CN102495325A - 同杆双回线故障精确测距方法 - Google Patents
同杆双回线故障精确测距方法 Download PDFInfo
- Publication number
- CN102495325A CN102495325A CN2011104000011A CN201110400001A CN102495325A CN 102495325 A CN102495325 A CN 102495325A CN 2011104000011 A CN2011104000011 A CN 2011104000011A CN 201110400001 A CN201110400001 A CN 201110400001A CN 102495325 A CN102495325 A CN 102495325A
- Authority
- CN
- China
- Prior art keywords
- fault
- vector
- bus
- double
- matrix
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Locating Faults (AREA)
Abstract
一种同杆双回线故障精确测距方法。为了克服目前同杆双回线的故障测距方法不能避免导线间的互阻抗和互电纳相差造成的测距误差和在任意故障时实现故障测距的问题,采用精确的故障计算方法:1..用傅里叶算法计算出故障前和故障后电流、电压向量的实测值,2..计算出两侧系统阻抗矩阵和电势,3.取不同故障距离值,采用特征模量分解方法计算得到同杆双回线故障点到母线的转移矩阵,4.取不同故障电阻值构成故障点的电阻矩阵,5.解方程得到两侧母线电压向量、线路到母线的电流向量计算值,6.计算各向量计算值与实测值的误差平方和。在故障距离和故障电阻取的不同值中与实际故障距离和故障电阻最接近的故障距离和故障电阻值步骤6计算的误差平方和最小。
Description
技术领域
本发明专利涉及电力系统输电线路继电保护领域,尤其涉及超高压同杆双回线和特高压同杆双回线任意故障时的故障距离的精确测量(简称故障测距)。
背景技术
同杆双回线具有高可靠性、占地少、投资省的特点,在高压输电系统中被广泛的应用。同杆双回线在运行中可能发生各种短路故障。由于同杆双回线有6根导线,各种故障组合多达一百多种,目前还没有可以在同杆双回线任意故障时精确测量故障距距的方法。超高压同杆双回线和特高压同杆双回线的导线间距大,导线与导线之间的间距相差很大,因此导线间的互阻抗和互电纳相差很大。目前各种同杆双回线故障测距方法都假设导线间的互阻抗和互电纳相等,造成目前各种同杆双回线故障测距方法在实际的故障测距中误差很大。
发明内容
为了克服目前各种超高压同杆双回线和特高压同杆双回线的故障测距方法不能避免导线间的互阻抗和互电纳相差造成的测距误差和在任意故障时实现故障测距的问题。本发明提供了一种新的超高压同杆双回线和特高压同杆双回线的故障测距方法。本方法利用同杆双回线的故障精确计算技术实现同杆双回线任意故障的精确测距。包括以下步骤:
(1)采集同杆双回线母线处的各导线的电流、电压信号。利用故障前、后的电流采样值和电压采样值用傅里叶算法计算出故障前和故障后电流的向量、故障前和故障后电压的向量的实测值。
(2)用步骤(1)得到的电气量计算出同杆双回线两侧的系统阻抗矩阵和电势。
(3)利用估计的故障点与两侧母线的距离和各段线路的阻抗矩阵和电纳矩阵,采用特征模量分解技术和传输线方程构成故障点两侧的转移矩阵。对于每段长度为1的同杆双回线,用特征模量变换方法将同杆双回线的6相解耦成6个相互独立的模分量η,φ,ξ,α,β,δ。
公式中S和Q为特征模量分解矩阵,W11、W12、W21和W22为转移矩阵,T11、T12、T21和T22的矩阵如下:
对于η,φ,ξ,α,β,δ中的任一个模分量m,在特征模量分解时有对应的阻抗Zm和导纳Ym,在公式(2)中波阻抗传播常数将故障点左侧的各段线路转移矩阵 按照从母线m到故障点的顺序相乘,得到故障点到母线m的转移矩阵 将故障点右侧的各段线路转移矩阵 按照从母线n到故障点的顺序相乘,得到故障点到母线n的转移矩阵
(4)选择故障电阻(附图2)构成故障点的电阻矩阵ZR=[zij],其中各元素为:当(i≤3∩j≤3),对角线上元素zii=Ri+R7+R9,非对角线上元素zji=zij=R7+R9;当(i≥4∩j≥4),对角线上元素zii=Ri+R8+R9,非对角线上元素zji=zij=R8+R9;矩阵的其它元素zij=R9。各电阻最小值为10-12,超过300欧则取1012欧(电阻值取1012欧相当于电阻两端电路开断),通过选择不同故障电阻值构成任意故障。
(5)计算 (公式3)
(公式3)中I是单位矩阵。
解方程:
下标中1、2、3分别表示I回线的A相、B相、C相,4、5、6分别表示II回线的A相、B相、C相。解方程计算出m侧和n侧故障时电流向量的计算值m侧和n侧故障时电压向量的计算值将m侧和n侧电流向量、电压向量的实部和虚部分开得到36个实数记为:eijs,i=1~36。公式4中为m侧电势,Zmj,k为m侧系统阻抗矩阵元素;公式7中为n侧电势,Znj,k为n侧系统阻抗矩阵元素。
(6)对步骤(1)测量得到的故障后两侧电压向量和电流向量的实部和虚部分开得到36个实数记为:eic1,i=1~36。计算:
当估计的故障距离和构成故障点的电阻与实际值一致时ε的值为零。为了搜索到精确的故障距离和故障点的电阻,采用0.1km的距离间隔和0.1欧的故障电阻间隔,按照步骤(3)~(6)计算ε的值,ε的值最小时对应的故障距离与实际故障距离最多仅相差0.05km。
附图说明
图1是/平行双回线系统图。图中1.m侧三相系统电势2.m侧系统阻抗矩阵,共有3*3个元素Zmj,k,3.故障点左侧的同杆双回线,4.故障电阻构成故障点的电阻电路,5.故障点右侧的同杆双回线,6.n侧系统阻抗矩阵,共有3*3个元素Znj,k,7.n侧三相系统电势8.m侧母线,9.n侧母线。
图2是故障电阻构成故障点的电阻电路,图中1~9分别表示电阻R1~R9。R1~R3分别接在I回线的A相、B相、C相,R4~R6分别接在II回线的A相、B相、C相。
具体实施方式
本发明利用同杆双回线的故障精确计算技术实现同杆双回线任意故障的精确测距。包括以下步骤:
(1)采集同杆双回线各导线母线处的电流、电压信号。利用故障前、后的电流采样值和电压采样值用傅里叶算法计算出故障前和故障后电流的向量、故障前和故障后电压的向量的实测值。
(2)用步骤(1)得到的电气量计算出同杆双回线两侧的系统阻抗矩阵和电势。用m侧n侧的正序电压向量的变化量和正序电流向量的变化量计算m侧n侧的系统的正序阻抗;用m侧和n侧的负序电压向量的变化量和负序电流向量的变化量计算m侧n侧的系统的负序阻抗;用m侧和n侧的零序电压向量的变化量和零序电流向量的变化量计算m侧n侧的系统的零序阻抗。利用对称分量变换矩阵和对称分量逆变换矩阵将m侧n侧的系统的正序阻抗、负序阻抗和零序阻抗变换成m侧和n侧的3*3个元素的系统阻抗矩阵。m侧阻抗矩阵为[zmi,j],n侧阻抗矩阵为[zni,j],用m侧n侧的系统阻抗矩阵和母线处故障前的电压向量、电流向量计算出.m侧三相系统电势和n侧三相系统电势m侧三相系统电势计算公式:
公式中电压和电流向量为m侧母线故障前的数值;下标中1、2、3分别表示I回线的A相、B相、C相,4、5、6分别表示II回线的A相、B相、C相。
(3)对设定的故障点两侧的线路长度,利用各段线路的阻抗矩阵和电纳矩阵,采用特征模量分解技术和传输线方程构成故障点两侧的转移矩阵。方法如下:
对于每段长度为1的同杆双回线,用特征模量变换方法将同杆双回线的6相解耦成6个相互独立的模分量η,φ,ξ,α,β,δ。
公式中S和Q为特征模量分解矩阵,W11、W12、W21和W22为转移矩阵,T11、T12、T21和T22矩阵如下:
对于η,φ,ξ,α,β,δ中的任一个模分量m,在特征模量分解时有对应的阻抗Zm和导纳Ym,在公式(2)中波阻抗传播常数将故障点左侧的各段线路转移矩阵 按照从母线m到故障点的顺序相乘,得到故障点到母线m的转移矩阵 将故障点右侧的各段线路转移矩阵 按照从母线n到故障点的顺序相乘,得到故障点到母线n的转移矩阵
(4)选择故障电阻构成故障点的电阻矩阵ZR=[zij],其中各元素为:当(i≤3∩j≤3),对角线上元素zii=Ri+R7+R9,非对角线上元素zji=zij=R7+R9;当(i≥4∩j≥4),对角线上元素zii=Ri+R8+R9,非对角线上元素zji=zij=R8+R9;矩阵的其它元素zij=R9。各电阻最小值为10-12,超过300欧则取1012欧(电阻值取1012欧相当于电阻两端电路开断),通过选择不同故障电阻值构成任意故障。
(5)计算 (公式3)
(公式3)中I是单位矩阵。
解方程:
下标中1、2、3分别表示I回线的A相、B相、C相,4、5、6分别表示II回线的A相、B相、C相。解方程计算出m侧和n侧故障时电流向量的计算值m侧和n侧故障时电压向量的计算值将m侧和n侧电流向量、电压向量的实部和虚部分开得到36个实数记为:eijs,i=1~36。公式4中为m侧电势,Zmj,k为m侧系统阻抗矩阵元素;公式7中为n侧电势,Znj,k为n侧系统阻抗矩阵元素。
(6)对步骤(1)测量得到的故障后两侧电压向量、电流向量实测值的实部和虚部分开得到36个实数记为:eic1,i=1~36。计算:
当估计的故障距离和构成故障点的电阻与实际值一致时ε的值为零。为了搜索到精确的故障距离和故障点的电阻,采用0.1km的距离间隔和0.1欧的故障电阻间隔,按照步骤(3)~(6)计算ε的值,ε的值最小时对应的故障距离与实际故障距离最多仅相差0.05km。由于测量和计算都有误差,在实际应用中取ε的值最小时的故障距离值为故障测距结果。
Claims (5)
1.一种同杆双回线故障精确测距方法,其特征是:利用故障前、后的电流采样值和电压采样值用傅里叶算法计算出故障前和故障后电流的向量的实测值,用故障前和故障后电压的向量;计算出同杆双回线两侧的系统阻抗矩阵和电势;用估计的故障点和两侧母线的距离和各段线路的阻抗矩阵和电纳矩阵,采用特征模量分解技术和传输线方程构成故障点两侧的转移矩阵;选择故障电阻构成故障点的电阻矩阵;解方程计算出同杆双回线两侧的电流向量和两侧母线的电压向量的计算值;计算各向量计算值与实测值的误差平方和;在故障距离和故障电阻取的不同值中与实际故障距离和故障电阻最接近的故障距离和故障电阻值计算的误差平方和最小。
2.根据权利要求1所述的一种同杆双回线故障精确测距方法,其特征是:采集同杆双回线母线处的各导线的电流、电压信号,利用故障前、后的电流采样值和电压采样值用傅里叶算法计算出故障前和故障后电流的向量、故障前和故障后电压的向量的实测值;计算出同杆双回线两侧的系统阻抗矩阵和电势。
3.根据权利要求1所述的一种同杆双回线故障精确测距方法,其特征是:利用估计的故障点与两侧母线的距离和各段线路的阻抗矩阵和电纳矩阵,采用特征模量分解技术和传输线方程构成故障点两侧的转移矩阵,对于每段同杆双回线,用特征模量变换方法将同杆双回线的6相解耦成6个相互独立的模分量η,φ,ξ,α,β,δ;计算出各段线路转移矩阵;将各段线路转移矩阵按照从母线到故障点的顺序相乘得到故障点到两侧母线的转移矩阵。
4.根据权利要求1所述的一种同杆双回线故障精确测距方法,其特征是:选择故障电阻构成故障点的电阻矩阵;解方程得到两侧母线电压向量、线路到母线的电流向量的计算值;计算两侧母线电压向量和线路到母线的电流向量的计算值与两侧母线电压向量和线路到母线的电流向量的实测值的误差平方和。
5.根据权利要求1所述的一种同杆双回线故障精确测距方法,其特征是:对故障距离,从左侧母线开始至右侧母线,采用0.1km的距离间隔;对故障电阻从10-12Ω至300Ω按0.1欧的故障电阻间隔,超过300Ω则取1012Ω,计算两侧母线电压向量和线路到母线的电流向量的计算值与两侧母线电压向量和线路到母线的电流向量的实测值的误差平方和,在故障距离和故障电阻取的不同值计算的误差平方和中,与实际故障距离和实际故障电阻最接近的故障距离和故障电阻取的值计算得到的误差平方和最小。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110400001.1A CN102495325B (zh) | 2011-12-05 | 2011-12-05 | 同杆双回线故障精确测距方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110400001.1A CN102495325B (zh) | 2011-12-05 | 2011-12-05 | 同杆双回线故障精确测距方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102495325A true CN102495325A (zh) | 2012-06-13 |
CN102495325B CN102495325B (zh) | 2014-07-02 |
Family
ID=46187166
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110400001.1A Expired - Fee Related CN102495325B (zh) | 2011-12-05 | 2011-12-05 | 同杆双回线故障精确测距方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102495325B (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103116112A (zh) * | 2013-01-06 | 2013-05-22 | 广东电网公司电力科学研究院 | 一种同杆并架双回线路故障测距方法 |
CN103743996A (zh) * | 2013-10-15 | 2014-04-23 | 昆明理工大学 | 一种基于π型等效电路直流接地极线路故障测距方法 |
CN104090209A (zh) * | 2014-07-02 | 2014-10-08 | 国家电网公司 | 一种基于参数识别的母线保护方法 |
CN104345249A (zh) * | 2014-10-27 | 2015-02-11 | 华南理工大学 | 一种同塔双回直流线路的混合模量时域故障定位方法 |
CN104950229A (zh) * | 2015-06-17 | 2015-09-30 | 国家电网公司 | 基于单回线路单端电气量双回线路跨线故障点短路电阻测量方法 |
CN107167707A (zh) * | 2017-06-08 | 2017-09-15 | 国网江苏省电力公司无锡供电公司 | 一种基于参数未知的同杆双回线故障测距方法及装置 |
CN110133437A (zh) * | 2019-05-10 | 2019-08-16 | 贵州电网有限责任公司 | 基于最小化电压估计误差的有源配电网故障定位方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3460336B2 (ja) * | 1994-10-21 | 2003-10-27 | 富士電機株式会社 | 多端子系送電線における故障点標定方法 |
CN101252275A (zh) * | 2008-04-08 | 2008-08-27 | 昆明理工大学 | 一种利用六相系统新相模变换的耦合双回线故障测距方法 |
CN101263394A (zh) * | 2005-09-14 | 2008-09-10 | Abb有限公司 | 用于电力线中的故障定位的方法 |
-
2011
- 2011-12-05 CN CN201110400001.1A patent/CN102495325B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3460336B2 (ja) * | 1994-10-21 | 2003-10-27 | 富士電機株式会社 | 多端子系送電線における故障点標定方法 |
CN101263394A (zh) * | 2005-09-14 | 2008-09-10 | Abb有限公司 | 用于电力线中的故障定位的方法 |
CN101252275A (zh) * | 2008-04-08 | 2008-08-27 | 昆明理工大学 | 一种利用六相系统新相模变换的耦合双回线故障测距方法 |
Non-Patent Citations (2)
Title |
---|
林军: "超高压同杆双回线多重故障的计算", 《中国电机工程学报》 * |
林军等: "平行/同杆双回线的单线故障精确测距算法", 《电力自动化设备》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103116112A (zh) * | 2013-01-06 | 2013-05-22 | 广东电网公司电力科学研究院 | 一种同杆并架双回线路故障测距方法 |
CN103116112B (zh) * | 2013-01-06 | 2015-06-10 | 广东电网公司电力科学研究院 | 一种同杆并架双回线路故障测距方法 |
CN103743996A (zh) * | 2013-10-15 | 2014-04-23 | 昆明理工大学 | 一种基于π型等效电路直流接地极线路故障测距方法 |
CN103743996B (zh) * | 2013-10-15 | 2016-06-22 | 昆明理工大学 | 一种基于π型等效电路直流接地极线路故障测距方法 |
CN104090209A (zh) * | 2014-07-02 | 2014-10-08 | 国家电网公司 | 一种基于参数识别的母线保护方法 |
CN104345249A (zh) * | 2014-10-27 | 2015-02-11 | 华南理工大学 | 一种同塔双回直流线路的混合模量时域故障定位方法 |
CN104950229A (zh) * | 2015-06-17 | 2015-09-30 | 国家电网公司 | 基于单回线路单端电气量双回线路跨线故障点短路电阻测量方法 |
CN104950229B (zh) * | 2015-06-17 | 2018-07-24 | 国家电网公司 | 基于单回线路单端电气量双回线路跨线故障点短路电阻测量方法 |
CN107167707A (zh) * | 2017-06-08 | 2017-09-15 | 国网江苏省电力公司无锡供电公司 | 一种基于参数未知的同杆双回线故障测距方法及装置 |
CN110133437A (zh) * | 2019-05-10 | 2019-08-16 | 贵州电网有限责任公司 | 基于最小化电压估计误差的有源配电网故障定位方法 |
CN110133437B (zh) * | 2019-05-10 | 2021-01-26 | 贵州电网有限责任公司 | 基于最小化电压估计误差的有源配电网故障定位方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102495325B (zh) | 2014-07-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102495325B (zh) | 同杆双回线故障精确测距方法 | |
Ghorbani et al. | Negative-sequence network based fault location scheme for double-circuit multi-terminal transmission lines | |
Das et al. | Transmission line fault detection and location using wide area measurements | |
US9476931B2 (en) | Method for fault location analysis of ungrounded distribution systems | |
EP2738561B1 (en) | Method and device for determining location of earth fault | |
Lin et al. | An algorithm for locating faults in three-terminal multisection nonhomogeneous transmission lines using synchrophasor measurements | |
CN108152673B (zh) | 一种利用多源数据的主动配电网故障分层定位方法 | |
EP1739441B1 (en) | Method and system for determining location of phase-to-earth fault | |
US11016134B2 (en) | Determination of power transmission line parameters using asynchronous measurements | |
CN105738769B (zh) | 基于分布参数模型的串联补偿双回线故障定位方法 | |
CN102445638B (zh) | 多端直流输电系统多分支直流线路时域故障定位方法 | |
CN102707197A (zh) | 一种输电线路单相接地故障距离测定方法及故障类型诊断方法 | |
CN111141995B (zh) | 一种基于比幅原理的线路双端稳态量测距方法和系统 | |
CN103954885B (zh) | 基于分布参数的双回线故障单端定位系统及定位方法 | |
CN109444657B (zh) | 一种配电网高阻接地故障区段定位方法 | |
CN109283430A (zh) | 一种基于电压分布原理的配电网故障测距方法 | |
CN107884682A (zh) | 基于故障点与监测点距离的配电网故障定位方法 | |
CN110045226A (zh) | 一种基于压缩感知的配电网故障定位方法 | |
CN105375484A (zh) | 一种基于pmu的电力系统分布式动态状态估计方法 | |
CN105425111A (zh) | 一种利用过渡电阻特征的输电线路故障测距方法 | |
CN103743998A (zh) | 基于互相关系数的配电网单相接地故障定位方法及系统 | |
EP1342095B1 (en) | Fault location method and device | |
CN106019046A (zh) | 一种新型小电流接地系统暂态选线方法 | |
CN103529356A (zh) | 用于确定距相对地故障的距离的方法和设备 | |
WO2019166903A1 (en) | Method and device for fault location in a two-terminal transmission system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140702 Termination date: 20151205 |
|
EXPY | Termination of patent right or utility model |