CN102403673A - Novel 2* one-drag-three tension stringing construction process - Google Patents

Novel 2* one-drag-three tension stringing construction process Download PDF

Info

Publication number
CN102403673A
CN102403673A CN2011103241294A CN201110324129A CN102403673A CN 102403673 A CN102403673 A CN 102403673A CN 2011103241294 A CN2011103241294 A CN 2011103241294A CN 201110324129 A CN201110324129 A CN 201110324129A CN 102403673 A CN102403673 A CN 102403673A
Authority
CN
China
Prior art keywords
novel
coaster
lead
tension stringing
under tension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103241294A
Other languages
Chinese (zh)
Inventor
黄成云
桂和怀
朱冠旻
武抒理
杨少春
孙淼
刘旭光
单长孝
刘承志
杨海峰
严继军
朱立明
张永奈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Power Transmission and Transformation Engineering Co Ltd
Original Assignee
Anhui Power Transmission and Transformation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Power Transmission and Transformation Engineering Co Ltd filed Critical Anhui Power Transmission and Transformation Engineering Co Ltd
Priority to CN2011103241294A priority Critical patent/CN102403673A/en
Publication of CN102403673A publication Critical patent/CN102403673A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention relates to a tension stringing construction process with an odd number of conductors, which opens up a new way for the spreading of an odd number of multi-split large-section conductors for the ultrahigh voltage engineering. The tension stringing construction process comprises the following steps of: improving a one-drag-four payoff tackle at a lowest cost to realize the matching and the common use of one-drag-four and one-drag-three tackles; selecting the type for a one-drag-three running board, ensuring that the self torque of the one-drag-three running board is balanced, and the one-drag-three running board is matched with the tackles and has strong passing performance and small extrusion for the tackles; researching and developing a novel one-drag-three payoff matched tool and forming the whole set of novel 2* one-drag-three tension stringing construction process.

Description

Novel 2 * one lead three construction under tension stringing technologies
Technical field
This InventionRelate to odd number wire tension overhead construction process.
Background technology
Increasingly high along with electric pressure, transmission capacity is increasing, more large-section lead constantly occurs, and has further improved laying tension, adopts even number lead traction again, main pull rope needs all upgradings to order again; As adopt the traction of odd number lead, releasing pulley need change to even number wheel eccentric wheel, and not strong with existing unwrapping wire mode matching, drop into huge.Research is transformed existing " one leads four " releasing pulley with the cost of minimum; Realize " one leads four " and " one leads three " mode coaster coupling, general; Form novel " 2 * one lead three " construction under tension stringing technology, for ± 800kV brocade Soviet Union line stringing reaches later large-section lead odd level unfolding conductor has extremely important meaning.
" one leads three " tension stringing is domestic to have Beijing to send power transformation to use in the lineman's journey that makes progress; Beijing send that power transformation adopts is six to take turns eccentric wheel, and this type coaster has been owing to adopted eccentric structure, can realize three root leads, main lead through the time all be in poised state; Because this type coaster needs customization again; Equipment has high input, and not strong with existing Work tool versatility, application value is not high.
Novel " 2 * one lead three " construction under tension stringing technology; Transform the hang of existing five wheel line tackles; Realized the slitless connection of from " one leads four " to " one leads three " unwrapping wire mode with the cost of minimum; Very strong promotional value is arranged, this " one leads three " overhead construction process, five wheel line tackle highly versatiles, do not need the customization.Novel " 2 * one lead three " construction under tension stringing technology overhead construction process does not still have relevant unit at home and in engineering, uses.
Summary of the invention
Be used for novel " 2 * one lead three " construction under tension stringing technology, it is characterized in that: adopt cost transformation " leads four " Φ 916mm five to take turns the sipes releasing pulley, realize " one leads four " and " one leads three " mode coaster coupling, general with minimum; Develop the supporting Work tool of novel " one leads three " five wheel line tackles; Select " one leads three " limp with five wheel line tackles coupling; Study novel 2*1 and lead 3 tension stringing coaster hangs.
Concrete technical solution is following:
Said five wheel line tackles adopt the double hanging point design, and single-point intensity satisfies force request, and two dot structures are used for self-balancing.
Said novel 2*1 leads 3 construction under tension stringing process matching Work tools and comprises special connection channel-section steel, the parallel link plate of P-2522, GJ-150 steel strand wire.
Said special connection channel-section steel middle part is provided with φ 39 holes, two φ 26 holes, is used to connect the tangent tower LXV yoke plate construction hole of dangling.
Two φ 32 holes that increase on parallel link plate of said P-2522 and the coaster yoke plate match, and promptly each five is taken turns coaster and adopt two parallel link plates of P-2522 to link to each other with the special channel-section steel that is connected, and is used for self-balancing.
Said GJ-150 steel strand wire are that gold utensil is supplied under the untimely situation, replace the gold utensil string and the hanger of special processing, its two ends compressed steel anchor.Be different from and traditional hanger (like pull-rod), its have in light weight, can stretch in the wrong, be easy to characteristics such as installation, convenient transportation.
Said " one leads three " limp adopts the asymmetrical design principle to guarantee self-balancing, and structure and coaster are supporting.Two parts before and after limp is divided into connect through the bolted splice formula, are beneficial to through coaster, and job-hopping is avoided in applying more, steady.
Said coaster hang is: link to each other through special connection channel-section steel construction hole, middle part (6,7) and LXV yoke plate (4) hole of constructing of dangling; Gold utensil does not utilize GJ-150 steel strand wire (5) to replace the gold utensil string to link to each other with the special construction holes, channel-section steel both ends (10) that are connected under situation; Then through go up two φ 32 holes (9) that increase at coaster yoke plate (8); Connect with the special channel-section steel that is connected with two parallel link plates of P-2522 (3), guaranteed main when leading with lead through coaster coaster all be in poised state.This InventionUseful technique effect be embodied in following several aspect:
1, makes full use of existing unwrapping wire facility completion six division large-section leads exhibitions and put, avoid purchasing jumboes such as large-tonnage hauling machine, pull rope, releasing pulley, reduce the equipment purchasing cost.
2, on details, optimize, the coaster double hanging point improves balance quality; The oblique guide rail simplified structure of limp, the balance when three root leads are drawn in the raising limp.
3, the exhibition of lead and pull rope minute wheel is put, and avoids the lead wearing and tearing; The sub-conductor spacing strengthens, and reduces sub-wire flogging and twisted wire probability, is beneficial to wire-protecting; Convenient follow-up construction technology is installed.
Description of drawings
Fig. 1 is five wheel line tackles
The novel 2*1 of Fig. 2 leads 3 construction under tension stringing process matching Work tools and coaster hang
Fig. 3 is SZF-1 * three-way limp of 3P type
Embodiment
Below in conjunction with accompanying drawing, through embodiment to this InventionDo explanation further.
Embodiment 1:
Referring to Fig. 1, Fig. 2, be used for novel " 2 * one lead three " construction under tension stringing technology unwrapping wire five and take turns coaster (1), groove width 125mm, groover rot diameter 800mm; Separation 130mm, the metallic channel kiss-coating is in the unwrapping wire process; The master leads away middle wheel, and 1,2, No. 5 wheel is walked lead, No. 4 byes; Another organizes reverse symmetry.
The coaster force analysis
(360+230-160)N=200F1
F1=2.15N
F2=0.85N
Releasing pulley adopts the double hanging point design, and single-point intensity satisfies force request, and two dot structures are used for self-balancing; Do not change original five and take turns the coaster overall structure, simple and practical, can be recycled and reused for other engineering.
Embodiment 2:
Referring to Fig. 2; Be used for the suspension of novel " 2 * one lead three " construction under tension stringing technology releasing pulley; Link to each other through special connection channel-section steel construction hole, middle part (6,7) and LXV yoke plate (4) hole of constructing of dangling; Gold utensil does not utilize GJ-150 steel strand wire (5) to replace the gold utensil string to link to each other with the special construction holes, channel-section steel both ends (10) that are connected under situation; Two φ 32 holes (9) through go up increasing at coaster yoke plate (8) then are connected the channel-section steel connection with two parallel link plates of P-2522 (3) with special, and coaster all is in poised state when having guaranteed that the master leads with lead through coaster.
Embodiment 3:
Referring to Fig. 3, be used for novel " 2 * one lead three " construction under tension stringing technology SZF-1 * three-way limp of 3P type (dividing A, Type B), adopt the asymmetrical design principle to guarantee self-balancing, structure and coaster are supporting.Two parts before and after limp is divided into connect through the bolted splice formula, are beneficial to through coaster, and job-hopping is avoided in applying more, steady.
Limp is dead-weight balanced
The tension force equalising torque of three root leads: T1 * 217+T2 * 86-T3 * 303=0
The downforce equalising torque of three root leads: F1 * 217+F2 * 86-F3 * 303=0

Claims (8)

1. novel 2*1 leads 3 construction under tension stringing technologies, it is characterized in that: adopt cost transformation " leads four " the Φ 916mm five with minimum to take turns the sipes releasing pulley, realize " one leads four " and " one leads three " mode coaster coupling, general; Develop novel 2*1 and lead 3 construction under tension stringing process matching Work tools; Select " one leads three " limp with five wheel line tackles coupling; Study novel 2*1 and lead 3 tension stringing coaster hangs.
2. lead 3 construction under tension stringing technologies according to the novel 2*1 of claim 1, it is characterized in that: said five wheel line tackles (1) adopt the double hanging point design, and single-point intensity satisfies force request, and two dot structures are used for self-balancing.
3. lead 3 construction under tension stringing technologies according to the said novel 2*1 of claim 1, it is characterized in that: said novel 2*1 leads 3 construction under tension stringing process matching Work tools and comprises special connection channel-section steel (2), the parallel link plate of P-2522 (3), GJ-150 steel strand wire (5).
4. lead 3 construction under tension stringing technologies according to the said novel 2*1 of claim 1-3, it is characterized in that: said special connection channel-section steel (3) middle part is provided with φ 39 holes (6), two φ 26 holes (7), is used to connect tangent tower LXV yoke plate (4) the construction hole of dangling.
5. lead 3 construction under tension stringing technologies according to the said novel 2*1 of claim 1-3; It is characterized in that: the parallel link plate of said P-2522 (3) is gone up two φ 32 holes (9) that increase with coaster yoke plate (8) and is matched; Be that each five takes turns that coaster (1) adopts two parallel link plates of P-2522 (3) and special to be connected channel-section steel (2) continuous, be used for self-balancing.
6. lead 3 construction under tension stringing technologies according to the said novel 2*1 of claim 1-3, it is characterized in that: said GJ-150 steel strand wire (5) are supplied under the untimely situation for gold utensil, replace the gold utensil string and the hanger of special processing, its two ends compressed steel anchor.Be different from and traditional hanger (like pull-rod), its have in light weight, can stretch in the wrong, be easy to characteristics such as installation, convenient transportation.
7. lead 3 construction under tension stringing technologies according to the said novel 2*1 of claim 1-2, it is characterized in that: said " one leads three " limp, adopt the asymmetrical design principle to guarantee self-balancing, structure and coaster are supporting.Two parts before and after limp is divided into connect through the bolted splice formula, are beneficial to through coaster, and job-hopping is avoided in applying more, steady.
8. lead 3 construction under tension stringing technologies according to the said novel 2*1 of claim 1-5; Said coaster hang is: link to each other through special connection channel-section steel construction hole, middle part (6,7) and LXV yoke plate (4) hole of constructing of dangling; Gold utensil does not utilize GJ-150 steel strand wire (5) to replace the gold utensil string to link to each other with the special construction holes, channel-section steel both ends (10) that are connected under situation; Then through go up two φ 32 holes (9) that increase at coaster yoke plate (8); Connect with the special channel-section steel that is connected with two parallel link plates of P-2522 (3), guaranteed main when leading with lead through coaster coaster all be in poised state.
CN2011103241294A 2011-10-21 2011-10-21 Novel 2* one-drag-three tension stringing construction process Pending CN102403673A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103241294A CN102403673A (en) 2011-10-21 2011-10-21 Novel 2* one-drag-three tension stringing construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103241294A CN102403673A (en) 2011-10-21 2011-10-21 Novel 2* one-drag-three tension stringing construction process

Publications (1)

Publication Number Publication Date
CN102403673A true CN102403673A (en) 2012-04-04

Family

ID=45885596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103241294A Pending CN102403673A (en) 2011-10-21 2011-10-21 Novel 2* one-drag-three tension stringing construction process

Country Status (1)

Country Link
CN (1) CN102403673A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103500963A (en) * 2013-09-24 2014-01-08 国网上海市电力公司 Suspension device for wire-unwinding tackle with combination between one-pull-four mode and one-pull-two mode
CN105576552A (en) * 2014-11-05 2016-05-11 辽宁省送变电工程公司 Tension stringing self-balancing wire paying-out tackle and towing plate
CN106058740A (en) * 2016-07-28 2016-10-26 郑州东辰科技有限公司 Overhead line erecting method
CN106300129A (en) * 2015-12-10 2017-01-04 国家电网公司 Great span device for suspending line tackles
CN106329386A (en) * 2016-09-23 2017-01-11 国家电网公司 Combined paying-off tackle hanging rack
CN107453273A (en) * 2017-08-14 2017-12-08 青海送变电工程公司 One kind eight divides large-section lead coaster hanger
CN109119932A (en) * 2018-05-25 2019-01-01 安徽送变电工程有限公司 A kind of " 2 lead 3 " device for suspending line tackles with equilibrium function
CN115275873A (en) * 2022-08-04 2022-11-01 国网福建省电力有限公司 Tension adjusting method for outlet tension of tension machine for transmission line tension paying-off walking plate to pass through corner tower

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201490626U (en) * 2009-08-21 2010-05-26 中国电力科学研究院 Asymmetrical towing plate for one-drag-three tension stringing

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201490626U (en) * 2009-08-21 2010-05-26 中国电力科学研究院 Asymmetrical towing plate for one-drag-three tension stringing

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
汤良友等: "±800 kV 特高压直流输电线路张力架线滑车悬挂施工工艺", 《电力建设》 *
沈志: "超高压架空输电线路张力放线施工技术应用研究", 《昆明理工大学硕士学位论文》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103500963A (en) * 2013-09-24 2014-01-08 国网上海市电力公司 Suspension device for wire-unwinding tackle with combination between one-pull-four mode and one-pull-two mode
CN103500963B (en) * 2013-09-24 2016-04-20 国网上海市电力公司 A kind of suspension arrangement of " one leads four+one leads two " releasing pulley
CN105576552A (en) * 2014-11-05 2016-05-11 辽宁省送变电工程公司 Tension stringing self-balancing wire paying-out tackle and towing plate
CN105576552B (en) * 2014-11-05 2018-02-02 辽宁省送变电工程公司 A kind of tension stringing self-balancing releasing pulley and towing plate
CN106300129A (en) * 2015-12-10 2017-01-04 国家电网公司 Great span device for suspending line tackles
CN106058740A (en) * 2016-07-28 2016-10-26 郑州东辰科技有限公司 Overhead line erecting method
CN106329386A (en) * 2016-09-23 2017-01-11 国家电网公司 Combined paying-off tackle hanging rack
CN107453273A (en) * 2017-08-14 2017-12-08 青海送变电工程公司 One kind eight divides large-section lead coaster hanger
CN107453273B (en) * 2017-08-14 2019-08-27 青海送变电工程公司 One kind eight divides large-section lead coaster hanger
CN109119932A (en) * 2018-05-25 2019-01-01 安徽送变电工程有限公司 A kind of " 2 lead 3 " device for suspending line tackles with equilibrium function
CN109119932B (en) * 2018-05-25 2023-06-20 安徽送变电工程有限公司 '2-traction-3' paying-off pulley suspension device with balancing function
CN115275873A (en) * 2022-08-04 2022-11-01 国网福建省电力有限公司 Tension adjusting method for outlet tension of tension machine for transmission line tension paying-off walking plate to pass through corner tower

Similar Documents

Publication Publication Date Title
CN102403673A (en) Novel 2* one-drag-three tension stringing construction process
CN101582572B (en) Method of extra-high voltage tension stringing
CN100464474C (en) Live line replacing method high voltage transmission line strain insulator-string and device
CN202471525U (en) Tensile bending test device for submarine cables
JP5812325B2 (en) Electric wire tension reduction device and electric wire tension reduction method
CN102354926A (en) Large-section conductor tension stringing construction method
CN102447242B (en) Combined structure of suspension insulator string and strain clamp and construction method thereof
CN102290742A (en) Tension stringing construction technology
CN102593759B (en) One-pulling-two expansion and construction process of large-section lead
CN103594976B (en) Combination stringing instrument for line conductor stringing
CN101651306B (en) Asymmetric traction plate and matching stringing pulley for one-pull-three tension stringing
CN102025119B (en) Paying-off system and method
CN202353087U (en) Tension stringing pulley suspension device
CN104022459A (en) 10 KV distribution line pole-mounted wire suspension device
CN101582571A (en) Multi-supporting point self balancing paying-off tackle
CN101692551B (en) Stringing pulley and stringing walking plate
CN104634677A (en) Horizontal stretch bending device
CN201490620U (en) Balanced dual-traction type running board
CN104233888A (en) Novel steel wire rope weaving and connecting method
CN208299329U (en) A kind of 1,250 8 split conductor coaster integral hanging yoke plates
CN103500963B (en) A kind of suspension arrangement of " one leads four+one leads two " releasing pulley
CN201383640Y (en) Walking board
CN202405723U (en) Combined structure for suspension insulator strings and strain clamps
CN103579952B (en) Bulb fixing-line device for overhead transmission line stringing
CN201417905Y (en) Combined type threading pulley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120404