasping the rock mass situation of change.State's internal stress displacement monitoring, the general using readout instrument obtains data from the Stress and displacement monitor, and the minority monitoring network utilizes the monitoring point strain gauge that data are inputted computer, carries out early warning when the method for analysis adopts the stress increment data to gather increase, sudden change more.Because rock mass causes secondary stress field redistribution behind excavation, cause the stress increment value mutation, when rock mass is in elastic stage, rock mass generation moderate finite deformation can't produce the large-scale damage unstability, and traditional analytical method does not consider that rock mass changes at the stress and strain in stress deformation process Elastic stage.So, utilize the sudden change of strain gauge monitored data to judge that rock mass failure instability easily produces wrong early warning conclusion, these factors have greatly affected the effect of rock mass failure instability early warning, and its application is restricted.
In view of the deficiency of above-mentioned Instability of Rock Body method for early warning, need a kind of new early warning recognition methods, both method was simple, distinguishing speed is fast, effective, can judge accurately that again rock mass failure instability carries out early warning, also has preferably applicability simultaneously.
Summary of the invention
The present invention be directed to rock mass failure instability early warning weak effect in the engineerings such as mine safety, road and rail traffic tunnel and water conservancy and hydropower chamber, easily produce the wrong problems such as early warning conclusion, proposed to adopt stress displacement monitoring data to realize a kind of method of rock mass failure instability early warning, not only method is simple, and has greatly improved the accuracy of rock mass failure instability early warning.
A kind of method of rock mass failure instability early warning identification is characterized in that:
(1) according to the radial dimension of multiple position extensometer, implement boring in the vertical direction of excavation face, diameter is generally 45mm~76mm, and boring length is excavation bulk radius r
0More than 3 times, length is designated as L, the shift value of generation is Δ l, unit is mm, the darkest monitoring point for displacement should be in initial stress area, anchor point quantity is 3-5 approximately, is used for grasping the stressed strain variation situation of rock mass;
(2) borehole stressmeter monitor stress direction should be consistent with multiple position extensometer displacement monitoring direction, at first setting tool and sensor are coupled together, mounting rod inserts in the central recess of sensor, determine the Sensor monitoring stress direction, the data cable port of sensor is connected upper readout instrument, display frequency.Then, the setting tool of left hand grip outside does not rotate it, turns clockwise erecting tools with the right hand, gives initial stress of sensor, until that the force value that shows reaches is a certain amount of (than the low 5Hz of original frequency~10Hz time), stops to twist erecting tools; Mounting rod is extracted out, again setting tool is withdrawed from boring, installation of sensors is complete; After frequency stabilization (approximately ten minutes), the frequency of record sensor this moment is as original frequency, and the input instrument returns to zero; But operate later on the stress increment value Δ σ of instrument direct representation rock mass;
What (3) propose utilizes displacement monitoring increment size Δ l and the darkest anchor point length L conversion strain increment value Δ ε that holes, and then, utilizes stress increment value Δ σ and strain increment Δ ε conversion tangent modulus E
t, method is
Δ σ=σ i wherein
-σ
I-1, Δ l=l
i-l
I-1,
(4) early warning identifying is as follows:
1) implements boring according to designing requirement;
2) utilize mounting rod that multiple position extensometer is installed, the darkest anchor point is in the protolith state;
3) utilize mounting rod that borehole stressmeter is installed, requiring borehole stressmeter to measure stress direction is the multiple position extensometer direction of displacement;
4) according to designing displacement and stress monitoring network connection computer, formation can be carried out the network of stress displacement monitoring in real time;
5) by monitoring network, the periodic monitoring data are analyzed its result, stress increment value Δ σ=σ
i-σ
I-1, the strain increment value
Conversion tangent modulus value
6) according to the stressed constitutive relation of rock mass, after the rock mass damaged enters the yield region, the phenomenon that tangent modulus descends appears.Carry out the tangent modulus data analysis and process, obtain the slope of tangent modulus value
Find out the point that k reduces, be rock mass failure instability early warning recognition methods;
Adopt the tangent modulus slope to reduce the method for early warning rock mass failure instability, with traditional method for early warning different manifestations following several aspect:
(1) the inventive method has high-reliability, traditional rock mass failure instability recognition methods, when only considering the stress increment situation of change, occurring stress behind the rock excavation increases suddenly, stresses re-distribution occurs after existing extensive rock mass to produce less displacement, belong to the rock mass original crack densification stage, rock mass can not produce unstable phenomenon; Only consider the displacement increment situation of change, rock mass is after progressively excavating, and stress increases gradually, produce macroscopical displacement, the excavation variation causes stress transfer, can not produce lasting rock mass failure instability, the result causes early warning mistake, reliability low, judges that the rock mass failure instability convincingness is inadequate.The present invention has not only considered the stress increment variation, also considered the strain increment variation, simultaneously, utilize rock mass loading process constitutive relation to enter the particularity that the yield region tangent modulus descends, realize the rock mass failure instability early warning, the low situation of the early warning credible result degree of having avoided influence factor to cause has less improved the early warning reliability greatly, supports for the early warning of engineering rock mass damage unstability provides effect technique;
(2) the inventive method has practicality, uses strain increment and stress increment data, the conversion tangent modulus, grasp simultaneously the tangent modulus variation tendency, utilize the reduction of tangent modulus to realize the rock mass failure instability early warning, the method is easy, practical, easily is widely applied;
(3) in traditional rock mass failure instability early warning, a few methods is considered that stress increment and strain increment change and is come early warning, when simple consideration stress increment or strain increment, only consider that the data of rock mass force and deformation suddenly change early warning, the variation relation of having ignored rock mass strain and stress in the stressed constitutive relation Elastic stage, the present invention has considered that not only the stress and strain increment changes, considered simultaneously elastic modulus change, increase the accuracy of early warning, brought the life and property loss early warning that huge meaning is arranged to rock mass failure unstability.
(4) the present invention is applicable to the rock body quality of mine dynamic disaster early warning that unstability occurs of breaking, and such as rock burst, roof fall, gushing water and slope and land slide etc., also is applicable to the large-sized rock mass engineering stability, such as disaster alarms such as power station chamber, side slope, tunnel and dam bodys.
Description of drawings
Fig. 1 is stressometer of the present invention and displacement meter field conduct figure.
Fig. 2 is monitoring network schematic diagram of the present invention.
Fig. 3 is early warning schematic diagram of the present invention.
Among the figure: the 1-borehole stressmeter; 2-borehole stressmeter data collecting instrument; The 3-multiple position extensometer; 4-multiple position extensometer data collecting instrument; The 5-computer; The 6-internet; The 7-multiple users; The 8-communication cable.
Illustrate: the field monitoring apparatus installation is implemented according to Fig. 1, and whole monitoring network should be implemented according to Fig. 2,, realize the rock mass unstability early warning of breaking according to Fig. 3 early warning principle.
The specific embodiment
The break following process of unstability early warning new method of this implementation rock mass is carried out:
(1) determine rock mass monitoring and warning zone, the main monitor prewarning area divided and is numbered, numbering corresponding the data variation of stress increment, displacement increment, in order to obtain a clearly monitoring network;
(2) carry out stress monitoring and displacement monitoring drilling construction according to design, should be arranged in easy generation at the bottom of the stress drilling hole and destroy the unstability rock mass, can not be positioned at protolith state rock mass; The darkest anchor point of multiple position extensometer boring should be in the protolith state;
Should be in 3 times when (3) borehole stressmeter being installed in excavation bulk radius, be used for grasping the rock mass stress state; The darkest anchor point of multiple position extensometer should be in former petrographic province, and all the other anchor points are uniformly distributed in the boring, is used for grasping the rock mass deformation state;
(4) parameters, the periodic monitoring data are analyzed stress increment and strain increment, get the tangent modulus value according to above-mentioned Solving Equations, draw tangent modulus slope variation trend;
(5) carry out the rock mass failure instability early warning according to the tangent modulus slope variation, when the tangent modulus slope for increasing or when constant, rock mass is in densification or elastic stage, can not produce rock mass failure instability; When the tangent modulus slope reduced, rock mass entered the yield region, and the germinating, expansion, the connection that begin to produce secondary crackle cause destroying unstability.So, the tangent modulus slope of rock mass is reduced the early warning of identification rock mass failure instability.
Claims (1)
1. the method for rock mass failure instability early warning identification is characterized in that, described method is to utilize that rock excavation is stressed to reduce the generation that comes the early warning rock mass failure instability by the tangent modulus slope behind the elastic stage; Concrete steps are as follows
(1) according to the radial dimension of multiple position extensometer, implement boring in the vertical direction of excavation face, diameter is 45mm ~ 76mm, and boring length is excavation bulk radius r
0More than 3 times, length is designated as L, the shift value of generation is Δ l, the Jun of unit is ㎜, the darkest monitoring point for displacement should be in initial stress area, anchor point quantity is 3-5, is used for grasping the stressed strain variation situation of rock mass;
(2) borehole stressmeter monitor stress direction should be consistent with multiple position extensometer displacement monitoring direction, at first setting tool and sensor are coupled together, mounting rod inserts in the central recess of sensor, determine the Sensor monitoring stress direction, the data cable port of sensor is connected upper readout instrument, display frequency; Then, the setting tool of holding on the other hand the outside does not rotate it, turns clockwise mounting rod with another hand, gives initial stress of sensor, until the force value that shows reaches when hanging down the 5Hz ~ 10Hz left and right sides than original frequency, stops to twist mounting rod; Mounting rod is extracted out, again setting tool is withdrawed from boring, installation of sensors is complete; After frequency stabilization, the frequency of record sensor this moment is as original frequency, and the input instrument returns to zero; But operate later on the stress increment value Δ σ of instrument direct representation rock mass;
(3) utilize displacement monitoring increment size Δ l and the darkest anchor point length L of the boring length L conversion strain increment value Δ ε that namely holes, then, utilize stress increment value Δ σ and strain increment Δ ε conversion tangent modulus E
t, method is
, Δ σ=σ wherein
i-σ
I-1, Δ l=l
i-l
I-1,
(4) early warning identifying is as follows:
1) implements boring according to designing requirement;
2) utilize mounting rod that multiple position extensometer is installed, the darkest anchor point is in the protolith state;
3) utilize mounting rod that borehole stressmeter is installed, requiring borehole stressmeter to measure stress direction is the multiple position extensometer direction of displacement;
4) according to designing displacement and stress monitoring network connection computer, formation can be carried out the network of stress displacement monitoring in real time;
5) by monitoring network, the periodic monitoring data are analyzed its result, stress increment value Δ σ=σ
i-σ
I-1, the strain increment value
, conversion tangent modulus value
According to the stressed constitutive relation of rock mass, after the rock mass damaged enters the yield region, the phenomenon that tangent modulus descends appears; Carry out the tangent modulus data analysis and process, obtain the slope of tangent modulus value
, find out the point that k reduces; The rock mass failure instability early warning is carried out in variation according to the tangent modulus slope k, when the tangent modulus slope k for increasing or when constant, rock mass is in densification or elastic stage, can not produce rock mass failure instability; When the tangent modulus slope k reduced, rock mass entered the yield region, and the germinating, expansion, the connection that begin to produce secondary crackle cause destroying unstability; So, the tangent modulus slope k of rock mass is reduced point as the early warning point that destroys unstability.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110357858 CN102505965B (en) | 2011-11-11 | 2011-11-11 | Method for identifying rock mass failure instability early warning |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110357858 CN102505965B (en) | 2011-11-11 | 2011-11-11 | Method for identifying rock mass failure instability early warning |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102505965A CN102505965A (en) | 2012-06-20 |
CN102505965B true CN102505965B (en) | 2013-10-23 |
