CN102758525A - Benzene hydrogenation engineering formwork installing method - Google Patents

Benzene hydrogenation engineering formwork installing method Download PDF

Info

Publication number
CN102758525A
CN102758525A CN2011101064350A CN201110106435A CN102758525A CN 102758525 A CN102758525 A CN 102758525A CN 2011101064350 A CN2011101064350 A CN 2011101064350A CN 201110106435 A CN201110106435 A CN 201110106435A CN 102758525 A CN102758525 A CN 102758525A
Authority
CN
China
Prior art keywords
template
benzene hydrogenation
mounting method
hydrogenation engineering
earlier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101064350A
Other languages
Chinese (zh)
Inventor
陈小东
冯娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN2011101064350A priority Critical patent/CN102758525A/en
Publication of CN102758525A publication Critical patent/CN102758525A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a benzene hydrogenation engineering formwork installing method. Formworks are processed and spliced in advance according to a formwork matching graph in a carpentry yard. The benzene hydrogenation engineering formwork installing method is characterized by comprising the following steps: a, installing a pillar formwork; b, installing a beam formwork; c, installing a floor formwork; and d, installing a wall body formwork. The benzene hydrogenation engineering formwork installing method disclosed by the invention has the advantages of reasonable design of the construction steps, simpleness in operation, safe and reliable engineering quality and reduction of the engineering construction cost.

Description

Benzene hydrogenation engineering template mounting method
Technical field
The present invention relates to the template mounting method in a kind of construction work, specifically, is a kind of benzene hydrogenation engineering template mounting method.
Background technology
The technology of benzene hydrogenation device is more special, its system complex, and equipment is many, and the pressure of system own, temperature are higher, and pump unit does not allow idle running.The benzene hydrogenation engineering mainly is divided into the ancillary facility of central control room and electric substation, refining plant, water supply and sewage work, air compression station, storage and handling facility (tank field and pump house), the power supply of full factory and the illumination of full factory, torch and engineering; Lightning protection, fire prevention, explosion-proof specific (special) requirements are arranged in the electric installation of these facilities, and template to install be the important step in the whole construction work.At present domesticly built or still be in the stage lack of standardization at benzene hydrogenation engineering template mounting method, existed much not science, irrational place, manufacturing process is numerous and diverse, manufacturing cost is high.
Therefore known benzene hydrogenation engineering template mounting method exists above-mentioned all inconvenience and problem.
Summary of the invention
The object of the invention is to propose a kind of safe and reliable benzene hydrogenation engineering template mounting method.
For realizing above-mentioned purpose, technical solution of the present invention is:
A kind of benzene hydrogenation engineering template mounting method, system is processed, pieced together to template at carpentry yard according to joining mould figure in advance, it is characterized in that may further comprise the steps:
A, post template are installed
On base surface, play mast axis and post template inner edge earlier; Earlier fix the bottom square plate according to the sideline, aim at sideline erection column template then, breach will be reserved in capital and beam junction; Notch size is the sectional dimension of beam, at the bottom of breach and both sides nail on the lining mouthful shelves;
B, beam forms are installed
On beam bracing frame cross bar, play beam center line and beam form sideline; The beam base plate takes the steel pipe framed bent with wooden model or the lumps of wood is shored; After a beam base plate template and a side template install, the opposite side template is installed again after waiting the beam steel colligation good;
C, slab form are installed
Earlier play horizon in the biside plate outside of inferior beam forms, horizontal absolute altitude is that absolute altitude deducts slab form thickness and grid height at the bottom of the floor, nails on bolster by horizon then, and bolster is suitable for reading mutually neat with horizon; Lay out five equilibrium grid spacing to the other grid of beam form earlier again; Pendulum mid portion grid, nail platform template at last on the grid upper berth;
D, wall form are installed
Wall form in installing earlier, back outer wall template; Exterior wall is installed inner side template, back outboard template earlier; Template handling to assembly unit is good is in place, with crowbar adjustment template aligned inside template inner edge snap the line, split bolt and back of the body side is installed at last.
Benzene hydrogenation engineering template mounting method of the present invention can also adopt following technical measures further to realize.
Aforesaid method, wherein said template and support thereof have enough intensity, rigidity and stability, and the supporting part of its support has enough bearing areas; If template is installed in Ji Tushang, base soil is wanted solid and drainage measure is arranged.
Aforesaid method, wherein said template are during as the upper former of cast-in-place structural and support thereof, and lower floor's floor has the supporting capacity of bearing the upper strata load, or adds support, and the column of upper and lower layer support aims at, and lay backing plate.
Aforesaid method, the seam of wherein said template is spillage not; Before concreting, wooden form waters moistening, but in the template ponding must not be arranged.
Aforesaid method, wherein said template must not be stain reinforcing bar and concrete joint stranding place when brushing template interleaving agent.
Aforesaid method, allowable variation such as following table 1 that wherein said template is installed as the cast-in-place structural template.
The allowable variation and the method for inspection that table 1 template is installed as the cast-in-place structural template
Figure 870114DEST_PATH_IMAGE002
Aforesaid method, among the wherein said step b, the inferior beam forms in the beam forms will be installed after the girder template is installed and proofreaied and correct again.
Aforesaid method, among the wherein said step b, beam forms will draw center line to check after installing.
Aforesaid method, among the wherein said step b, beam forms was provided with split bolt when depth of beam was big, in case the template end opening moves outward or the mould that rises.
Aforesaid method, among the wherein said step b, when the span of beam was not less than 4m, beam forms was by the designing requirement arch camber, and during the design no requirement (NR), the height of arch camber is 1 ‰ of beam span~3 ‰.
Aforesaid method, among the wherein said step c, slab form is only in the template end or the joint stickfast, and middle few nail or do not follow closely is with form removal after convenient.
After adopting technique scheme, benzene hydrogenation engineering template mounting method of the present invention has the following advantages:
1, construction sequence is reasonable in design, simple to operate;
2, workmanship is safe and reliable;
3, reduce the engineering construction cost.
Description of drawings
Fig. 1 is the post template scheme of installation of the embodiment of the invention;
Fig. 2 is the beam forms scheme of installation of the embodiment of the invention.
Among the figure: 1 channel-section steel, 2 wooden a tree, used in making timber for boats, 3 reinforcing bar split bolts, 4 wooden forms, 5 steel pipes.
The specific embodiment
Below further specify the present invention through specific embodiment and accompanying drawing thereof.
Benzene hydrogenation engineering template mounting method of the present invention, system is processed, pieced together to template at carpentry yard according to joining mould figure in advance, it is characterized in that may further comprise the steps:
A, post template are installed
Fig. 1 is the post template scheme of installation of the embodiment of the invention.Go up at base surface (or flooring) earlier and play mast axis and post template 4 inner edges; Earlier fix the bottom square plate according to the sideline, aim at sideline erection column template then, breach will be reserved in capital and beam junction; Notch size is the sectional dimension of beam, at the bottom of breach and both sides nail on the lining mouthful shelves; (beam base plate thickness considered is interior).Column section hour can will be used split bolt when column section is big without reinforcing bar split bolt 3;
B, beam forms are installed
Fig. 2 is the beam forms scheme of installation of the embodiment of the invention.On beam bracing frame cross bar, play beam center line and beam form sideline; The beam base plate takes steel pipe 5 framed bents with wooden model or the lumps of wood is shored; After a beam base plate template and a side template install, the opposite side template is installed again after waiting the beam steel colligation good; The installation of inferior beam forms will be carried out after the girder template is installed and proofreaied and correct again.Beam forms is installed the post-tensioning center line and is checked.
Establish split bolt when depth of beam is big, in case the template end opening moves or the mould that rises outward.
When the span of beam was not less than 4m, by the designing requirement arch camber, during the design no requirement (NR), springing height was 1 ‰ of beam span~3 ‰;
C, slab form are installed
Earlier play horizon in the biside plate outside of inferior beam forms, horizontal absolute altitude is that absolute altitude deducts slab form thickness and grid height at the bottom of the floor, nails on bolster by horizon then, and bolster is suitable for reading mutually neat with horizon; Lay out five equilibrium grid spacing to the other grid of beam form earlier again; Pendulum mid portion grid, nail platform template at last on the grid upper berth; For ease of form removal, only in the template end or the joint stickfast, middle few nail or do not follow closely is with form removal after convenient.
D, wall form are installed
Wall form in installing earlier, back outer wall template; Exterior wall is installed inner side template, back outboard template earlier; Template handling to assembly unit is good is in place, with crowbar adjustment template aligned inside template inner edge snap the line.By job design split bolt and back of the body side are installed.
Benzene hydrogenation engineering template mounting method of the present invention, said template and support thereof have enough intensity, rigidity and stability, and the supporting part of its support has enough bearing areas; If template is installed in Ji Tushang, base soil is wanted solid and drainage measure is arranged.
Said template is during as the upper former of cast-in-place structural and support thereof, and lower floor's floor has the supporting capacity of bearing the upper strata load, or adds support, and the column of upper and lower layer support aims at, and lays backing plate.
The seam of said template is spillage not; Before concreting, wooden form waters moistening, but in the template ponding must not be arranged.
Said template must not be stain reinforcing bar and concrete joint stranding place when brushing template interleaving agent.
Allowable variation such as following table 1 that said template is installed as the cast-in-place structural template.
The allowable variation and the method for inspection that table 1 template is installed as the cast-in-place structural template
Figure 849571DEST_PATH_IMAGE004
Above embodiment only supplies to explain the present invention's usefulness, but not limitation of the present invention, the technician in relevant technologies field under the situation that does not break away from the spirit and scope of the present invention, can also make various conversion or variation.Therefore, all technical schemes that are equal to also should belong to category of the present invention, should be limited each claim.

Claims (11)

1. benzene hydrogenation engineering template mounting method, system is processed, pieced together to template at carpentry yard according to joining mould figure in advance, it is characterized in that may further comprise the steps:
A, post template are installed
On base surface, play mast axis and post template inner edge earlier; Earlier fix the bottom square plate according to the sideline, aim at sideline erection column template then, breach will be reserved in capital and beam junction; Notch size is the sectional dimension of beam, at the bottom of breach and both sides nail on the lining mouthful shelves;
B, beam forms are installed
On beam bracing frame cross bar, play beam center line and beam form sideline; The beam base plate takes the steel pipe framed bent with wooden model or the lumps of wood is shored; After a beam base plate template and a side template install, the opposite side template is installed again after waiting the beam steel colligation good;
C, slab form are installed
Earlier play horizon in the biside plate outside of inferior beam forms, horizontal absolute altitude is that absolute altitude deducts slab form thickness and grid height at the bottom of the floor, nails on bolster by horizon then, and bolster is suitable for reading mutually neat with horizon; Lay out five equilibrium grid spacing to the other grid of beam form earlier again; Pendulum mid portion grid, nail platform template at last on the grid upper berth;
D, wall form are installed
Wall form in installing earlier, back outer wall template; Exterior wall is installed inner side template, back outboard template earlier; Template handling to assembly unit is good is in place, with crowbar adjustment template aligned inside template inner edge snap the line, split bolt and back of the body side is installed at last.
2. benzene hydrogenation engineering template mounting method as claimed in claim 1 is characterized in that said template and support thereof have enough intensity, rigidity and stability, and the supporting part of its support has enough bearing areas; Template is installed in Ji Tushang, and base soil is wanted solid and drainage measure is arranged.
3. benzene hydrogenation engineering template mounting method as claimed in claim 1 is characterized in that, said template is during as the upper former of cast-in-place structural and support thereof; Lower floor's floor has the supporting capacity of bearing the upper strata load; Or add support, and the column aligning of upper and lower layer support, and lay backing plate.
4. benzene hydrogenation engineering template mounting method as claimed in claim 1 is characterized in that the seam of said template is spillage not; Before concreting, wooden form waters moistening, but in the template ponding must not be arranged.
5. benzene hydrogenation engineering template mounting method as claimed in claim 1 is characterized in that, said template must not be stain reinforcing bar and concrete joint stranding place when brushing template interleaving agent.
6. benzene hydrogenation engineering template mounting method as claimed in claim 1 is characterized in that, allowable variation such as following table that said template is installed as the cast-in-place structural template:
7. benzene hydrogenation engineering template mounting method as claimed in claim 1 is characterized in that, among the said step b, the inferior beam forms in the beam forms will be installed after the girder template is installed and proofreaied and correct again.
8. benzene hydrogenation engineering template mounting method as claimed in claim 1 is characterized in that, among the said step b, beam forms will draw center line to check after installing.
9. benzene hydrogenation engineering template mounting method as claimed in claim 1 is characterized in that, among the said step b, beam forms was provided with split bolt when depth of beam was big, in case the template end opening moves outward or the mould that rises.
10. benzene hydrogenation engineering template mounting method as claimed in claim 1 is characterized in that, among the said step b, when the span of beam was not less than 4m, the height of beam forms arch camber was 1 ‰ of beam span~3 ‰.
11. benzene hydrogenation engineering template mounting method as claimed in claim 1 is characterized in that, among the said step c, slab form is only in the template end or the joint stickfast, and middle few nail or do not follow closely is with form removal after convenient.
CN2011101064350A 2011-04-27 2011-04-27 Benzene hydrogenation engineering formwork installing method Pending CN102758525A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101064350A CN102758525A (en) 2011-04-27 2011-04-27 Benzene hydrogenation engineering formwork installing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101064350A CN102758525A (en) 2011-04-27 2011-04-27 Benzene hydrogenation engineering formwork installing method

Publications (1)

Publication Number Publication Date
CN102758525A true CN102758525A (en) 2012-10-31

Family

ID=47053155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101064350A Pending CN102758525A (en) 2011-04-27 2011-04-27 Benzene hydrogenation engineering formwork installing method

Country Status (1)

