CN102459762B - Method for commissioning machine - Google Patents
Method for commissioning machine Download PDFInfo
- Publication number
- CN102459762B CN102459762B CN201080027059.XA CN201080027059A CN102459762B CN 102459762 B CN102459762 B CN 102459762B CN 201080027059 A CN201080027059 A CN 201080027059A CN 102459762 B CN102459762 B CN 102459762B
- Authority
- CN
- China
- Prior art keywords
- track
- machine
- lifting
- digger chain
- digger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/06—Renewing or cleaning the ballast in situ, with or without concurrent work on the track
- E01B27/10—Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track
- E01B27/105—Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track the track having been lifted
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The invention relates to commissioning a machine (1) having a first and a second excavating chain (10, 11), wherein rails (15) of the track are parted, and a front track end (16) relative to a working direction (9) is lifted up, forming a track gap (17). The rear, second excavating chain (11) is then inserted into the track gap (17) and ballast (2) is received for forming a trench (18). The machine (1) is then run in reverse while lifting up the second excavating chain (11), and the first excavating chain (10) is inserted in the trench (18) for receiving ballast (2) of a first ballast layer (20) and the machine (1) is displaced in the working direction (9). The second excavating chain (11) is dropped beneath the track while lifting the front track end (16), and is commissioned for receiving ballast (2) of a second ballast layer (21).
Description
The present invention relates to a kind of method for machining, this machine be arranged between two track running mechanisms, for taking the first and second digger chains of the ballast aggregate that is positioned at track below.
By the known a kind of screen scarifier for clean orbit ballast of US6672398, it is equipped with two digger chains and is used for taking ballast aggregate.Before work starts, below track, need to remove ballast aggregate to form irrigation canals and ditches by servicing unit.The section that digger chain is extended transverse to track is introduced in these irrigation canals and ditches, and is connected with parts subsequently.This expends time in and bothers very much.Also known on the other hand, the rail and the lifting track that cut off track form track space.Then make digger chain drop in this track space and along with machine travels forward.But the precondition of this technology is between orbit gap and anterior track running gear, to have enough large distance available, to avoid unallowed track stress.
Technical problem to be solved by this invention is at present, and a kind of method that starts described type is provided, and by the method, can start simplifiedly the machine with two digger chains.
This technical problem solves by a kind of method with following steps that starts described type by the present invention
-cut off the rail of described track, and lifting is positioned at anterior rail end to form track space with respect to operative orientation;
-the second digger chain that is arranged in rear portion with respect to described operative orientation is introduced to described track space and take ballast aggregate to form irrigation canals and ditches;
-then, described machine and operative orientation back being travelled on the contrary the second digger chain in the situation that described in lifting, described the first digger chain is introduced to described irrigation canals and ditches to take the ballast aggregate of the first ballastway, and described machine is travelled along operative orientation;
-described in lifting, described the second digger chain is dropped under described track anterior rail end in the situation that, and bring into operation to take the ballast aggregate of the second ballastway.
By described method step, can in the situation that avoiding using additional device, by the second digger chain, form irrigation canals and ditches, and next the first digger chain be introduced in these irrigation canals and ditches.This distance between the first digger chain and the anterior track running gear followed relatively hour also can be carried out without any problems.Therefore, by described method, take full advantage of the larger distance of the second digger chain and anterior track running gear, to there is the possibility of unallowed flexural stress while getting rid of reliably the anterior rail end of lifting.
Other advantage of the present invention is drawn by the description of the drawings.
According to embodiment illustrated in the accompanying drawings, further set forth the present invention below.In the accompanying drawings:
Fig. 1 to 4 is respectively machine with two digger chains lateral view in distinct methods step.
At the machine 1 shown in Fig. 1 to 4, for taking ballast aggregate 2, have the machine frame 3 of strip, this machine frame 3 can travel by distolateral track travel device 4 on track 5.In service depot 6, there is control device 7.For lifting track 5, adjustable for height lifting gear 8 is fixed on machine frame 3.
With respect to operative orientation 9, be positioned at anterior or the first digger chain 10 and the second digger chain 11 subsequently and be hinged on machine frame 3, the first digger chain 10 and the second digger chain 11 are positioned between two track travel devices 4.Each digger chain 10,11 is furnished with height adjusting driver 12.The ballast aggregate 2 excavating for cleaning is provided with screening plant 13.Conveyer belt 14 is abandoned quarrel for removing.
Below describe by of the present invention for machining 1 method step:
Once machine 1 arrives building site, directly cuts off two rail 15 of track 5 before the second digger chain 11.Next, by lifting gear 8 liftings, with respect to operative orientation 9, be positioned at anterior rail end 16 to form orbit gap 17 (referring to Fig. 1).
