CN102425172B - 紧邻高层建筑开挖深基坑的支护方法 - Google Patents

紧邻高层建筑开挖深基坑的支护方法 Download PDF

Info

Publication number
CN102425172B
CN102425172B CN2011103973428A CN201110397342A CN102425172B CN 102425172 B CN102425172 B CN 102425172B CN 2011103973428 A CN2011103973428 A CN 2011103973428A CN 201110397342 A CN201110397342 A CN 201110397342A CN 102425172 B CN102425172 B CN 102425172B
Authority
CN
China
Prior art keywords
construction
building structure
underground building
excavation
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011103973428A
Other languages
English (en)
Other versions
CN102425172A (zh
Inventor
侯秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN2011103973428A priority Critical patent/CN102425172B/zh
Publication of CN102425172A publication Critical patent/CN102425172A/zh
Application granted granted Critical
Publication of CN102425172B publication Critical patent/CN102425172B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种紧邻高层建筑开挖深基坑的支护方法,包括高层建筑以及地下建筑结构,在准备开挖地下建筑结构深基坑的高层建筑一侧施工钢筋砼灌注桩以及冠梁,再施工水泥搅拌桩,其步骤为:(1)、地下建筑结构深基坑土方开挖,该深基坑土方开挖分两次进行;(2)、在地下建筑结构施工处施工预埋钢板,在预埋钢板与冠梁之间加装支撑钢管;(3)、开挖预留土方二次开挖施工线以下部分土方,再进行支撑钢管下方地下建筑结构的施工,在地下建筑结构的横向梁之间加装临时水平现浇钢筋混凝土梁;(4)、将临时水平现浇钢筋混凝土梁拆除;支护完成。本发明简单易行,增加了施工的安全性,有效缩短了施工时间,提高了施工效率,降低了施工成本,提高了施工质量。

Description

紧邻高层建筑开挖深基坑的支护方法
技术领域
本发明属于深基坑的支护领域,尤其是一种紧邻高层建筑开挖深基坑的支护方法。
背景技术
现在城市建筑密度越来越大,地下空间工程开挖深度越来越深,基坑开挖引起的地层移动会使得周边的建筑物发生附加变形,当附加变形过大时会引起结构的开裂和破坏,从而影响周边建筑物的正常使用。某大厦工程,其建筑高度为90.2m,基坑底标高为-13.8m,地下室占地面积为3564.23m2,距相邻建筑的距离为7m,且基础埋深相对相邻建筑基础埋深低7.3m,这种特殊的深基坑单纯采用灌注桩和冠梁支护会产生较大安全隐患,基坑较深,桩体悬壁部份较长,长时间受到临近高层建筑侧压力作用使桩体产生水平位移,从而使临近建筑物随土体的滑移而产生倾斜受到破坏,引发安全事故。
发明内容
本发明的目的在于克服现有技术的不足,提供一种紧邻高层建筑开挖深基坑的支护方法,该支护方法简单易行,增加了施工的安全性,有效缩短了施工时间,提高了施工效率,降低了施工成本,提高了施工质量。
本发明解决其技术问题是通过以下技术方案实现的:
一种紧邻高层建筑开挖深基坑的支护方法,包括高层建筑以及地下建筑结构,在准备开挖地下建筑结构深基坑的高层建筑一侧施工钢筋砼灌注桩以及冠梁,再施工水泥搅拌桩,其步骤:
(1)、地下建筑结构深基坑土方开挖,该深基坑土方开挖分两次进行,第一次开挖的土方为预留土方二次开挖施工线以上部分,所述的预留土方二次开挖施工线以上部分为钢筋砼灌注桩一侧向地下建筑结构一侧放坡,坡度为1∶1.1~1.2以上部分;
(2)、在地下建筑结构施工处施工预埋钢板,在预埋钢板与冠梁之间加装支撑钢管,支撑钢管两端满焊,焊缝高度10mm;
(3)、支撑钢管施工完毕,开挖预留土方二次开挖施工线以下部分土方,再进行支撑钢管下方地下建筑结构的施工,在地下建筑结构的横向梁之间加装临时水平现浇钢筋混凝土梁,该临时水平现浇钢筋混凝土梁的截面为300×450mm;
(4)、地下建筑结构施工到支撑钢管的位置且临时水平现浇钢筋混凝土梁强度达到70%时,将支撑钢管拆除,继续进行地下建筑结构施工直至施工完毕,将临时水平现浇钢筋混凝土梁拆除;整个紧邻高层建筑开挖深基坑的支护完成。
而且,所述的支撑钢管为Φ500×12mm。
本发明的优点和有益效果为:
1、本紧邻高层建筑开挖深基坑的支护方法主要采用三大支护方式配合,第一为钢筋砼灌注桩、冠梁以及水泥搅拌桩,第二采用支撑钢管,第三采用临时水平现浇钢筋混凝土梁,三种方式的结合提高了紧邻高层建筑开挖深基坑的安全性,有效加快施工进度。
2、本发明简单易行,增加了施工的安全性,有效缩短了施工时间,提高了施工效率,降低了施工成本,提高了施工质量,是一种可靠的紧邻高层建筑开挖深基坑的支护方法。
附图说明
图1为本发明应用时高层建筑和地下建筑结构施工示意图。
具体实施方式
下面通过具体实施例对本发明作进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种紧邻高层建筑开挖深基坑的支护方法,包括高层建筑10以及地下建筑结构5,在准备开挖地下建筑结构深基坑的高层建筑一侧施工钢筋砼灌注桩8以及冠梁7,再施工水泥搅拌桩9,其步骤:
(1)、地下建筑结构深基坑土方开挖,该深基坑土方开挖分两次进行,第一次开挖的土方为预留土方二次开挖施工线6以上部分,所述的预留土方二次开挖施工线以上部分为钢筋砼灌注桩一侧向地下建筑结构一侧放坡,坡度为1∶1.1~1.2以上部分;
(2)、在地下建筑结构施工处施工预埋钢板2,在预埋钢板与冠梁之间加装支撑钢管3,支撑钢管两端满焊,焊缝高度10mm,支撑钢管为Φ500×12mm;
(3)、支撑钢管施工完毕,开挖预留土方二次开挖施工线以下部分土方,再进行支撑钢管下方地下建筑结构的施工,在地下建筑结构的横向梁1之间加装临时水平现浇钢筋混凝土梁4,该临时水平现浇钢筋混凝土梁的截面为300×450mm;
(4)、地下建筑结构施工到支撑钢管的位置且临时水平现浇钢筋混凝土梁强度达到70%时,将支撑钢管拆除,继续进行地下建筑结构施工直至施工完毕,将临时水平现浇钢筋混凝土梁拆除;整个紧邻高层建筑开挖深基坑的支护完成。

Claims (2)

1.一种紧邻高层建筑开挖深基坑的支护方法,包括高层建筑以及地下建筑结构,在准备开挖地下建筑结构深基坑的高层建筑一侧施工钢筋砼灌注桩以及冠梁,再施工水泥搅拌桩,其特征在于:该方法还包括如下步骤:
(1)、地下建筑结构深基坑土方开挖,该深基坑土方开挖分两次进行,第一次开挖的土方为预留土方二次开挖施工线以上部分,所述的预留土方二次开挖施工线以上部分为钢筋砼灌注桩一侧向地下建筑结构一侧放坡,坡度为1∶1.1~1.2以上部分;
(2)、在地下建筑结构施工处施工预埋钢板,在预埋钢板与冠梁之间加装支撑钢管,支撑钢管两端满焊,焊缝高度10mm;
(3)、支撑钢管施工完毕,开挖预留土方二次开挖施工线以下部分土方,再进行支撑钢管下方地下建筑结构的施工,在地下建筑结构的横向梁之间加装临时水平现浇钢筋混凝土梁,该临时水平现浇钢筋混凝土梁的截面为300×450mm;
(4)、地下建筑结构施工到支撑钢管的位置且临时水平现浇钢筋混凝土梁强度达到70%时,将支撑钢管拆除,继续进行地下建筑结构施工直至施工完毕,将临时水平现浇钢筋混凝土梁拆除;整个紧邻高层建筑开挖深基坑的支护完成。
2.根据权利要求1所述的紧邻高层建筑开挖深基坑的支护方法,其特征在于:所述的支撑钢管为Φ500×12mm。
CN2011103973428A 2011-12-05 2011-12-05 紧邻高层建筑开挖深基坑的支护方法 Active CN102425172B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103973428A CN102425172B (zh) 2011-12-05 2011-12-05 紧邻高层建筑开挖深基坑的支护方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103973428A CN102425172B (zh) 2011-12-05 2011-12-05 紧邻高层建筑开挖深基坑的支护方法

Publications (2)

Publication Number Publication Date
CN102425172A CN102425172A (zh) 2012-04-25
CN102425172B true CN102425172B (zh) 2013-12-11

Family

ID=45959198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103973428A Active CN102425172B (zh) 2011-12-05 2011-12-05 紧邻高层建筑开挖深基坑的支护方法

Country Status (1)

Country Link
CN (1) CN102425172B (zh)

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452098B (zh) * 2012-05-28 2016-04-27 上海市政工程设计研究总院(集团)有限公司 一种地下连续墙对撑预埋件施工方法
CN102758454A (zh) * 2012-07-24 2012-10-31 华东建筑设计研究院有限公司 一种能传递相邻独立地下室之间水平力的构造
CN102839672B (zh) * 2012-09-19 2015-08-12 广州机施建设集团有限公司 一种防止软基水泥搅拌桩位移超限的基坑支护方法
CN102966108B (zh) * 2012-11-23 2014-10-08 中铁四局集团建筑工程有限公司 紧临既有建筑物以地下结构为内支撑的深基坑施工方法
CN103243720A (zh) * 2013-05-20 2013-08-14 中冶天工集团有限公司 软土地基超深基坑支护方法
CN103243721B (zh) * 2013-05-22 2016-02-17 中国建筑第八工程局有限公司 软弱地质条件下高层建筑筏板基础及核心筒开挖施工方法
CN103290849B (zh) * 2013-06-20 2015-03-04 江苏城市职业学院 一种半逆作法坑中坑支护结构及其施工方法
CN103469798B (zh) * 2013-08-28 2016-01-20 中国建筑第七工程局有限公司 一种基坑支护结构及其施工方法
CN103498475B (zh) * 2013-10-12 2015-04-22 中国建筑股份有限公司 控制既有建筑变形的基坑支护结构及基坑开挖施工方法
CN104060618A (zh) * 2014-07-04 2014-09-24 上海建工七建集团有限公司 一种基坑支护设计方法
CN104131571B (zh) * 2014-08-18 2016-03-23 中冶建工集团有限公司 一种深基坑支护施工方法
CN105113512A (zh) * 2015-08-05 2015-12-02 中国建筑第八工程局有限公司 基坑围护结构中梁板缺失处的换撑及其施工方法
CN105649089B (zh) * 2016-01-13 2017-11-07 南昌市建筑工程集团有限公司 一种基坑开挖临近既有浅基础保护结构施工方法
CN106400814B (zh) * 2016-11-11 2021-03-16 天脊煤化工集团股份有限公司 一种基坑支护方法
CN106958250B (zh) * 2017-04-28 2023-05-02 高创建工股份有限公司 紧邻高层建筑开挖深基坑的支护方法及其结构
CN107254879A (zh) * 2017-07-01 2017-10-17 温州振华建设有限公司 一种建筑施工地基开挖及施工方法
CN112554198B (zh) * 2020-11-04 2022-05-20 中建五局土木工程有限公司 紧邻高层建筑物的深基坑防护结构的施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070052109A (ko) * 2005-11-16 2007-05-21 금동성 슬림형 합성 바닥 구조를 이용한 슬라브와 외벽의 동시 타설 및 지하 역타설 동시구축방법
JP4050816B2 (ja) * 1997-12-16 2008-02-20 株式会社フジタ 鉄骨鉄筋コンクリート建築物の地下部分の施工方法
CN101285309A (zh) * 2008-06-06 2008-10-15 南通华汇建筑工程有限公司 高层建筑深基坑复合支护方法
CN101614019A (zh) * 2008-11-11 2009-12-30 中铁四局集团建筑工程有限公司 紧临既有建筑物多层地下结构自支护施工方法
CN101705685A (zh) * 2009-11-06 2010-05-12 上海市第一建筑有限公司 地下结构周边梁板踏步式逆作施工方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60172157A (ja) * 1984-02-15 1985-09-05 Mitsubishi Electric Corp 放電ランプ
WO2000042263A2 (en) * 1999-01-13 2000-07-20 Won Kee Hong Composite retaining wall and construction method for underground structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4050816B2 (ja) * 1997-12-16 2008-02-20 株式会社フジタ 鉄骨鉄筋コンクリート建築物の地下部分の施工方法
KR20070052109A (ko) * 2005-11-16 2007-05-21 금동성 슬림형 합성 바닥 구조를 이용한 슬라브와 외벽의 동시 타설 및 지하 역타설 동시구축방법
CN101285309A (zh) * 2008-06-06 2008-10-15 南通华汇建筑工程有限公司 高层建筑深基坑复合支护方法
CN101614019A (zh) * 2008-11-11 2009-12-30 中铁四局集团建筑工程有限公司 紧临既有建筑物多层地下结构自支护施工方法
CN101705685A (zh) * 2009-11-06 2010-05-12 上海市第一建筑有限公司 地下结构周边梁板踏步式逆作施工方法

Also Published As

Publication number Publication date
CN102425172A (zh) 2012-04-25

Similar Documents

Publication Publication Date Title
CN102425172B (zh) 紧邻高层建筑开挖深基坑的支护方法
CN106150506B (zh) 一种出入口明挖段倒挂井壁施工方法
CN205742213U (zh) 基坑支护结构
CN102434717B (zh) 工字钢顶管工作坑的施工方法
CN104452809A (zh) 一种超浅埋隧道盖挖施工方法
CN102758632A (zh) 岩质地层双初支分层法修建大型地下结构的方法
CN104264688A (zh) 人工挖孔变截面桩支护施工工艺
CN103321246B (zh) 采用地下连续墙的基坑施工方法
CN104131565B (zh) 一种逆作土方正作开挖的施工方法
CN103774675A (zh) 组合双排桩联合竖向预应力锚杆支护体系及其施工方法
CN103306289A (zh) 基坑桩锚护壁混凝土锚索冠梁结构及其施工方法
CN102817372A (zh) 地下深基础混凝土反模施工方法
CN111560962A (zh) 一种回填区基坑支护结构及其施工方法
CN104653188A (zh) 一种在暗挖风道内设置大直径盾构接收和始发井的方法
CN109853399A (zh) 用于拱桥的大截面倾斜隧道式拱座结构及其施工方法
CN103527204B (zh) 一种先墙后拱交叉中隔壁的隧道施工方法
CN203729309U (zh) 组合双排桩联合竖向预应力锚杆支护体系
CN211851850U (zh) 一种适用于湿陷性黄土的小净距隧道支护结构
CN209941754U (zh) 一种高压电力管涵原地保护结构
CN210163910U (zh) 一种管道顶管接收井基坑支护结构
CN203373753U (zh) 基坑桩锚护壁混凝土锚索冠梁结构
CN102605801A (zh) 一种地下圆形水池悬挂半逆作施工方法
CN212642730U (zh) 一种湿陷性黄土地区隧道穿越人防结构
CN113445548A (zh) 一种城市地下空间拓建竖井加固方法
CN210507517U (zh) 一种适用于挡土墙加高的组合构件

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant