CN102465534A - 相邻双坑的施工方法 - Google Patents
相邻双坑的施工方法 Download PDFInfo
- Publication number
- CN102465534A CN102465534A CN2010105396469A CN201010539646A CN102465534A CN 102465534 A CN102465534 A CN 102465534A CN 2010105396469 A CN2010105396469 A CN 2010105396469A CN 201010539646 A CN201010539646 A CN 201010539646A CN 102465534 A CN102465534 A CN 102465534A
- Authority
- CN
- China
- Prior art keywords
- foundation
- adjacent
- construction
- wall
- ditches
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本发明公开了一种相邻双坑的施工方法,包括:将两相邻基坑在公共墙部位的中心标高设定在同一水平位置,计算两相邻基坑可同时进行施工的最大深度和同时施工的区域,根据第一基坑设置支撑时第二基坑一侧的公共墙提供的土压力,确定所述第一基坑和所述第二基坑能够同时进行施工的各基坑的深度和区域;从公共墙的一侧的靠近墙体处开挖一基坑,公共墙的另一侧的远离墙体处开挖另一基坑;在两基坑挖掘的过程中对已完成挖掘的部分进行支撑;两基坑均挖至所述最大深度后,从远离墙体处开挖的基坑停止施工;完成靠近墙体处开挖基坑的基础底板施工;完成两基坑剩余部分的施工。本发明实现了两相邻基坑的同时施工,大大提高了施工效率,缩短了施工的周期。
Description
技术领域
本发明涉及一种施工方法,尤其涉及一种相邻双坑的施工方法。
背景技术
基坑是指为进行建筑物(包括构筑物)基础与地下室的施工所开挖的地面以下空间。基坑属于临时性工程,其作用是提供一个空间,使基础的砌筑作业得以按照设计所指定的位置进行。
目前随着大城市建设开发用地需求的紧张,越来越多的建筑向地下进行发展,同时由于周围已完成建筑物的施工影响,对于有限制的相邻双坑也逐渐普遍了起来,这类的地下建筑在施工过程中,在完成首先开挖的基坑的挖掘且完成首先开挖基坑内的支撑体系后才能进行后开挖基坑的开挖及建立支撑体系,由于必须按照先后的顺序来进行施工,所以在施工过程中将花费相当长的时间,进而影响到整个建筑的施工周期,增加了工程的施工投入。
发明内容
本发明公开了一种相邻双坑的施工方法,用以解决现有技术相邻双坑无法同时施工,导致施工周期较长的问题。
本发明的上述目的是通过以下技术方案实现的:
一种相邻双坑的施工方法,其中,包括:将两相邻基坑在公共墙部位的中心标高设定在同一水平位置,计算两相邻基坑可同时进行施工的最大深度和同时施工的区域,根据第一基坑设置支撑时第二基坑一侧的公共墙提供的土压力,确定所述第一基坑和所述第二基坑能够同时进行施工的各基坑的深度和区域;从公共墙的一侧的靠近墙体处开挖一基坑,公共墙的另一侧的远离墙体处开挖另一基坑;在两基坑挖掘的过程中对已完成挖掘的部分进行支撑;两基坑均挖至所述最大深度后,从远离墙体处开挖的基坑停止施工;完成靠近墙体处开挖基坑的基础底板施工;完成两基坑剩余部分的施工。
如上所述的相邻双坑的施工方法,其中,还包括:使两相邻基坑支撑的标高、支撑的形式以及支撑的道数均相同。
如上所述的相邻双坑的施工方法,其中,还包括:所述基础底板与靠近墙体处开挖的基坑底部的钢支撑采用铰接的形式进行固定。
如上所述的相邻双坑的施工方法,其中,还包括:在所述基础底板与所述钢支撑铰接完成后,对铰接的强度进行测试,并在所述强度达到一预定标准后,继续完成施工。
如上所述的相邻双坑的施工方法,其中,所述公共墙为两相邻基坑的相邻部分共用的连续墙。
综上所述,本发明相邻双坑的施工方法解决了现有技术中相邻双坑无法同时施工,导致施工周期较长的问题,通过错开相邻部位土方开挖的时间,实现两相邻基坑的同时施工,在不影响施工质量的前提下,大大提高了施工效率,缩短了施工的周期。
附图说明
图1是本发明相邻双坑的施工方法的流程图。
具体实施方式
下面结合附图对本发明的具体实施方式作进一步的说明:
图1是本发明相邻双坑的施工方法的流程图,请参见图1,一种相邻双坑的施工方法,其中,包括:
步骤101:将两相邻基坑在公共墙部位的中心标高设定在同一水平位置。
所达到的技术效果是,使得两相邻基坑开挖完成后两基坑内的钢支撑对连续墙的支撑力施加在同一水平高度上,从而使得连续墙两侧受力平衡,保证连续墙墙体不会发生变形。其中,中心标高是指设置在同一基坑内的所有钢支撑的平均高度。
步骤102:计算两相邻基坑可同时施工的最大深度和同时施工的区域,根据第一基坑设置支撑时第二基坑一侧的公共墙提供的土压力,确定所述第一基坑和所述第二基坑能够同时进行施工的各基坑的深度和区域。
即通过计算得出两相邻基坑同时挖掘所要达到的深度和挖掘出的土方,使得两相邻基坑同时进行挖掘的过程中不会产生由于一侧土压力过低而导致在另一侧设置钢支撑时引起公共墙变形的情况的发生。
步骤103:从公共墙的一侧的靠近墙体处开挖一基坑,公共墙的另一侧的远离墙体处开挖另一基坑。
使得在公共墙的一侧形成支撑时不会由于公共墙的另外一侧缺乏土压力而影响支撑的质量。
步骤104:在两基坑挖掘的过程中对已完成挖掘的部分进行支撑,在两基坑同时挖掘的过程中建立钢支撑。
使得两基坑在挖掘的过程中支撑体系也同时建立起来,增加了基坑支撑的质量,缩短了施工的周期。
步骤105:两基坑均挖至所述最大深度后,从远离墙体处开挖的基坑停止施工。
使得连续墙位于远离墙体处开挖的基坑的墙面受到的土压力得到保持,不会由于远离墙体处开挖的基坑内挖掘深度过大或面积过大而导致连续墙的一侧受到的土压力过小,进而影响在连续墙的另一侧建立支撑,一般施工时远离墙体处开挖的基坑完成开挖后其顶部土与连续墙的垂直厚度不会小于10~12M。
步骤106:完成靠近墙体处开挖基坑的基础底板施工。
使得靠近墙体处开挖基坑对公共墙施加的支撑力达到指定的强度,满足远离墙体处开挖基坑的剩余部分的挖掘的条件。
步骤107:完成两基坑剩余部分的施工。
即在靠近墙体处开挖基坑的基础底板施工后,两基坑内都还有一部分没有挖掘完成,分别是靠近墙体处开挖基坑的远离公共墙的部分,以及远离墙体处开挖基坑的靠近公共墙的部分,由于公共墙的一侧的支撑已经稳定,对剩余部分的挖掘不会影响支撑体系的建立及稳定,剩余部分的挖掘完成且建立起支撑后,两相邻的基坑的支撑体系也就建立起来了。
本发明还包括:使两相邻基坑支撑的标高、支撑的形式以及支撑的道数均相同,采用相同的支撑的标高、支撑形式以及支撑的道数使得两相邻基坑的支撑体系得到进一步的统一,更加有利于两基坑建立支撑时的稳定,进一步保证公共墙不会由于两侧受力不均而产生变形。
本发明还还包括:所述基础底板与靠近墙体处开挖的基坑底部的钢支撑采用铰接的形式进行固定,采用铰接的方法进行固定使得钢支撑与基础底板之间的固定关系非常牢固,使得基础底板与底部的钢支撑共同形成一个一体的更为牢固的支撑体系,确保在远离墙体处开挖的基坑进行靠近公共墙部分的开挖建立支撑的过程中公共墙能够提供足够的轴力,不会发生变形。
本发明还包括:在基础底板与钢支撑铰接完成后,对铰接的强度进行测试,并在所述强度达到一预定标准后,继续完成施工,由于采用铰接的模式,需要测试铰接后的基础底板与钢支撑是否达到一定强度,可以保证在另一侧挖掘设置钢支撑的过程中不会对已完成支撑的一侧产生影响。
本发明中的公共墙为两相邻基坑的相邻部分共用的连续墙,即在进行地下连续墙的铺设的过程中,两相邻基坑的相邻部分并不会各自设置连续墙,而是共用同一墙体。
本发明相邻双坑的施工方法的具体施工流程为:在两相邻基坑的施工区域建立地下连续墙,对两相邻基坑的支撑体系进行统一,对两基坑同时施工的最大深度及同时施工的区域进行计算,制定相应的施工计划,两基坑同时开始施工,从公共墙的一侧的靠近墙体处开挖一基坑,公共墙的另一侧的远离墙体处开挖另一基坑,在两基坑挖掘的过程中同时对已完成挖掘的部分进行支撑;两基坑均挖至所述最大深度后,从远离墙体处开挖的基坑停止施工,完成靠近墙体处开挖基坑的基础底板施工,对基础底板与钢支撑进行铰接,铰接部位达到指定强度后,完成两基坑剩余部分的施工。
综上所述,本发明相邻双坑的施工方法解决了现有技术中相邻双坑无法同时施工,导致施工周期较长的问题,通过错开相邻部位土方开挖的时间,同时对两相邻基坑可同时施工的最大深度及施工面积进行计算,实现两相邻基坑的同时施工,在不影响施工质量的前提下,大大提高了施工效率,缩短了施工的周期。
以上对本发明的具体实施例进行了详细描述,但其只是作为范例,本发明并不限制于以上描述的具体实施例。对于本领域技术人员而言,任何对本发明进行的等同修改和替代也都在本发明的范畴之中。因此,在不脱离本发明的精神和范围下所作的均等变换和修改,都应涵盖在本发明的范围内。
Claims (5)
1.一种相邻双坑的施工方法,其特征在于,包括:将两相邻基坑在公共墙部位的中心标高设定在同一水平位置,计算两相邻基坑可同时进行施工的最大深度和同时施工的区域,根据第一基坑设置支撑时第二基坑一侧的公共墙提供的土压力,确定所述第一基坑和所述第二基坑能够同时进行施工的各基坑的深度和区域;从公共墙的一侧的靠近墙体处开挖一基坑,公共墙的另一侧的远离墙体处开挖另一基坑;在两基坑挖掘的过程中对已完成挖掘的部分进行支撑;两基坑均挖至所述最大深度后,从远离墙体处开挖的基坑停止施工;完成靠近墙体处开挖基坑的基础底板施工;完成两基坑剩余部分的施工。
2.根据权利要求1所述的相邻双坑的施工方法,其特征在于,还包括:使两相邻基坑支撑的标高、支撑的形式以及支撑的道数均相同。
3.根据权利要求1所述的相邻双坑的施工方法,其特征在于,还包括:所述基础底板与靠近墙体处开挖的基坑底部的钢支撑采用铰接的形式进行固定。
4.根据权利要求3所述的相邻双坑的施工方法,其特征在于,还包括:在所述基础底板与所述钢支撑铰接完成后,对铰接的强度进行测试,并在所述强度达到一预定标准后,继续完成施工。
5.根据权利要求1所述的相邻双坑的施工方法,其特征在于,所述公共墙为两相邻基坑的相邻部分共用的连续墙。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010539646.9A CN102465534B (zh) | 2010-11-11 | 2010-11-11 | 相邻双坑的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010539646.9A CN102465534B (zh) | 2010-11-11 | 2010-11-11 | 相邻双坑的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102465534A true CN102465534A (zh) | 2012-05-23 |
CN102465534B CN102465534B (zh) | 2015-07-29 |
Family
ID=46069622
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010539646.9A Active CN102465534B (zh) | 2010-11-11 | 2010-11-11 | 相邻双坑的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102465534B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704494A (zh) * | 2012-06-20 | 2012-10-03 | 上海建工二建集团有限公司 | 相邻基坑先后开挖顶圈梁共用装置及施工方法 |
CN102733416A (zh) * | 2012-06-29 | 2012-10-17 | 上海建工二建集团有限公司 | 地墙分隔墙处混凝土板连接工艺 |
CN105804084A (zh) * | 2016-03-25 | 2016-07-27 | 中铁三局集团广东建设工程有限公司 | 一种临近已开挖深基坑的小基坑开挖施工方法 |
CN110528531A (zh) * | 2019-07-31 | 2019-12-03 | 浙江杭海城际铁路有限公司 | 一种利用紧邻基坑围护桩做待开挖基坑围护桩的方法 |
CN115288155A (zh) * | 2022-08-19 | 2022-11-04 | 中国一冶集团有限公司 | 一种方圆组合超深永久基坑支护结构的高效建造方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5664028A (en) * | 1979-10-31 | 1981-06-01 | Maeda Kensetsu Kogyo Kk | Sheathing construction work by antecedent support framework |
KR20050082811A (ko) * | 2004-02-20 | 2005-08-24 | 삼부토건주식회사 | 흙막이 겸용 옹벽 및 그 시공방법 |
-
2010
- 2010-11-11 CN CN201010539646.9A patent/CN102465534B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5664028A (en) * | 1979-10-31 | 1981-06-01 | Maeda Kensetsu Kogyo Kk | Sheathing construction work by antecedent support framework |
KR20050082811A (ko) * | 2004-02-20 | 2005-08-24 | 삼부토건주식회사 | 흙막이 겸용 옹벽 및 그 시공방법 |
Non-Patent Citations (5)
Title |
---|
尤文贵: "相邻深基坑同时开挖的变形性状分析", 《福建建筑》 * |
李昀等: "相邻深大基坑同步施工的相互影响研究", 《水运工程》 * |
毛子成: "与两条地铁线共墙的地下五层结构超深基坑施工技术", 《建筑施工》 * |
陈东杰: "上海铁路南站特长相邻基坑平行施工技术", 《施工技术》 * |
陈东杰: "上海铁路南站相邻基坑开挖变形影响研究", 《建筑科学》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102704494A (zh) * | 2012-06-20 | 2012-10-03 | 上海建工二建集团有限公司 | 相邻基坑先后开挖顶圈梁共用装置及施工方法 |
CN102704494B (zh) * | 2012-06-20 | 2014-08-27 | 上海建工二建集团有限公司 | 相邻基坑先后开挖顶圈梁共用装置及施工方法 |
CN102733416A (zh) * | 2012-06-29 | 2012-10-17 | 上海建工二建集团有限公司 | 地墙分隔墙处混凝土板连接工艺 |
CN105804084A (zh) * | 2016-03-25 | 2016-07-27 | 中铁三局集团广东建设工程有限公司 | 一种临近已开挖深基坑的小基坑开挖施工方法 |
CN105804084B (zh) * | 2016-03-25 | 2017-08-29 | 中铁三局集团广东建设工程有限公司 | 一种临近已开挖深基坑的小基坑开挖施工方法 |
CN110528531A (zh) * | 2019-07-31 | 2019-12-03 | 浙江杭海城际铁路有限公司 | 一种利用紧邻基坑围护桩做待开挖基坑围护桩的方法 |
CN115288155A (zh) * | 2022-08-19 | 2022-11-04 | 中国一冶集团有限公司 | 一种方圆组合超深永久基坑支护结构的高效建造方法 |
CN115288155B (zh) * | 2022-08-19 | 2023-10-27 | 中国一冶集团有限公司 | 一种方圆组合超深永久基坑支护结构的高效建造方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102465534B (zh) | 2015-07-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563128B (zh) | 软土地区非对称深大基坑同步开挖的支护体系及实施方法 | |
CN109723085B (zh) | 一种深基坑分坑施工肋墙换撑结构及其施工方法 | |
CN102465534A (zh) | 相邻双坑的施工方法 | |
CN106522241A (zh) | 超大层高地下室结构的深基坑支护方法 | |
CN103290849B (zh) | 一种半逆作法坑中坑支护结构及其施工方法 | |
CN104947681B (zh) | 一种超大超深地下室基坑的施工方法 | |
CN203654294U (zh) | 一种逆作法中基坑的支护结构 | |
CN204590038U (zh) | 一种永久性基坑支护结构 | |
CN204491624U (zh) | 软土地区非对称深大基坑同步开挖支护体系 | |
CN103104102B (zh) | 一种地下增层改造施工方法 | |
CN109610466B (zh) | 已建地铁车站两侧不规则深基坑不同步施工方法及结构 | |
CN106164380B (zh) | 风力发电机预制基座 | |
CN102953385B (zh) | 一种坡道异形处基坑换撑施工方法 | |
CN109505298A (zh) | 一种自平衡基坑围护方法 | |
CN113356219A (zh) | 运营地铁两侧不同深度基坑同期开挖施工方法 | |
CN104975606A (zh) | 逆作基坑与相邻基坑相邻处高低跨处理方法 | |
CN208517810U (zh) | 一种用于深大基坑开挖施工的临时栈桥 | |
CN101831915A (zh) | 宽大缺陷基础的加固结构及其施工方法 | |
CN203904971U (zh) | 控制地下连续墙缩颈、漏筋、夹泥的钢筋笼保护装置 | |
CN109056870A (zh) | 一种用于房屋修建的夯土挖槽机械设备 | |
CN102493488A (zh) | 基坑工程逆梁顺板施工方法 | |
CN101597897B (zh) | 一种湿陷性黄土地区地基的二次处理方法及复合地基结构 | |
CN217536985U (zh) | 基坑围护结构 | |
CN207728018U (zh) | 适用于多层建筑套建高层建筑的建筑结构 | |
CN203066083U (zh) | 相邻的两个基坑的支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 200120 Shanghai city Pudong New Area Fushan Road No. 33 Applicant after: Shanghai Construction NO.5 (Group) Co., Ltd. Address before: 200120 Shanghai city Pudong New Area Fushan Road No. 33 Applicant before: Shanghai No.5 Construction Co., Ltd. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: SHANGHAI NO.5 BUILDING CO., LTD. TO: SHANGHAI CONSTRUCTION NO. 5 (GROUP) CO., LTD. |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |