CN102444228A - Major/auxiliary full curtain wall structure and construction - Google Patents

Major/auxiliary full curtain wall structure and construction Download PDF

Info

Publication number
CN102444228A
CN102444228A CN2011102800845A CN201110280084A CN102444228A CN 102444228 A CN102444228 A CN 102444228A CN 2011102800845 A CN2011102800845 A CN 2011102800845A CN 201110280084 A CN201110280084 A CN 201110280084A CN 102444228 A CN102444228 A CN 102444228A
Authority
CN
China
Prior art keywords
curtain wall
construction
major
stress system
master
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102800845A
Other languages
Chinese (zh)
Other versions
CN102444228B (en
Inventor
周嘉陵
孟红雨
陈明敏
唐增洪
陈正达
陈颖
胡家华
胡建军
叶辉
甘仁鹏
周智平
刘本源
吴强
胡伟东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rao Chun
Shenzhen Qianyi Construction Technology Co ltd
Original Assignee
周嘉陵
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 周嘉陵 filed Critical 周嘉陵
Priority to CN201110280084.5A priority Critical patent/CN102444228B/en
Publication of CN102444228A publication Critical patent/CN102444228A/en
Priority to PCT/CN2012/079591 priority patent/WO2013040955A1/en
Application granted granted Critical
Publication of CN102444228B publication Critical patent/CN102444228B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/90Curtain walls comprising panels directly attached to the structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention relates to a major/auxiliary full curtain wall structure and construction, comprising a major curtain wall and an auxiliary curtain wall, wherein the major curtain wall is located between the main body structures of a building, while the auxiliary curtain wall covers the outside surface of the main body structure of the building. The major curtain wall comprises a structure stress system and a member; the structure stress system is located between the main body structures of the building; and the member is fixed to the structure stress system. The auxiliary curtain wall is provided with a member and covers the outside surface of the main body structure of the building; and the member of the auxiliary curtain wall transfers loads to the structure stress system of the major curtain wall structure or directly transfers the loads to the main body structure of the building. The major/auxiliary full curtain wall structure and construction keep the building appearance effect of the existing conventional curtain wall; however, the structure stress system of the curtain wall is changed to be arranged between the main body structures of the building in stead of being arranged outside the main body structure of the building; therefore, the structure stress system of the curtain wall is simplified and the materials and cost of the structure stress system are reduced on one hand, and on the other hand, the area utilization ratio can be increased and this arrangement is advantageous for energy saving, fire protection and environmental protection of the curtain wall.

Description

A kind of master, inferior full curtain wall construction and structure
Technical field
The invention belongs to the civil construction project technical field, relate in particular to a kind of master, inferior full curtain wall construction and structure, it is applicable to the outer curtain wall of building construction.
Background technology
See also Fig. 1 and Fig. 2; The structure stress system of existing conventional curtain wall like members such as column 1 ', crossbeams 2 ', is suspended on major structure of construction 3 ' outer end; The external force that curtain wall bore (comprising the external force that member bore such as column 1 ', crossbeam 2 ', column active joint 4 '); Like deadweight and wind load etc., rely on the curtain wall construction post to pass to column suspension fulcrum 5 ' (also can be the metal embedded part), give major structure of construction 3 ' by column suspension fulcrum 5 ' with Load Transfer again.
Above-mentioned curtain wall construction system is except that stressed complicacy, load are big, and the cross section of column 1 ', crossbeam 2 ', column suspension fulcrum 5 ' is bigger, and therefore, its materials are more, cost is higher.And; Curtain wall member 6 ' is in the major structure of construction 3 ' outside; There is the certain distance space between curtain wall member 6 ' and the major structure of construction 3 '; Be unfavorable for energy-conservationly, and for making building body have heat insulation effect preferably, need fill insulant material in the space between curtain wall member 6 ' and major structure of construction 3 '; The most fireproof performance of heat insulating material is relatively poor at present; The a lot of fire incidents that cause because of heat insulating material of doubting of domestic in recent years appearance, for example: accidents such as Shanghai mansion big fire at noon on the 15th November in 2010, Shenyang deluxe hotel big fire at midnight on the 3rd February in 2011, the secondary building big fire of the new mansion of Beijing Chinese Central Television (CCTV) it is reported that the main cause of analyzing all is that outer curtain wall has adopted uncomfortable heat insulating material.In addition,, need to fill in the space between curtain wall member 6 ' and major structure of construction 3 ' fire proofing material in order to reach flameproof effect, the present lower-cost glass fiber fire proofing material of domestic most employing, this material is harmful, not enough environmental protection.
Summary of the invention
Technical problem to be solved by this invention is; A kind of master, inferior full curtain wall construction and structure are provided; Its structural system is stressed simply, materials are less, cost is lower, help curtain-wall energy-saving, fire prevention, environmental protection simultaneously, and can keep the architectural appearance effect of existing conventional curtain wall.
For solving the problems of the technologies described above, the present invention provides a kind of master, inferior full curtain wall construction and structure, comprises main curtain wall and time curtain wall; Main curtain wall is between major structure of construction, and inferior curtain wall is covered in the major structure of construction outer surface; Main curtain wall comprises structure stress system and member, and the structure stress system is between major structure of construction, and member is fixed on the structure stress system; Inferior curtain wall has member, and inferior curtain wall member is covered in the major structure of construction outer surface, and is given Load Transfer on the main curtain wall construction stress system or be directly passed on the major structure of construction by inferior curtain wall member.
Further, the structure stress system of said main curtain wall comprises curtain-wall stand-column and crossbeam.
Further, said structure stress system is connected with major structure of construction through built-in fitting.
Further, said curtain wall member is covered on the outer surface of major structure of construction.
Further, said time the curtain wall member is fixedly connected on the structure stress system of main curtain wall through connector, perhaps is fixedly connected on the major structure of construction through connector.
Further, said main curtain wall member is positioned at same plane with time curtain wall member.
Further, said structure stress system and member carry out modular integral installation again to the job site after semiproduct are processed by factory, perhaps separate installation at the construction field (site).
Further, said main curtain wall is a curtain wall.
Further, said curtain wall is curtain wall, Al-alloy metal curtain wall, stainless steel metal curtain wall, stone curtain wall or metal heat preservation composite material.
Further, said major structure of construction comprises beam, post and plate.
Compared with prior art; Master of the present invention, inferior full curtain wall construction and structure have kept the architectural appearance effect of existing conventional curtain wall; But the structure stress system of curtain wall is changed between the major structure of construction by the major structure of construction outside; The external force (comprising the external force that member bore such as column, crossbeam) that main curtain wall is born is directly passed to major structure of construction, on the one hand, has simplified the curtain wall construction stress system; Reduce structural system central post, crossbeam, built-in fitting cross section, thereby reduced materials and cost; On the other hand; Because the structure stress system of main curtain wall is between major structure of construction; Main, inferior curtain wall member can make spacing between the two as far as possible little as far as possible near major structure of construction, need not between curtain wall member and major structure of construction, to fill fire proofing material; Thereby improved the area utilization rate, helped curtain-wall energy-saving, fire prevention, environmental protection.
Description of drawings
Fig. 1 is the cross-sectional schematic of existing conventional curtain wall.
Fig. 2 is the elevational schematic view of existing conventional curtain wall shown in Figure 1.
Fig. 3 is master of the present invention, inferior full curtain wall construction and the cross-sectional schematic of constructing a preferred embodiment.
Fig. 4 is the elevational schematic view of master shown in Figure 3, inferior full curtain wall construction and constructed embodiment.
The specific embodiment
In order to make technical problem to be solved by this invention, technical scheme and beneficial effect clearer,, the present invention is further elaborated below in conjunction with accompanying drawing and embodiment.Should be appreciated that specific embodiment described herein only in order to explanation the present invention, and be not used in qualification the present invention.
Seeing also Fig. 3 and Fig. 4, is a preferred embodiment of the present invention, and this master, inferior full curtain wall construction and structure comprise main curtain wall 1 and time curtain wall 2, and main curtain wall 1 is between major structure of construction 3, and inferior curtain wall 2 is covered in major structure of construction 3 outer surfaces.Main curtain wall 1 comprises structure stress system 11 and member 12; Structure stress system 11 is between major structure of construction 3, and member 12 is fixed on the structure stress system 11.Inferior curtain wall 2 has member (among the figure indicate), and inferior curtain wall 2 members are covered in major structure of construction 3 outer surfaces, and is given Load Transfer on the structure stress system 11 of main curtain wall 1 or be directly passed on the major structure of construction 3 by inferior curtain wall 2 members.