Family
ID=46218093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110357858 Expired - Fee Related CN102505965B (en) | 2011-11-11 | 2011-11-11 | Method for identifying rock mass failure instability early warning |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102505965B (en) |
Families Citing this family (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102998180A (en) * | 2012-11-30 | 2013-03-27 | 北京交通大学 | Method for establishing damaged rock constitutive relation by utilizing residual strength |
CN103591915B (en) * | 2013-11-25 | 2016-06-29 | 中国矿业大学(北京) | A kind of deep hole tension type multipoint displacement monitoring and warning system and construction method |
CN103606019B (en) * | 2013-12-04 | 2016-09-28 | 江西理工大学 | Mine goaf overlying stratum sedimentation dynamic prediction method based on time-space relationship |
CN103712587B (en) * | 2014-01-13 | 2016-03-16 | 湖北工业大学 | Based on the critical displacement prediction and warning method of breakage mechanism of slope distortion |
CN105068113B (en) * | 2015-07-21 | 2018-01-09 | 中国铁道科学研究院铁道建筑研究所 | Judge the method for side slope danger float stone |
CN104989456B (en) * | 2015-07-24 | 2017-04-05 | 青岛理工大学 | Large-span underground engineering surrounding rock excavation stability monitoring and early warning method |
CN105758565B (en) * | 2016-03-03 | 2018-09-28 | 山东科技大学 | Coal roadway tunneling is met head on stress determination method and risk assessment method |
CN106370306B (en) * | 2016-09-14 | 2023-11-10 | 中国矿业大学(北京) | Method for identifying rock burst disaster through infrared thermal image early warning |
CN106596618A (en) * | 2016-11-21 | 2017-04-26 | 中山大学 | Energy dissipation-based rock-soil stability monitoring device |
CN107421481B (en) * | 2017-07-04 | 2023-05-02 | 成都理工大学 | Three-dimensional monitoring and early warning multipoint displacement meter for measuring rock mass expansion deformation |
CN107842394B (en) * | 2017-10-23 | 2019-03-26 | 青岛理工大学 | Dynamic elastic modulus detection method for stability of mining top plate of large-span underground chamber |
CN108050986B (en) * | 2017-12-13 | 2019-09-20 | 河北工业大学 | The method for determining Rock And Soil internal rupture face position is monitored based on multipoint displacement meter |
CN108877156A (en) * | 2018-09-06 | 2018-11-23 | 东北大学 | A kind of slope instability early warning system and method |
CN109765297A (en) * | 2019-01-03 | 2019-05-17 | 北京科技大学 | A kind of avalanche early warning method based on the identification of separation failure omen |
CN109853508B (en) * | 2019-03-15 | 2021-05-04 | 长江岩土工程总公司(武汉) | Method for measuring landslide or rock mass deformation in construction excavation |
CN110631936B (en) * | 2019-09-02 | 2021-02-23 | 中国矿业大学 | Quantitative evaluation test method for coal core damage |
CN111472840B (en) * | 2020-04-07 | 2020-11-13 | 北京科技大学 | Mining surrounding rock ground pressure disaster intelligent prediction method and system |
CN111678438B (en) * | 2020-06-18 | 2021-11-16 | 广东韶钢松山股份有限公司 | Scale body displacement early warning method and system |
CN112326788A (en) * | 2020-10-23 | 2021-02-05 | 江西理工大学 | Monitoring and early warning method and system for instability of tailing dam |
CN112629586A (en) * | 2020-12-03 | 2021-04-09 | 武汉理工大学 | Synchronous measuring equipment for internal displacement and apposition stress of rock mass |
CN113901105B (en) * | 2021-09-24 | 2024-08-02 | 中冶长天国际工程有限责任公司 | Rock mass instability early warning method and system based on stress monitoring data change |
CN114046766A (en) * | 2021-09-24 | 2022-02-15 | 广东省交通规划设计研究院集团股份有限公司 | Device and method for testing stress-strain based on soil layer in drill hole |
CN113982681B (en) * | 2021-10-26 | 2024-07-12 | 中煤西安设计工程有限责任公司 | Automatic monitoring and early warning method and system for large-area overhead disasters in coal mine goaf |
CN114061535B (en) * | 2021-11-15 | 2022-09-13 | 北京环安工程检测有限责任公司 | Subway tunnel automatic deformation monitoring method and device based on MEMS |
CN114396312A (en) * | 2022-01-15 | 2022-04-26 | 安徽铜冠(庐江)矿业有限公司 | Multi-source monitoring and coupling early warning method suitable for large goaf ground pressure activity |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6098021A (en) * | 1999-01-15 | 2000-08-01 | Baker Hughes Incorporated | Estimating formation stress using borehole monopole and cross-dipole acoustic measurements: theory and method |
CN101526009A (en) * | 2009-04-09 | 2009-09-09 | 西安科技大学 | Wall rock destabilization acousto-optic-electric integrated monitoring system and monitoring method thereof |
CN101718876A (en) * | 2009-11-13 | 2010-06-02 | 北京科技大学 | Method for monitoring stability and predicting destabilization of side slope based on change of state of strain of soil-rock mass |
-
2011
- 2011-11-11 CN CN 201110357858 patent/CN102505965B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6098021A (en) * | 1999-01-15 | 2000-08-01 | Baker Hughes Incorporated | Estimating formation stress using borehole monopole and cross-dipole acoustic measurements: theory and method |
CN101526009A (en) * | 2009-04-09 | 2009-09-09 | 西安科技大学 | Wall rock destabilization acousto-optic-electric integrated monitoring system and monitoring method thereof |
CN101718876A (en) * | 2009-11-13 | 2010-06-02 | 北京科技大学 | Method for monitoring stability and predicting destabilization of side slope based on change of state of strain of soil-rock mass |
Non-Patent Citations (4)
Title |
---|
深部开采围岩失稳模式分析;胡万宏等;《现代矿业》;20100630(第6期);57-59 * |
考虑岩体劣化的大型地下厂房围岩变形动态监测预警方法研究;陈国庆等;《岩土力学》;20100930;第31卷(第9期);3012-3018 * |
胡万宏等.深部开采围岩失稳模式分析.《现代矿业》.2010,(第6期),57-59. |
陈国庆等.考虑岩体劣化的大型地下厂房围岩变形动态监测预警方法研究.《岩土力学》.2010,第31卷(第9期),3012-3018. |
Also Published As
Publication number | Publication date |
---|---|
CN102505965A (en) | 2012-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102505965B (en) | Method for identifying rock mass failure instability early warning | |
CN110390152B (en) | Discrete element method for simulating crack evolution of surrounding rock of roadway | |
Huang et al. | Application and prospect of hard rock TBM for deep roadway construction in coal mines | |
CN107387166B (en) | Real-time monitoring and early warning system and method for failure depth of coal seam floor of stope face | |
CN111270987B (en) | Method for accurately preventing and controlling rock burst in remote area under coal mine | |
CN103293560B (en) | A kind of method of testing adopting triple stress court | |
CN103233777B (en) | A kind of roof safety ore pressure monitor method and device | |
CN109653800B (en) | Composite power disaster monitoring and early warning system and method for deep water-rich overburden thick coal seam mining | |
CN111859712A (en) | Ground advanced pre-control method for coal mine rock burst | |
CN113622913B (en) | Deformation control method for mining tunnel surrounding rock integrated with underground and up-down tunnel by full-caving method | |
CN102944906B (en) | The fine search observation procedure of crack of coal-mine roof form and evolutionary process thereof | |
CN116595809B (en) | Underground engineering surrounding rock drilling pressure relief-detection evaluation method | |
WO2023197821A1 (en) | Overlying strata damage partition and height determination method based on permeability-damage relationship | |
CN111985101A (en) | Deep well impact dangerous roadway branch unloading coupling scour prevention method | |
CN104832163A (en) | Method for monitoring rock burst dangerousness in coal underground mining process | |
CN109779634B (en) | Method for determining position of fractured hard top plate of coal mine ground vertical well | |
CN104537195A (en) | Deeply-buried rock blasting excavation induced vibration prediction method based on energy principle | |
CN109915139B (en) | Hard coal seam mining method for balancing energy to induce plastic damage and preventing power damage | |
CN209327139U (en) | For studying the experiment loading system of rock fragmentation mechanisms under mine | |
Qin et al. | Stability and control of retracement channels in thin seam working faces with soft roof | |
Wang et al. | Evolution Laws of Floor Stress and Stability of Floor Roadway Affected by Overhead Mining | |
Lu et al. | Floor Disturbance and Failure Characteristics of Super‐Large Mining Height Working Face | |
Zheng et al. | Large Deformation Mechanics of Gob‐Side Roadway and Its Controlling Methods in Deep Coal Mining: A Case Study | |
Xu et al. | Deformation and fracture evolution of surrounding rock for shallow underground projects | |
CN111380638A (en) | Method for improving actual measurement precision of mining induced stress |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131023 |
|
CF01 | Termination of patent right due to non-payment of annual fee |