CN102465315B - 制止电解槽启动期间槽壳上拱的电解槽结构 - Google Patents

制止电解槽启动期间槽壳上拱的电解槽结构 Download PDF

Info

Publication number
CN102465315B
CN102465315B CN201010532130.1A CN201010532130A CN102465315B CN 102465315 B CN102465315 B CN 102465315B CN 201010532130 A CN201010532130 A CN 201010532130A CN 102465315 B CN102465315 B CN 102465315B
Authority
CN
China
Prior art keywords
pot shell
tank
crossbeam
electrolytic tank
temporary supports
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201010532130.1A
Other languages
English (en)
Other versions
CN102465315A (zh
Inventor
王愚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN201010532130.1A priority Critical patent/CN102465315B/zh
Publication of CN102465315A publication Critical patent/CN102465315A/zh
Application granted granted Critical
Publication of CN102465315B publication Critical patent/CN102465315B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

本发明公开了一种制止电解槽启动期间槽壳上拱的电解槽结构,在电解槽的中部、大面两侧设置两个临时支撑(2),临时支撑(2)上端与上部结构大梁(3)连接,下端与槽壳(1)连接。临时支撑(2)上端顶在上部结构大梁(3)的上边缘,下端顶在槽壳(1)的边缘内侧;或者,临时支撑(2)上端顶在上部结构大梁(3)的下边缘,下端顶在槽壳(1)的边缘内侧。临时支撑(2)上端与上部结构大梁(3)之间、下端与槽壳(1)之间设置有绝缘板。本发明在槽壳中部增加临时支撑,使上部结构的重量通过这个临时支撑,压在槽壳的中部,从而压制电解槽启动期间的槽壳上拱,解决了电解槽阴极炭块上拱和电解槽内衬发生变形,提高了内衬的使用寿命。