Particularly, the structure stress system 11 of main curtain wall 1 comprises members such as curtain-wall stand-column 111, crossbeam 112.Major structure of construction 3 comprises beam, post and plate.Structure stress system 11 is connected with major structure of construction 3 through built-in fitting 113.Structure stress system 11 can with member 12 after semiproduct are processed by factory; Carry out modular integral installation again to the job site; Also can separate installation at the construction field (site); Promptly earlier structure stress system 11 is installed on the major structure of construction 3, again member 12 is installed on the structure stress system 11 afterwards.To lead, inferior curtain wall is installed to 3 last times of major structure of construction, and main curtain wall can be installed earlier, and time curtain wall is installed again.The material of major structure of construction 3 can be composite decoration concrete, clear-water concrete or ordinary concrete etc.; When the material of major structure of construction 3 is the composite decoration concrete; The member of inferior curtain wall 2 is covered on the outer surface of major structure of construction 3, and is very close to each other between itself and the major structure of construction 3.In the present embodiment, the member 12 of the member of inferior curtain wall 2 and main curtain wall 1 is positioned at same plane, and certainly, the member of inferior curtain wall 2 also can be positioned at different plane with the member 12 of main curtain wall 1.
Inferior curtain wall 2 can be fixedly connected on the structure stress system 11 of main curtain wall 1 through connector; Also can be fixedly connected on the major structure of construction 3 through connector; Like this, can the Load Transfer of inferior curtain wall 2 members be given on the structure stress system 11 of main curtain wall 1 or is directly passed on the major structure of construction 3.
Main curtain wall 1 of the present invention can be curtain wall; Inferior curtain wall 2 can be curtain wall, Al-alloy metal curtain wall, stainless steel metal curtain wall, stone curtain wall or metal heat preservation composite material.
Master of the present invention, inferior full curtain wall construction and structure have kept the architectural appearance effect of existing conventional curtain wall; But the structure stress system 11 of curtain wall is changed between the major structure of construction 3 by major structure of construction 3 outsides; The external force (comprising the external force that member bore such as column 111, crossbeam 112) that main curtain wall 1 is born is directly passed to major structure of construction 3; On the one hand; Simplify the curtain wall construction stress system, reduced column 111, crossbeam 112, built-in fitting 113 cross sections, thereby reduced materials and cost.On the other hand; Because the structure stress system 11 of main curtain wall 1 is between major structure of construction 3; Main, inferior curtain wall member can make spacing between the two as far as possible little as far as possible near major structure of construction 3, need not between curtain wall member and major structure of construction 3, to fill fire proofing material; Thereby improved the area utilization rate, helped curtain-wall energy-saving, fire prevention, environmental protection.
The above is merely preferred embodiment of the present invention, not in order to restriction the present invention, all any modifications of within spirit of the present invention and principle, being done, is equal to and replaces and improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a master, inferior full curtain wall construction and structure is characterized in that, comprise main curtain wall and time curtain wall; Said main curtain wall is between major structure of construction, and said time curtain wall is covered in the major structure of construction outer surface; Said main curtain wall comprises structure stress system and member, and said structure stress system is between major structure of construction, and said member is fixed on the said structure stress system; Said time curtain wall has member, and said time the curtain wall member is covered in the major structure of construction outer surface, and is given Load Transfer on the said main curtain wall construction stress system or be directly passed on the major structure of construction by inferior curtain wall member.
2. master as claimed in claim 1, inferior full curtain wall construction and structure is characterized in that the structure stress system of said main curtain wall comprises curtain-wall stand-column and crossbeam.
3. master as claimed in claim 1, inferior full curtain wall construction and structure is characterized in that said structure stress system is connected with major structure of construction through built-in fitting.
4. master as claimed in claim 1, inferior full curtain wall construction and structure is characterized in that said curtain wall member is covered on the outer surface of said major structure of construction.
5. master as claimed in claim 1, inferior full curtain wall construction and structure is characterized in that, said time the curtain wall member is fixedly connected on the structure stress system of said main curtain wall through connector, perhaps is fixedly connected on the major structure of construction through connector.
6. master as claimed in claim 1, inferior full curtain wall construction and structure is characterized in that, said main curtain wall member is positioned at same plane with time curtain wall member.
7. master as claimed in claim 1, inferior full curtain wall construction and structure is characterized in that, said structure stress system and member carry out modular integral installation again to the job site after semiproduct are processed by factory, perhaps separate installation at the construction field (site).
8. master as claimed in claim 1, inferior full curtain wall construction and structure is characterized in that said main curtain wall is a curtain wall.
9. master as claimed in claim 1, inferior full curtain wall construction and structure is characterized in that, said curtain wall is curtain wall, Al-alloy metal curtain wall, stainless steel metal curtain wall, stone curtain wall or metal heat preservation composite material.
10. master as claimed in claim 1, inferior full curtain wall construction and structure is characterized in that said major structure of construction comprises beam, post and plate.
CN201110280084.5A 2011-09-20 2011-09-20 Major/auxiliary full curtain wall structure and construction Expired - Fee Related CN102444228B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110280084.5A CN102444228B (en) 2011-09-20 2011-09-20 Major/auxiliary full curtain wall structure and construction
PCT/CN2012/079591 WO2013040955A1 (en) 2011-09-20 2012-08-02 Primary and secondary full curtain wall structure and architecture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110280084.5A CN102444228B (en) 2011-09-20 2011-09-20 Major/auxiliary full curtain wall structure and construction

Publications (2)

Publication Number Publication Date
CN102444228A true CN102444228A (en) 2012-05-09
CN102444228B CN102444228B (en) 2015-01-14

Family

ID=46007133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110280084.5A Expired - Fee Related CN102444228B (en) 2011-09-20 2011-09-20 Major/auxiliary full curtain wall structure and construction

Country Status (2)

Country Link
CN (1) CN102444228B (en)
WO (1) WO2013040955A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013040955A1 (en) * 2011-09-20 2013-03-28 饶淳 Primary and secondary full curtain wall structure and architecture
CN104453033A (en) * 2013-09-25 2015-03-25 江苏合发集团有限责任公司 Connecting structure of curtain walls made of different materials
CN115162592A (en) * 2022-08-11 2022-10-11 中建幕墙有限公司 Glass curtain wall system and construction method

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049539A (en) * 2018-01-26 2018-05-18 武汉建工集团股份有限公司 A kind of component type curtain wall system and installation method
CN109518853A (en) * 2018-11-19 2019-03-26 上海建工五建集团有限公司 A kind of built-in fitting and installation method for curtain wall installation
CN113136993B (en) * 2021-04-02 2022-04-12 中建一局集团建设发展有限公司 Overhanging outer curtain wall supporting structure of building adjacent to historical landscape protection and construction method thereof
CN114319659B (en) * 2021-12-21 2023-12-19 上海江河幕墙系统工程有限公司 Large-span double-upright-column unitized curtain wall system
CN115898236B (en) * 2022-11-07 2024-06-28 中建三局集团华南有限公司 Fire rescue window of glass and ceramic roller double-layer curtain wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040043260A1 (en) * 2000-09-20 2004-03-04 Nicolas Nadaud Substrate with photocatalytic coating
WO2004076773A1 (en) * 2003-02-11 2004-09-10 Jianwei Cui Selectively sunlight transmitting material and the application thereof
CN101200925A (en) * 2007-10-29 2008-06-18 鲁文杰 Doubling glass inner-expanding type swivel joint and mounting method
CN101225683A (en) * 2007-01-16 2008-07-23 深圳金粤幕墙装饰工程有限公司 Method for connecting and installing unit curtain walls
CN101566034A (en) * 2008-07-18 2009-10-28 罗进南 Precision equally-high mechanical-seal filtering-thick air layer multi-glass energy-saving window
CN101581141A (en) * 2008-05-15 2009-11-18 万怡娟 Double-layer heat insulation curtain wall decorating system
CN202248411U (en) * 2011-09-20 2012-05-30 周嘉陵 Primary and secondary full-curtain wall structure and construction

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4538217B2 (en) * 2003-11-26 2010-09-08 トステム株式会社 curtain wall
CN101255722B (en) * 2007-01-16 2011-09-07 深圳金粤幕墙装饰工程有限公司 Double-trough curved surface unit type panel wall
CN201567700U (en) * 2009-10-21 2010-09-01 班广生 Keel ventilation type double-layer glass curtain wall
JP2011111886A (en) * 2009-11-24 2011-06-09 Buheng Stone Material Truss Co Ltd Outer-wall construction apparatus for building capable of constructing without conducting field welding
JP5656391B2 (en) * 2009-11-27 2015-01-21 株式会社Lixil Curtain wall unit and curtain wall
CN102444228B (en) * 2011-09-20 2015-01-14 饶淳 Major/auxiliary full curtain wall structure and construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040043260A1 (en) * 2000-09-20 2004-03-04 Nicolas Nadaud Substrate with photocatalytic coating
WO2004076773A1 (en) * 2003-02-11 2004-09-10 Jianwei Cui Selectively sunlight transmitting material and the application thereof
CN101225683A (en) * 2007-01-16 2008-07-23 深圳金粤幕墙装饰工程有限公司 Method for connecting and installing unit curtain walls
CN101200925A (en) * 2007-10-29 2008-06-18 鲁文杰 Doubling glass inner-expanding type swivel joint and mounting method
CN101581141A (en) * 2008-05-15 2009-11-18 万怡娟 Double-layer heat insulation curtain wall decorating system
CN101566034A (en) * 2008-07-18 2009-10-28 罗进南 Precision equally-high mechanical-seal filtering-thick air layer multi-glass energy-saving window
CN202248411U (en) * 2011-09-20 2012-05-30 周嘉陵 Primary and secondary full-curtain wall structure and construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013040955A1 (en) * 2011-09-20 2013-03-28 饶淳 Primary and secondary full curtain wall structure and architecture
CN104453033A (en) * 2013-09-25 2015-03-25 江苏合发集团有限责任公司 Connecting structure of curtain walls made of different materials
CN115162592A (en) * 2022-08-11 2022-10-11 中建幕墙有限公司 Glass curtain wall system and construction method
CN115162592B (en) * 2022-08-11 2023-10-20 中建幕墙有限公司 Glass curtain wall system and construction method

Also Published As

Publication number Publication date
WO2013040955A1 (en) 2013-03-28
CN102444228B (en) 2015-01-14

Similar Documents

Publication Publication Date Title
CN102444228A (en) Major/auxiliary full curtain wall structure and construction
CN204983131U (en) DGC modularization prefabricated buildings system
CN202248499U (en) Outer wall prefabricated slab in framework structure
CN202248411U (en) Primary and secondary full-curtain wall structure and construction
CN208618583U (en) Assembling type steel structure residential housing balcony slab break bridge structure
CN204475593U (en) Support structure installed by a kind of curtain wall
CN203531178U (en) Wholly prefabricated shear wall
CN103104057B (en) Full-glass self-balance glass curtain wall
CN201865224U (en) Unidirectional pre-stress inhaul cable curtain wall supporting structure
CN105040813A (en) Front vertical face system of aluminum alloy house
CN110725412A (en) Integrated house system with embedded steel structure
CN202831365U (en) Calcium silicate composite heat-insulating wallboard
CN105040811A (en) Rear vertical face system of aluminum alloy house
CN202031203U (en) Plate-assembling type enveloping and filling system
CN110792189A (en) Prefabricated assembled outer wall and prefabricated assembled building
CN110259173B (en) Assembled elevartor shaft of steel construction and combination of multi-functional wallboard
CN102505773A (en) Precast concrete sandwiched heat-insulation external wall
CN207685987U (en) A kind of easy-to-dismount prefabricated balcony and the building with the prefabricated balcony
CN202248369U (en) Prefabricated concrete sandwich insulation exterior wall
CN216865844U (en) Flat floor-to-home steel structure of elevator outside building
CN219672128U (en) Prefabricated wall member and outer wall structure
CN111962693B (en) Support for built-in composite heat-insulating wall system and node structure thereof
CN203080826U (en) Frame type glass canopy with aluminum veneer wrapping steel joists
CN216740213U (en) Building energy conservation and structure integrated external wall self-insulation template
CN102888948B (en) A kind of assembled steel skeleton light thermal-insulation energy-saving roof boarding and processing and assembling thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: RAO CHUN

Free format text: FORMER OWNER: ZHOU JIALING

Effective date: 20121212

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518026 SHENZHEN, GUANGDONG PROVINCE TO: 518028 SHENZHEN, GUANGDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20121212

Address after: 518028 Guangdong city of Shenzhen province Futian District Yuanling garden building D 16F

Applicant after: Rao Chun

Address before: 518026 Guangdong city of Shenzhen province Futian District Pengcheng Road No. 1 Television Building 16F

Applicant before: Zhou Jialing

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171020

Address after: 518000, room 2015, East Building, CLP information mansion, 1 news Road, Futian District, Shenzhen, Guangdong

Co-patentee after: Rao Chun

Patentee after: SHENZHEN QIANYI CONSTRUCTION TECHNOLOGY CO.,LTD.

Address before: 518028 Guangdong city of Shenzhen province Futian District Yuanling garden building D 16F

Patentee before: Rao Chun

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114