Next step, introduce the second digger chain 11 in orbit gap 17 and when machine 1 slowly moves ahead and form irrigation canals and ditches 18 by taking ballast aggregate 2.At irrigation canals and ditches 18, reach after prescribed level, machine 1 back travels on the contrary with operative orientation 9, and now, the second digger chain 11 is automatically derived from orbit gap 17.Lifting gear 8 unclamps from rail 15, and these rail 15 are connected with the rail 15 of adjacency by clamping plate connector where necessary.
When the first digger chain 10 next-door neighbours are positioned at irrigation canals and ditches 18 rear, stop back travelling of machine 1.After removing clamping plate connection, now by the anterior rail end 16 (referring to Fig. 2) of auxiliary rail lifting apparatus 19 liftings, to again form orbit gap 17.At machine 1, along operative orientation 9 to overtake in the situation that, the first digger chain 10 drops in this orbit gap 17.
Next, anterior rail end 16 by lifting gear 8, caught and lifting to introduce the second digger chain 11 (referring to Fig. 3).Next, rail 15 interconnects again, and machine 1 continues mobile to remove continuously the first and second ballastways 20,21 (referring to Fig. 4).
Claims (1)
1. the method for machine (1), this machine (1) be arranged between two track travel devices (4), for taking first and second digger chains (10,11) of the ballast aggregate (2) that is positioned at track (5) below, it is characterized in that having following methods step:
A) cut off the rail (15) of described track (5), and lifting is positioned at anterior rail end (16) to form track space (17) with respect to operative orientation (9);
Second digger chain (11) that b) will be arranged in rear portion with respect to described operative orientation (9) is introduced described track space (17) and is taken ballast aggregate (2) to form irrigation canals and ditches (18);
C) then, described in lifting, make the second digger chain (11) in the situation that described machine (1) and operative orientation back travel on the contrary, described the first digger chain (10) is introduced to described irrigation canals and ditches (18) to take the ballast aggregate (2) of the first ballastway (20), and described machine (1) is travelled along operative orientation (9);
D) described in lifting, described the second digger chain (11) is dropped under described track (5) anterior rail end (16) in the situation that, and bringing into operation to take the ballast aggregate (2) of the second ballastway (21).
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ATA931/2009 | 2009-06-17 | ||
AT0093109A AT507789B1 (en) | 2009-06-17 | 2009-06-17 | METHOD FOR COMMISSIONING A MACHINE |
PCT/EP2010/002540 WO2010145729A1 (en) | 2009-06-17 | 2010-04-24 | Method for commissioning a machine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102459762A CN102459762A (en) | 2012-05-16 |
CN102459762B true CN102459762B (en) | 2014-04-09 |
Family
ID=42537243
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201080027059.XA Active CN102459762B (en) | 2009-06-17 | 2010-04-24 | Method for commissioning machine |
Country Status (8)
Country | Link |
---|---|
EP (1) | EP2443286B1 (en) |
CN (1) | CN102459762B (en) |
AT (1) | AT507789B1 (en) |
DK (1) | DK2443286T3 (en) |
EA (1) | EA019551B1 (en) |
ES (1) | ES2534247T3 (en) |
PL (1) | PL2443286T3 (en) |
WO (1) | WO2010145729A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT13254U1 (en) * | 2012-07-06 | 2013-09-15 | Plasser Bahnbaumasch Franz | Method and machine for cleaning a ballast bed |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002348803A (en) * | 2001-04-25 | 2002-12-04 | Franz Plasser Bahnbaumaschinen-Industrie Gmbh | Cleaning apparatus and cleaning method for ballast |
CN1384244A (en) * | 2001-05-03 | 2002-12-11 | 弗兰茨普拉塞铁路机械工业股份有限公司 | Method and machine for renewing ballast bed |
US6672398B2 (en) * | 2001-04-26 | 2004-01-06 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Ballast cleaning machine |
CN2880892Y (en) * | 2005-07-28 | 2007-03-21 | 襄樊金鹰轨道车辆有限责任公司 | Railway switch ballast cleaning machine |
EP1841919B1 (en) * | 2005-01-17 | 2008-08-20 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | Method for cleaning the ballast of a track |
