CN102400558B - Process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method - Google Patents

Process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method Download PDF

Info

Publication number
CN102400558B
CN102400558B CN201010279866.2A CN201010279866A CN102400558B CN 102400558 B CN102400558 B CN 102400558B CN 201010279866 A CN201010279866 A CN 201010279866A CN 102400558 B CN102400558 B CN 102400558B
Authority
CN
China
Prior art keywords
steel
platform
steel column
column
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010279866.2A
Other languages
Chinese (zh)
Other versions
CN102400558A (en
Inventor
陈小东
冯娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201010279866.2A priority Critical patent/CN102400558B/en
Publication of CN102400558A publication Critical patent/CN102400558A/en
Application granted granted Critical
Publication of CN102400558B publication Critical patent/CN102400558B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method, it is characterized in that comprising the following steps: a, lifting steel column, b, correction steel column, steel column in c, observing and controlling composite steel frame installation, d, installation multilayer technology steel platform girder steel, e, connection steel column and Vierendeel girder web and the edge of a wing, f, installation secondary beam and platform bed board.It is reasonable in design, simple to operate that process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method of the present invention has making step, the safe and reliable advantage with reducing engineering cost of workmanship.

Description

Process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method
Technical field
The present invention relates to a kind of main body frame Steel Structure Installation method, specifically, is a kind of process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method.
Background technology
The technique of benzol hydro refining unit is more special, its system complex, and equipment is many, and the pressure of system own, temperature are higher, and pump unit does not allow idle running.Benzene hydrogenation engineering be mainly divided into central control room and electric substation, refining plant, water supply and sewage work, air compression station, storage and handling facility (tank field and pump house), full factory powers and the illumination of full factory, torch and engineering ancillary facility, in the electrical install of these facilities, have lightning protection, fire prevention, explosion-proof particular/special requirement, wherein main body frame Steel Structure Installation is the important step in whole electrical installation system.Current domestic built or install and be still in the stage lack of standardization building process steel platform steel columns in project of mounting benzene hydrogenation steel structure, there is a lot of not science, irrational place, manufacturing process is numerous and diverse, manufacturing cost is high.
Therefore known process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method also exists above-mentioned all inconvenience and problem.
Summary of the invention
Object of the present invention, is to propose a kind of safe and reliable process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method.
For achieving the above object, technical solution of the present invention is:
A kind of process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method, is characterized in that comprising the following steps:
A, lifting steel column, described steel column is steel column, and first paragraph steel column hoisted in position stone bolt is fixed, second segment and above steel column first fill 1/2 plain bolt and fix, with the clamping of web junction plate, otic placode plain bolt is fixed, and changes high-strength bolt again after steel column adjustment;
B, correction steel column, after steel column in place, use crane, steel are carved and are first adjusted absolute altitude with backing plate, then adjust torsion, finally adjust verticality, no longer do Integral correction after forming framework;
Steel column in c, observing and controlling composite steel frame installation, the observing and controlling of composite steel frame installation precision is based on observing and controlling steel column, observing and controlling steel column dropping place fixed vertical degree and capital axis, after considering steel girder erection, post beam splice Site Welding amount of contraction, the outward-dipping scope of steel column is (platform elevation location) 1 ~ 2mm;
D, installation multilayer technology steel platform girder steel, described technique steel platform girder steel is shaped steel;
E, connection steel column and Vierendeel girder web and the edge of a wing, steel column is connected with Vierendeel girder web high-strength bolt, and steel column and the edge of a wing are for being welded and fixed, and construction order is just twist high-strength bolt, then welds, last stubborn high-strength bolt eventually;
F, installation secondary beam and platform bed board, the platform surface of technique steel platform is waffle slab, pays civil engineering concrete platform after installation, welding secondary beam and platform bed board.
Process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method of the present invention can also be further achieved by the following technical measures.
Aforesaid method, wherein said steps d installs multilayer technology steel platform girder steel, and the first therefrom span of same colonnade Vierendeel girder of multilayer technology steel platform girder steel starts to install, symmetry is expanded to two ends, when installing girder steel, verticality of steel column generally can not change, and uses transit tracking observation; If verticality of steel column is overproof, girder steel size should be checked and carry out necessary process.
Aforesaid method, wherein said steps d installs multilayer technology steel platform girder steel, after the same layer platform framework beam hoisted in position of multilayer technology steel platform girder steel, repetition measurement verticality, girder steel absolute altitude conform to quality requirements, connect with high-strength bolt, fix steel column and steel column, steel column and platform framework web.
After adopting technique scheme, process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method of the present invention has the following advantages:
1, making step is reasonable in design, simple to operate;
2, workmanship is safe and reliable;
3, engineering cost is reduced.
Detailed description of the invention
The present invention is further illustrated below by way of specific embodiment.
Embodiment 1
A kind of process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method, is characterized in that comprising the following steps:
A, lifting steel column, described steel column is steel column, and first paragraph steel column hoisted in position stone bolt is fixed, second segment and above steel column first fill 1/2 plain bolt and fix, with the clamping of web junction plate, otic placode plain bolt is fixed, and changes high-strength bolt again after steel column adjustment;
B, correction steel column, after steel column in place, use crane, steel are carved and are first adjusted absolute altitude with backing plate, then adjust torsion, finally adjust verticality, no longer do Integral correction after forming framework;
Steel column in c, observing and controlling composite steel frame installation, the observing and controlling of composite steel frame installation precision is based on observing and controlling steel column, observing and controlling steel column dropping place fixed vertical degree and capital axis, after considering steel girder erection, post beam splice Site Welding amount of contraction, the outward-dipping scope of steel column is (platform elevation location) 1 ~ 2mm;
D, installation multilayer technology steel platform girder steel, described technique steel platform girder steel is shaped steel; The first therefrom span of same colonnade Vierendeel girder of described multilayer technology steel platform girder steel starts to install, and symmetrical to two ends expansion, when installing girder steel, verticality of steel column generally can not change, and uses transit tracking observation; If verticality of steel column is overproof, girder steel size should be checked and carry out necessary process; After the same layer platform framework beam hoisted in position of described multilayer technology steel platform girder steel, repetition measurement verticality, girder steel absolute altitude conform to quality requirements, connect with high-strength bolt, fix steel column and steel column, steel column and platform framework web;
E, connection steel column and Vierendeel girder web and the edge of a wing, steel column is connected with Vierendeel girder web high-strength bolt, and steel column and the edge of a wing are for being welded and fixed, and construction order is just twist high-strength bolt, then welds, last stubborn high-strength bolt eventually;
F, installation secondary beam and platform bed board, the platform surface of technique steel platform is waffle slab, pays civil engineering concrete platform after installation, welding secondary beam and platform bed board.
Above embodiment is used for illustrative purposes only, but not limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes also should belong to category of the present invention, should be limited by each claim.

Claims (3)

1. a process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method, is characterized in that comprising the following steps:
A, lifting steel column, described steel column is steel column, and first paragraph steel column hoisted in position stone bolt is fixed, second segment and above steel column first fill 1/2 plain bolt and fix, with the clamping of web junction plate, otic placode plain bolt is fixed, and changes high-strength bolt again after steel column adjustment;
B, correction steel column, after steel column in place, use crane, steel are carved and are first adjusted absolute altitude with backing plate, then adjust torsion, finally adjust verticality, no longer do Integral correction after forming framework;
Steel column in c, observing and controlling composite steel frame installation, the observing and controlling of composite steel frame installation precision based on observing and controlling steel column, observing and controlling steel column dropping place fixed vertical degree and capital axis, the outward-dipping scope of steel column is 1 ~ 2mm;
D, installation multilayer technology steel platform girder steel, described technique steel platform girder steel is shaped steel;
E, connection steel column and Vierendeel girder web and the edge of a wing, steel column is connected with Vierendeel girder web high-strength bolt, and steel column and the edge of a wing are for being welded and fixed, and construction order is just twist high-strength bolt, then welds, last stubborn high-strength bolt eventually;
F, installation secondary beam and platform bed board, the platform surface of technique steel platform is waffle slab, pays civil engineering concrete platform after installation, welding secondary beam and platform bed board.
2. process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method as claimed in claim 1, it is characterized in that, described steps d installs multilayer technology steel platform girder steel, the first therefrom span of same colonnade Vierendeel girder of multilayer technology steel platform girder steel starts to install, symmetrical to two ends expansion, use transit tracking observation; If verticality of steel column is overproof, girder steel size should be checked.
3. process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method as claimed in claim 1, it is characterized in that, described steps d installs multilayer technology steel platform girder steel, after the same layer platform framework beam hoisted in position of multilayer technology steel platform girder steel, repetition measurement verticality, girder steel absolute altitude conform to quality requirements, be connected and fixed steel column and steel column, steel column and platform framework web with high-strength bolt.
CN201010279866.2A 2010-09-13 2010-09-13 Process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method Active CN102400558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010279866.2A CN102400558B (en) 2010-09-13 2010-09-13 Process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010279866.2A CN102400558B (en) 2010-09-13 2010-09-13 Process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method

