CN102434160A - 两翼预切割中央无房柱式联合横巷连续分段充填采矿法 - Google Patents
两翼预切割中央无房柱式联合横巷连续分段充填采矿法 Download PDFInfo
- Publication number
- CN102434160A CN102434160A CN201110374786XA CN201110374786A CN102434160A CN 102434160 A CN102434160 A CN 102434160A CN 201110374786X A CN201110374786X A CN 201110374786XA CN 201110374786 A CN201110374786 A CN 201110374786A CN 102434160 A CN102434160 A CN 102434160A
- Authority
- CN
- China
- Prior art keywords
- wings
- stope
- panel
- mining
- segmentation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
本发明公开了一种薄~中厚缓倾斜~倾斜破碎矿体的两翼预切割中央无房柱式联合横巷连续分段充填采矿法,盘区长为400~800m,垂高为40~60m,分段垂高为10m。盘区中央布置脉外采准,两翼离盘区分界线100~200m转入脉内采准。两翼采场在回采前预先施工完两个分段的炮孔和切割上山,以两翼采场为主导开采。中央采场分Ⅰ步、Ⅱ步矿房,分段内开采完Ⅰ步矿房后即开采Ⅱ步矿房,作为盘区两翼采场因充填养护时间较长而不能实现连续开采的补充采场。最下一分段采用高强度胶结充填体作为下中段开采的人工假顶,掘进的废石采用铲运机运至采空区进行充填实现废石不出隆。本发明具有贫化损失率低、采准比低、安全、高效等显著特点。
Description
技术领域
本发明涉及一种薄~中厚缓倾斜~倾斜层状破碎矿体的两翼预切割中央无房柱式联合横巷连续分段充填采矿法,主要适用于矿体走向较长、矿体较规整,且要求生产能力大、效率高的薄~中厚缓倾斜~倾斜层状破碎矿体的开采。
技术背景
我国工业磷矿层多为薄~中厚缓倾斜~倾斜破碎矿体,矿体呈层状、似层状产出,矿体走向长,矿岩稳定性较差。随着磷矿山进一步发展,对该类矿体的开采方法更加趋向于无轨化、机械化,生产能力大型化。因此,如何在安全的前提下寻找一种高效采矿方法来实现薄~中厚缓倾斜~倾斜破碎矿体的低贫损、低采准比、低成本开采是本发明的创新核心。
发明内容
本发明要解决的技术问题是针对薄~中厚缓倾斜~倾斜破碎矿体提供一种贫化损失率低、采准比低、安全、高效回采的两翼预切割中央无房柱式联合横巷连续分段充填采矿法。
为了解决上述技术问题,本发明提供的两翼预切割中央无房柱式联合横巷连续分段充填采矿法,盘区长为400~800m,垂高为40~60m,分段垂高为10m。盘区中央布置脉外采准,两翼离盘区分界线100~200m转入脉内采准。两翼采场在回采前预先施工完两个分段的炮孔和切割上山,以两翼采场为主导开采。中央采场分Ⅰ步、Ⅱ步矿房,分段内开采完Ⅰ步矿房后即开采Ⅱ步矿房,作为盘区两翼采场因充填养护时间较长而不能实现连续开采的补充采场。最下一分段采用高强度胶结充填体作为下中段开采的人工假顶,掘进的废石采用铲运机运至采空区进行充填实现废石不出隆。
本发明的技术解决方案如下:
1、盘区长为400~800m,垂高为40~60m,分段垂高为10m,盘区两翼脉内预切割预支护采场长度为20m,盘区中央共用出矿横巷的Ⅰ步、Ⅱ步矿房长度为15~20m。
2、盘区中央距矿体边界线17~20m位置布置脉外分段脉外采准,盘区两翼的分段平巷隔盘区分界线100~200m时转入脉内采准兼做凿岩出矿平巷。
3、分段间采完第一分段充填接顶后再开采第二分段,盘区两翼采场在回采前预先施工完两个分段的炮孔和切割上山,分段内以盘区两翼采场为主导开采。
4、盘区中央采场分Ⅰ步、Ⅱ步矿房,分段内开采完Ⅰ步矿房后即开采Ⅱ步矿房,作为盘区两翼采场因充填养护时间较长而不能实现连续开采的补充采场。
5、盘区中央采场的脉外分段平巷及脉外出矿横巷掘进产生的废石可堆放至回采后的采空区及充填后的充填体表面,防止设备在充填体上运行时打滑。
6、盘区最下一分段均采用高强度胶结充填体作为下中段开采的人工假顶。盘区两翼采场均采用胶结充填,盘区中央采场Ⅰ步矿房采用胶结充填,Ⅱ步矿房采用非胶结及废石充填。
附图说明
图1为本发明采矿方法结构示意图
图2为图1的B—B剖面图
图3为图1的C—C剖面图
图中:1—中段运输平巷,2—穿脉,3—分段平巷,4—溜井,5—溜井联络道,6—脉外出矿横巷,7—沿脉凿岩巷道,8—切割上山,9—矿石,10—胶结充填体,11—非胶结及废石充填体,12—人工顶柱,13—充填隔离墙,14—矿柱。
具体实施方式
实施例 以贵州开磷(集团)矿肥有限责任公司沙坝土矿的一个采场为例。
贵州开磷(集团)矿肥有限责任公司是开磷集团磷资源主要生产部门。公司以生产高品位优质磷矿石及其磷化工产品著称,为适应市场经济的发展,实现做大做强的战略目标,公司扩大生产规模到200万t/a。
沙坝土矿南起E23线,北至E54线,西以洋水河为界,东至赶板冲~桐子园一线。矿区南北长5500m,东西宽1100m,面积5.5平方公里,属大型磷块岩矿床。矿段磷块岩呈稳定的层状产出,其产状与地层产状一致。+700m标高以上,沙坝土矿段南以F210断层为界,北以E47线为界,走向长约3700m;+700m标高以下矿体,南以F210断层为界,北以E54线为界,走向长约5100m。
矿层直接顶板为泥质粘土岩或白云岩,厚度0.10~5.87m,平均厚2.06m,工程遇见率26.9%。该层松软易风化,很不稳固,易冒落,对采矿作业安全及矿石损失率影响较大,也是矿石贫化加剧,MgO含量增高的主要根源。假顶层为全矿唯一含水层,f=4~7,中等稳固。矿层直接底板一般为中厚层状石英砂岩或含砾砂岩,厚1.35~17m,稳固性较好。其下为紫红色砂页岩、页岩,致密,凿岩爆破性好,但岩层暴露后易风化垮塌,属不稳固岩体。
具体实施步骤如下:
1、盘区长为600m,垂高为60m,分段垂高为10m,盘区两翼脉内预切割预支护采场长度为20m,盘区中央共用出矿横巷的Ⅰ步、Ⅱ步矿房长度均为15~20m,分段内先采完第一分段所有采场充填后再开采第二分段,依此类推。
2、采用无轨采准系统,如图1、图2和图3所示,首先在矿体下盘掘进中段运输平巷1,然后掘进穿脉2穿过矿体至矿体上盘,通过斜坡道距矿体边界线17.6m施工分段平巷3,离盘区分界线150m时分段平巷转入脉内采准兼做凿岩出矿巷,施工中央溜矿井4及分别距中央溜矿井150m位置掘进两个溜矿系统,在分段平巷内掘进溜井联络巷5至溜井,同时掘进盘区中央Ⅰ步、Ⅱ步矿房共用的脉外出矿横巷6。
3、脉内采场在上个盘区开采完之前,提前做好待采盘区的回采准备工作,两端脉内采场提前施工好两个分段的中深孔及采场中央的切割上山这两道工序,把回采工序分开,提高生产能力。
4、中央采场不再采用分矿房矿柱,而是分Ⅰ步矿房、Ⅱ步矿房,盘区中央的采场,先提前做好两个分段的一半的出矿进路和Ⅰ步矿房、Ⅱ步矿房的脉内凿岩出矿巷道,盘区中央的采场作为盘区两翼应采场充填养护时间较长不能实现连续开采的补充采场,盘区中央采场另一半出矿进路掘进废石充填至两翼采场回采充填后充填体的表面,防止设备在充填体上运行时打滑。
5、第三分段的脉外采准巷道掘进废石可通过废石溜井到第二分段脉外运输平巷充填至第一分段人工底柱的充填体上面和第二分段的采空区。第四分段的脉外采准巷道掘进废石可通过废石溜井到第三分段脉外运输平巷充填至第二分段的充填体上面和第二分段、第三分段的采空区。依此类推,实现盘区内部废石不出窿,同时,废石与磷石膏胶结体或非胶结体混合充填可缩短充填养护时间。
通过采用两翼预切割中央无房柱式联合横巷连续分段充填采矿法,实现了沙坝土矿薄~中厚缓倾斜~倾斜破碎矿体的低贫损、低采准比、安全、高效开采。
Claims (1)
1.一种薄~中厚缓倾斜~倾斜破碎矿体的两翼预切割中央无房柱式联合横巷连续分段充填采矿法,其特征在于:盘区长为400~800m,垂高为40~60m,分段垂高为10m;盘区中央布置脉外采准,两翼离盘区分界线100~200m转入脉内采准;两翼采场在回采前预先施工完两个分段的炮孔和切割上山,以两翼采场为主导开采;中央采场分Ⅰ步、Ⅱ步矿房,分段内开采完Ⅰ步矿房后即开采Ⅱ步矿房,作为盘区两翼采场因充填养护时间较长而不能实现连续开采的补充采场;最下一分段采用高强度胶结充填体作为下中段开采的人工假顶,掘进的废石采用铲运机运至采空区进行充填实现废石不出隆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110374786XA CN102434160A (zh) | 2011-11-23 | 2011-11-23 | 两翼预切割中央无房柱式联合横巷连续分段充填采矿法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110374786XA CN102434160A (zh) | 2011-11-23 | 2011-11-23 | 两翼预切割中央无房柱式联合横巷连续分段充填采矿法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102434160A true CN102434160A (zh) | 2012-05-02 |
Family
ID=45982481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110374786XA Pending CN102434160A (zh) | 2011-11-23 | 2011-11-23 | 两翼预切割中央无房柱式联合横巷连续分段充填采矿法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102434160A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103244123A (zh) * | 2013-05-14 | 2013-08-14 | 贵州晨辉达矿业工程设计有限公司 | 一种急倾斜中厚矿体采矿方法 |
CN105781551A (zh) * | 2016-04-11 | 2016-07-20 | 贵州晨辉达矿业工程设计有限公司 | 一种适用于三下矿体开采的水平条带式混合充填采矿法 |
CN112012743A (zh) * | 2020-09-18 | 2020-12-01 | 陕西华源矿业有限责任公司 | 一种胶结充填采矿方法 |
CN114183142A (zh) * | 2021-12-08 | 2022-03-15 | 西北矿冶研究院 | 一种开采倾斜及急倾斜薄矿体的方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10131699A (ja) * | 1996-10-31 | 1998-05-19 | Ohbayashi Corp | 空洞の充填方法 |
CN101818643A (zh) * | 2010-05-18 | 2010-09-01 | 中南大学 | 深井特厚大破碎矿体盘区阶梯式无间柱连续充填采矿法 |
CN102168579A (zh) * | 2011-04-15 | 2011-08-31 | 中南大学 | 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法 |
-
2011
- 2011-11-23 CN CN201110374786XA patent/CN102434160A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10131699A (ja) * | 1996-10-31 | 1998-05-19 | Ohbayashi Corp | 空洞の充填方法 |
CN101818643A (zh) * | 2010-05-18 | 2010-09-01 | 中南大学 | 深井特厚大破碎矿体盘区阶梯式无间柱连续充填采矿法 |
CN102168579A (zh) * | 2011-04-15 | 2011-08-31 | 中南大学 | 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法 |
Non-Patent Citations (2)
Title |
---|
汪军等: "马路坪矿中磷开采工艺的改进", 《采矿技术》, no. 4, 31 July 2011 (2011-07-31), pages 19 - 20 * |
陈发吉等: "脉内采准中深孔落矿嗣后充填法在沙坝土矿的应用", 《现代矿业》, no. 5, 31 May 2011 (2011-05-31), pages 62 - 64 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103244123A (zh) * | 2013-05-14 | 2013-08-14 | 贵州晨辉达矿业工程设计有限公司 | 一种急倾斜中厚矿体采矿方法 |
CN103244123B (zh) * | 2013-05-14 | 2015-05-27 | 贵州晨辉达矿业工程设计有限公司 | 一种急倾斜中厚矿体采矿方法 |
CN105781551A (zh) * | 2016-04-11 | 2016-07-20 | 贵州晨辉达矿业工程设计有限公司 | 一种适用于三下矿体开采的水平条带式混合充填采矿法 |
CN112012743A (zh) * | 2020-09-18 | 2020-12-01 | 陕西华源矿业有限责任公司 | 一种胶结充填采矿方法 |
CN112012743B (zh) * | 2020-09-18 | 2022-07-15 | 陕西华源矿业有限责任公司 | 一种胶结充填采矿方法 |
CN114183142A (zh) * | 2021-12-08 | 2022-03-15 | 西北矿冶研究院 | 一种开采倾斜及急倾斜薄矿体的方法 |
CN114183142B (zh) * | 2021-12-08 | 2023-10-13 | 西北矿冶研究院 | 一种开采倾斜及急倾斜薄矿体的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018836B (zh) | 一种有不稳固假顶倾斜中厚矿体的分采方法 | |
CN105587318B (zh) | 一种缓倾斜平行中厚矿体群连续回采的充填采矿法 | |
CN102619513B (zh) | 同在原岩中布置底部出矿结构的房柱式中深孔充填采矿法 | |
CN107869349B (zh) | 一种缓倾斜中厚矿体的机械化采矿方法 | |
CN104060991B (zh) | 一种用于缓倾斜薄矿脉的脉内斜坡道上向分层充填采矿法 | |
CN103032070A (zh) | 一种控界房柱式分段空场嗣后阶段充填采矿法 | |
CN106121643B (zh) | 预留护壁矿两步骤嵌套组合充填采矿法 | |
CN103557002B (zh) | 一种盘区机械化集中溜井上向水平分层充填采矿法 | |
CN106223958B (zh) | 倾斜中厚矿体分区凿岩阶段落矿嗣后充填协同采矿法 | |
CN103437769B (zh) | 组合再造结构体中深孔落矿协同锚索支护嗣后充填采矿法 | |
CN101818643B (zh) | 深井特厚大破碎矿体盘区阶梯式无间柱连续充填采矿法 | |
CN101338674B (zh) | 直接装运矿石的无底柱分段崩落采矿法 | |
CN108612530A (zh) | 一种上盘围岩破碎倾斜中厚矿体的采矿方法 | |
CN102168579A (zh) | 中厚倾斜破碎矿体脉内采准无间柱连续分段充填法 | |
CN102953733A (zh) | 中央脉外房柱式联合横巷两端脉内连续分段充填采矿法 | |
CN104100270B (zh) | 一种缓倾斜矿脉无轨开采方法 | |
CN106761756B (zh) | 一种用于上向分层全尾砂胶结充填法的采场结构 | |
CN103628878B (zh) | 破碎围岩矿体下向进路分层无分段巷道充填采矿方法 | |
CN102518438A (zh) | 一种顶板再造中深孔落矿嗣后充填采矿法 | |
CN107829742A (zh) | 一种崩落‑充填‑空场‑崩落采矿方法 | |
CN105927226A (zh) | 一种中深孔落矿连续分段水平充填采矿法 | |
CN109339783A (zh) | 缓倾斜中厚矿体的进路空场嗣后充填采矿法 | |
CN105019902A (zh) | 一种脉内斜巷上向分层充填采矿法 | |
CN104481543A (zh) | 阶段留矿崩落采矿法 | |
CN104453900A (zh) | 一种近水平矿体充填采矿方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120502 |