CN201144371Y (en) * | 2007-11-15 | 2008-11-05 | 昆明中铁大型养路机械集团有限公司 | Railroad switch ballast cleaning machine |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DD240043A1 (en) * | 1985-08-05 | 1986-10-15 | Deutsche Reichsbahn | GRAVEL BED WASHER |
AT502187B1 (en) * | 2005-11-14 | 2007-02-15 | Plasser Bahnbaumasch Franz | Method for cleaning of ballast bed of track, involves accomplishing of first and second working processes alternatively whereby first and second working processes depend on degree of contamination of ballast bed |
-
2009
- 2009-06-17 AT AT0093109A patent/AT507789B1/en active
-
2010
- 2010-04-24 EA EA201101600A patent/EA019551B1/en not_active IP Right Cessation
- 2010-04-24 PL PL10718077T patent/PL2443286T3/en unknown
- 2010-04-24 DK DK10718077.0T patent/DK2443286T3/en active
- 2010-04-24 CN CN201080027059.XA patent/CN102459762B/en active Active
- 2010-04-24 WO PCT/EP2010/002540 patent/WO2010145729A1/en active Application Filing
- 2010-04-24 EP EP10718077.0A patent/EP2443286B1/en active Active
- 2010-04-24 ES ES10718077.0T patent/ES2534247T3/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002348803A (en) * | 2001-04-25 | 2002-12-04 | Franz Plasser Bahnbaumaschinen-Industrie Gmbh | Cleaning apparatus and cleaning method for ballast |
US6672398B2 (en) * | 2001-04-26 | 2004-01-06 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Ballast cleaning machine |
CN1384244A (en) * | 2001-05-03 | 2002-12-11 | 弗兰茨普拉塞铁路机械工业股份有限公司 | Method and machine for renewing ballast bed |
EP1841919B1 (en) * | 2005-01-17 | 2008-08-20 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | Method for cleaning the ballast of a track |
CN2880892Y (en) * | 2005-07-28 | 2007-03-21 | 襄樊金鹰轨道车辆有限责任公司 | Railway switch ballast cleaning machine |
CN201144371Y (en) * | 2007-11-15 | 2008-11-05 | 昆明中铁大型养路机械集团有限公司 | Railroad switch ballast cleaning machine |
Non-Patent Citations (2)
Title |
---|
重载线路清筛机的作业方法及改进措施;闫学文;《科技情报开发与经济》;20080403;第17卷(第36期);第288-290页 * |
闫学文.重载线路清筛机的作业方法及改进措施.《科技情报开发与经济》.2008,第17卷(第36期),第288-290页. |
Also Published As
Publication number | Publication date |
---|---|
CN102459762A (en) | 2012-05-16 |
AT507789B1 (en) | 2010-08-15 |
EA019551B1 (en) | 2014-04-30 |
DK2443286T3 (en) | 2015-04-13 |
PL2443286T3 (en) | 2015-06-30 |
AT507789A4 (en) | 2010-08-15 |
WO2010145729A1 (en) | 2010-12-23 |
EP2443286B1 (en) | 2015-01-07 |
ES2534247T3 (en) | 2015-04-21 |
EP2443286A1 (en) | 2012-04-25 |
EA201101600A1 (en) | 2012-04-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101222219B1 (en) | Maschine for renewing a railway track | |
CN107227791A (en) | A kind of dredging robot and its application method | |
CN105473787A (en) | Method for replacing sleepers and ballast under a raised rail section | |
KR101746895B1 (en) | System for cleaning a ballast bed | |
CN1928238B (en) | Railway turnout ballast cleaning-sieving machine(6) | |
CN102459762B (en) | Method for commissioning machine | |
US5926981A (en) | Track work machine for excavating material from a track bed | |
RU2002110822A (en) | Machine and method for cleaning crushed stone | |
CN105401494A (en) | Railway ballast excavating device | |
CN101960071B (en) | Method for refurbishing a ballast bed of a track | |
CN101099001B (en) | Method for cleaning the ballast of a track | |
RU2008117805A (en) | HYDRA-CUTTING CLEANING MECHANIZED COMPLEX WITH EXTRACTION OF FOSSIL LARGE UNITS AND DELIVERY BY EXCALATORS | |
CN105074088B (en) | Machine for cleaning track ballast with a sliding slope reinforcement | |
US10385517B2 (en) | Method for track renewal | |
CN205368909U (en) | Railway ballast excavating gear | |
US6209462B1 (en) | Machine with ballast scarifying device | |
US9157194B2 (en) | Machine for cleaning a ballast bed of a track | |
CN101892615A (en) | Full section ballast bed gravel efficient screen scarifier | |
EP1348057B1 (en) | Ballast removal method and apparatus | |
CN108368679B (en) | Method for renewing the ties of a track consisting of rails and ties and track-laying machine | |
CN201785780U (en) | Integrated high-efficiency excavator | |
CN201785684U (en) | Combined excavation screen cleaning machine | |
CN201785682U (en) | Road bed full-section gravel screen cleaning machine | |
CN1928237B (en) | Digging mechanism for railway ballast | |
AU2013204957A1 (en) | Ballast Undercutter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |