CN102441628A CN201010501759XA CN201010501759A CN102441628A CN 102441628 A CN102441628 A CN 102441628A CN 201010501759X A CN201010501759X A CN 201010501759XA CN 201010501759 A CN201010501759 A CN 201010501759A CN 102441628 A CN102441628 A CN 102441628A
Authority
CN
China
Prior art keywords
forging
temperature
hours
sealing ring
heating method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201010501759XA
Other languages
Chinese (zh)
Inventor
李军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI TENGHUI FORGING CO Ltd
Original Assignee
SHANGHAI TENGHUI FORGING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI TENGHUI FORGING CO Ltd filed Critical SHANGHAI TENGHUI FORGING CO Ltd
Priority to CN201010501759XA priority Critical patent/CN102441628A/en
Publication of CN102441628A publication Critical patent/CN102441628A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a forging heating method for a sealing ring of a forge piece. The forging heating method comprises the following steps of: placing an NiCr20TiAl-T6 forging stock in a heating furnace with the temperature of 300DEG C; then raising the temperature to be 800DEG C at a constant speed; maintaining the temperature for 3.8 hours; raising the temperature to be 1150DEG C at a constant speed within 3 hours; and maintaining the temperature for 3 hours and then taking out the forging stock for forging. According to the forging heating method disclosed by the invention, material selection, production process fineness and processing deployment are required to be reasonable and scientific; vacuum melting electoslag remelting steel is used as the material; a strict heating forging control process is formulated for solving the key technical problems of narrow range (100-120DEG C) of forging temperature, high resistance to deformation, easiness for cracking, coarse crystal, loose center and control over critical deflection and intermediate forging process; and the sealing ring of the forge piece has excellent mechanical property.

Description

A kind of Forge Heating method of forging sealing ring
Technical field
The present invention relates to a kind of Forge Heating method of forging sealing ring.
Background technology
At present the sealing ring of steam turbine main inlet throttle-stop valve pitch assembly normally adopts round steel to process through machining, heat treatment, and this type sealing ring exists that intensity is low, inner materials shortcoming closely not, the big technical problem of deflection after the heat treatment.
Summary of the invention
Technical problem to be solved by this invention is to provide to the existing technical problem of processing method of existing sealing ring a kind of Forge Heating method of forging sealing ring, to solve the existing in prior technology problem.
Technical problem to be solved by this invention can realize through following technical scheme:
A kind of Forge Heating method of forging sealing ring; It puts into temperature with the NiCr20TiAl-T6 forging blank is 300 ℃ of heating furnaces, in 4 hours, at the uniform velocity is warming up to 800 ℃ then, is incubated 3.8 hours; In 3 hours, at the uniform velocity be warming up to 1150 ℃ again, be incubated to take out after 3.5 hours and forge.
Owing to adopted technical scheme as above; Science is rationally disposed in material selection of the present invention, manufacturing process thickness, processing; Material adopts the vacuum metling electroslag melt steel, formulates strict heats forged control technology and solves narrow forging temperature (100-120 ℃), and resistance of deformation is big; Easy to crack, coarse-grain, center porosity, critical strain amount and middle forging process control key technical problem, its forging sealing ring has good mechanical performance.
The specific embodiment
In order to make technological means of the present invention, creation characteristic, to reach purpose and effect and be easy to understand and understand,, further set forth the present invention below in conjunction with specific embodiment.
A kind of Forge Heating method of forging sealing ring; It puts into temperature with the NiCr20TiAl-T6 forging blank is 300 ℃ of heating furnaces, in 4 hours, at the uniform velocity is warming up to 800 ℃ then, is incubated 3.8 hours; In 3 hours, at the uniform velocity be warming up to 1150 ℃ again, be incubated to take out after 3.5 hours and forge.
The yield strength of forging sealing ring of the present invention can reach 600N/mm 2, tensile strength can reach 1000-1300N/mm 2, percentage elongation>=12%, shrinkage factor>=12%, impulsive force>=20J, hardness HB305-405.
More than show and described basic principle of the present invention, principal character and advantage of the present invention.The technical staff of the industry should understand; The present invention is not restricted to the described embodiments; That describes in the foregoing description and the specification just explains principle of the present invention; The present invention also has various changes and modifications under the prerequisite that does not break away from spirit and scope of the invention, and these variations and improvement all fall in the scope of the invention that requires protection.The present invention requires protection domain to be defined by appending claims and equivalent thereof.

Claims (1)

1. the Forge Heating method of a forging sealing ring; It is characterized in that; It is 300 ℃ of heating furnaces that the NiCr20TiAl-T6 forging blank is put into temperature, in 4 hours, at the uniform velocity is warming up to 800 ℃ then, is incubated 3.8 hours; In 3 hours, at the uniform velocity be warming up to 1150 ℃ again, be incubated to take out after 3.5 hours and forge.
CN201010501759XA 2010-10-11 2010-10-11 Forging heating method for sealing ring of forge piece Pending CN102441628A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010501759XA CN102441628A (en) 2010-10-11 2010-10-11 Forging heating method for sealing ring of forge piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010501759XA CN102441628A (en) 2010-10-11 2010-10-11 Forging heating method for sealing ring of forge piece

Publications (1)

Publication Number Publication Date
CN102441628A true CN102441628A (en) 2012-05-09

Family

ID=46004845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010501759XA Pending CN102441628A (en) 2010-10-11 2010-10-11 Forging heating method for sealing ring of forge piece

Country Status (1)

Country Link
CN (1) CN102441628A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102784863A (en) * 2012-08-09 2012-11-21 湖北上大模具材料科技有限公司 High-alloy steel forging and heating method
CN103014473A (en) * 2012-12-26 2013-04-03 洛阳双瑞特种装备有限公司 Machining process of Ti-containing corrosion-resisting alloy sealing ring
CN104259360A (en) * 2014-07-29 2015-01-07 张家港市广大机械锻造有限公司 Heating process of Cr9SiMn bearing steel before forging

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06170418A (en) * 1992-12-04 1994-06-21 Japan Steel Works Ltd:The Manufacture of forging work roll for hot rolling
JPH07138719A (en) * 1993-11-13 1995-05-30 Kobe Steel Ltd Method for forging ni-based superalloy forged part
CN101153360A (en) * 2006-09-29 2008-04-02 宝山钢铁股份有限公司 Method of producing large scale high-temperature alloy round cake

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06170418A (en) * 1992-12-04 1994-06-21 Japan Steel Works Ltd:The Manufacture of forging work roll for hot rolling
JPH07138719A (en) * 1993-11-13 1995-05-30 Kobe Steel Ltd Method for forging ni-based superalloy forged part
CN101153360A (en) * 2006-09-29 2008-04-02 宝山钢铁股份有限公司 Method of producing large scale high-temperature alloy round cake

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《锻压技术》 19980831 黄春峰 高温合金(GH3039)环形件的锻造工艺 11-13 1 , 第4期 *
王有铭: "R-26高温合金密封环锻造", 《机械工程师》, no. 05, 10 May 2010 (2010-05-10), pages 159 - 160 *
黄春峰: "高温合金(GH3039)环形件的锻造工艺", 《锻压技术》, no. 4, 31 August 1998 (1998-08-31), pages 11 - 13 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102784863A (en) * 2012-08-09 2012-11-21 湖北上大模具材料科技有限公司 High-alloy steel forging and heating method
CN103014473A (en) * 2012-12-26 2013-04-03 洛阳双瑞特种装备有限公司 Machining process of Ti-containing corrosion-resisting alloy sealing ring
CN103014473B (en) * 2012-12-26 2015-01-21 洛阳双瑞特种装备有限公司 Machining process of Ti-containing corrosion-resisting alloy sealing ring
CN104259360A (en) * 2014-07-29 2015-01-07 张家港市广大机械锻造有限公司 Heating process of Cr9SiMn bearing steel before forging

Similar Documents

Publication Publication Date Title
CN100519813C (en) High-strength toughness cold working die steel and method of producing the same
CN102312118B (en) Hot-working method for GH864 Waspaloy with accurately controlled structure
CN102517502A (en) Disk-shaped roller cutter ring and manufacture method thereof
CN101525726A (en) Heat-resisting steel material used as vane or bolt of supercritical steam turbine and preparation method thereof
CN102492906A (en) Forging method of high-temperature alloy fine-grained bars
CN104907470A (en) 13Cr9Mo2Co1NiVNbNB steel forged piece manufacturing method
CN104001845B (en) Forging process method of Ti2AlNb alloy large-size disk parts
CN107747066A (en) Raw nano TiC ceramic particle In-sltu reinforcement casts high chromium hot die steel and preparation method thereof in one kind
CN104862608A (en) Supporting hanger for grooved cable bridge and preparation process of supporting hanger
CN103422039A (en) Method for reinforcing V-4Cr-4Ti alloy
CN102441628A (en) Forging heating method for sealing ring of forge piece
AU2014358718A1 (en) Nickel-based alloy, method and use
CN106191701A (en) A kind of heat-resisting steel material as turbine blade and preparation method thereof
JP5869739B1 (en) Turbine rotor material for geothermal power generation and method for manufacturing the same
CN101724783A (en) Heat resisting type alloy structure steel plate and method for producing same
CN107641765A (en) A kind of nuclear power station integration heap top component forging and its manufacturing process
CN105543653A (en) Plastic die steel with high intensity, high toughness and high corrosion resistance and production method thereof
CN102703821B (en) Heat treatment process of heat resistant steel for sintering machine grates
CN104630649B (en) A kind of low-alloy heat-resistant high-strength steel and component thereof
CN104646955B (en) A kind of preparation method of 20CrNi4 material perforating head
CN100554441C (en) Thin brilliant strength-toughening treatment process after the forging of generating set usefulness 1Mn18Cr18N 18 N steel guard ring forging
CN108070794B (en) High-wear-resistance hot-work die steel and preparation method thereof
CN102441629B (en) Forging heating method of sleeve for forging steam turbine
CN105695699A (en) Micro-deformation vacuum heat treatment process for 40CrNi steel gear
CN102943218B (en) Spinner roller steel 27Cr2Ni3SiMn2Mo and preparation technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120509