CN102430695A - Manufacture method of highly-novel round-link chain - Google Patents
Manufacture method of highly-novel round-link chain Download PDFInfo
- Publication number
- CN102430695A CN102430695A CN2011103954060A CN201110395406A CN102430695A CN 102430695 A CN102430695 A CN 102430695A CN 2011103954060 A CN2011103954060 A CN 2011103954060A CN 201110395406 A CN201110395406 A CN 201110395406A CN 102430695 A CN102430695 A CN 102430695A
- Authority
- CN
- China
- Prior art keywords
- forging
- link
- chain
- preparation
- link chain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Heat Treatment Of Articles (AREA)
Abstract
The invention discloses a manufacture method of a highly-novel round-link chain, which comprises the following steps of: a, forging a semi-link ring; b, intensely cleaning; c, welding a link ring; d, processing burrs; and e, ageing and processing. The invention discloses the manufacture method of the highly-novel round-link chain, which has the advantages of reasonable procedure and arrangement, simpleness and convenience for operation, and moderate cost. Due to a special plane boss structure design at the inner side of an arc section, stress concentration at a corner the link ring of the round-link chain can be effectively relieved, probability of generating deformation and crack by the link ring is reduced so that the service life of the round-link chain is more durable, goods are more safely and reliably transported, and human safety of workers is ensured.
Description
Technical field
The present invention relates to a kind of preparation method of round-link chain, relate in particular to the preparation method of the lasting novel round-link chain of a kind of good mechanical performance, service life, belong to the suspender technical field.
Background technology
Suspender is to hang the device of getting weight in the hoisting machinery, and hanging and getting the most frequently used suspender of member article is suspension hook, and relative accessory has suspension ring, hoisting suction cup, clamp and pallet fork etc.Wherein, hoisting suction cup, clamp and pallet fork are used on crane, can be used as special hanger and use for a long time, also can be used as auxiliary suspender and hang over use temporarily on the suspension hook, to improve operating efficiency.The suspender that grasps bulk material is generally jaw grab bucket to be opened/closed, and also available magnechuck is drawn like magnetic conductivity materials such as borings; Hang the suspender of getting flowable materials commonly used the bucket of Sheng and cage are arranged, generally through canting or take out mode such as bottom plug and draw off molten steel or chemical solution, draw off flowable materials such as concrete through opening the cage bottom door.
Round-link chain is a building block important in the suspender, mainly plays connecting shackle and goods, receives pulling force and goods and the downward active force of deadweight that suspension hook makes progress; Simultaneously; Mostly round-link chain is heeling condition also to have certain frictional force between the chain link each other, therefore when work; The stressed comparatively complicacy of round-link chain, service life and performance are restricted.In case round-link chain deforms or ruptures, the normal allocation and transportation that influence goods that will strengthen, even beyond thought accident appears.
Summary of the invention
To the demand, the invention provides a kind of preparation method of novel round-link chain, this preparation method's procedure arrangement is reasonable, compact, the round-link chain high comprehensive performance that makes, service life is lasting, makes the allocation and transportation of goods safer, reliable.
The present invention is a kind of preparation method of novel round-link chain, and this preparation method comprises the steps: a) to forge half chain link, b) strengthens cleaning, c) chain loops welded, and d) burr are handled, e) Ageing Treatment.
In the present invention's one preferred embodiment, in the described step a), the Forging Technology master operation is: gropping of forging billet, forging stock heating, die-forging forming, side cut, rectification and cooling.
In the present invention's one preferred embodiment, the equipment that described forging is selected for use is fly press, and tonnage is 2000-2500KN; The initial forging temperature of forging stock is controlled at 1150 ℃-1180 ℃, and final forging temperature is controlled at 820 ℃-850 ℃, and forging ratio is 3-3.5; The type of cooling of forging is the air cooling of coming out of the stove after cooling to 450 ℃ with the furnace.
In the present invention's one preferred embodiment, in the described step b), the forging intensive treatment comprises modified and bead; Wherein, the temperature of modifier treatment is controlled at 550 ℃-580 ℃, and tempering time is 1-2 hour; In the bead, the bullet diameter is 0.7-0.8nm, and hardness is 55HRC, and speed is 45m/s; Cleaning process mainly is to remove the oxide skin of half chain ring surface, improves its surface quality.
In the present invention's one preferred embodiment, in the described step c), the welding procedure that chain link adopted is the group flashing light weldering, and this technology mainly comprises The pre-heat treatment, group flashing light and upset treatment process; Wherein, preheat temperature is about 1350 ℃-1400 ℃; Temperature is 1350 ° of C before the upset, about 1050 ℃ of-1100 ° of C of postwelding temperature.
In the present invention's one preferred embodiment, in the described step e), the oil sealing of finished product chain link is placed on left standstill under the normal temperature 5-8 hour, further stablized the chain ring size, improved its serviceability.
The present invention has disclosed a kind of preparation method of novel round-link chain, and this preparation method's procedure arrangement is reasonable, and preparation technology is easy; Cost is moderate, and the inboard unique plane boss structure of its arc section designs, and can effectively alleviate the stress concentration phenomenon of round-link chain chain link corner; Reduce the probability that chain link deforms and ftractures; Make the service life of round-link chain more lasting, the allocation and transportation of goods are safer, reliable, guaranteed staff's personal safety.
Description of drawings
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further detailed explanation:
Fig. 1 is the preparation method's of the novel round-link chain of the embodiment of the invention process figure.
The specific embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present invention is set forth in detail, thereby protection scope of the present invention is made more explicit defining so that advantage of the present invention and characteristic can be easier to it will be appreciated by those skilled in the art that.
Fig. 1 is the preparation method's of the novel round-link chain of the embodiment of the invention process figure; This preparation method comprises the steps: a) to forge half chain link, b) strengthens cleaning, c) chain loops welded, and d) burr are handled, e) Ageing Treatment.
Embodiment
These preparation method's concrete steps are following:
A) forge half chain link, the Forging Technology master operation is: gropping of forging billet, forging stock heating, die-forging forming, side cut, rectification and cooling; Wherein, hot forging equipment is selected fly press for use, and tonnage is 2000-2500KN, and the forging molding time is short, and efficient is high, can realize the single-piece production in enormous quantities; The initial forging temperature of forging stock is controlled at 1150 ℃-1180 ℃, and final forging temperature is controlled at 820 ℃-850 ℃, and forging ratio is 3-3.5; The type of cooling is the air cooling of coming out of the stove after cooling to 450 ℃ with the furnace;
B) strengthen cleaning, half chain link of forging molding also need carry out modified and bead; Wherein, modifier treatment improves welding performance in order to eliminate forging stress, and temperature is controlled at 550 ℃-580 ℃, and tempering time is 1-2 hour; Bead can be strengthened half chain link surface strength and wearability, reduces fatigue, improves service life; In the bead implementation process, the bullet diameter is 0.7-0.8nm, and hardness is 55HRC; Speed is 45m/s, and this processing can effectively improve for half chain link service life more than 30%; Cleaning process mainly is to remove the oxide skin of half chain ring surface, improves its surface quality;
C) chain loops welded, the welding procedure that chain link adopted are the group flashing light weldering, need carry out The pre-heat treatment before this process implementing, and preheat temperature is about 1350 ℃-1400 ℃; Group flashing light and upset operation implementation process are: at first, closed primary circuit slightly contacts two chain link end faces, in the gap of end face, promptly ejects molten metal particulate as the spark; Then, mobile chain link makes both ends of the surface still keep slight contact, forms group flashing light; At last, when flash of light reaches the scheduled time, when two chain link ends nearly are heated to fusing point; Just carry out upset rapidly with certain pressure, when upset is cut off the electricity supply behind certain-length, the technology of welding chain link is promptly accused and is finished; Temperature is 1350 ° of C before the upset, about 1050 ℃ of-1100 ° of C of postwelding temperature;
D) burr are handled, and after the chain loops welded finishes, use the removal of hydraulic pressure deburring device to make and are soldered on the chain girth joint because the burr that extruding is produced improves the chain link surface quality;
E) Ageing Treatment is placed on the oil sealing of finished product chain link and left standstill under the normal temperature 5-8 hour, further stablizes the chain ring size, improves its serviceability.
