CN202967879U - Lifting appliance for large-size steel ingot and forge piece - Google Patents

Lifting appliance for large-size steel ingot and forge piece Download PDF

Info

Publication number
CN202967879U
CN202967879U CN 201220716137 CN201220716137U CN202967879U CN 202967879 U CN202967879 U CN 202967879U CN 201220716137 CN201220716137 CN 201220716137 CN 201220716137 U CN201220716137 U CN 201220716137U CN 202967879 U CN202967879 U CN 202967879U
Authority
CN
China
Prior art keywords
lifting appliance
steel ingot
tong
forging
tong arms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220716137
Other languages
Chinese (zh)
Inventor
黄友红
杨以振
罗晓芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Guangda Special Material Co ltd
Original Assignee
ZHANGJIAGANG CITY GUANGDA MACHINERY FORGING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHANGJIAGANG CITY GUANGDA MACHINERY FORGING CO Ltd filed Critical ZHANGJIAGANG CITY GUANGDA MACHINERY FORGING CO Ltd
Priority to CN 201220716137 priority Critical patent/CN202967879U/en
Application granted granted Critical
Publication of CN202967879U publication Critical patent/CN202967879U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a lifting appliance for a large-size steel ingot and a forge piece. The lifting appliance comprises two tong arms and two tong claws, wherein the lower ends of the two tong arms are respectively and fixedly connected with the two tong claws; the middle parts of the two tong arms are hinged through a pin shaft; the pin shaft is provided with a cover plate; and the two tong claws are matched to clamp the large-size steel ingot and the forge piece. The lifting appliance is simple in structure, convenient to assemble and dissemble and safe to operate, and is suitable for hoisting of large-size steel ingots and force pieces; and the lifting appliance can be operated by a crane driver, and other auxiliary workers are not needed, so that the manual labor is saved to a certain extent. The lifting appliance is strong in practicability, can not only improve the productivity, lessen the labor intensity and reduce the operation dangerousness, but also meet the hoisting requirement of the large-size stele ingots and the forge pieces, and safe and reliable hoisting operation is realized. Besides, the principle of the lifting appliance for clamping workpieces is different from those of ordinary lifting appliances, and the clamp force comes from the dead load of the workpieces. With the adoption of the design, the structural strength and rigid requirement are met, favorable clamp performance is realized, and materials can be saved.

