CN102409614B - 节段梁拼装造桥机节段支撑横梁 - Google Patents

节段梁拼装造桥机节段支撑横梁 Download PDF

Info

Publication number
CN102409614B
CN102409614B CN2011102579250A CN201110257925A CN102409614B CN 102409614 B CN102409614 B CN 102409614B CN 2011102579250 A CN2011102579250 A CN 2011102579250A CN 201110257925 A CN201110257925 A CN 201110257925A CN 102409614 B CN102409614 B CN 102409614B
Authority
CN
China
Prior art keywords
fabrication machine
bridge fabrication
sections
bridge
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011102579250A
Other languages
English (en)
Other versions
CN102409614A (zh
Inventor
方中虎
孙述灿
贾东荣
陈中竹
董育军
吕鹏
姚松柏
王玉林
冯海珍
程桂芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN2011102579250A priority Critical patent/CN102409614B/zh
Publication of CN102409614A publication Critical patent/CN102409614A/zh
Application granted granted Critical
Publication of CN102409614B publication Critical patent/CN102409614B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种节段梁拼装造桥机节段支撑横梁,其特征是在左右两段对称设置的结构中,与造桥机主箱梁呈“L”形设置的支撑横梁是由双头螺杆吊挂在造桥机主箱梁的内侧;在造桥机主箱梁的外侧,位于上部设置一旋转油缸,位于底部设置一转动支撑块;支撑横梁以处在主箱梁外侧对应位置上的支撑立柱与主箱梁上转动支撑块铰接,以支撑横梁上延伸在主箱梁以外的端部立柱与旋转油缸中可伸缩的液压拉杆相连接,形成以造桥机主箱梁上转动支撑块为转动中心的支撑横梁在竖直平面中的可转动结构。本发明以合理的结构形式实现左右两段支撑横梁的开合,使造桥机顺利前移过孔,有效降低安全风险。

Description

节段梁拼装造桥机节段支撑横梁
技术领域
本发明涉及移动模架造桥机,更具体地说是节段梁拼装造桥机节段支撑横梁。
背景技术
随着交通建设事业的不断发展,移动模架造桥机的应用日益广泛,而在桥梁节段箱梁拼装施工中,造桥机如何实现前移过孔是一项关键技术。尤其是在客运专线中,桥梁墩身设计截面较大,过孔时,造桥机支撑横梁如何避开前方墩身是前移过孔时最大的技术难点。
我国大西铁路客运专线晋陕黄河特大桥引桥部分采用了82孔48m节段箱梁,由于墩身高度均在46m以上,无法采用支架或膺架法现浇施工;也由于梁跨较大,如果采用整孔现浇,各种工程材料的运输、小型机具、周转料的运送均很困难,这也将大大降低施工效率和安全性。在综合考虑以上各种因素后,梁部最终设计为节段箱梁,并以中下承式造桥机进行现场拼装施工。
晋陕黄河特大桥48m节段箱梁每孔分11个节段,其中端部节段2节,每节长度3.2m,其余段长度3.9m,桥面宽度12m,梁高4.628m。节段拼装采用湿接法施工,湿接缝宽0.8m。结合这一结构特点,造桥机在设计上需针对湿接缝设置10个支撑横梁,用以支承11个节段梁块,另外为湿接缝底模的安装、节段梁块平面及高程的调整提供一个可靠的工作平台。
根据移动模架造桥机的特点,支撑横梁必须设置成左右两段,分别与两侧主梁呈“L”形相连接,并在箱梁的中线位置处左右两段支撑横梁之间设置成螺栓连接,在拼装施工和造桥机前移过孔时可实现自由开合,从而实现造桥机的移动。
由于桥墩高度较高的原因,墩身的结构采用了薄壁空心墩形式,墩身最小截面尺寸为6.0m×9.0m,而梁面宽度为12.0m,造桥机前移过孔时支撑横梁如何避开桥墩是一大难题。对于采用水平开合结构形式,由于桥墩宽度为9m,单侧需要外移4.6m以上,这在设计和施工上难度太大,可操作性较差,安全风险非常大。
迄今为止,针对上述情况还没有相关的解决方式的公开报导。
发明内容
本发明是为避免上述现有技术所存在的不足之处,提供一种节段梁拼装造桥机节段支撑横梁,以合理的结构形式实现左右两段支撑横梁的开合,使造桥机顺利前移过孔,降低安全风险。
本发明为解决技术问题采用如下技术方案:
本发明节段梁拼装造桥机节段支撑横梁是以桥箱梁的中线为中心,左右两段呈对称设置。
本发明的结构特点是在所述左右两段对称设置的结构中,与造桥机主箱梁呈“L”形设置的支撑横梁是由双头螺杆吊挂在造桥机主箱梁的内侧;在所述造桥机主箱梁的外侧,位于上部设置一旋转油缸,位于底部设置一转动支撑块;所述支撑横梁以处在造桥机主箱梁的外侧对应位置上的支撑立柱与造桥机主箱梁上转动支撑块铰接,以支撑横梁上延伸在造桥机主箱梁以外的端部立柱与旋转油缸中可伸缩的液压拉杆相连接,形成以所述造桥机主箱梁上转动支撑块为转动中心的支撑横梁在竖直平面中的可转动结构;所述左右两段支撑横梁在左右两段对接位置上是以螺栓连接,并用螺纹钢加固。
本发明节段梁拼装造桥机节段支撑横梁的结构特点也在于:以所述支撑横梁作为支撑平台,在所述支撑平台上设置用于支撑节段块的调节撑杆,所述调节撑杆设置为可以调节支撑高度的螺旋杆。
与已有技术相比,本发明有益效果体现在:
1、本发明是将支撑横梁设置为可绕线路中线适度旋转的结构形式,这样,在造桥机前移时,只需水平打开1m的宽度,支撑横梁以旋转的方式进行开合,可以避开前方桥墩轻松过孔。
2、本发明中支撑横梁兼具支承梁体和工作平台的作用,具有很强的应用价值。
3、本发明以支撑横梁作为湿接缝施工的操作平台,在进行湿接缝施工时,施工人员全部位于节段支撑横梁内,作为空间宽阔,有效地确保了操作空间的需要和人身安全的保障。
附图说明
图1为本发明结构示意图;
图中标号:1桥箱梁;2造桥机主箱梁;3支撑横梁;4双头螺杆;5旋转油缸;6转动支撑块;7支撑立柱;8端部立柱;9调节撑杆。
具体实施方式
参见图1,本实施例中节段梁拼装造桥机节段支撑横梁,是以桥箱梁1的中线为中心,左右两段呈对称设置,在左右两段对称设置的结构中,与造桥机主箱梁2呈“L”形设置的支撑横梁3是由双头螺杆4吊挂在造桥机主箱梁2的内侧;在造桥机主箱梁2的外侧,位于上部设置一旋转油缸5,位于底部设置一转动支撑块6;支撑横梁3以处在造桥机主箱梁2外侧对应位置上的支撑立柱7与造桥机主箱梁2上转动支撑块6铰接,以支撑横梁3上延伸在造桥机主箱梁2以外的端部立柱8与旋转油缸5中可伸缩的液压拉杆相连接,形成以造桥机主箱梁2上转动支撑块6为转动中心的支撑横梁3在竖直平面中的可转动结构;左右两段支撑横梁3在左右两段对接位置上是以螺栓连接,并以螺纹钢形成加固;
具体实施中,以支撑横梁3作为支撑平台,在支撑平台上设置用于支撑节段块的调节撑杆9,节段块支撑在调节撑杆9上,调节撑杆9设置为可以调节支撑高度,即调节节段块竖向标高的螺旋杆。
本实施例中同时以支撑横梁3作为操作平台,在操作平台上设置用于存放拆下的湿接缝底模的模板连接座。
此外,为了保证支撑横梁的旋转开合,还需要按常规设置水平方向的开模油缸,使左右两段支撑横梁在水平方向上可相向移动一段距离,形成相互之间的合拢或分开;使左右两段支撑横梁在旋转过程中不形成相互干扰。
施工过程:
1、开模油缸收缩,合拢左右两段支撑横梁,在左右两段支撑横梁的对接处以螺栓连接,并以螺纹钢和锁紧螺母形成加固;
2、连接造桥机主箱梁与支撑横梁之间的双头螺杆,节段块吊装就位,起重天车吊起节段梁块、旋转调节撑杆对节段梁块形成有效支撑;支立模板、置入钢筋、砼浇筑、预应力施工:
3、解除支撑横梁的各种连接,拆除双头螺杆,启动开模油缸使左右两段支撑横梁水平分开;启动旋转油缸、支撑横梁在竖直平面中向下旋转打开;
4、造桥机启动后辅助支腿、拆除后托架支腿,前移过孔;在使造桥机纵向就位之后重复上述过程进行施工。

Claims (2)

1.节段梁拼装造桥机节段支撑横梁,是以桥箱梁(1)的中线为中心,左右两段呈对称设置,其特征是:在所述左右两段对称设置的结构中,与造桥机主箱梁(2)呈“L”形设置的支撑横梁(3)是由双头螺杆(4)吊挂在造桥机主箱梁(2)的内侧;在所述造桥机主箱梁(2)的外侧,位于上部设置一旋转油缸(5),位于底部设置一转动支撑块(6);所述支撑横梁(3)以处在造桥机主箱梁(2)的外侧对应位置上的支撑立柱(7)与造桥机主箱梁(2)上转动支撑块(6)铰接,以支撑横梁(3)上延伸在造桥机主箱梁(2)以外的端部立柱(8)与旋转油缸(5)中可伸缩的液压拉杆相连接,形成以所述造桥机主箱梁(2)上转动支撑块(6)为转动中心的支撑横梁(3)在竖直平面中的可转动结构;所述左右两段支撑横梁(3)在左右两段对接位置上是以螺栓连接,并用螺纹钢加固。
2.根据权利要求1所述的节段梁拼装造桥机节段支撑横梁,其特征是以所述支撑横梁(3)作为支撑平台,在所述支撑平台上设置用于支撑节段块的调节撑杆(9),所述调节撑杆(9)设置为可以调节支撑高度的螺旋杆。
CN2011102579250A 2011-09-02 2011-09-02 节段梁拼装造桥机节段支撑横梁 Expired - Fee Related CN102409614B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011102579250A CN102409614B (zh) 2011-09-02 2011-09-02 节段梁拼装造桥机节段支撑横梁

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011102579250A CN102409614B (zh) 2011-09-02 2011-09-02 节段梁拼装造桥机节段支撑横梁

Publications (2)

Publication Number Publication Date
CN102409614A CN102409614A (zh) 2012-04-11
CN102409614B true CN102409614B (zh) 2013-08-07

Family

ID=45911935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011102579250A Expired - Fee Related CN102409614B (zh) 2011-09-02 2011-09-02 节段梁拼装造桥机节段支撑横梁

Country Status (1)

Country Link
CN (1) CN102409614B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485286B (zh) * 2013-10-08 2015-09-02 中铁二局股份有限公司 一种箱梁预制节段箱室加固方法
CN104179123A (zh) * 2014-08-26 2014-12-03 中国铁建大桥工程局集团有限公司 一种两孔连做节段拼装造桥机
CN111501566B (zh) * 2020-04-24 2022-04-15 贵州路桥集团有限公司 一种钢混组合梁节段螺栓连接平台及其连接施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101126223A (zh) * 2007-09-17 2008-02-20 中铁二局股份有限公司 移动式整体施工平台及施工方法和专用吊具
CN201648971U (zh) * 2010-03-29 2010-11-24 山东省路桥集团有限公司 曲线箱梁滑移模架
CN202194076U (zh) * 2011-09-02 2012-04-18 中铁上海工程局第一工程有限公司 节段梁拼装造桥机节段支撑横梁

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101126223A (zh) * 2007-09-17 2008-02-20 中铁二局股份有限公司 移动式整体施工平台及施工方法和专用吊具
CN201648971U (zh) * 2010-03-29 2010-11-24 山东省路桥集团有限公司 曲线箱梁滑移模架
CN202194076U (zh) * 2011-09-02 2012-04-18 中铁上海工程局第一工程有限公司 节段梁拼装造桥机节段支撑横梁

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
MZ32型移动模架造桥机在秦沈客运专线的应用;肖敏 雷昌龙;《铁道工程学报》;20011031(第10期);107-110 *
肖敏 雷昌龙.MZ32型移动模架造桥机在秦沈客运专线的应用.《铁道工程学报》.2001,(第10期),107-110.

Also Published As

Publication number Publication date
CN102409614A (zh) 2012-04-11

Similar Documents

Publication Publication Date Title
CN106012864B (zh) 一种桥梁拱肋整体提升安装的方法
CN101408019B (zh) 一种低高度预制箱梁内模施工方法
CN203768814U (zh) 高墩小半径曲线现浇箱梁新型移动模架
CN202658533U (zh) 一种变幅宽曲线桥移动模架
CN106640138A (zh) 廊道分离式钢模板台车
CN102409614B (zh) 节段梁拼装造桥机节段支撑横梁
CN110184944A (zh) 一种宽体双幅架桥机及其架设方法
CN102154988A (zh) 大跨度钢箱叠拱桥先梁后拱的施工方法
CN104131515A (zh) 移动模架现浇箱梁施工方法
CN102660925A (zh) 一种变幅宽曲线桥移动模架
CN106223983A (zh) 一种引水隧洞斜井、平段全断面通用钢模台车
CN110158470B (zh) 一种复杂环境下可纵、横移移动模架施工公路连续梁的方法
CN108149589B (zh) 大跨度过隧箱梁架桥机
CN202194076U (zh) 节段梁拼装造桥机节段支撑横梁
CN209114331U (zh) 可翻转开模避开障碍物的上行式移动模架
CN210368663U (zh) 一种宽体双幅架桥机
CN104018855A (zh) 一种内通式针梁衬砌台车
CN101205702A (zh) 梁模合一型移动模架
CN201279830Y (zh) 一种低高度预制箱梁内模
CN2490261Y (zh) 房屋柱的型钢托换装置
CN105863261A (zh) 一种万向可调式悬挂模板系统
CN206092017U (zh) 一种引水隧洞斜井、平段全断面通用钢模台车
CN209469044U (zh) 一种便于材料堆存与加工的可移动式防护棚
CN201132942Y (zh) 梁模合一型移动模架
CN210597031U (zh) 用于宽体架桥机的四前支腿系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: THE 1ST CIVIL ENGINEERING CO., LTD. OF CREC SHANGH

Effective date: 20120314

Owner name: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

Free format text: FORMER OWNER: THE 1ST CIVIL ENGINEERING CO., LTD. OF CREC SHANGHAI

Effective date: 20120314

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 241000 WUHU, ANHUI PROVINCE TO: 200436 ZHABEI, SHANGHAI

TA01 Transfer of patent application right

Effective date of registration: 20120314

Address after: 272 No. three, No. 278, Shanghai Road, Zhabei District, 200436

Applicant after: Shanghai Civil Engineering Co., Ltd. of CREC

Co-applicant after: The 1st Civil Engineering Co., Ltd. of CREC Shanghai

Address before: 241000 Wuhu City, Anhui province Bu shop

Applicant before: The 1st Civil Engineering Co., Ltd. of CREC Shanghai

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

Free format text: FORMER NAME: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

CP01 Change in the name or title of a patent holder

Address after: 272 No. three, No. 278, Shanghai Road, Zhabei District, 200436

Patentee after: Shanghai Civil Engineering Co., Ltd. of Crec

Patentee after: THE FIRST CIVIL ENGINEERING CO., LTD. OF CREC SHANGHAI GROUP

Address before: 272 No. three, No. 278, Shanghai Road, Zhabei District, 200436

Patentee before: Shanghai Civil Engineering Co., Ltd. of CREC

Patentee before: The 1st Civil Engineering Co., Ltd. of CREC Shanghai

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130807

Termination date: 20190902