CN102493471A - 结构地脚锚栓悬空安装施工工艺方法 - Google Patents

结构地脚锚栓悬空安装施工工艺方法 Download PDF

Info

Publication number
CN102493471A
CN102493471A CN201110393062XA CN201110393062A CN102493471A CN 102493471 A CN102493471 A CN 102493471A CN 201110393062X A CN201110393062X A CN 201110393062XA CN 201110393062 A CN201110393062 A CN 201110393062A CN 102493471 A CN102493471 A CN 102493471A
Authority
CN
China
Prior art keywords
bolt
crab
mould
installation
anchor bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110393062XA
Other languages
English (en)
Other versions
CN102493471B (zh
Inventor
周光毅
仇春慧
张强
毛立贤
刘旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd Dalian Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd Dalian Branch filed Critical China Construction Eighth Engineering Division Co Ltd Dalian Branch
Priority to CN201110393062.XA priority Critical patent/CN102493471B/zh
Publication of CN102493471A publication Critical patent/CN102493471A/zh
Application granted granted Critical
Publication of CN102493471B publication Critical patent/CN102493471B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明属于建筑施工方法。结构地脚锚栓悬空安装施工工艺方法,按照地脚锚栓、模具制作→桩基础钢筋安装→地脚锚栓定位→地脚锚栓安装固定→成品保护→砼浇筑的工艺流程进行施工,本发明的工艺按照设计采用8#角钢制作高精度专用整体定位、固定夹具,按施工图的螺栓直径、间距在角钢上成孔,孔内径比地脚锚栓外径大1mm。设置吊挂钢梁,用角钢将吊挂钢梁和专用夹具将整体固定的螺栓群连接,通过调整吊挂钢梁位置实现螺栓的平面定位,通过用垫板调整钢梁标高实现对螺栓标高控制。通过混凝土浇筑前、浇筑过程中、浇筑后的定位监测、调整,最终实现地脚锚栓的精确定位。具有安装速度快;安装质量高,位置准确;需用设备少,操作工艺简单等特点。

Description

结构地脚锚栓悬空安装施工工艺方法
技术领域
本发明属于建筑施工方法
背景技术
随着我国国民经济的发展,钢结构工程也越来越受建设单位的青睐,各类基础的预埋地脚锚栓被大量采用,地脚锚栓施工精度是影响钢结构安装质量十分重要的因素。对于埋入式柱脚设计中,地脚锚栓直接锚入桩基础的做法较常见,而地脚锚栓安装过程中悬空状态,地脚锚栓预埋存在定位、固定困难,工效差、速度慢、不经济等情况,一直没有较好的解决方法。
发明内容
本发明的目的是克服上述不足问题,提供一种结构地脚锚栓悬空安装施工工艺方法,本工法通过一系列技术措施,优化并完善了地脚锚栓施工技术及相关施工工艺,形成了一套技术上先进、经济上合理的完整的施工方法。
本发明为实现上述目的所采用的技术方案是:结构地脚锚栓悬空安装施工工艺方法,按照地脚锚栓、模具制作 → 桩基础钢筋安装→地脚锚栓定位 →地脚锚栓安装固定 →成品保护→砼浇筑的工艺流程进行施工,具体方法是:
第一步地脚锚栓、模具制作:依据施工图在加工车间制作夹具模具 ,模具上精确标注出轴线(中心线)位置及各排栓孔中心线,标注线必须清晰准确,允许偏差1mm,锚栓孔采用钻孔机钻孔;
第二步桩基础钢筋安装锚栓穿入模具的预留螺纹长度,符合图纸要求后,锚栓与模具点焊固定;
第三步地脚锚栓定位:首先将基础轴线、标高引到桩基础护壁顶部或桩口内壁四周,用红油漆画好标记;测量锚栓安装位置到桩基础护壁顶部距离,按此长度在锚栓模具四个角上焊接四根50×50×5垂直角钢,作为吊挂使用,角钢要大于实际长度;按桩护壁顶部到锚栓的距离在四根角钢上端画标高线,然后横向焊接二根12#槽钢,作为悬挂梁使用;
第四步地脚锚栓安装固定:锚栓安装就位后在槽钢下嵌好斜垫片,用水准仪检查锚栓标高,通过斜垫片调整平整度,使用线坠将轴线垂到模具上,调整模具的轴线,模具上的轴线位置与基础轴线重合后,开始加固;使用Φ25螺纹钢作支撑,螺纹钢顶紧桩壁后与模具焊接固定,四个方向全部支撑固定完毕后,由测量人员重新校核锚栓标高,允许偏差±2㎜,然后检测轴线,模具轴线与基础轴线完全一致,允许偏差2mm,然后把斜垫片与槽钢点焊固定,使锚栓形成完整的空间稳定体系;
第五步成品保护:地脚锚栓固定完毕,外露螺纹部分要涂抹润滑油,用塑料布进行包裹,外加塑料套模进行保护;
第六步砼浇筑:基础混凝土初凝前,测量人员再次对锚栓位置复测,如发现锚栓发生微小偏移,则采用铁锤小心敲击,做细微调整;完成后由质量部门及监理检查验收,合格后方可进行混凝土浇筑施工。
所述第六步砼浇筑:混凝土浇筑过程中,加派监护人员,严禁施工人员及混凝土泵管碰撞模具,造成模具偏位。
本发明的工艺原理:1、按照设计采用8#角钢制作高精度专用整体定位、固定夹具,按施工图的螺栓直径、间距在角钢上成孔,孔内径比地脚锚栓外径 大1mm。2、设置吊挂钢梁,用角钢将吊挂钢梁和专用夹具将整体固定的螺栓群连接,通过调整吊挂钢梁位置实现螺栓的平面定位,通过用垫板调整钢梁标高实现对螺栓标高控制。3、通过混凝土浇筑前、浇筑过程中、浇筑后的定位监测、调整,最终实现地脚锚栓的精确定位。
本发明工法采取用角钢制作高精度专用夹具对每组基础预埋地脚锚栓进行集群组装、固定,并针对桩基地脚锚栓预埋通过设置吊挂钢梁来调整其标高及平面位置,采用正确的振捣方法,混凝土初凝之前及时校正,使本工法具有以下特点:
1、使用本工法螺栓安装速度快;
2、使用本工法螺栓安装质量高,位置准确;
3、本工法需用设备少,操作工艺简单;
4、角钢专用夹具制作,实用性强,能适用于各种螺栓的予埋安装;
5、型钢吊挂钢梁使桩基础预埋地脚锚栓标高及平面位置控制便捷、简单,实用性强。
本发明工法适用于钢结构埋入式柱脚桩基础地脚锚栓的予埋工作;同时也适用于其他设备基础地脚锚栓的予埋工作。
附图说明
图1是本发明固定锚栓模具结构示意图。
图2是本发明轴线、标高定位结构示意图。
图3是本发明悬挂梁与角钢焊接结构示意图。
图4是本发明锚栓安装固定结构示意图。
图5是本发明锚栓调平固定模具结构示意图。
图中:模具1;锚栓2;桩基础护壁顶部或桩口内壁3;垂直角钢4;悬挂梁5;起重架6;斜垫片7;槽钢8。
具体实施方式:
结构地脚锚栓悬空安装施工工艺方法,工艺流程是:地脚锚栓、模具制作 → 桩基础钢筋安装→地脚锚栓定位 →地脚锚栓安装固定 →成品保护→砼浇筑;具体操作如下:
第一步地脚锚栓、模具制作:依据施工图在加工车间制作夹具模具1 ,模具上精确标注出轴线(中心线)位置及各排栓孔中心线,标注线必须清晰准确,允许偏差1mm,锚栓孔采用钻孔机钻孔;加工成型的模具必须满足:表面平整,不得有翘曲变形;截面尺寸准确,对角线允许偏差不大于2mm;栓孔位置严格满足设计图纸要求,允许偏差1mm,孔壁圆滑无毛边。
第二步桩基础钢筋安装:锚栓穿入模具的预留螺纹长度,符合图纸要求后,锚栓2与模具1点焊固定(如图1);
第三步地脚锚栓定位:首先将基础轴线、标高引到桩基础护壁顶部或桩口内壁3四周,用红油漆画好标记(见图2);测量锚栓安装位置到桩基础护壁顶部距离,按此长度在锚栓模具四个角上焊接四根50×50×5垂直角钢4,作为吊挂使用,角钢要大于实际长度;按桩护壁顶部到锚栓的距离在四根角钢上端画标高线,然后横向焊接二根12#槽钢,作为悬挂梁5使用(见图3);由于模具较重,安装时使用移动式脚手架或三脚架作为起重架6,起重架挂上2吨倒链将模具吊起,模具对准桩口后缓慢放松倒链,当横在角钢上的二根悬挂梁槽钢完全担在桩护壁顶部后,可将倒链摘除并移开起重架;(见图4)
第四步地脚锚栓安装固定:锚栓安装就位后在槽钢下嵌好斜垫片7,用水准仪检查锚栓标高,通过斜垫片调整平整度,使用线坠将轴线垂到模具上,调整模具的轴线,模具上的轴线位置与基础轴线重合后,开始加固;使用Φ25螺纹钢作支撑,螺纹钢顶紧桩壁后与模具焊接固定,四个方向全部支撑固定完毕后,由测量人员重新校核锚栓标高,允许偏差±2㎜,然后检测轴线,模具轴线与基础轴线完全一致,允许偏差2mm,然后把斜垫片与槽钢8点焊固定,使锚栓形成完整的空间稳定体系(见图5);
第五步成品保护:地脚锚栓固定完毕,外露螺纹部分要涂抹润滑油,用塑料布进行包裹,外加塑料套模进行保护;
第六步砼浇筑:基础混凝土初凝前,测量人员再次对锚栓位置复测,如发现锚栓发生微小偏移,则采用铁锤小心敲击,做细微调整;完成后由质量部门及监理检查验收,合格后方可进行混凝土浇筑施工;混凝土浇筑过程中,加派监护人员,严禁施工人员及混凝土泵管碰撞模具,造成模具偏位。

Claims (2)

1.结构地脚锚栓悬空安装施工工艺方法,其特征是:按照地脚锚栓、模具制作 → 桩基础钢筋安装→地脚锚栓定位 →地脚锚栓安装固定 →成品保护→砼浇筑的工艺流程进行施工,具体方法是:
第一步地脚锚栓、模具制作:依据施工图在加工车间制作夹具模具 ,模具上精确标注出轴线(中心线)位置及各排栓孔中心线,标注线必须清晰准确,允许偏差1mm,锚栓孔采用钻孔机钻孔;
第二步桩基础钢筋安装锚栓穿入模具的预留螺纹长度,符合图纸要求后,锚栓与模具点焊固定;
第三步地脚锚栓定位:首先将基础轴线、标高引到桩基础护壁顶部或桩口内壁四周,用红油漆画好标记;测量锚栓安装位置到桩基础护壁顶部距离,按此长度在锚栓模具四个角上焊接四根50×50×5垂直角钢,作为吊挂使用,角钢要大于实际长度;按桩护壁顶部到锚栓的距离在四根角钢上端画标高线,然后横向焊接二根12#槽钢,作为悬挂梁使用;
第四步地脚锚栓安装固定:锚栓安装就位后在槽钢下嵌好斜垫片,用水准仪检查锚栓标高,通过斜垫片调整平整度,使用线坠将轴线垂到模具上,调整模具的轴线,模具上的轴线位置与基础轴线重合后,开始加固;使用Φ25螺纹钢作支撑,螺纹钢顶紧桩壁后与模具焊接固定,四个方向全部支撑固定完毕后,由测量人员重新校核锚栓标高,允许偏差±2㎜,然后检测轴线,模具轴线与基础轴线完全一致,允许偏差2mm,然后把斜垫片与槽钢点焊固定,使锚栓形成完整的空间稳定体系;
第五步成品保护:地脚锚栓固定完毕,外露螺纹部分要涂抹润滑油,用塑料布进行包裹,外加塑料套模进行保护;
第六步砼浇筑:基础混凝土初凝前,测量人员再次对锚栓位置复测,如发现锚栓发生微小偏移,则采用铁锤小心敲击,做细微调整;完成后由质量部门及监理检查验收,合格后方可进行混凝土浇筑施工。
2.根据权利要求1所述的结构地脚锚栓悬空安装施工工艺方法,其特征是:所述第六步砼浇筑:混凝土浇筑过程中,加派监护人员,严禁施工人员及混凝土泵管碰撞模具,造成模具偏位。
CN201110393062.XA 2011-12-01 2011-12-01 结构地脚锚栓悬空安装施工工艺方法 Active CN102493471B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110393062.XA CN102493471B (zh) 2011-12-01 2011-12-01 结构地脚锚栓悬空安装施工工艺方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110393062.XA CN102493471B (zh) 2011-12-01 2011-12-01 结构地脚锚栓悬空安装施工工艺方法

Publications (2)

Publication Number Publication Date
CN102493471A true CN102493471A (zh) 2012-06-13
CN102493471B CN102493471B (zh) 2014-03-26

Family

ID=46185327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110393062.XA Active CN102493471B (zh) 2011-12-01 2011-12-01 结构地脚锚栓悬空安装施工工艺方法

Country Status (1)

Country Link
CN (1) CN102493471B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979108A (zh) * 2012-11-17 2013-03-20 中建钢构有限公司 用于定位锚栓群的定位套架
CN103510536A (zh) * 2013-05-29 2014-01-15 洛阳天信矿山机械制造有限公司 一种锤式破碎机的安装及调整方法
CN106368234A (zh) * 2016-09-08 2017-02-01 中国航天建设集团有限公司 一种新型杯口基础箱形钢柱安装施工工艺
CN106759457A (zh) * 2017-03-23 2017-05-31 中国二十二冶集团有限公司 悬臂结构高精度预埋件的安装方法
CN107254967A (zh) * 2017-06-20 2017-10-17 中建八局第二建设有限公司 一种叠合柱预埋件悬空安装的施工方法
CN109629434A (zh) * 2019-01-04 2019-04-16 中交二航局第四工程有限公司 一种高精度悬挂式预埋钢筋定位架结构及利用其进行孔桥墩身交接面平整度校准的方法
CN110485742A (zh) * 2019-08-08 2019-11-22 中铁十六局集团城市建设发展有限公司 一种独立基础预埋柱脚锚栓的定位装置及施工方法
CN111549815A (zh) * 2020-05-27 2020-08-18 德州天元集团有限责任公司 一种钢结构基础地脚螺栓预埋施工工法
CN113155586A (zh) * 2021-04-25 2021-07-23 中冶南方城市建设工程技术有限公司 一种混凝土试块取样辅助装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242202A (ja) * 2001-02-16 2002-08-28 Sekisui House Ltd 基礎の柱脚部施工方法
CN1737292A (zh) * 2004-08-20 2006-02-22 华东建筑设计研究院有限公司 一种斜塔柱脚预埋锚栓的加工、安装方法
CN101666100A (zh) * 2009-09-15 2010-03-10 中冶实久建设有限公司 工业设备基础大型地脚螺栓精确安装的方法
CN201756803U (zh) * 2010-05-31 2011-03-09 中建钢构有限公司 地脚锚栓预埋定位套模
CN202031179U (zh) * 2011-04-20 2011-11-09 中国十七冶集团有限公司 基础预埋螺栓的中心线找正和标高调整装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002242202A (ja) * 2001-02-16 2002-08-28 Sekisui House Ltd 基礎の柱脚部施工方法
CN1737292A (zh) * 2004-08-20 2006-02-22 华东建筑设计研究院有限公司 一种斜塔柱脚预埋锚栓的加工、安装方法
CN101666100A (zh) * 2009-09-15 2010-03-10 中冶实久建设有限公司 工业设备基础大型地脚螺栓精确安装的方法
CN201756803U (zh) * 2010-05-31 2011-03-09 中建钢构有限公司 地脚锚栓预埋定位套模
CN202031179U (zh) * 2011-04-20 2011-11-09 中国十七冶集团有限公司 基础预埋螺栓的中心线找正和标高调整装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吕京录等: "基础锚栓预埋加固方案", 《青岛建筑工程学院学报》, vol. 24, no. 02, 30 June 2003 (2003-06-30) *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102979108A (zh) * 2012-11-17 2013-03-20 中建钢构有限公司 用于定位锚栓群的定位套架
CN102979108B (zh) * 2012-11-17 2015-11-25 中建钢构有限公司 用于定位锚栓群的定位套架
CN103510536A (zh) * 2013-05-29 2014-01-15 洛阳天信矿山机械制造有限公司 一种锤式破碎机的安装及调整方法
CN106368234A (zh) * 2016-09-08 2017-02-01 中国航天建设集团有限公司 一种新型杯口基础箱形钢柱安装施工工艺
CN106759457A (zh) * 2017-03-23 2017-05-31 中国二十二冶集团有限公司 悬臂结构高精度预埋件的安装方法
CN107254967A (zh) * 2017-06-20 2017-10-17 中建八局第二建设有限公司 一种叠合柱预埋件悬空安装的施工方法
CN109629434A (zh) * 2019-01-04 2019-04-16 中交二航局第四工程有限公司 一种高精度悬挂式预埋钢筋定位架结构及利用其进行孔桥墩身交接面平整度校准的方法
CN110485742A (zh) * 2019-08-08 2019-11-22 中铁十六局集团城市建设发展有限公司 一种独立基础预埋柱脚锚栓的定位装置及施工方法
CN111549815A (zh) * 2020-05-27 2020-08-18 德州天元集团有限责任公司 一种钢结构基础地脚螺栓预埋施工工法
CN113155586A (zh) * 2021-04-25 2021-07-23 中冶南方城市建设工程技术有限公司 一种混凝土试块取样辅助装置

Also Published As

Publication number Publication date
CN102493471B (zh) 2014-03-26

Similar Documents

Publication Publication Date Title
CN102493471B (zh) 结构地脚锚栓悬空安装施工工艺方法
JP4850151B2 (ja) 風力発電用ハイブリッドタワー及びその施工法
CN110219326B (zh) 逆作法一柱一桩水下调垂施工工艺
CN102080417B (zh) 大型t型套筒螺栓分体埋设施工方法
CN109610441B (zh) 一种采用液压调垂架逆作法一柱一桩施工方法
CN210238595U (zh) 逆作法一柱一桩水下调垂施工装置
CN103422512B (zh) 可更换预埋螺栓式风机组混凝土基础及其施工方法
CN104141318A (zh) 一种大直径钢管柱柱脚安装施工方法
CN204001428U (zh) 一种大直径钢管柱柱脚安装预埋定位结构及其柱脚结构
CN104358262A (zh) 一种可拆卸工具式深基坑内支撑引柱及施工方法
CN112663613A (zh) 一种格构柱的垂直度控制装置及垂直度控制方法
CN102587386A (zh) 地下室逆作法钢管柱hpe液压施工方法
CN101851915A (zh) 测力管桩
CN105297731A (zh) 一种逆作法钢立柱定位装置以及定位方法
CN105347142A (zh) 一种施工升降机安装在地下室顶板上的穿板安装方法
CN202023298U (zh) 适用于交叉式塔吊吊装的整榀分段式屋面钢梁结构
CN208280128U (zh) 用于钻孔灌注桩多节钢筋笼直螺纹对接安装的操作平台
CN105735228A (zh) 高扬程齿爬式升船机齿条系统施工方法及安装精度控制方法
CN202393382U (zh) 复合式炉壳吊心对位及调平装置
CN214116620U (zh) 一种用于永久双钢管柱精确定位的可调节支架
CN205591587U (zh) 钢结构箱式板房
CN209923971U (zh) 逆作法施工钢管柱与钢筋笼悬吊连接装置
CN205134323U (zh) 一种逆作法钢立柱定位装置
CN212956615U (zh) 一种基于bim的盖挖逆作法钢管中立柱精准定位平台
CN101344005B (zh) 同时安装深井高压曝气反应器内筒及内件的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA CONSTRUCTION EIGHTH ENGINEERING DIVISION CO.

Effective date: 20130306

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130306

Address after: 116000. 235 and 237 Gorky Road, Shahekou District, Liaoning, Dalian

Applicant after: Dalian Branch China Construction Eineering Division Corp. Ltd.

Applicant after: China Construction Eighth Engineering Division Co., Ltd.

Address before: 116000. 235 and 237 Gorky Road, Shahekou District, Liaoning, Dalian

Applicant before: Dalian Branch China Construction Eineering Division Corp. Ltd.

GR01 Patent grant
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160726

Address after: 200135 China (Shanghai) free trade test zone, 1568 Century Avenue, 27 floor

Patentee after: China Construction Eighth Engineering Division Co., Ltd.

Address before: 116000. 235 and 237 Gorky Road, Shahekou District, Liaoning, Dalian

Patentee before: Dalian Branch China Construction Eineering Division Corp. Ltd.

Patentee before: China Construction Eighth Engineering Division Co., Ltd.