Description

A kind of suspender for large-scale steel ingot and forging
Technical field
The utility model relates to the suspender field, refers to especially a kind of suspender for large-scale steel ingot and forging.
Background technology
Flourish along with China's industrial construction, the equipment of the departments such as metallurgy, machinery, electric power, oil, chemical industry shipbuilding, aviation, defense Industry and some light industry is all to large capacity, high-power, performance-oriented future development, weight and dimensional characteristic to product are increasing, and the heavy forging (abbreviation heavy forging) that occurs therefrom manufacturing is the heavy-duty machinery Base of manufacture.Heavy forging has the distinguishing features such as the large body weight of shape, production is wide in variety, requirements for quality is high.In the process that Large Steel iron enterprise produces, the handling of large-scale steel ingot and forging products is that one very heavy and to have a handling of work, especially high-temperature forging of certain danger very dangerous.
At present, usually adopt a large amount of riggings to carry out handling to large-scale steel ingot and forging, operating personal must be near workpiece in the handling process, danger is higher, and also to be subject to the thermal radiation of high temperature when the loading and unloading high-temperature forging, virtually increased especially operator's labour intensity and the danger of operation.The automatic tongs load-carrying capacity that uses now is too little, operates too slowly, can not satisfy the lifting job of large-scale steel ingot and forging fully.
The utility model content
Technical problem to be solved in the utility model is: a kind of suspender for large-scale steel ingot and forging is provided, and this hanger structure is simple, easy to loading and unloading, and operation can be widely used in large-scale steel ingot and forging without dangerous.
For solving the problems of the technologies described above, the technical solution of the utility model is: a kind of suspender for large-scale steel ingot and forging, comprise two tong arms and two chelas, captive joint with two chelas respectively in the bottom of described two tong arms, the middle part of two tong arms is hinged by bearing pin, on described bearing pin, cover plate is installed, two chelas coordinate clamping large-scale steel ingot and forging.
As a kind of preferred scheme, the upper end of two tong arms all is equipped with bearing pin.
As a kind of preferred scheme, be equipped with on described chela and be convenient to the clamping work pieces gap.
As a kind of preferred scheme, described chela is U-shaped.
As a kind of preferred scheme, the material of described tong arm and chela is dead-soft steel.
After having adopted technique scheme, effect of the present utility model is: a kind of suspender for large-scale steel ingot and forging, comprise two tong arms and two chelas, captive joint with two chelas respectively in the bottom of described two tong arms, the middle part of two tong arms is hinged by bearing pin, on described bearing pin, cover plate is installed, two chelas coordinate clamping large-scale steel ingot and forging.This hanger structure is simple, easy to loading and unloading, operation is applicable to the handling of large-scale steel ingot and forging without dangerous, and the work of only need driving a vehicle just can be attached operation, need not other auxiliary works, saved to a certain extent manpower, this suspender is practical, not only can boost productivity, alleviate the danger of labor strength and operation, also satisfied the handling requirement of large-scale steel ingot and forging simultaneously, realized lifting job safely and reliably.In addition, the principle of this suspender holding workpiece is different with general suspender, and its gripping power results from the deadweight of workpiece, and structural strength, rigidity requirement had both been satisfied in this design, possessed again good gripping performance and materials and economized.
The material of described tong arm and chela is dead-soft steel, and it generally can to produce joint plasticity and the impact toughness of serious sclerotic tissue or quenching structure and postwelding not good because of welding, excellent weldability.
Description of drawings
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is the structural representation of the utility model embodiment;
In accompanying drawing: 1. tong arm; 2. chela; 3. the first bearing pin; 4. the second bearing pin; 5. the 3rd bearing pin.
The specific embodiment
Below by specific embodiment, a kind of suspender for large-scale steel ingot and forging of the utility model is described in further detail.
As shown in Figure 1, comprise two tong arms 1 and two chelas 2, two tong arm 1 middle parts are hinged by the first bearing pin 3, captive joint with two chelas 2 respectively in the bottom of described two tong arms 1, the upper end of two tong arms all is equipped with bearing pin, be respectively the second bearing pin 4 and the 3rd bearing pin 5, cover plate all is installed on described bearing pin, two chelas 2 coordinate clamping large-scale steel ingot and forging.
Preferably, be equipped with on described chela 2 and be convenient to the clamping work pieces gap, in the present embodiment, described chela 2 is U-shaped, and the material of described tong arm 1 and chela 2 is dead-soft steel.
During handling, bottom at two tong arms 1 is wound around secondary chain, the upper end of two tong arms 1 is hinged with main chain by the second bearing pin 4 and the 3rd bearing pin 5 respectively, the bottom that secondary chain upwards draws two tong arms 1, make two chelas 2 stay open state and shift to large-scale steel ingot and forging, after arriving assigned address, slowly put down this suspender, after chela 2 lands, chela 2 clamps large-scale steel ingot and forging when the main chain lifting is closed, and handling is slowly put down suspender to assigned address, the driving work makes chela 2 open secondary chain lifting, and workpiece is unloaded.In the handling process, do not need auxiliary work that workpiece is operated, the labour intensity that has greatly alleviated the operative employee has also reduced danger simultaneously.
Because the principle of this suspender holding workpiece is different with general suspender, its gripping power results from the deadweight of workpiece, and structural strength, rigidity requirement had both been satisfied in this design, possessed again good gripping performance and materials and economized.

Claims (5)

1. suspender that is used for large-scale steel ingot and forging, it is characterized in that: comprise two tong arms and two chelas, captive joint with two chelas respectively in the bottom of described two tong arms, the middle part of two tong arms is hinged by bearing pin, on described bearing pin, cover plate is installed, two chelas coordinate clamping large-scale steel ingot and forging.
2. a kind of suspender for large-scale steel ingot and forging as claimed in claim 1, it is characterized in that: the upper end of two tong arms all is equipped with bearing pin.
3. a kind of suspender for large-scale steel ingot and forging as claimed in claim 2 is characterized in that: be equipped with on described chela and be convenient to the clamping work pieces gap.
4. a kind of suspender for large-scale steel ingot and forging as claimed in claim 3, it is characterized in that: described chela is U-shaped.
5. as a kind of suspender for large-scale steel ingot and forging as described in claim 1 to 4 any one, it is characterized in that: the material of described tong arm and chela is dead-soft steel.
CN 201220716137 2012-12-22 2012-12-22 Lifting appliance for large-size steel ingot and forge piece Expired - Lifetime CN202967879U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220716137 CN202967879U (en) 2012-12-22 2012-12-22 Lifting appliance for large-size steel ingot and forge piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220716137 CN202967879U (en) 2012-12-22 2012-12-22 Lifting appliance for large-size steel ingot and forge piece

Publications (1)

Publication Number Publication Date
CN202967879U true CN202967879U (en) 2013-06-05

Family

ID=48508983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220716137 Expired - Lifetime CN202967879U (en) 2012-12-22 2012-12-22 Lifting appliance for large-size steel ingot and forge piece

Country Status (1)

Country Link
CN (1) CN202967879U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103010936A (en) * 2012-12-22 2013-04-03 张家港市广大机械锻造有限公司 Lifting tool for large steel ingot and large forge piece
CN103466435A (en) * 2013-09-27 2013-12-25 无锡市新华起重工具有限公司 Steel plate lifting hook

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103010936A (en) * 2012-12-22 2013-04-03 张家港市广大机械锻造有限公司 Lifting tool for large steel ingot and large forge piece
CN103466435A (en) * 2013-09-27 2013-12-25 无锡市新华起重工具有限公司 Steel plate lifting hook

Similar Documents

Publication Publication Date Title
CN201240756Y (en) Special sling for loading and unloading sheet billet
CN103010936A (en) Lifting tool for large steel ingot and large forge piece
CN203006738U (en) Section bar lifting tool
CN202967879U (en) Lifting appliance for large-size steel ingot and forge piece
CN201151614Y (en) Clamp for turning steel plates over
CN102562946A (en) High-performance round-link chain
CN201614227U (en) Hoisting rigging device
CN201151607Y (en) Clamper for handling shell ring structural member
CN208629462U (en) A kind of manipulator for steel part transfer
CN201932810U (en) Lifting hook
CN202152256U (en) Lifting hook
CN202848864U (en) Automatic gripping and unloading device for stacked aluminum ingots
CN101717034A (en) Hoisting rigging device
CN202848844U (en) Rapid assembling and disassembling tool for oil barrel
CN102513786A (en) Preparation method of high-performance round ring chain
CN202912558U (en) Special chucking appliance used for end socket hoisting
CN207903739U (en) A kind of snap-gauge lifting of aircraft door assembling jig
CN212315307U (en) Well formula is loop forming element lifting device for heat treatment furnace
CN209685122U (en) Portal clamp hangs structural tool
CN202054531U (en) Workpiece lifting appliance
CN107739008B (en) Frock of supplementary installation shackle
CN202358831U (en) Clamp for crucible
CN201605087U (en) Goods hoisting device
CN204237441U (en) A kind of heavy-duty truck transmission shaft special hanger
CN201151615Y (en) Balancing sling for shafts

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215600 Zhangjiagang Municipal Machinery Forging Co., Ltd., Anqing Village, Phoenix Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee after: ZHANGJIAGANG GUANGDA SPECIAL MATERIAL CO.,LTD.

Address before: 215600 Zhangjiagang Municipal Machinery Forging Co., Ltd., Anqing Village, Phoenix Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee before: ZHANGJIAGANG CITY GUANGDA MACHINERY FORGING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20130605

CX01 Expiry of patent term