Description

制止电解槽启动期间槽壳上拱的电解槽结构
技术领域
本发明新型涉及一种电解槽结构。
背景技术
铝电解槽在启动期间会发生槽壳上拱的现象,影响电解槽的正常生产(参考《轻金属》2005,4期,p31,论文“电解槽启动期间的槽壳上拱”,王愚)。铝电解槽在启动初期要熔化冰晶石电解质,整个槽膛内都是~1000℃的熔融电解质,熔岩翻滚,这是槽膛内温度最高的时期。此时,槽侧炉帮尚未形成,电解槽周围还没有侧部结壳这一有效的隔热层,电解槽槽壳在这期间要经受最高的温度,槽壳侧壁钢板经常烧得发红。
电解槽的槽壳都是摇篮架结构,方形槽壳外是十多个至二十多个的摇篮架。摇篮架由400mm高的工字钢组焊而成,刚性很大,是槽壳的主要受力部件。槽壳的摇篮架支撑在槽底的两根280mm高的工字钢梁上,280工字钢梁通过绝缘板放在槽基础水泥墩上。
电解槽在启动期间,随着槽温升高,槽壳发生上拱变形。中间部位的摇篮架被槽壳上拱带起,离开280工字钢梁,中心线附近的摇篮架上拱量最大。如图1所示。280kA和300kA电解槽的槽壳上拱为30mm。350kA 电解槽的最大上拱则达40mm。在电解槽启动的当天或第二天,槽壳大都上拱达到其最大值。一般启动24小时后,向槽内灌铝,电压逐渐降低,电解槽温度也降低,侧部炉帮开始形成,槽壳上拱值逐渐减小。槽温高,且维持时间长的,槽壳上拱则大。槽温低,维持时间短的,槽壳上拱则小。
电解槽启动初期的上拱,造成电解槽阴极炭块也上拱,导致阴极电流分布不均;也使电解槽内衬发生变形,有可能导致内衬损伤,影响内衬的使用寿命。
发明内容
本发明要解决的技术问题是,提供一种制止电解槽启动期间槽壳上拱的电解槽结构,以克服现有技术存在的造成电解槽阴极炭块上拱,导致阴极电流分布不均;使电解槽内衬发生变形,可能导致内衬损伤,影响内衬的使用寿命等不足。
本发明采用以下技术方案:在电解槽的中部、大面两侧设置两个临时支撑,临时支撑上端与上部结构大梁连接,下端与槽壳连接。
临时支撑上端顶在上部结构大梁的上边缘,下端顶在槽壳的边缘内侧。
或者,临时支撑上端顶在上部结构大梁的下边缘,下端顶在槽壳的边缘内侧。
临时支撑上端与上部结构大梁之间、下端与槽壳之间设置有绝缘板。
电解槽的槽壳是下部的基础刚构件,槽壳上面有电解槽的上部结构。上部结构包括大梁、阳极、阳极母线、打壳下料机构等。上部结构由一个大梁支撑在槽壳的两端。本发明在槽壳中部增加临时支撑,使上部结构的重量通过这个临时支撑,压在槽壳的中部,从而压制电解槽启动期间的槽壳上拱。
与现有技术相比,本发明解决了电解槽启动初期的上拱问题,从而解决了电解槽阴极炭块上拱导致的阴极电流分布不均;解决了电解槽内衬发生变形可能导致的内衬损伤,提高了内衬的使用寿命。
附图说明
图1为现有技术的电解槽结构示意图;
图2为图1中的Ⅰ局部放大图;示意出电解槽中间部位的摇篮架被槽壳上拱带起的情形;
图3为本发明的电解槽结构示意图;图中示意出临时支撑上端顶在上部结构大梁的上边缘的情形;
图4为图3的A—A剖视图;
图5为本发明的另一种电解槽结构示意图;图中示意出临时支撑上端顶在上部结构大梁的下边缘的情形;
图6为图5的B—B剖视图。
具体实施方式
本发明的实施例:在电解槽的中部、大面两侧设置两个临时支撑2,临时支撑2上端与上部结构大梁3连接,下端与槽壳1连接。
临时支撑2上端顶在上部结构大梁3的上边缘,下端顶在槽壳1的边缘内侧。
或者,临时支撑2上端顶在上部结构大梁3的下边缘,下端顶在槽壳1的边缘内侧。
临时支撑2上端与上部结构大梁3之间、下端与槽壳1之间设置有绝缘板。
对于临时支撑2上端顶在上部结构大梁3的上边缘的情况:上端要从外向内顶在上部结构大梁3的上边缘,下端要顶在槽壳边缘内侧,可靠地支撑在大梁与槽壳之间。该结构将会妨碍中间阳极的更换作业。一般情况下,电解槽启动后约一周开始换阳极,可以安排中间阳极再稍后二、三天更换,这时,槽壳温度已经降低,槽壳不再上拱,可以拆除临时支撑了。即拆除临时支撑后,再换中间的阳极。
对于临时支撑2上端顶在上部结构大梁3的下边缘的情况:该结构的优点是支撑构件较短,缺点是中部临时支撑对槽壳有较大的向外扩张的力,这对槽壳不利。只要槽壳的刚度足够大,这个扩张力不至于扩大槽壳的中部膨胀,这种支撑就是可行的。
由于大梁与电解槽的阳极等电位,槽壳与电解槽的阴极等电位,阳极与阴极不能短路,所以,在临时支撑2的上端与大梁之间必须设置绝缘板;在临时支撑2的下端与槽壳之间也必须设置绝缘板。

Claims (4)

1.一种制止电解槽启动期间槽壳上拱的电解槽结构,其特征在于:在电解槽的中部、大面两侧设置两个临时支撑(2),临时支撑(2)上端与上部结构大梁(3)连接,下端与槽壳(1)连接。
2.根据权利要求1所述的制止电解槽启动期间槽壳上拱的电解槽结构,其特征在于:临时支撑(2)上端顶在上部结构大梁(3)的上边缘,下端顶在槽壳(1)的边缘内侧。
3.根据权利要求1所述的制止电解槽启动期间槽壳上拱的电解槽结构,其特征在于:临时支撑(2)上端顶在上部结构大梁(3)的下边缘,下端顶在槽壳(1)的边缘内侧。
4.根据权利要求1所述的制止电解槽启动期间槽壳上拱的电解槽结构,其特征在于:临时支撑(2)上端与上部结构大梁(3)之间、下端与槽壳(1)之间设置有绝缘板。
CN201010532130.1A 2010-11-05 2010-11-05 制止电解槽启动期间槽壳上拱的电解槽结构 Expired - Fee Related CN102465315B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010532130.1A CN102465315B (zh) 2010-11-05 2010-11-05 制止电解槽启动期间槽壳上拱的电解槽结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010532130.1A CN102465315B (zh) 2010-11-05 2010-11-05 制止电解槽启动期间槽壳上拱的电解槽结构

Publications (2)

Publication Number Publication Date
CN102465315A CN102465315A (zh) 2012-05-23
CN102465315B true CN102465315B (zh) 2014-09-17

Family

ID=46069417

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010532130.1A Expired - Fee Related CN102465315B (zh) 2010-11-05 2010-11-05 制止电解槽启动期间槽壳上拱的电解槽结构

Country Status (1)

Country Link
CN (1) CN102465315B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104593822A (zh) * 2013-10-30 2015-05-06 贵阳铝镁设计研究院有限公司 一种预防电解槽槽壳上端变形的装置及方法
GB2571274A (en) * 2018-02-21 2019-08-28 Dubai Aluminium Pjsc Electrolytic cell with a superstructure having intermediate legs, suitable for the Hall-Heroult process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201125269Y (zh) * 2007-11-20 2008-10-01 沈阳铝镁设计研究院 防止大型铝电解槽槽壳变形的结构
CN201158717Y (zh) * 2007-11-29 2008-12-03 沈阳铝镁设计研究院 铝电解槽防槽底上拱结构
CN201326022Y (zh) * 2008-12-09 2009-10-14 沈阳铝镁设计研究院 减小铝电解槽底上拱的结构
CN201343574Y (zh) * 2008-12-11 2009-11-11 中国铝业股份有限公司 一种防止铝电解槽槽壳上拱的结构

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101440501B (zh) * 2007-11-20 2011-08-31 沈阳铝镁设计研究院有限公司 一种铝电解槽的防槽底上拱方法及其结构
CN201873761U (zh) * 2010-11-05 2011-06-22 贵阳铝镁设计研究院 制止电解槽启动期间槽壳上拱的电解槽结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201125269Y (zh) * 2007-11-20 2008-10-01 沈阳铝镁设计研究院 防止大型铝电解槽槽壳变形的结构
CN201158717Y (zh) * 2007-11-29 2008-12-03 沈阳铝镁设计研究院 铝电解槽防槽底上拱结构
CN201326022Y (zh) * 2008-12-09 2009-10-14 沈阳铝镁设计研究院 减小铝电解槽底上拱的结构
CN201343574Y (zh) * 2008-12-11 2009-11-11 中国铝业股份有限公司 一种防止铝电解槽槽壳上拱的结构

Also Published As

Publication number Publication date
CN102465315A (zh) 2012-05-23

Similar Documents

Publication Publication Date Title
CN101629304B (zh) 一种预焙阳极铝电解槽焦粒焙烧启动方法及结构
AU2011204685A1 (en) Cathode with protrusion structure for aluminum electrolytic cell
CN202465911U (zh) 25ka氟盐体系稀土熔盐电解槽
RU2703758C2 (ru) Низкопрофильный катодный кожух алюминиевого электролиза и способ повышения производительности линии алюминиевых электролизеров
CN102465315B (zh) 制止电解槽启动期间槽壳上拱的电解槽结构
CN201873761U (zh) 制止电解槽启动期间槽壳上拱的电解槽结构
CN103060848B (zh) 一种人造炉膛铝电解槽
CN105934538A (zh) 包括包含在封闭腔内的阳极组件的电解池
CN107541755B (zh) 一种内加热式熔盐电解槽
CN105862079B (zh) 铝电解槽上部结构在线顶升抬高机构及工艺
CN205710955U (zh) 铝电解槽上部结构在线顶升抬高机构
CN201296786Y (zh) 一种预焙阳极铝电解槽焦粒焙烧启动结构
CN203247321U (zh) 金属锂电解槽
CN105780056B (zh) 双层铝阴极铝电解槽
CN202323053U (zh) 铝电解槽槽壳用防拱变形的可拆式中间支承装置
CN105714335A (zh) 一种可降低阳极电解残存率的阳极板
CN221822352U (zh) 一种新型铝电解槽内衬
CN204298473U (zh) 一种铝电解槽阳极预热装置
CN104611723B (zh) 一种缩短电解槽新阳极电流导通时间的方法
CN210379239U (zh) 一种锂电池用具有高韧性防形变的极耳
AU2021100219A4 (en) Low-energy Energy-saving Aluminum Electrolytic Cell with Aluminum-Carbon Composite Cathode Replacing Steel Bar Cathode
CN202730260U (zh) 一种平底碳碗的预焙阳极
CN103132102A (zh) 铝电解槽槽壳用防拱变形的可拆式中间支承装置
CN215440714U (zh) 一种新型电解槽槽周铝母线绝缘砖
CN103243351B (zh) 一种分区电解预焙铝电解槽

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140917

Termination date: 20151105

EXPY Termination of patent right or utility model