CN102454828A - 深水s型海底管道铺设过程中的收弃管工艺 - Google Patents
深水s型海底管道铺设过程中的收弃管工艺 Download PDFInfo
- Publication number
- CN102454828A CN102454828A CN2010105301435A CN201010530143A CN102454828A CN 102454828 A CN102454828 A CN 102454828A CN 2010105301435 A CN2010105301435 A CN 2010105301435A CN 201010530143 A CN201010530143 A CN 201010530143A CN 102454828 A CN102454828 A CN 102454828A
- Authority
- CN
- China
- Prior art keywords
- pipe
- pipeline
- end socket
- laying
- ship
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010530143 CN102454828B (zh) | 2010-10-29 | 2010-10-29 | 深水s型海底管道铺设过程中的收弃管工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010530143 CN102454828B (zh) | 2010-10-29 | 2010-10-29 | 深水s型海底管道铺设过程中的收弃管工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102454828A true CN102454828A (zh) | 2012-05-16 |
CN102454828B CN102454828B (zh) | 2013-10-30 |
Family
ID=46038315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010530143 Active CN102454828B (zh) | 2010-10-29 | 2010-10-29 | 深水s型海底管道铺设过程中的收弃管工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102454828B (zh) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103277583A (zh) * | 2013-05-30 | 2013-09-04 | 中国石油集团海洋工程有限公司 | 一种无安装残余应力的海底管道海上水平口对接方法 |
CN103574288A (zh) * | 2012-07-19 | 2014-02-12 | 罗晓晖 | 潜艇扩环互助式水下隐布管道系统 |
CN105605314A (zh) * | 2016-02-23 | 2016-05-25 | 中国海洋石油总公司 | 双层海底管道的s形铺设方法 |
CN106167229A (zh) * | 2016-06-21 | 2016-11-30 | 中交天航港湾建设工程有限公司 | 一种海上起吊水下挖泥管线的施工方法 |
CN106285480A (zh) * | 2016-08-23 | 2017-01-04 | 中国海洋石油总公司 | 一种用于海上动力定位钻井平台的井场调查方法 |
CN106516054A (zh) * | 2016-12-09 | 2017-03-22 | 上海遨拓深水装备技术开发有限公司 | 一种方便rov在检测时获得连续稳定数据的装置 |
CN106969200A (zh) * | 2017-04-24 | 2017-07-21 | 中国海洋石油总公司 | 深水海底管道的回收装置 |
CN107917280A (zh) * | 2017-11-29 | 2018-04-17 | 浙江海洋大学 | 海洋管道铺设辅助装置及其施工方法 |
CN108351046A (zh) * | 2015-07-06 | 2018-07-31 | 派特法石油服务有限公司 | 现场接头传送系统 |
CN108909956A (zh) * | 2018-07-13 | 2018-11-30 | 中国石油集团工程技术研究有限公司 | 一种玻纤增强柔性管的铺设方法 |
CN109163144A (zh) * | 2018-10-24 | 2019-01-08 | 海洋石油工程股份有限公司 | 海底管道终止铺设时海底管道终端的复位方法 |
CN109386651A (zh) * | 2018-09-05 | 2019-02-26 | 哈尔滨工程大学 | 一种管道应急回收装置 |
CN109625188A (zh) * | 2018-12-17 | 2019-04-16 | 国家海洋局第海洋研究所 | 一种具有动力定位功能的科考船回收浮标的方法 |
CN109780326A (zh) * | 2019-01-14 | 2019-05-21 | 海洋石油工程股份有限公司 | 海底管道弃管和回收的方法 |
CN112643666A (zh) * | 2019-10-12 | 2021-04-13 | 中国科学院沈阳自动化研究所 | 一种遥控式水下机器人水面与水下协同控制装置及方法 |
CN114992386A (zh) * | 2022-06-30 | 2022-09-02 | 天津市精研工程机械传动有限公司 | 一种海管弃管脱扣装置控制系统及控制方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3472035A (en) * | 1967-05-11 | 1969-10-14 | Shell Oil Co | Method of abandoning and recovering a pipeline during an underwater pipe laying operation |
FR2271482A1 (en) * | 1973-10-08 | 1975-12-12 | Exxon Production Research Co | Submerged pipeline recovery - using one-way pigging device inserted at submerged end |
JPS55149476A (en) * | 1979-04-05 | 1980-11-20 | Pirelli | Recovering method and device for long and slender member like as laid pipe under water * cable or the like |
US4445804A (en) * | 1982-05-28 | 1984-05-01 | Exxon Production Research Co. | Method and apparatus for remote recovery of submerged pipelines |
GB2214259A (en) * | 1988-01-04 | 1989-08-31 | Heerema Engineering | Pipeline recovery |
US5044827A (en) * | 1990-10-30 | 1991-09-03 | Diverless Systems, Inc. | Method for recovering wet buckled pipe |
WO2010026132A2 (en) * | 2008-09-08 | 2010-03-11 | Subsea 7 Limited | Method and apparatus for at sea pipe abandonment and recovery |
-
2010
- 2010-10-29 CN CN 201010530143 patent/CN102454828B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3472035A (en) * | 1967-05-11 | 1969-10-14 | Shell Oil Co | Method of abandoning and recovering a pipeline during an underwater pipe laying operation |
FR2271482A1 (en) * | 1973-10-08 | 1975-12-12 | Exxon Production Research Co | Submerged pipeline recovery - using one-way pigging device inserted at submerged end |
JPS55149476A (en) * | 1979-04-05 | 1980-11-20 | Pirelli | Recovering method and device for long and slender member like as laid pipe under water * cable or the like |
US4445804A (en) * | 1982-05-28 | 1984-05-01 | Exxon Production Research Co. | Method and apparatus for remote recovery of submerged pipelines |
GB2214259A (en) * | 1988-01-04 | 1989-08-31 | Heerema Engineering | Pipeline recovery |
US5044827A (en) * | 1990-10-30 | 1991-09-03 | Diverless Systems, Inc. | Method for recovering wet buckled pipe |
WO2010026132A2 (en) * | 2008-09-08 | 2010-03-11 | Subsea 7 Limited | Method and apparatus for at sea pipe abandonment and recovery |
Non-Patent Citations (1)
Title |
---|
赵婷: "S型海洋管道铺设过程中的力学性质研究", 《大连理工大学硕士学位论文》, 31 December 2007 (2007-12-31), pages 35 - 36 * |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103574288A (zh) * | 2012-07-19 | 2014-02-12 | 罗晓晖 | 潜艇扩环互助式水下隐布管道系统 |
CN103277583A (zh) * | 2013-05-30 | 2013-09-04 | 中国石油集团海洋工程有限公司 | 一种无安装残余应力的海底管道海上水平口对接方法 |
CN108351046A (zh) * | 2015-07-06 | 2018-07-31 | 派特法石油服务有限公司 | 现场接头传送系统 |
CN105605314A (zh) * | 2016-02-23 | 2016-05-25 | 中国海洋石油总公司 | 双层海底管道的s形铺设方法 |
CN106167229B (zh) * | 2016-06-21 | 2018-06-08 | 中交天航港湾建设工程有限公司 | 一种海上起吊水下挖泥管线的施工方法 |
CN106167229A (zh) * | 2016-06-21 | 2016-11-30 | 中交天航港湾建设工程有限公司 | 一种海上起吊水下挖泥管线的施工方法 |
CN106285480A (zh) * | 2016-08-23 | 2017-01-04 | 中国海洋石油总公司 | 一种用于海上动力定位钻井平台的井场调查方法 |
CN106285480B (zh) * | 2016-08-23 | 2019-03-19 | 中国海洋石油总公司 | 一种用于海上动力定位钻井平台的井场调查方法 |
CN106516054A (zh) * | 2016-12-09 | 2017-03-22 | 上海遨拓深水装备技术开发有限公司 | 一种方便rov在检测时获得连续稳定数据的装置 |
CN106969200A (zh) * | 2017-04-24 | 2017-07-21 | 中国海洋石油总公司 | 深水海底管道的回收装置 |
CN107917280A (zh) * | 2017-11-29 | 2018-04-17 | 浙江海洋大学 | 海洋管道铺设辅助装置及其施工方法 |
CN108909956A (zh) * | 2018-07-13 | 2018-11-30 | 中国石油集团工程技术研究有限公司 | 一种玻纤增强柔性管的铺设方法 |
CN109386651A (zh) * | 2018-09-05 | 2019-02-26 | 哈尔滨工程大学 | 一种管道应急回收装置 |
CN109386651B (zh) * | 2018-09-05 | 2023-12-08 | 哈尔滨工程大学 | 一种管道应急回收装置 |
CN109163144A (zh) * | 2018-10-24 | 2019-01-08 | 海洋石油工程股份有限公司 | 海底管道终止铺设时海底管道终端的复位方法 |
CN109625188A (zh) * | 2018-12-17 | 2019-04-16 | 国家海洋局第海洋研究所 | 一种具有动力定位功能的科考船回收浮标的方法 |
CN109780326A (zh) * | 2019-01-14 | 2019-05-21 | 海洋石油工程股份有限公司 | 海底管道弃管和回收的方法 |
CN112643666A (zh) * | 2019-10-12 | 2021-04-13 | 中国科学院沈阳自动化研究所 | 一种遥控式水下机器人水面与水下协同控制装置及方法 |
CN114992386A (zh) * | 2022-06-30 | 2022-09-02 | 天津市精研工程机械传动有限公司 | 一种海管弃管脱扣装置控制系统及控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102454828B (zh) | 2013-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102454828B (zh) | 深水s型海底管道铺设过程中的收弃管工艺 | |
CN101280862B (zh) | 海底pe管道边敷边埋施工方法 | |
US5044827A (en) | Method for recovering wet buckled pipe | |
US7377225B2 (en) | Spar-type offshore platform for ice flow conditions | |
US8047151B2 (en) | System and method for mooring of offshore structures | |
US20110155383A1 (en) | Offshore seabed to surface conduit transfer system | |
US4445804A (en) | Method and apparatus for remote recovery of submerged pipelines | |
US8480334B2 (en) | Hybrid riser systems and methods | |
CN102374338A (zh) | 深水s型海底管道的铺设工艺 | |
EP3436335B1 (en) | Method for installing a subsea structure | |
CN103738477A (zh) | 系泊锚腿上锚缆的更换方法 | |
JP2020514175A (ja) | スチールカテナリーライザートップインターフェイス | |
CN106979382A (zh) | 深水s型海底管道的起始铺设工艺 | |
WO2012066031A1 (en) | Transfer system | |
US3756034A (en) | Method and apparatus for laying pipelines | |
CN102221128B (zh) | 一种基于锚墩固定的海底输油输气软管管线 | |
CN102230553B (zh) | 用于海底输油输气的软管管线 | |
AU2013100495A4 (en) | Buoy | |
US9340942B2 (en) | Method for installing a device for recovering hydrocarbons | |
CN104960635A (zh) | 一种水下采矿系统应急弃放装置 | |
GB2462638A (en) | Water supported installation tube | |
AU2007244951B2 (en) | Towing and recovery method for deepwater pipelines and risers | |
CN104613234A (zh) | 深水管线弃管的回收方法 | |
WO2011008593A1 (en) | Mid-water transfer line | |
RU2200109C1 (ru) | Комплекс для передачи жидкого груза на танкер (варианты) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee after: Offshore Oil Engineering Co., Ltd. Patentee after: China Offshore Oil Group Co., Ltd. Co-patentee after: Zhejiang University Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing Co-patentee before: Offshore Oil Engineering Co., Ltd. Patentee before: China National Offshore Oil Corporation Co-patentee before: Zhejiang University |
|
CP01 | Change in the name or title of a patent holder |