CN102425153A - 湿陷性黄土场地浸水方法 - Google Patents

湿陷性黄土场地浸水方法 Download PDF

Info

Publication number
CN102425153A
CN102425153A CN2011104290917A CN201110429091A CN102425153A CN 102425153 A CN102425153 A CN 102425153A CN 2011104290917 A CN2011104290917 A CN 2011104290917A CN 201110429091 A CN201110429091 A CN 201110429091A CN 102425153 A CN102425153 A CN 102425153A
Authority
CN
China
Prior art keywords
water
piling wall
circle
underground piling
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104290917A
Other languages
English (en)
Inventor
李长风
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA HUI AUTONOMOUS REGION ELECTRIC POWER DESIGN INSTITUTE
Original Assignee
NINGXIA HUI AUTONOMOUS REGION ELECTRIC POWER DESIGN INSTITUTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA HUI AUTONOMOUS REGION ELECTRIC POWER DESIGN INSTITUTE filed Critical NINGXIA HUI AUTONOMOUS REGION ELECTRIC POWER DESIGN INSTITUTE
Priority to CN2011104290917A priority Critical patent/CN102425153A/zh
Publication of CN102425153A publication Critical patent/CN102425153A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明涉及湿陷性黄土地区地基处理,特别是一种湿陷性黄土场地浸水方法,该方法是在在拟建场地或厂区边界形成了一圈地下桩墙,形成捅型隔水帷幕,在隔水帷幕围护范围内进行浸水消陷,阻隔了场地浸水向场地外的渗透,有效的防止了“跑水”和穿洞,大大降低了用水量;由于不“跑水”,在土体浸透,沉降稳定后即可抽水,加速压密过程,大大缩短了浸水到沉降稳定的时间;沉降范围得到有效控制,从而消除了对场地周边已有建筑物及农田的不良影响,同时大大降低了引起浸水土体产生滑坡的可能性。施工时,地下桩墙又可作为基坑护坡设施和厂区围墙地基。

Description

湿陷性黄土场地浸水方法
所属技术领域
本发明涉及湿陷性黄土地区地基处理,特别是一种湿陷性黄土场地浸水方法。
背景技术
针对大厚度自重湿陷性黄土地基,消除自重湿陷性是保证建筑物安全的必要条件。目前成熟的湿陷性黄土地基处理方法有强夯法、浸水法,碎石挤密桩、灰土桩等,每一种方法都受到环境、运输等因素的限制。
浸水法用于湿陷性黄土地区的工业和民用建筑的地基加固和处理在我国是60年代开始的,浸水法的原理是在建筑物施工前对湿陷性黄土场地大面积浸水,使土体在饱和自重压力作用下发生湿陷,产生压密,以消除全部土层的自重湿陷性和深部土层的外荷湿陷性。它的最大特点是节约建筑材料,节约工程投资。这种方法可以消除地面下6米以下全部土层的湿陷性,不留死角。使用于厚度大的湿陷性黄土。但浸水法在我国应用多年后也暴露出它的缺陷。1.因为没有周边限制,水浸入土层后向周边渗透流失,用水量大;2.由于浸水时场地周围地表下沉开裂,并容易造成“跑水”,穿洞,影响附近建筑物安全;3.由于浸水后土体压密沉降,土的孔隙度减小,阻止了水的渗出,造成一个场地从浸水起至下沉稳定以后,土的含水量降低到一定要求时所需要的时间较长;4.在山区,当黄土层底面倾向下坡且倾角较大时,浸水后由于饱和土体容重增加,土体滑动力增加,黄土层底面浸水导致抗滑力降低,容易引起浸水土体滑坡。
发明内容
本发明的目的是针对现有浸水技术的缺陷,提供一种可以限制浸水范围的湿陷性黄土场地浸水方法。 
本发明的技术方案是:一种湿陷性黄土场地浸水方法,该方法包括一下步骤:
1)沿工程施工图围墙位置设置地下桩墙,地下使桩墙形成完整的闭合圈;
2)在地下桩墙圈外5米内按50米间距设置抽水井;
3)在地下桩墙圈内设置渗水砂井和内抽水井;
4)地下桩墙圈内设置沉降观测标尺;
5)沿地下桩墙圈筑高0.5米的一圈土堤,使场地形成一个水池;
6)向上述形成的水池场地内灌水至地面水深0.3米,观测沉降直至沉降稳定;
7)地下桩墙圈内沉降稳定后,将地下桩墙圈内渗水砂井和抽水井中的水抽干;抽干水后放置15天,继续观测场地土的固结过程,待地基土再次沉降稳定即可根据建筑物荷载要求进行后续处理和基础配置。
上述地下桩墙的上端与地面平齐,地下桩墙的下端必须穿透湿陷性土层,进入隔水层0.5米。
上述地下桩墙开采用水泥混凝土制成。
本发明具有以下特点:1、由于在拟建场地或厂区边界形成了一圈地下桩墙,形成捅型隔水帷幕,在隔水帷幕围护范围内进行浸水消陷,阻隔了场地浸水向场地外的渗透,有效的防止了“跑水”和穿洞,大大降低了用水量;2、由于不“跑水”,在土体浸透,沉降稳定后即可抽水,加速压密过程,大大缩短了浸水到沉降稳定的时间;3、沉降范围得到有效控制,从而消除了对场地周边已有建筑物及农田的不良影响,同时大大降低了引起浸水土体产生滑坡的可能性。4、施工时,地下桩墙又可作为基坑护坡设施和厂区围墙地基。
附图说明
附图1为本发明的俯视结构示意图;
附图2为本发明的A-A剖面示意图。
具体实施方式
如附图1、2所示,湿陷性黄土场地浸水方法的施工工艺:
1、按照审定的工程施工图围墙位置布置地下桩墙1,使地下桩墙形成完整的闭合圈,也就是捅型隔水帷幕。地下桩墙的上端与地面平齐,地下桩墙的下端必须穿透湿陷性土层,进入隔水层0.5米。这样在进行浸水消陷时,阻隔了场地内的浸水向场地外渗透;地下桩墙开采用水泥混凝土制成;
2、在地下桩墙圈外5米内按50米间距设置抽水井2;
3、在地下桩墙圈内设置渗水砂井3和内抽水井4;
4、地下桩墙圈内设置沉降观测标尺,用于观测沉降量;
5、沿地下桩墙圈筑高0.5米的一圈土堤5,使场地形成一个水池;
6、向上述形成的水池场地内灌水至地面水深0.3米,观测沉降直至沉降稳定;
7、地下桩墙圈内沉降稳定后,将地下桩墙圈内渗水砂井和抽水井中的水抽干;抽干水后放置15天,继续观测场地土的固结过程,待地基土再次沉降稳定即可根据建筑物荷载要求进行后续处理和基础配置。
本湿陷性黄土场地浸水方法适用于黄土层之下有稳定的隔水层,如第三系泥岩;地下桩墙的高度一般≤20米。

Claims (3)

1. 一种湿陷性黄土场地浸水方法,该方法包括一下步骤:
1)沿工程施工图围墙位置设置地下桩墙,地下使桩墙形成完整的闭合圈;
2)在地下桩墙圈外5米内按50米间距设置抽水井;
3)在地下桩墙圈内设置渗水砂井和内抽水井;
4)地下桩墙圈内设置沉降观测标尺;
5)沿地下桩墙圈筑高0.5米的一圈土堤,使场地形成一个水池;
6)向上述形成的水池场地内灌水至地面水深0.3米,观测沉降直至沉降稳定;
7)地下桩墙圈内沉降稳定后,将地下桩墙圈内渗水砂井和抽水井中的水抽干;抽干水后放置15天,继续观测场地土的固结过程,待地基土再次沉降稳定即可根据建筑物荷载要求进行后续处理和基础配置。
2. 根据权利要求1所述的湿陷性黄土场地浸水方法,其特征在于上述地下桩墙的上端与地面平齐,地下桩墙的下端必须穿透湿陷性土层,进入隔水层0.5米。
3. 根据权利要求2所述的湿陷性黄土场地浸水方法,其特征在于上述地下桩墙开采用水泥混凝土制成。
CN2011104290917A 2011-12-20 2011-12-20 湿陷性黄土场地浸水方法 Pending CN102425153A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104290917A CN102425153A (zh) 2011-12-20 2011-12-20 湿陷性黄土场地浸水方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104290917A CN102425153A (zh) 2011-12-20 2011-12-20 湿陷性黄土场地浸水方法

Publications (1)

Publication Number Publication Date
CN102425153A true CN102425153A (zh) 2012-04-25

Family

ID=45959179

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104290917A Pending CN102425153A (zh) 2011-12-20 2011-12-20 湿陷性黄土场地浸水方法

Country Status (1)

Country Link
CN (1) CN102425153A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239480A (zh) * 2015-08-26 2016-01-13 中国十七冶集团有限公司 一种围堰式焖料施工工艺
CN105735232A (zh) * 2016-02-18 2016-07-06 河海大学 一种湿陷性黄土井点预浸水强夯置换方法
CN106400768A (zh) * 2016-09-12 2017-02-15 中铁第勘察设计院集团有限公司 湿陷性黄土隧道浸水试验方法
CN107090842A (zh) * 2017-05-18 2017-08-25 甘肃省地震局 一种地铁车站大厚度湿陷性黄土地基的处理方法
CN110672491A (zh) * 2019-10-18 2020-01-10 西安科技大学 深厚湿陷性土层浸水量的研究方法
CN112695736A (zh) * 2020-08-11 2021-04-23 甘肃中建市政工程勘察设计研究院有限公司 预浸水联合堆载降水预压处理湿陷性黄土地基结构及方法
CN114859016A (zh) * 2022-06-21 2022-08-05 西安理工大学 黄土湿陷性试验方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1395762A1 (ru) * 1986-07-04 1988-05-15 Таджикский политехнический институт Способ уплотнени лессовых просадочных грунтов
CN1807773A (zh) * 2006-02-09 2006-07-26 西安理工大学 一种深厚湿陷性黄土地基的处理方法
CN1851146A (zh) * 2006-05-18 2006-10-25 贵阳铝镁设计研究院 湿陷性黄土地基压力水固结法
CN1851145A (zh) * 2006-05-18 2006-10-25 贵阳铝镁设计研究院 湿陷性黄土地基浸水固结法
CN1873108A (zh) * 2006-06-30 2006-12-06 贵阳铝镁设计研究院 湿陷性黄土地基密闭真空膜压力水固结法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1395762A1 (ru) * 1986-07-04 1988-05-15 Таджикский политехнический институт Способ уплотнени лессовых просадочных грунтов
CN1807773A (zh) * 2006-02-09 2006-07-26 西安理工大学 一种深厚湿陷性黄土地基的处理方法
CN1851146A (zh) * 2006-05-18 2006-10-25 贵阳铝镁设计研究院 湿陷性黄土地基压力水固结法
CN1851145A (zh) * 2006-05-18 2006-10-25 贵阳铝镁设计研究院 湿陷性黄土地基浸水固结法
CN1873108A (zh) * 2006-06-30 2006-12-06 贵阳铝镁设计研究院 湿陷性黄土地基密闭真空膜压力水固结法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王军平: "对深厚湿陷性黄土地基处理的探讨", 《西北水电》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105239480A (zh) * 2015-08-26 2016-01-13 中国十七冶集团有限公司 一种围堰式焖料施工工艺
CN105735232A (zh) * 2016-02-18 2016-07-06 河海大学 一种湿陷性黄土井点预浸水强夯置换方法
CN106400768A (zh) * 2016-09-12 2017-02-15 中铁第勘察设计院集团有限公司 湿陷性黄土隧道浸水试验方法
CN106400768B (zh) * 2016-09-12 2019-01-11 中铁第一勘察设计院集团有限公司 湿陷性黄土隧道浸水试验方法
CN107090842A (zh) * 2017-05-18 2017-08-25 甘肃省地震局 一种地铁车站大厚度湿陷性黄土地基的处理方法
CN110672491A (zh) * 2019-10-18 2020-01-10 西安科技大学 深厚湿陷性土层浸水量的研究方法
CN110672491B (zh) * 2019-10-18 2021-10-19 西安科技大学 深厚湿陷性土层浸水量的研究方法
CN112695736A (zh) * 2020-08-11 2021-04-23 甘肃中建市政工程勘察设计研究院有限公司 预浸水联合堆载降水预压处理湿陷性黄土地基结构及方法
CN114859016A (zh) * 2022-06-21 2022-08-05 西安理工大学 黄土湿陷性试验方法

Similar Documents

Publication Publication Date Title
CN102425153A (zh) 湿陷性黄土场地浸水方法
CN101245602A (zh) 坑中坑支护体系的施工工艺
CN103031837A (zh) 井点降水联合堆载预压加固深厚软土地基方法
Chu et al. Land reclamation using clay slurry or in deep water: challenges and solutions
CN107587516A (zh) 一种跟进式高效止水阻砂降水复合系统及其施工方法
CN104947650B (zh) 砂井堆载预压后后注浆封闭加固方法
CN102926376A (zh) 一种围海造地区域软土地基处理方法
CN107090842A (zh) 一种地铁车站大厚度湿陷性黄土地基的处理方法
CN104695456A (zh) 一种新型竖井水平旋喷桩基坑侧壁止水帷幕的施工方法
CN101413277B (zh) 一种深层钻孔挤淤排泥建筑物纠倾方法
CN104695457B (zh) 一种新型竖井水平旋喷桩基坑封底隔水层的施工方法
CN108867673A (zh) 一种基于抽水帷幕的基坑中地下水治理方法
CN102787608B (zh) 真空作用重力式基坑支护体系及施工方法
Raju et al. Ground improvement: principles and applications in Asia
CN107190709B (zh) 新近疏浚土吹填成陆围区内建设河道的方法
CN204919566U (zh) 一种软土地区塔吊基础施工支护结构
Jefferson et al. Improvement of collapsible loess in Eastern Europe
CN207211176U (zh) 一种超高大沉井
CN109826201A (zh) 一种软弱土基坑台阶式支护方法
CN203113361U (zh) 深基坑封闭降水装置
CN105350544A (zh) 用于含有块石区域的止水帷幕及其施工方法
Xu et al. Numerical study on karst treatment technology of Wuhan Metro Line 6
CN203755332U (zh) 灰土挤密桩与cfg刚性桩联合处理湿陷性黄土的装置
CN103938640B (zh) 搭设钢平台进行陆上桥梁基础施工工艺
RU131747U1 (ru) Противофильтрационный экран

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120425