The present invention has disclosed a kind of preparation method of high novel round-link chain, is characterized in: this preparation method's procedure arrangement is reasonable, and preparation technology is easy; Cost is moderate, and the inboard unique plane boss structure of its arc section designs, and can effectively alleviate the stress concentration phenomenon of round-link chain chain link corner; Reduce the probability that chain link deforms and ftractures; Make the service life of round-link chain more lasting, the allocation and transportation of goods are safer, reliable, guaranteed staff's personal safety.
The above; Be merely the specific embodiment of the present invention; But protection scope of the present invention is not limited thereto; Any those of ordinary skill in the art are in the technical scope that the present invention disclosed, and variation or the replacement that can expect without creative work all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain that claims were limited.
Claims (6)
1. the preparation method of a novel round-link chain is characterized in that, this preparation method comprises the steps: a) to forge half chain link, b) strengthens cleaning, c) chain loops welded, and d) burr are handled, e) Ageing Treatment.
2. the preparation method of novel round-link chain according to claim 1 is characterized in that, in the described step a), the Forging Technology master operation is: gropping of forging billet, forging stock heating, die-forging forming, side cut, rectification and cooling.
3. the preparation method of novel round-link chain according to claim 2 is characterized in that, the equipment that described forging is selected for use is fly press, and tonnage is 2000-2500KN; The initial forging temperature of forging stock is controlled at 1150 ℃-1180 ℃, and final forging temperature is controlled at 820 ℃-850 ℃, and forging ratio is 3-3.5; The type of cooling of forging is the air cooling of coming out of the stove after cooling to 450 ℃ with the furnace.
4. the preparation method of novel round-link chain according to claim 1 is characterized in that, in the described step b), the forging intensive treatment comprises modified and bead; Wherein, the temperature of modifier treatment is controlled at 550 ℃-580 ℃, and tempering time is 1-2 hour; In the bead, the bullet diameter is 0.7-0.8nm, and hardness is 55HRC, and speed is 45m/s; Cleaning process mainly is to remove the oxide skin of half chain ring surface, improves its surface quality.
5. the preparation method of novel round-link chain according to claim 1 is characterized in that, in the described step c), the welding procedure that chain link adopted is the group flashing light weldering, and this technology mainly comprises The pre-heat treatment, group flashing light and upset treatment process; Wherein, preheat temperature is about 1350 ℃-1400 ℃; Temperature is 1350 ° of C before the upset, about 1050 ℃ of-1100 ° of C of postwelding temperature.
6. the preparation method of novel round-link chain according to claim 1 is characterized in that, in the described step e), the oil sealing of finished product chain link is placed on left standstill under the normal temperature 5-8 hour, further stablized the chain ring size, improved its serviceability.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103954060A CN102430695A (en) | 2011-12-03 | 2011-12-03 | Manufacture method of highly-novel round-link chain |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011103954060A CN102430695A (en) | 2011-12-03 | 2011-12-03 | Manufacture method of highly-novel round-link chain |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102430695A true CN102430695A (en) | 2012-05-02 |
Family
ID=45979247
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011103954060A Pending CN102430695A (en) | 2011-12-03 | 2011-12-03 | Manufacture method of highly-novel round-link chain |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102430695A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110016538A (en) * | 2019-05-27 | 2019-07-16 | 安吉长虹制链有限公司 | Tow chain processing technology for chain production |
CN111687605A (en) * | 2020-06-22 | 2020-09-22 | 四川华都核设备制造有限公司 | Preparation method of connecting ring chain for control rod system and connecting ring chain |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0042283A1 (en) * | 1980-06-16 | 1981-12-23 | Dominion Chain Inc | A chain link |
GB2136717A (en) * | 1983-03-03 | 1984-09-26 | Crown Foundry Co Ltd The | Casting chain |
CN1730974A (en) * | 2005-08-30 | 2006-02-08 | 潘祖放 | High precision hoisting chain and preparation process thereof |
CN101918159A (en) * | 2007-12-20 | 2010-12-15 | 佩瓦格奥地利有限公司 | Method for producing welded round and profile chains, chain links for a round or profile chain and round or profile chain made of chain links of said kind |
-
2011
- 2011-12-03 CN CN2011103954060A patent/CN102430695A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0042283A1 (en) * | 1980-06-16 | 1981-12-23 | Dominion Chain Inc | A chain link |
GB2136717A (en) * | 1983-03-03 | 1984-09-26 | Crown Foundry Co Ltd The | Casting chain |
CN1730974A (en) * | 2005-08-30 | 2006-02-08 | 潘祖放 | High precision hoisting chain and preparation process thereof |
CN101918159A (en) * | 2007-12-20 | 2010-12-15 | 佩瓦格奥地利有限公司 | Method for producing welded round and profile chains, chain links for a round or profile chain and round or profile chain made of chain links of said kind |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110016538A (en) * | 2019-05-27 | 2019-07-16 | 安吉长虹制链有限公司 | Tow chain processing technology for chain production |
CN111687605A (en) * | 2020-06-22 | 2020-09-22 | 四川华都核设备制造有限公司 | Preparation method of connecting ring chain for control rod system and connecting ring chain |
CN111687605B (en) * | 2020-06-22 | 2021-09-07 | 四川华都核设备制造有限公司 | Preparation method of connecting ring chain for control rod system and connecting ring chain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103691860A (en) | Machining method for effectively improving quality of large forging | |
CN207209744U (en) | A kind of quenching hook frock for the heat treatment lifting of single flange main shaft | |
CN102430695A (en) | Manufacture method of highly-novel round-link chain | |
CN102562946A (en) | High-performance round-link chain | |
CN101658892A (en) | Forging method of extra-high voltage aluminum alloy suspension clamp | |
CN104107872B (en) | Forging press large-scale steel ingot method for upsetting | |
CN102513786A (en) | Preparation method of high-performance round ring chain | |
CN104625034A (en) | Transfer bag for automobile aluminum alloy wheel low-pressure casting | |
CN103010936A (en) | Lifting tool for large steel ingot and large forge piece | |
CN108526381B (en) | Forging method of ultra-large aluminum-based composite ring piece | |
CN102562947A (en) | Novel round-link chain | |
CN104191179A (en) | Process for quickly forming double-hook lifting hooks of cranes by means of die forging | |
CN210763902U (en) | Heat treatment lifting appliance for ring forging in wind power industry | |
CN107598573A (en) | A kind of step-down side casting cyclone for being used for truck and passenger carriage aluminum alloy wheel hub | |
CN102434630A (en) | Round-link chain for heavy-duty hoisting | |
CN108262433A (en) | One kind quickly forges fervent production system and its method of work | |
CN102423841A (en) | Method for manufacturing round link chain for heavy hoisting | |
CN202967879U (en) | Lifting appliance for large-size steel ingot and forge piece | |
CN102515014A (en) | Double-compacted wire rope pressure-welded rigging and manufacturing method thereof | |
CN108097861B (en) | Method for forging large-sized short and thick steel ingot | |
CN102423794A (en) | Process for manufacturing high-strength lifting appliance head for building | |
CN206246340U (en) | Wear-resisting plunger component | |
CN104690199A (en) | Free forging method for blowout preventer body used for petroleum drilling and production | |
CN205653085U (en) | Forging formula arm -tie | |
CN204508566U (en) | The dedicated lifting hook of base accident is fallen in a kind of fast processing heating |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120502 |