Publications (2)

Publication Number Publication Date
CN102400558A CN102400558A (en) 2012-04-04
CN102400558B true CN102400558B (en) 2016-01-27

Family

ID=45883167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010279866.2A Active CN102400558B (en) 2010-09-13 2010-09-13 Process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method

Country Status (1)

Country Link
CN (1) CN102400558B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569351A (en) * 2015-12-20 2016-05-11 安徽伟宏钢结构集团股份有限公司 Mounting construction technology of steel structure steel column
CN105672667A (en) * 2016-04-12 2016-06-15 中交一航局安装工程有限公司 Installation process for electric coal wharf screening system
CN106193625B (en) * 2016-07-15 2018-05-04 沈阳建筑大学 A kind of transport of roundstone column and hanging method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201128956Y (en) * 2007-09-30 2008-10-08 贵州喀斯特钢结构有限公司 Assembled integral flat-plate or curve type vierendeel steel lattice structure
CN101691787A (en) * 2009-09-22 2010-04-07 中铁十二局集团建筑安装工程有限公司 Converse construction process for middle-high steel structure building
JP2010121286A (en) * 2008-11-17 2010-06-03 Tekken Constr Co Ltd Construction method of steel structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201128956Y (en) * 2007-09-30 2008-10-08 贵州喀斯特钢结构有限公司 Assembled integral flat-plate or curve type vierendeel steel lattice structure
JP2010121286A (en) * 2008-11-17 2010-06-03 Tekken Constr Co Ltd Construction method of steel structure
CN101691787A (en) * 2009-09-22 2010-04-07 中铁十二局集团建筑安装工程有限公司 Converse construction process for middle-high steel structure building

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
高层建筑结构工程施工技术分析与探讨;杜欣双;《价值工程》;20100808(第22期);第75页 *
高层建筑钢结构安装关键技术研究;李恩平等;《青岛理工大学学报》;20090615;第30卷(第3期);第151-154页"3关键工序施工技术及质量控制措施"部分 *

Also Published As

Publication number Publication date
CN102400558A (en) 2012-04-04

Similar Documents

Publication Publication Date Title
US20190257094A1 (en) Building based on large-space structure and freestanding external envelope as well as construction method
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN102400559A (en) Steel column correction method in assembly of main body frame steel structure in benzene hydrogenation engineering
CN103982038B (en) A kind of for solar energy separate house modularization rapid-assembling construction method
CN105019573A (en) Prefabricated external wall template structure system with heat insulation function, and construction method thereof
CN204040464U (en) A kind of slab form supporting construction
CN203961276U (en) High-building construction steel form and handling frame Integral lifting stage apparatus
CN107227870B (en) Substation building spliced by prefabricated parts
CN202810173U (en) Mounting and construction platform for steel lining bracket and circular crane track girder of nuclear power plant
CN102400558B (en) Process steel platform steel columns in project of mounting benzene hydrogenation steel structure mounting method
CN103615047B (en) The method that lighting roof steel truss and curtain wall are installed high up in the air
CN105089192A (en) Dismountable bottom formwork steel bar truss floor support plate and assembling method of dismountable bottom formwork steel bar truss floor support plate
CN109267695B (en) Light assembled prefabricated wallboard with connecting structure and installation method thereof
CN108049666A (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN106930527A (en) The compound formwork high-altitude long-span prestressed girder construction technology of encorbelmenting of three-dimensional artificial shaped steel
CN203471133U (en) Welding device for steel-bar-truss production line
CN203441069U (en) Outer wall dangling working platform capable of overturning
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN202577580U (en) Multilayer longspan assembled integral space steel grid building structure
CN102465601B (en) Method for installing main body frame steel structure of benzene hydrogenation project
CN105625732A (en) Supporting-free construction method of ultrahigh overhung steel-structure truss
CN102758525A (en) Benzene hydrogenation engineering formwork installing method
CN102287050B (en) Construction method for long-span steel reinforced concrete roof truss
CN104947804A (en) Steel bracket and construction method for constructing beam column joint structure through steel bracket
CN201411926Y (en) Arc beam hoisting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant