CN102485360A - Tianziling garbage landfill method - Google Patents

Tianziling garbage landfill method Download PDF

Info

Publication number
CN102485360A
CN102485360A CN2010105853248A CN201010585324A CN102485360A CN 102485360 A CN102485360 A CN 102485360A CN 2010105853248 A CN2010105853248 A CN 2010105853248A CN 201010585324 A CN201010585324 A CN 201010585324A CN 102485360 A CN102485360 A CN 102485360A
Authority
CN
China
Prior art keywords
garbage
landfill
rubbish
platform
tianziling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105853248A
Other languages
Chinese (zh)
Inventor
张海华
黄耆馨
缪文根
马懿
唐素琴
徐月恩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU ENVIRONMENTAL GROUP CO Ltd
Original Assignee
HANGZHOU ENVIRONMENTAL GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU ENVIRONMENTAL GROUP CO Ltd filed Critical HANGZHOU ENVIRONMENTAL GROUP CO Ltd
Priority to CN2010105853248A priority Critical patent/CN102485360A/en
Publication of CN102485360A publication Critical patent/CN102485360A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The invention belongs to the field of garbage treatment, discloses a Tianziling garbage landfill method and relates to garbage landfill and garbage landfill sewage guiding discharge. The Tianziling garbage landfill method aims at improving a level of the existing garbage landfill technology. The Tianziling garbage landfill method solves the problems of a high landfill cost, influences on the environment, resource wasting and storage occupation, improves landfill efficiency and reduces a landfill cost. The Tianziling garbage landfill method is characterized in that 1, a garbage landfill area is controlled in a range of 3000 square meters every day; and after landfill, a garbage surface is covered completely; 2, a steel plate roadbed box replaces soil and rocks to be utilized for manufacture of reservoir area temporary roads and garbage dumping platforms; 3, a high-density polyethylene (HDPE) film replaces a soil material to cover an exposed garbage surface; 4, a trash-removal shunting drain, a blind drain and a hump-type drain are arranged so that sewage can be discharged effectively; 5, a field road flushing process is reinforced; 6, processes of deodorizing agent sprinkling and fly killing are reinforced; 7, a scientific monitoring process is reinforced; and 8, propaganda communication and understanding are reinforced. The Tianziling garbage landfill method is mainly utilized for landfill work in garbage landfills.

Description

Emperor mountain range garbage loading embeading working system
Technical field
The invention belongs to the garbage disposal field, be specifically related to rubbish landfill and with the guide of refuse landfill sewage.
Background technology
Get into after 21 century, urbanization process is constantly accelerated, and city size enlarges rapidly.The refuse landfill of building the outer suburbs in the past in becomes the outskirts of a town, city gradually also along with the expansion in city.Along with increasing gradually of peripheral population, dwelling house, factory, landfill yard is increasing to the influence of peripheral economy and environment.Simultaneously, the quantity of refuse cumulative year after year has been brought no small pressure and difficulty to landfill work.Under such form, innovate landfill process, cut operating costs, reduce influence, improve the landfill intervention level and become the only way that sustainable development is walked in refuse landfill now surrounding enviroment.
At present the garbage loading embeading technology that extensively adopts of institute is: the temporary road that rubbish metering → piece stone is laid and dump platform → push away concora crush reality → clay covering.Improve constantly along with the development of society and to what landfill operation required, the shortcoming that traditional coverage mode exposes is also more and more.
At first, adopt building stones to lay rubbish and dump platform, the material of building stones is had relatively high expectations, in conjunction with seasonal variations, the laying of building stones requires also different.The value that the building stones platform just has no after using basically reuses also difficultly, can be regarded as disposablely, has promptly taken storage capacity, has wasted resource again.
Secondly, clay is disposable material, can not utilize again.And on buying, to pay a very big expense, and improved operating cost, taken storage capacity greatly, account for 10~12% of landfill storage capacity, reduced the service life of landfill yard.Stir up a cloud of dust if run into the dry weather of strong wind, it is then more abominable to run into the rainy day environment, and road is muddy to can't bear.Greatly reduce operating efficiency, the operating environment of integral body is caused have a strong impact on.Also other links in the landfill operation many negative influences have also been produced with the soil covering.
Once more, existing technology is prone to produce the sewage guide and has some setbacks, and causes often having sewage to accumulate in the surface around the operating area, reservoir area, time one long at once with rubbish in percolate ooze mutually, send unpleasant penetrating odor, the environment around having influenced greatly.
Show according to the retrieval of interrelated datas such as Chinese patent net, except " emperor mountain range garbage loading embeading working system " that the inventor applied for, do not see other relevant reports as yet at present about this working system.
Summary of the invention
In order to overcome the deficiency of original garbage loading embeading technology; The present invention is on the basis of former technology; Important innovation has been carried out in job platform, operation coverage rate, cladding material, operation technique aspect, better solved original landfill process expensive, influence environment, waste resource, take problems such as storage capacity.
Main points of the present invention are that a control, two improves, four reinforcements.One control: the rubbish scope of operation of every day is controlled in 3000 square metres, carries out rubbish surface all standing after operation finishes, no rubbish exposure; Two improve: dump platform with steel plate subgrade case making reservoir area temporary road and rubbish, replace original Tu Shilu and building stones platform; Substitute of the covering of original earth material with the HDPE film to the rubbish exposure; Realize the dirty shunting of rain, increase the gas collection rate, prevent that foul smell is excessive, platform and path formation, it is subsidiary to reduce rubbish; Four strengthen: add the flushing of high electric area road; Strengthening the deodorizing medicament sprays and fly eradication work; Strengthen angles of science monitoring; Strengthening propaganda links up and understanding.
The control of working area: calculate the rubbish operating area to plate platform, draws rational working area, effectively is controlled at 3000m to working area 2In.
Plate platform technology
The plate platform manufacturing materials: road and platform plate size are length and width 4m * 1.5m, two kinds of specifications of 7m * 15m; Platform rubbish dumps port plate and is of a size of length and width 6m * 1.5m, two kinds of specifications of 6m * 3m, and all steel plate thickness are 0.135m.
The plate platform shape: the flatbed shape is " L " type, fall three kinds of " L " type, T-shapes." L " type, " L " type that falls dump port for there is a rubbish in platform the place ahead, and platform side has a rubbish to dump port; T-shape dumps port (like Fig. 2) for a rubbish is each side arranged.Re-lay the platform port plate after " L " type platform road front end port extends 3 base boards forward, lateral port re-lays the platform port plate after extending 3~7 base boards." L " type, " L " type platform that falls pave at normal rubbish and use when advancing, and the T-shape platform uses in road turning or special area.
Temporary road: temporary road is laid by monolithic 7m * 15m steel plate, and width is 7m.Use soil, building stones to cover into wide road as 8m on one side, the soil, the Shi Lu that are 8m are used to park the place of big machinery and on-the-spot flight-line maintenance, also can be used for stacking untapped steel plate subgrade case.The road left side also is provided with the earth dam of a high 0.5m, and earth dam covers with film, and about the steel plate road extended 1m, earth dam was filled out the shop with stone between earth dam and the steel plate road apart from about the steel plate road 2m to the film of covering from the earth dam limit.The zone that both sides rubbish puts in place covers with the HDPE film, reaches the effect of the dirty shunting of rain.When after this zone operation puts in place, withdrawing the steel plate subgrade case, rubbish exposure under the original path and dirt road are covered with the HDPE film.
Cover new technology
New overwrite job refers to use the HDPE film that the rubbish scope of operation is carried out " the middle covering " exactly, with waterproof cloth the rubbish scope of operation is carried out covering in interim day.
Cover the material that uses: the HDPE film of 1mm, 0.75mm, woven bag, geotechnological cloth bag, stone, tire.
The shunting of removing contamination
The setting shunting ditch of removing contamination carries out the sewage separation guide, and french drain and " hump ditch " are set, and sewage is carried out effective guide.
After carrying out emperor mountain range garbage loading embeading working system, environment, society and economic benefit be improved significantly.The environmental benefit aspect: roadbed steel plate case is made temporary road and is toppled over platform; Avoided the situation of flying upward on the muddy and fine dirt of rainy day road; Increased the planarization of temporary road; Eliminate wheel and poked the hidden danger with wheel sinkage, obviously improved the current environment of garbage truck by sharp objects such as rubbish and building stones; HDPE film covering process effectively reduces odor concentration.Reduced and used the obstruct made from local methods in the heap body in a large number, improved the gentle orderly guide ability of water in the heap body.The economic benefit aspect: the use amount that can significantly reduce earth and stone material with practice thrift storage capacity, prolong landfill yard service life; Use the HDPE film to cover, can increase the shunting effect of precipitation in the storehouse greatly, both reduced pollution, reduced sewage quantity and sewage disposal expense again precipitation in the storehouse.
Description of drawings
Fig. 1 is a process chart of the present invention
Fig. 2 is plate platform geomery figure of the present invention
Fig. 3 is the present invention's shunting ditch schematic cross-section of removing contamination
The specific embodiment
Plate platform, road are made
Compacting is carried out on basis to platform and road: the basis of platform and road is the rubbish of landfill; Be the sinking speed that guarantees road and platform in running garbage areas less than periphery; Avoid causing road and platform to be lower than peripheral plane; Common waste layer rolls (bull-dozer 5 times) 3 times back and forth with compacting machine, must roll (or bull-dozer rolls more than 10 times back and forth) more than 5 times once more back and forth with compacting machine as platform and the basic waste layer of road.
Basal layer is flattened: garbage truck re-uses excavator later on compacted region is flattened, and rugged phenomenon is dug clearly and is filled up, for the later stage steel plate is laid ready.Road and platform should be than more than the high 0.2m in neighboring area, prevent that sewage from building up below road and platform.
Carry out the laying of steel plate subgrade case: the steel plate subgrade case is laid by excavator.At first lay backing plate, be generally the steel plate of 4m * 1.5m, seamless linking to each other between the backing plate.On backing plate, lay roads plate, landing slab then, reach port plate.Steel plate misplaces up and down at process of deployment light plate and steel plate and interlocks, and connects with " U " type screw or steel wire rope etc. between the steel plate, reduces the displacement situation that steel plate in use occurs, thereby reduces the slit of road and platform centre.
The plate platform operational method
There are a plate platform and an interim emergent platform in the reservoir area.Plate platform has 6 refuse dump truck positions; Each parking stall guarantees that all an auxiliary worker commands and assistance is toppled over;, vehicle ' is responsible for opening the back car bonnet after putting in place; Be responsible for the remaining rubbish of garbage truck peace you mouth is in time cleared up toppling over the back that finishes, keep smooth and clean and tidy on the platform constantly.Vehicle turnover platform has the special messenger to command, and guarantees the orderly running of platform.Being equipped with machinery during operation has: 3~5 bull-dozers, 1~2 excavator and 1 compacting machine.Each rubbish dumps port and is equipped with 1 bull-dozer, the platform port is dumped the rubbish that gets off clear up, pave; Be equipped with 1~3 bull-dozer on the scope of operation, the rubbish on the scope of operation is carried out paving operation and slope operation; Compacting machine carries out compacting operation; Excavator can according to circumstances dig the rubbish below the platform earlier and be transported to other place, carries out paving operation with bull-dozer again, both can ensure that the rubbish of the platform below scope of operation can not piled up, and can also in time repair plate platform simultaneously.
The concrete work flow that film covers
Compacting, smooth: at first, the scope of operation usage mining machine that puts in place carries out roughly smooth of whole plane, and main purpose is whole plane to be made the oblique gesture of a water guide, and repair in the not enough or too much zone of rubbish to rubbish simultaneously; Secondly, the scope of operation that trims is carried out compacting, carry out compacting operation (bull-dozer rolls 5 times back and forth, and compacting machine rolls 3 times back and forth), under the situation that has personnel to exercise supervision, carry out compacting with excavator near the zone of antiseepage film side slope with pushing to machine or compacting machine; At last, use digging machine bucket or special-purpose compacting head,, guarantee that the surface does not have hard material, so that the paving of film the compacting leveling that the rubbish surface becomes more meticulous.
Paving of HDPE film: the size of HDPE film is 6m * 50m generally speaking, can just carry out reasonably vertical or horizontal paving according to the shape size and the landform of overlay area when paving.Reasonably paving not only can be time saving and energy saving, can also practice thrift the use amount of HDPE film.Earlier the HDPE film of rolling is placed on an end of wanting the overlay area when paving, the staff spreads the HDPE film out together to the other end then, until film use up or the regional end that paves till.The overlapping of 10cm~15cm arranged between film and the film, be used for the welding between the film.
Weld, press solidly: through heat welded, guarantee to weld free from flaw between film and the film, welding edge should be consistent with water (flow) direction along the position.Geotechnological cloth bag is used in pressing solidly of reservoir area marginal membrane, keeps seamless between bag and the bag.Above the zone line film, put junked tire and blown away by wind preventing, the spacing between no matter each tire is gone, is listed as is 10m.
The shunting of removing contamination
Remove contamination and shunt the manufacture craft of ditch: ditch middle berth HDPE film, the top guide clear water of film, the below guide sewage of film.When making, at first dig and establish one and spread the thick stone in the 0.5m left and right sides then deeply for the irrigation canals and ditches about 1m, the useless film in stone upper berth carries out liner, then on old film, lays the HDPE film that covers, and the top of film also demonstrates one and is the irrigation canals and ditches of 0.5m deeply like this.Can in stone, bury the HDPE pipe underground according to the size of sewage quantity simultaneously, strengthen the guide ability of sewage.Here being noted that, in order to prevent the film wearing and tearing mixed flow of the time removing contamination, laying old film and carry out liner key very, is not omissible step.
The making flow process of " hump ditch ": is " waste dam " about 1 meter earlier piling up the twice height on the rubbish plane, at the bottom of two dams between horizontal range be 0.4m, horizontal range is 0.8m between two dam crests, forms trapezoid-shaped trench.At the bottom of inboard dam, outwards lay the HDPE film then, the bottom, HDPE film dam on both sides is divided overlapping, adds a cover an old HDPE film after having laid the HDPE film of new shop is protected.Fill out the thick stone in the 0.2m left and right sides after having spread, on stone, lay the HDPE pipe of Φ 200mm or Φ 400mm, and then spread stone, stone is taped against apart from dam crest 0.2m and gets final product.
The laying of french drain and the guiding of sewage: the reservoir area sewage quantity is predicted, thereby more reasonably laid french drain.Owing to when preceding one deck operation, carried out the laying of main french drain in advance, so when operation, only need prop up digging to establish and getting final product of french drain and french drain temporarily.Intersection at french drain can establish vertical vertical shaft, leads to the blow-off line of bottom of the reservior.Interim french drain is to dig according to the different times sewage quantity to establish, and the son that can only rockfill is not buried the HDPE pipe underground, can practice thrift cost and time like this.And whether these interim french drains can also dig at peak value according to sewage quantity at that time and establish, thereby increase this regional sewage guide ability, forms the regional guide net of a prosperity.Use the HDPE pipe of Φ 400mm in the main generally speaking french drain, use the HDPE pipe of Φ 200mm in the french drain; On guiding, earlier the scope of operation is pressed dividing elements, the smooth reservoir area scope of operation is formulated surface tilt gradient operation or work standard according to actual conditions.

Claims (5)

1. improved garbage loading embeading working system, it is characterized in that: the rubbish scope of operation of every day is controlled in 3000 square metres, carries out rubbish surface all standing after operation finishes, no rubbish exposure; Dump platform with steel plate subgrade case making reservoir area temporary road and rubbish, replace original Tu Shilu and building stones platform; Substitute the covering of original earth material to the rubbish exposure with the HDPE film, realize the dirty shunting of rain, increase the gas collection rate, prevent that foul smell is excessive, it is subsidiary to reduce rubbish; Setting is removed contamination and is shunted ditch, french drain and " hump ditch ", and sewage is carried out effective guide; Add the flushing of high electric area road; Strengthening the deodorizing medicament sprays and fly eradication work; Strengthen angles of science monitoring; Strengthening propaganda links up and understanding.
2. according to claims 1 described garbage loading embeading working system, it is characterized in that: the rubbish scope of operation of every day is controlled in 3000 square metres;
3. according to claims 1 described garbage loading embeading working system, it is characterized in that: dump platform with steel plate subgrade case making reservoir area temporary road and rubbish;
4. according to claims 1 described garbage loading embeading working system, it is characterized in that: the rubbish exposure is covered with the HDPE film;
5. according to claims 1 described garbage loading embeading working system, it is characterized in that: establish " hump ditch " sewage is carried out guide.
CN2010105853248A 2010-12-03 2010-12-03 Tianziling garbage landfill method Pending CN102485360A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105853248A CN102485360A (en) 2010-12-03 2010-12-03 Tianziling garbage landfill method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105853248A CN102485360A (en) 2010-12-03 2010-12-03 Tianziling garbage landfill method

Publications (1)

Publication Number Publication Date
CN102485360A true CN102485360A (en) 2012-06-06

Family

ID=46150954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105853248A Pending CN102485360A (en) 2010-12-03 2010-12-03 Tianziling garbage landfill method

Country Status (1)

Country Link
CN (1) CN102485360A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563143A (en) * 2014-12-30 2015-04-29 桑德环境资源股份有限公司 Solid waste landfill water intercepting low dam and solid waste garbage landfill yard
CN105983562A (en) * 2015-01-28 2016-10-05 浩蓝环保股份有限公司 High-dimensional landfill method of waste landfill
CN107262488A (en) * 2017-08-09 2017-10-20 广州环投环境服务有限公司 A kind of the soot platform and its application method, building method of subregion unloading

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59161507A (en) * 1983-03-04 1984-09-12 Unitika Ltd Reclamation treatment of wastes
DE3714743A1 (en) * 1987-05-02 1988-11-17 Holzmann Philipp Ag Landfill site with a landfill base which can be monitored
JPH1157644A (en) * 1997-08-21 1999-03-02 Ohbayashi Corp Removing method for rain water in waste disposal site
CN1500569A (en) * 2002-11-12 2004-06-02 上海市废弃物老港处置场 Covering process for house garbage filling field
CN1631560A (en) * 2005-01-14 2005-06-29 北京市四清环卫工程集团有限责任公司 Refuse landfilling process in rainy season
CN2839354Y (en) * 2005-10-20 2006-11-22 上海老港废弃物处置有限公司 The steel plate subgrade case
CN101016750A (en) * 2007-02-12 2007-08-15 傅仲萼 Reticular blind drainage method for groundwater of sanitary landfill for disposing house refuse

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59161507A (en) * 1983-03-04 1984-09-12 Unitika Ltd Reclamation treatment of wastes
DE3714743A1 (en) * 1987-05-02 1988-11-17 Holzmann Philipp Ag Landfill site with a landfill base which can be monitored
JPH1157644A (en) * 1997-08-21 1999-03-02 Ohbayashi Corp Removing method for rain water in waste disposal site
CN1500569A (en) * 2002-11-12 2004-06-02 上海市废弃物老港处置场 Covering process for house garbage filling field
CN1631560A (en) * 2005-01-14 2005-06-29 北京市四清环卫工程集团有限责任公司 Refuse landfilling process in rainy season
CN2839354Y (en) * 2005-10-20 2006-11-22 上海老港废弃物处置有限公司 The steel plate subgrade case
CN101016750A (en) * 2007-02-12 2007-08-15 傅仲萼 Reticular blind drainage method for groundwater of sanitary landfill for disposing house refuse

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
邵建越等: "杭州天子岭垃圾填埋场提高雨污分流效果研究", 《环境卫生工程》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563143A (en) * 2014-12-30 2015-04-29 桑德环境资源股份有限公司 Solid waste landfill water intercepting low dam and solid waste garbage landfill yard
CN105983562A (en) * 2015-01-28 2016-10-05 浩蓝环保股份有限公司 High-dimensional landfill method of waste landfill
CN107262488A (en) * 2017-08-09 2017-10-20 广州环投环境服务有限公司 A kind of the soot platform and its application method, building method of subregion unloading

Similar Documents

Publication Publication Date Title
CN104060631B (en) A kind of manhole mouth elevation Dynamic controlling structure
CN201835198U (en) Drainage roadbed for high underground water level
CN104514216B (en) A kind of canal on embankment frost heaving resistant leakage preventing structure and construction method
CN109024701B (en) Phosphogypsum reservoir slope seepage prevention method
CN206219935U (en) A kind of permeable pavement structure of high intensity, high osmosis
CN100518966C (en) Method for building garbage landfill field and the landfill field
CN103711195B (en) Refuse landfill is carried out to processing method and the rain dirt point stream processing system of rain dirt shunting
CN102485360A (en) Tianziling garbage landfill method
CN205530580U (en) System for collection is prevented osmosis membrane anchor, is cut flood and current as an organic whole
TWM621567U (en) High-intensity road for water resource adaptive system in response to climate change
CN112458813A (en) Temporary road structure and construction method thereof
CN1631560A (en) Refuse landfilling process in rainy season
CN203782849U (en) Processing system used for carrying out rain and sewage separation in refuse landfill
CN207260082U (en) Active service refutes bank revetment and increases structure
CN111022764B (en) Dry construction method for water diversion pipe water-land adapter
CN210529888U (en) Bottom drainage facility for channel type slag yard
CN111827198A (en) Construction method for central control water replacement and filling in tidal lake water environment ecological restoration
CN111636539A (en) Assembled longitudinal and transverse guide drainage system for refuse landfill and construction method thereof
CN214301341U (en) Water drainage channel crossing temporary road on anti-seepage film of garbage pile
RU2176700C1 (en) Method for protecting territory from flooding
CN213925694U (en) Temporary road structure
TWI833115B (en) High-strength path for water resources adaptation system in response to climate change
CN218596801U (en) Temporary pavement in embankment structure
CN111636447B (en) Phosphogypsum storage yard slope ballast structure
CN215715862U (en) Energy dissipation formula catch water ditch structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120606