CN102455434A - Monitoring method of working-face coal-body advanced stress - Google Patents

Monitoring method of working-face coal-body advanced stress Download PDF

Info

Publication number
CN102455434A
CN102455434A CN2010105145761A CN201010514576A CN102455434A CN 102455434 A CN102455434 A CN 102455434A CN 2010105145761 A CN2010105145761 A CN 2010105145761A CN 201010514576 A CN201010514576 A CN 201010514576A CN 102455434 A CN102455434 A CN 102455434A
Authority
CN
China
Prior art keywords
sensor probe
monitoring
coal body
stress
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105145761A
Other languages
Chinese (zh)
Inventor
王强
李安洪
李良兵
张玉东
彭景跃
郭志林
蓝航
毛德兵
秦子晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tiandi Science and Technology Co Ltd
Shanxi Luan Environmental Energy Development Co Ltd
Original Assignee
Tiandi Science and Technology Co Ltd
Shanxi Luan Environmental Energy Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tiandi Science and Technology Co Ltd, Shanxi Luan Environmental Energy Development Co Ltd filed Critical Tiandi Science and Technology Co Ltd
Priority to CN2010105145761A priority Critical patent/CN102455434A/en
Publication of CN102455434A publication Critical patent/CN102455434A/en
Pending legal-status Critical Current

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention discloses a monitoring method of a working-face coal-body advanced stress. The method is characterized by: firstly, determining a monitoring area; then setting a sensor probe and a shot point in the monitoring area; through monitoring analysis of a shock wave generated by shot firing, acquiring a propagation velocity in the coal body; carrying out inversion according to different wave velocity distributions in the coal body through software processing so as to acquire a size of the stress and distribution conditions in the coal body. By using the method of the invention, the stress distribution in the coal body at the front of the working face can be effectively monitored. Monitoring precision is high. Compared to the current other methods, in the invention, boring construction is not needed so that a work amount can be substantially reduced; the method can be used effectively and rapidly; real-time monitoring can be realized so that an adverse impact brought by a hysteresis quality can be reduced; the monitoring precision is high and a function of early warning of hazards is possessed, and installation and operation are convenient.

Description

The monitoring method of the leading stress of a kind of workplace coal body
Technical field
The present invention relates to the monitoring method of the leading stress of a kind of workplace coal body, mainly be applicable to coal mine fully-mechanized mining working, fully mechanized coal face, carry out the monitoring that workplace the place ahead coal body internal stress distributes with hard or thicker top board.
Background technology
For the coal winning method that adopts the mode that all collapses, behind the seam mining, the structure major part of superincumbent stratum is the structure of semiarch formula, so rib one end is almost supporting most of weight of the outstanding cut-layer in working room top.And inbreak spoil in rear, goaf only bears the weight of compacting zone, and is much smaller compared with the support pressure in rib the place ahead, and therefore, the stress distribution of grasping rib the place ahead has vital role for coal face Roof Control and definite advanced support method.
In recent years, along with the increase of mining depth, the increasing of mining rate, the distribution of coal body internal stress not only is related to the problem on deformation in tunnel, also is the immediate cause that rock burst takes place, and therefore the monitoring for ahead work face stress also seems particularly urgent.At present also varied for the monitoring method of the leading stress of coal body, comparatively commonly used at present is exactly the borehole stressmeter method.This method all is to reach the monitoring purpose through erection stress meter in coal body, at first in the workplace crossheading, in the coal body of workplace the place ahead, drills; Boring is along the seam inclination direction, and boring is imbedded borehole stressmeter in the hole after accomplishing; Utilize oil pressure pump in taseometer, to be pressed into fluid; Make it to have certain first pressing, the tensimeter record STRESS VARIATION trend that links to each other with taseometer of basis afterwards, thus draw the Changing Pattern of leading support pressure.But the drilling construction of this method is comparatively complicated, because the crash rate of borehole stressmeter is higher, will once arrange a plurality of taseometers usually, and monitoring periods is longer.In addition, the monitoring range of this method only limits to the near zone of holing, and receives this regional structure influence bigger.And drilling hole stress counts disposable products, can not reuse.It is found that in recent years when stress wave was propagated in coal and rock, the suffered stress intensity of its velocity of propagation and coal and rock was being deposited greatly certain relation, therefore, through the propagation law of velocity of wave in the judgement coal body, but just inverting becomes the stress distribution in the coal body.
Summary of the invention
The monitoring method that the purpose of this invention is to provide the leading stress of a kind of workplace coal body can be monitored any zone of workplace, and monitoring time is shorter, and is very little to producing influence.
To achieve these goals, the present invention adopts following technical scheme:
The monitoring method of the leading stress of a kind of workplace coal body, step is following:
A, choose a workplace of exploiting as the monitored area;
B, skyhook: in a side crossheading of monitoring face, anchor pole is installed near the tunnel of coal body and helps, anchor pole spacing 3~5m; Quantity is looked monitored area length and is decided; The length requirement tail end of skyhook must be deep into zone outside the fissure zone, is positioned at the centre, coal seam, is parallel to top, base plate and vertical rib; Anchor pole needs full length fastening, and anchor pole should closely be fixed with boring;
C, the sensor probe of on mounted said anchor pole tailing screw flight section, screwing on clockwise; This sensor probe is to be used for monitoring the shock wave that explosion produces; This sensor probe should guarantee the center of circle maintenance level of surperficial circle when installing; After this sensor probe installation, all the sensors probe is connected on the mine seismic survey appearance shock wave data that this mine seismic survey appearance is used for collecting and the storage sensors probe monitors with cable;
D, in institute's monitoring face opposite side crossheading, arrange blow-up point, produce the shock wave that supplies sensor probe to receive through explosion, the layout of blow-up point is corresponding with the sensor probe position, equally in the side near coal body;
E, check whether the circuit of each blow-up point is normal, whether be communicated with between exploder and the said sensor probe whether inspection mine seismic survey appearance is in normal operating conditions;
F, carry out explosion: exploder starts moment, and sensor probe and mine seismic survey appearance are started working; After explosion finishes; Lead between exploder and the sensor probe is broken off; The seismic wave signal that sensor probe is monitored imports computer through the vibrations registering instrument, and operation analysis software seismic wave CT resolution system analyzes, and draws the velocity of wave distribution plan of monitored area; Through the anomaly of wave velocity zone is analyzed, just obtained the ABNORMAL STRESS distribution plan of monitored area.
Said adjacent blow-up point spacing, said neighboring sensors probe spacing are from more little, and precision is high more, are to enlarge survey area, can accomplish one-shot measurement after, sensor probe is arranged in new position.
Beneficial effect of the present invention: the present invention can effectively monitor the stress distribution in the coal body of workplace the place ahead, and has higher monitoring accuracy.With existing data by MoM and MEI; This invention need not carried out drilling construction, has significantly reduced quantities, and is more effectively quick; And this invention can realize real-time monitoring; Reduced the adverse effect that hysteresis quality is brought, this invention also possesses the function of monitoring accuracy height and danger early warning, installation and easy to operate in addition.
Embodiment
The monitoring method of the leading stress of a kind of workplace coal body: its step is following: a. chooses a workplace of exploiting as the monitored area; Can realize like this stress distribution in the coal body of workplace the place ahead is observed; B. skyhook: in a side crossheading of monitoring face, anchor pole is installed near the tunnel of coal body and helps, anchor pole spacing 3~5m; Quantity is looked monitored area length and is decided; The length requirement tail end of skyhook must be deep into zone outside the fissure zone, is positioned at the centre, coal seam, is parallel to top, base plate and vertical rib; Anchor pole needs full length fastening, and anchor pole should closely be fixed with boring; C. the sensor probe of on mounted said anchor pole tailing screw flight section, screwing on clockwise; This sensor probe is to be used for monitoring the shock wave that explosion produces; This sensor probe should guarantee the center of circle maintenance level of surperficial circle when installing; After this sensor probe installation, all the sensors probe is connected on the vibrations registering instrument shock wave data that this mine seismic survey appearance is used for collecting and the storage sensors probe monitors with cable; D. in institute's monitoring face opposite side crossheading, arrange blow-up point, produce the shock wave that supplies sensor probe to receive through explosion, the layout of blow-up point is corresponding with the sensor probe position, and is same in the side near coal body; Whether whether the circuit of e. checking each blow-up point is normal, be communicated with between exploder and the said sensor probe, and whether inspection mine vibrations registering instrument is in normal operating conditions; F. carry out explosion: exploder starts moment, and sensor probe and mine vibrations registering instrument are started working; After explosion finishes; Lead between exploder and the sensor probe is broken off; The seismic wave signal that sensor probe is monitored imports computer through the vibrations registering instrument, and operation analysis software seismic wave CT resolution system analyzes, and draws the velocity of wave distribution plan of monitored area; Through the anomaly of wave velocity zone is analyzed, just obtained the ABNORMAL STRESS distribution plan of monitored area.
Said adjacent blow-up point spacing, said neighboring sensors probe spacing are from more little, and precision is high more, are to enlarge survey area, can accomplish one-shot measurement after, probe is arranged in new position.Can there be certain coincidence fore-and-aft survey position (rock gangway road direction).
More than be preferred embodiment of the present invention and design graphic; Above-mentioned preferred embodiment and designing graphicly only illustrates; Be not to be used to limit interest field of the present invention; All with equalization technological means or be the interest field that contained of the application's claim and the implementer does not all break away from protection scope of the present invention.

Claims (2)

1. the monitoring method of the leading stress of workplace coal body, it is characterized in that: its step is following:
A, choose a workplace of exploiting as the monitored area;
B, skyhook: in a side crossheading of monitoring face, anchor pole is installed near the tunnel of coal body and helps, anchor pole spacing 3~5m; Quantity is looked monitored area length and is decided; The length requirement tail end of skyhook must be deep into zone outside the fissure zone, is positioned at the centre, coal seam, is parallel to top, base plate and vertical rib; Anchor pole needs full length fastening, and anchor pole should closely be fixed with boring;
C, the sensor probe of on mounted said anchor pole tailing screw flight section, screwing on clockwise; This sensor probe is to be used for monitoring the shock wave that explosion produces; This sensor probe should guarantee the center of circle maintenance level of surperficial circle when installing; After this sensor probe installation, all the sensors probe is connected on the mine seismic survey appearance shock wave data that this mine seismic survey appearance is used for collecting and the storage sensors probe monitors with cable;
D, in institute's monitoring face opposite side crossheading, arrange blow-up point, produce the shock wave that supplies sensor probe to receive through explosion, the layout of blow-up point is corresponding with the sensor probe position, equally in the side near coal body;
E, check whether the circuit of each blow-up point is normal, whether be communicated with between exploder and the said sensor probe whether inspection mine seismic survey appearance is in normal operating conditions;
F, carry out explosion: exploder starts moment, and sensor probe and mine seismic survey appearance are started working; After explosion finishes; Lead between exploder and the sensor probe is broken off; The seismic wave signal that sensor probe is monitored imports computer through the vibrations registering instrument, and operation analysis software seismic wave CT resolution system analyzes, and draws the velocity of wave distribution plan of monitored area; Through the anomaly of wave velocity zone is analyzed, just obtained the ABNORMAL STRESS distribution plan of monitored area.
2. the monitoring method of the leading stress of a kind of workplace coal body according to claim 1; It is characterized in that: said adjacent blow-up point spacing, said neighboring sensors probe spacing are from more little; Precision is high more; Be to enlarge survey area, can accomplish one-shot measurement after, sensor probe is arranged in new position.
CN2010105145761A 2010-10-20 2010-10-20 Monitoring method of working-face coal-body advanced stress Pending CN102455434A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105145761A CN102455434A (en) 2010-10-20 2010-10-20 Monitoring method of working-face coal-body advanced stress

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105145761A CN102455434A (en) 2010-10-20 2010-10-20 Monitoring method of working-face coal-body advanced stress

Publications (1)

Publication Number Publication Date
CN102455434A true CN102455434A (en) 2012-05-16

Family

ID=46038840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105145761A Pending CN102455434A (en) 2010-10-20 2010-10-20 Monitoring method of working-face coal-body advanced stress

Country Status (1)

Country Link
CN (1) CN102455434A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103775073A (en) * 2014-01-22 2014-05-07 中国矿业大学 Mining working face ground stress distribution characteristic detection method
CN103790628A (en) * 2013-05-30 2014-05-14 天地科技股份有限公司 Warning evaluation method for fully mechanized mining face roof disasters
CN104481590A (en) * 2014-11-18 2015-04-01 煤炭科学技术研究院有限公司 Long wall coal mining roof pressure hydraulic support resistance change characteristic pre-warning method
CN107304681A (en) * 2016-04-22 2017-10-31 天地科技股份有限公司 Coal petrography gas composite power disaster is with position monitoring and pre-alarming method
CN105784221B (en) * 2016-04-08 2018-08-03 山东科技大学 Lead abutment pressure monitoring method based on fiber bragg grating pressure sensor
CN111337971A (en) * 2020-04-21 2020-06-26 天地科技股份有限公司 Coal body stress detection device based on controllable seismic source
CN111812728A (en) * 2020-07-06 2020-10-23 山东大学 Well ground resistivity CT observation system and working method thereof
CN111810127A (en) * 2020-07-06 2020-10-23 北京安科兴业科技股份有限公司 Laser positioning drilling stress meter mounting rod and mounting method thereof
CN113359645A (en) * 2021-06-30 2021-09-07 四川交达预应力工程检测科技有限公司 Prestressed construction monitoring and early warning system and method based on engineering Internet of things

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790628A (en) * 2013-05-30 2014-05-14 天地科技股份有限公司 Warning evaluation method for fully mechanized mining face roof disasters
CN103775073A (en) * 2014-01-22 2014-05-07 中国矿业大学 Mining working face ground stress distribution characteristic detection method
CN103775073B (en) * 2014-01-22 2016-04-13 中国矿业大学 A kind of getting working face geostatic stress distribution characteristics detection method
CN104481590A (en) * 2014-11-18 2015-04-01 煤炭科学技术研究院有限公司 Long wall coal mining roof pressure hydraulic support resistance change characteristic pre-warning method
CN105784221B (en) * 2016-04-08 2018-08-03 山东科技大学 Lead abutment pressure monitoring method based on fiber bragg grating pressure sensor
CN107304681A (en) * 2016-04-22 2017-10-31 天地科技股份有限公司 Coal petrography gas composite power disaster is with position monitoring and pre-alarming method
CN111337971A (en) * 2020-04-21 2020-06-26 天地科技股份有限公司 Coal body stress detection device based on controllable seismic source
CN111812728A (en) * 2020-07-06 2020-10-23 山东大学 Well ground resistivity CT observation system and working method thereof
CN111810127A (en) * 2020-07-06 2020-10-23 北京安科兴业科技股份有限公司 Laser positioning drilling stress meter mounting rod and mounting method thereof
CN111810127B (en) * 2020-07-06 2023-11-24 北京安科兴业科技股份有限公司 Laser positioning drilling stress meter mounting rod and mounting method thereof
CN113359645A (en) * 2021-06-30 2021-09-07 四川交达预应力工程检测科技有限公司 Prestressed construction monitoring and early warning system and method based on engineering Internet of things

Similar Documents

Publication Publication Date Title
CN102455434A (en) Monitoring method of working-face coal-body advanced stress
CN102644482B (en) Rock burst predicting and warning method
CN102392685B (en) Dense roadway group rock burst hazard prediction method
CN109611143A (en) The multi-parameter integrated monitoring system of top plate hydrofracturing and fracturing effect method of discrimination
CN101694163B (en) Determination method of deep tunnel roof support forms and support depth
CN104454010A (en) Integrated monitoring and early warning system and early warning method for dynamic condition of deep well drivage construction
CN103104294B (en) Rock burst prediction method
CN108802193A (en) A kind of detecting devices and detection method of Exploring Loose Rock Country in Tunnels
CN102852524B (en) Method for utilizing hydraulic support to improve bauxite recovery rate
CN105759010B (en) A kind of dynamic monitoring of mining influence tunnel and Stability Assessment method
CN111852566A (en) Microseismic monitoring method for coal mine underground hydraulic fracturing crack propagation rule
CN104697683B (en) Dynamic disaster mine anchor rock stability integrated testing method and system
CN100494636C (en) Remote monitoring predicting method of empty zone hard top plate
CN103244185B (en) Early warning method for instability of bolt-supported roadway roof separation
CN105093349A (en) Method for actually measuring growth and development rule of crack in tunnel roof
CN111913216B (en) Roadway surrounding rock stability force structure cooperative monitoring method influenced by repeated mining
CN202362466U (en) Height detecting device for water flowing fracture zone on coal extraction working surface
CN106032750B (en) Geological logging instrument based on drilling energy spectrum
CN102455176A (en) Monitoring method of damage height of overlying strata in mining field
CN110579194B (en) On-site testing method and application of fracture position of lateral basic roof rock beam of gob-side roadway
CN106092311B (en) A kind of blasting circuit quality evaluating method based on actual measurement high-frequency vibration blasting vibration signal
CN105756709A (en) Working face roof weighing and fracture monitoring method
CN114542067B (en) Safe mining method for coal seam overlying hard rock stratum
CN107288670B (en) Supporting method for supporting roadway
CN113447982B (en) Impact danger detection method for advanced area of single-head tunneling roadway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120516