Country Link
CN (1) CN102758525A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174288A (en) * 2013-03-15 2013-06-26 中国十七冶集团有限公司 Reinforcing method for U-bar hoop formworks of large-section frame column
CN103334582A (en) * 2013-07-05 2013-10-02 天津住宅集团建设工程总承包有限公司 Method for installing and constructing short-leg shear wall formwork supporting system
CN105178625A (en) * 2015-06-05 2015-12-23 中国十七冶集团有限公司 Beam-slab supporting set
CN108104464A (en) * 2017-12-26 2018-06-01 宁波二十冶建设有限公司 A kind of elder generation's beam rear pillar formwork structure and erection method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007277813A (en) * 2006-04-03 2007-10-25 Taisei Corp Method and device for changing construction plan using three-dimensional laser scanner
CN101886470A (en) * 2010-07-20 2010-11-17 中国建筑第八工程局有限公司 Construction method of exposed concrete ribbed beams
CN101892743A (en) * 2010-06-19 2010-11-24 张培霞 Construction method of permanent housing
CN101967882A (en) * 2010-08-26 2011-02-09 陕西建工集团第一建筑工程有限公司 Construction method for controlling wall thickness by utilizing large formwork split bolts

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007277813A (en) * 2006-04-03 2007-10-25 Taisei Corp Method and device for changing construction plan using three-dimensional laser scanner
CN101892743A (en) * 2010-06-19 2010-11-24 张培霞 Construction method of permanent housing
CN101886470A (en) * 2010-07-20 2010-11-17 中国建筑第八工程局有限公司 Construction method of exposed concrete ribbed beams
CN101967882A (en) * 2010-08-26 2011-02-09 陕西建工集团第一建筑工程有限公司 Construction method for controlling wall thickness by utilizing large formwork split bolts

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
郝增锁等: "《建筑工程档案资料快速编制、组卷与范例》", 31 January 2011, article "建筑工程档案资料快速编制、组卷与范例", pages: 207-208 *
黄展东: "《建筑施工知识》", 31 October 2002, article "建筑施工知识", pages: 75-81 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103174288A (en) * 2013-03-15 2013-06-26 中国十七冶集团有限公司 Reinforcing method for U-bar hoop formworks of large-section frame column
CN103334582A (en) * 2013-07-05 2013-10-02 天津住宅集团建设工程总承包有限公司 Method for installing and constructing short-leg shear wall formwork supporting system
CN103334582B (en) * 2013-07-05 2015-03-18 天津住宅集团建设工程总承包有限公司 Method for installing and constructing short-leg shear wall formwork supporting system
CN105178625A (en) * 2015-06-05 2015-12-23 中国十七冶集团有限公司 Beam-slab supporting set
CN108104464A (en) * 2017-12-26 2018-06-01 宁波二十冶建设有限公司 A kind of elder generation's beam rear pillar formwork structure and erection method

Similar Documents

Publication Publication Date Title
CN103352563B (en) The board-like bar frame gang form of self-supporting and construction method thereof
CN102383443B (en) Connection structures between foundation pit support piles and outer walls of basement and construction method
CN102912900A (en) Prefabricated assembled superposed plate type concrete shear wall and construction method thereof
CN103422672A (en) Construction method for reinforced concrete prefabricated house
CN106088662B (en) Concrete frame structure Vierendeel girder, superimposed sheet Construction of Supporting method
CN104032904A (en) Combined assembled type stairway
CN102953546A (en) Construction method for mounting deformation joint template at double walls
CN104196231A (en) Concrete floor aluminum alloy template and construction method thereof
CN103104091A (en) Sliding mold whole lifting platform and construction method
CN104594655A (en) Application method for dismantling temporary supports in brick-concrete structure wall
CN102758525A (en) Benzene hydrogenation engineering formwork installing method
CN202324606U (en) U-shaped force bearing seat
CN202925721U (en) Prefabricated superimposed sheet-type concrete shear wall structure
CN103741970A (en) Assembled machining shed for building construction and manufacture and installation method thereof
CN205475677U (en) Steel house room unit
CN102561392A (en) Structure for supporting construction elevator foundation on basement top plate and construction method thereof
CN203285050U (en) Combined type Bailey frame multifunctional platform carried by sliding formwork to rise and fall
CN105064551A (en) Movable wallboard system
CN202347534U (en) Force transferring structure between foundation ditch support pile and basement outer wall
CN204059940U (en) A kind of concrete floor aluminum alloy mould plate
CN103321405A (en) Large-formwork lifting-type construction method for shear wall or cylinder concrete structure
CN202440833U (en) Structure for supporting construction elevator base on top plate of basement
KR101862567B1 (en) Standardization of Mat Foundation assembling House system
CN102787717A (en) Self-supporting combined steel template construction method
CN203403668U (en) Self-supporting plate type steel bar mesh frame combination formwork

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121031