CN102490263A CN201110367043XA CN201110367043A CN102490263A CN 102490263 A CN102490263 A CN 102490263A CN 201110367043X A CN201110367043X A CN 201110367043XA CN 201110367043 A CN201110367043 A CN 201110367043A CN 102490263 A CN102490263 A CN 102490263A
Authority
CN
China
Prior art keywords
concrete
pipe joint
pipe
tube coupling
punching block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110367043XA
Other languages
English (en)
Other versions
CN102490263B (zh
Inventor
史美鹏
李军
方中军
许立华
贾慧萍
陈学国
张盛创
毕志敏
王光忠
吴捷安
孙健
林伟挺
叶先光
李雪良
鲍颖杰
张秀华
王果
华群岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO HARBOUR ENGINEERING Co Ltd
Original Assignee
NINGBO HARBOUR ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO HARBOUR ENGINEERING Co Ltd filed Critical NINGBO HARBOUR ENGINEERING Co Ltd
Priority to CN 201110367043 priority Critical patent/CN102490263B/zh
Publication of CN102490263A publication Critical patent/CN102490263A/zh
Application granted granted Critical
Publication of CN102490263B publication Critical patent/CN102490263B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明涉及一种长管节混凝土管桩的管节制作方法,其包括如下步骤:首先在钢模内壁、钢模端盖环面和橡胶套管外表面涂刷混凝土脱模剂;将钢筋笼滚焊成型,然后将钢筋笼安装于钢模内;将配置好的混凝土采用运灰车喂料入模,然后合拢钢模,调直预留孔芯棒,钢模上离心机离心,使管节成型;将得到的成型管节蒸汽养护20小时;最后将蒸养后的成型管节拔出预留孔芯棒,拆除钢模,管节制作完成。本发明的有益效果为:生产工艺简单,制作出来的管节耐久性更好,预留孔更加顺直,弯曲率低,且管节在保证预留孔道弯曲率的情况下,可以做的更长,管节混凝土抗拉强度更强,提高了抗渗、抗弯能力,大大提高了长管节混凝土管桩抗击打能力。

Description

一种长管节混凝土管桩的管节制作方法
技术领域
本发明涉及一种长管节混凝土管桩的管节制作方法。
背景技术
随着海工工程的发展,对预应力混凝土大直径管桩的要求也越来越高,每对预应力混凝土管桩的需求也越来越大。目前海上用混凝土桩的抗弯、抗拉能力、桩的混凝土有效预压应力值显得偏小,而且设备投资大,能源消耗大,安全隐患多,每米预应力混凝土管桩的制备成本多消耗1-2元/米。
发明内容
本发明的目的是提供一种长管节混凝土管桩的管节制作方法,生产工艺简单,制作出来的管节耐久性更好,预留孔更加顺直,弯曲率低,且管节在保证预留孔道弯曲率的情况下,可以做的更长,管节混凝土抗拉强度更强,提高了抗渗、抗弯能力,大大提高了长管节混凝土管桩抗击打能力,克服了目前市场上现有技术产品上述的不足。
本发明的目的是通过以下技术方案来实现:
一种长管节混凝土管桩的管节制作方法,其包括如下步骤:
1)首先在钢模内壁、钢模端盖环面和橡胶套管外表面涂刷混凝土脱模剂;
2)将钢筋笼滚焊成型,然后将钢筋笼安装于步骤1)中得到的钢模内;
3)将配置好的混凝土采用运灰车喂料入模,然后合拢钢模,调直预留孔芯棒,钢模上离心机离心,使管节成型;
4)将步骤3)得到的成型管节蒸汽养护20小时;
5)最后将蒸养后的成型管节拔出预留孔芯棒,拆除钢模,管节制作完成。
本发明的有益效果为:生产工艺简单,制作出来的管节耐久性更好,预留孔更加顺直,弯曲率低,且管节在保证预留孔道弯曲率的情况下,可以做的更长,管节混凝土抗拉强度更强,提高了抗渗、抗弯能力,大大提高了长管节混凝土管桩抗击打能力。
具体实施方式
本发明实施例所述的一种长管节混凝土管桩的管节制作方法,其包括如下步骤:
1)首先在钢模内壁、钢模端盖环面和橡胶套管外表面涂刷常规混凝土脱模剂,以减少混凝土与钢模的粘结力;
2)将钢筋笼滚焊成型,然后将钢筋笼安装于步骤1)中得到的钢模内;
3)将配置好的混凝土采用运灰车喂料入模,然后合拢钢模,调直预留孔芯棒,钢模上离心机离心,使管节成型;
4)将步骤3)得到的成型管节蒸汽养护20小时;
5)最后将蒸养后的成型管节拔出预留孔芯棒,拆除钢模,管节制作完成。
具体制作时,所述混凝土由包括以下材料按常规方法制成:硅酸盐水泥,其强度等级不低于42.5级;细骨料采用洁净的河砂,细度模数约2.5~3.0,含泥量(质量)不大于1%,氯离子质量含量不大于0.01%,硫化物及硫酸盐质量含量不大于0.5%;粗骨料采用的碎石石料抗压强度须大于2倍混凝土强度等级,其最大粒径不大于25mm,碎石的含泥量不大于0.5%,硫化物及硫酸盐质量含量不大于0.5%,其中水锈石含量不超过10%,粒径5mm以下质量含量须控制在6%以下。
普通管桩的力学性能以D1200C型桩为例:管桩外径1200mm,壁厚150mm,管节长度30m,混凝土强度等级C80;它的力学性能指标:混凝土有效预压应力为9.60MPa、开裂弯矩值为1962kN·m、极限弯矩设计值3924kN·m。
本方法制作的管节,以桩规格主要特征值以HG1200-48-B为例:管桩外径1200mm,壁厚150mm,管节长度10m,混凝土强度等级C80,混凝土耐久性指标在1000库伦以下;其力学性能指标:混凝土有效预压应力为14.86MPa;纯弯状态下桩截面开裂时裂弯矩(混凝土拉应力限制系数αct=0.3)为1975.52kN·m;纯弯状态下桩截面混凝土极限弯弯矩值为3477.58kN·m;纯弯状态下桩截面完全破坏时弯矩值为3988.23kN·m。其力学性能指标都超过了外径1200mm的大管桩。
混凝土的技术标准如下:
强度等级C80;采用高速离心成型和二阶段蒸汽养护时,其胶凝材料用量为518Kg/m3,采用高速离心成型和免蒸汽养护时,水泥用量为500Kg/m3;混凝土塌落度为70mm,采用高速离心成型和二阶段蒸汽养护工艺时,水胶比是0.31,采用高速离心成型和免蒸汽养护工艺时,水灰比是0.27;吸水率不大于3.5%;抗渗等级大于等于W8;抗氯离子渗透性不大于1000C。
本发明不局限于上述最佳实施方式,任何人在本发明的启示下都可得出其他各种形式的产品,但不论在其形状或结构上作任何变化,凡是具有与本申请相同或相近似的技术方案,均落在本发明的保护范围之内。

Claims (2)

1.一种长管节混凝土管桩的管节制作方法,其特征在于,其包括如下步骤:
1)在钢模内壁、钢模端盖环面和橡胶套管外表面涂刷常规混凝土脱模剂;
2)将钢筋笼滚焊成型,然后将钢筋笼安装于步骤1)中得到的钢模内;
3)将配置好的混凝土采用运灰车喂料入模,然后合拢钢模,调直预留孔芯棒,钢模上离心机离心,使管节成型;
4)将步骤3)得到的成型管节蒸汽养护20小时;
5)最后将蒸养后的成型管节拔出预留孔芯棒,拆除钢模,管节制作完成。
2.根据权利要求1所述的一种长管节混凝土管桩的管节制作方法,其特征在于,所述混凝土由包括以下材料按常规方法制成:硅酸盐水泥,其强度等级不低于42.5级;细骨料采用洁净的河砂,细度模数约2.5~3.0,含泥量不大于1%,氯离子质量含量不大于0.01%,硫化物及硫酸盐质量含量不大于0.5%;粗骨料采用的碎石石料抗压强度大于2倍混凝土强度等级,其最大粒径不大于25mm,碎石的含泥量不大于0.5%,硫化物及硫酸盐质量含量不大于0.5%,其中水锈石含量不超过10%,粒径5mm以下质量含量须控制在6%以下。
CN 201110367043 2011-11-18 2011-11-18 一种长管节混凝土管桩的管节制作方法 Active CN102490263B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110367043 CN102490263B (zh) 2011-11-18 2011-11-18 一种长管节混凝土管桩的管节制作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110367043 CN102490263B (zh) 2011-11-18 2011-11-18 一种长管节混凝土管桩的管节制作方法

Publications (2)

Publication Number Publication Date
CN102490263A true CN102490263A (zh) 2012-06-13
CN102490263B CN102490263B (zh) 2013-12-25

Family

ID=46182145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110367043 Active CN102490263B (zh) 2011-11-18 2011-11-18 一种长管节混凝土管桩的管节制作方法

Country Status (1)

Country Link
CN (1) CN102490263B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103538145A (zh) * 2013-10-24 2014-01-29 华煜建设集团有限公司 一种长管节混凝土预制桩的施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1133771A (zh) * 1995-10-13 1996-10-23 广州羊城管桩有限公司 掺磨细建筑砂生产预应力高强混凝土管桩的工艺
CN1410240A (zh) * 2002-08-21 2003-04-16 蒋元海 预应力高强混凝土管桩免压蒸生产制作方法
CN101614010A (zh) * 2009-07-16 2009-12-30 广东三和管桩有限公司 一种预应力高强混凝土管桩
CN101745984A (zh) * 2010-01-27 2010-06-23 四川省富侨工业有限公司 先张法预应力高强度混凝土管桩的生产方法
CN101761075A (zh) * 2008-12-23 2010-06-30 陈子成 圆形实心预应力混凝土管桩及其生产工艺
CN101992501A (zh) * 2010-09-30 2011-03-30 中交第三航务工程局有限公司 一种高耐久、低脆性phc管桩的制备方法
CN102011397A (zh) * 2010-11-09 2011-04-13 中安泰达建设发展(北京)有限公司 混凝土模板止水咬合桩施工工艺

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1133771A (zh) * 1995-10-13 1996-10-23 广州羊城管桩有限公司 掺磨细建筑砂生产预应力高强混凝土管桩的工艺
CN1410240A (zh) * 2002-08-21 2003-04-16 蒋元海 预应力高强混凝土管桩免压蒸生产制作方法
CN101761075A (zh) * 2008-12-23 2010-06-30 陈子成 圆形实心预应力混凝土管桩及其生产工艺
CN101614010A (zh) * 2009-07-16 2009-12-30 广东三和管桩有限公司 一种预应力高强混凝土管桩
CN101745984A (zh) * 2010-01-27 2010-06-23 四川省富侨工业有限公司 先张法预应力高强度混凝土管桩的生产方法
CN101992501A (zh) * 2010-09-30 2011-03-30 中交第三航务工程局有限公司 一种高耐久、低脆性phc管桩的制备方法
CN102011397A (zh) * 2010-11-09 2011-04-13 中安泰达建设发展(北京)有限公司 混凝土模板止水咬合桩施工工艺

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103538145A (zh) * 2013-10-24 2014-01-29 华煜建设集团有限公司 一种长管节混凝土预制桩的施工方法

Also Published As

Publication number Publication date
CN102490263B (zh) 2013-12-25

Similar Documents

Publication Publication Date Title
CN103086675B (zh) 在沿海特殊地质情况下使用的预应力防腐管桩及其制造方法
CN101581095B (zh) 抗腐蚀性预应力混凝土管桩基础
CN102276214B (zh) 一种高耐久性高承载力混凝土管桩
CN105041336A (zh) 一种超高性能混杂纤维混凝土盾构管片及其制备方法
CN102898103B (zh) 一种型钢高延性纤维混凝土组合柱
CN106677551A (zh) 一种外套圆形钢管混凝土纤维复材复合加固钢管柱的方法
CN101303095B (zh) 钢筋混凝土与玻璃钢夹砂复合管及其成型工艺
CN105200983A (zh) Pvc管与厚壁钢管复合空心再生混凝土桩
CN108298913B (zh) 适用于地下硫酸盐侵蚀环境的预应力管桩及其制备方法
CN102888946B (zh) 一种钢管高延性纤维混凝土组合柱
CN110627442B (zh) 纤维网格增强混杂纤维高强和高延性水泥基复合材料检查井井盖及制备
CN104878875B (zh) 一种frp筋超高性能混凝土盖板及其制备方法
CN107489431A (zh) 一种大变形围岩段复合式衬砌
CN104829182A (zh) 一种超高性能混凝土管道制备方法
CN110642577A (zh) 一种耐腐蚀混凝土管桩的制备工艺
CN107869116A (zh) 一种轻质保温隔音条板及其制作方法
CN102490263B (zh) 一种长管节混凝土管桩的管节制作方法
CN104908157A (zh) 一种超高性能混凝土复合管道制备方法
CN107445551A (zh) 一种整体式声屏障立柱及其制作方法
CN102936964B (zh) 一种高延性混凝土嵌入式构造柱的施工方法
CN105174857A (zh) 一种纤维混凝土预制构件
CN111574185A (zh) 一种抗酸性腐蚀混凝土管桩及其制备方法
CN107059932A (zh) 一种组合井盖及其制作方法
CN209722949U (zh) 一种超高强pshc预应力管桩
CN110330294B (zh) 一种高韧性抗冲耐磨修补材料

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant