CN102383430A - 中掘预应力离心管桩(方桩)桩底承载力提高法 - Google Patents
中掘预应力离心管桩(方桩)桩底承载力提高法 Download PDFInfo
- Publication number
- CN102383430A CN102383430A CN2011100436303A CN201110043630A CN102383430A CN 102383430 A CN102383430 A CN 102383430A CN 2011100436303 A CN2011100436303 A CN 2011100436303A CN 201110043630 A CN201110043630 A CN 201110043630A CN 102383430 A CN102383430 A CN 102383430A
- Authority
- CN
- China
- Prior art keywords
- pile
- stake
- drilling rod
- drill stem
- bearing capacity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了中掘预应力离心管桩(方桩)桩底承载力提高法,通过取土钻杆掘地取土,在取土钻杆掘地取土的同时通过压桩,将预应力离心管桩(方桩)压入土中,当取土钻杆下钻至标高后,再次转动取土钻杆至标高下两倍于离心管桩(方桩)桩径深度,然后反转取土钻杆,反转扩翼钻头张开,使得底部搅拌范围加大,通过钻杆中孔注水,反转扩翼钻头搅动,在反转过程中通过钻杆侧孔喷射带有添加剂的水泥浆,一边喷射水泥浆,一边反转取土钻杆,取土钻杆提升,当反转扩翼钻头上升至高于标高为取土钻杆直径时,停止喷射水泥浆,这样使桩底部快速固结,形成圆柱状固化混合层。本发明具有提高桩底的承载力、降低原材料、降低成本、提高工作效率等优点。
Description
技术领域
本发明中掘预应力离心管桩(方桩)桩底承载力提高法主要应用于建筑物的基础和大型设备基础,预应力离心管桩(方桩)桩它支撑着建筑物以及各种设备基础的荷重,使建筑物、构筑物造得更高,所以该桩的入土深度和桩的直径直接影响到该桩的承载力。本方法可使在同样桩径同样桩长的范围里提高单桩承载力。
背景技术
在现在的建筑物基础建筑中,为了使得建筑物造的更加稳固,更加有高度,因此在建筑物建设之前在建筑物的地基上要打入很多预应力离心管桩(方桩)桩或者其他支撑桩位,但是由于这些桩要支撑很大的作用力,因此桩打的深浅和桩的直径面的大小直接影响桩的承载力,在这个过程中在增大承载力的时候,就需要将桩打的更深或者让桩的直径变大,这样一来就会花费很多的人力、物力、财力在打桩上面,同时增加桩的直径优惠耗费很多原材料,使得成本增加。
发明内容
为了克服现状的不足,不能满足现代社会对建筑物发展的要求,本发明改变以往的直接压桩方法,即在压桩的同时通过掘土将取土钻杆下至标高后再下转两倍反转扩翼钻头的深度,通过喷射带有添加剂的水泥浆,扩大桩底的水泥土搅拌桩的直径,增加承载力的方法。
本发明是这样实现的,中掘预应力离心管桩(方桩)桩底承载力提高法,通过取土钻杆掘地取土,在取土钻杆掘地取土的同时通过压桩,将预应力离心管桩(方桩)压入土中,当取土钻杆下钻至标高后,再次转动取土钻杆至标高下两倍于离心管桩(方桩)桩径深度,然后反转取土钻杆,反转扩翼钻头张开,使得底部搅拌范围加大,通过钻杆中孔注水,反转扩翼钻头搅动,在反转过程中通过钻杆侧孔喷射带有添加剂的水泥浆,一边喷射水泥浆,一边反转取土钻杆,取土钻杆提升,当反转扩翼钻头上升至高于标高为取土钻杆直径时,停止喷射水泥浆,这样使桩底部快速固结,形成圆柱状固化混合层。
本发明具有以下明显的优势和有益效果:
1)使得桩底柱形变大,提高桩底的承载力,从而使得离心管桩(方桩)承载力加大;
2)在相同承载力的作用下,可以缩小离心管桩(方桩)的直径,从而降低成本。
附图说明
图1是本发明中掘预应力离心管桩(方桩)桩底承载力提高法实施前示意图;
图2是本发明中掘预应力离心管桩(方桩)桩底承载力提高法实施过程中示意图;
图3是本发明中掘预应力离心管桩(方桩)桩底承载力提高法实施后示意图;
其中:1-离心方桩(管桩);2-取土钻杆;3-钻杆中孔;4-反转扩翼钻头;5-钻杆侧孔;6-固化混合层。
具体实施方式
如图1-3所示:中掘预应力离心管桩(方桩)桩底承载力提高法,通过取土钻杆2掘地取土,在取土钻杆2掘地取土的同时通过压桩,将预应力离心管桩(方桩)1压入土中,当取土钻杆2下钻至标高后,再次转动取土钻杆2至标高下两倍于离心管桩(方桩)1桩径深度,然后反转取土钻杆2,反转扩翼钻头4张开,使得底部搅拌范围加大,通过钻杆中孔3注水,反转扩翼钻头4搅动,在反转过程中通过钻杆侧孔5喷射带有添加剂的水泥浆,一边喷射水泥浆,一边反转取土钻杆2,取土钻杆2提升,当反转扩翼钻头4上升至高于标高为取土钻杆2直径时,停止喷射水泥浆,这样使桩底部快速固结,形成圆柱状固化混合层6。
如图1为本发明掘预应力离心管桩(方桩)桩底承载力提高法实施前示意图,此时,取土钻杆2下沉至标高下两倍于离心管桩(方桩)1桩径深度,此次反转扩翼钻头4处于合拢状态,然后停止转动。
如图2为本发明掘预应力离心管桩(方桩)桩底承载力提高法实施过程中状态示意图,此时,取土钻杆2反转,带动反转扩翼钻头4反转,反转扩翼钻头4张开,通过钻杆中孔3注水,搅动反转扩翼钻头4周围土层或沙层,再次通过钻杆侧孔5喷射带有添加剂的水泥浆,边搅动边喷射水泥浆,在反转扩翼钻头4搅动的过程中取土钻杆2不断往上提升。
如图3为本发明中掘预应力离心管桩(方桩)桩底承载力提高法实施后示意图,此时取土钻杆2已经提升至离心方桩(管桩)1底部上方位置,此时停止喷射水泥浆,这样在离心方桩(管桩)1底部形成一个大面积的柱状固化混合层6,正好在离心方桩(管桩)1底部,这样就支撑着离心方桩(管桩)1,从而实现离心方桩(管桩)1支撑力增大的作用。
最后应说明的是:以上实施例仅用以说明本发明而并非限制本发明所描述的技术方案;因此,尽管本说明书参照上述的各个实施例对本发明已进行了详细的说明,但是,本领域的普通技术人员应当理解,仍然可以对本发明进行修改或等同替换;而一切不脱离发明的精神和范围的技术方案及其改进,其均应涵盖在本发明的权利要求范围当中。
Claims (2)
1.中掘预应力离心管桩(方桩)桩底承载力提高法,其特征在于:通过取土钻杆掘地取土,在取土钻杆掘地取土的同时通过压桩,将预应力离心管桩(方桩)压入土中,当取土钻杆下钻至标高后,再次转动取土钻杆至标高下两倍于离心管桩(方桩)桩径深度,然后反转取土钻杆,反转扩翼钻头张开,使得底部搅拌范围加大,通过钻杆中孔注水,反转扩翼钻头搅动,在反转过程中通过钻杆侧孔喷射带有添加剂的水泥浆,一边喷射水泥浆,一边反转取土钻杆,取土钻杆提升,当反转扩翼钻头上升至高于标高为取土钻杆直径时,停止喷射水泥浆,这样使桩底部快速固结,形成圆柱状固化混合层。
2.根据权利要求1所述的中掘预应力离心管桩(方桩)桩底承载力提高法,其特征在于:所述的喷射带有添加剂的水泥浆的喷射压力为50-300公斤/平方厘米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100436303A CN102383430A (zh) | 2011-02-23 | 2011-02-23 | 中掘预应力离心管桩(方桩)桩底承载力提高法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100436303A CN102383430A (zh) | 2011-02-23 | 2011-02-23 | 中掘预应力离心管桩(方桩)桩底承载力提高法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102383430A true CN102383430A (zh) | 2012-03-21 |
Family
ID=45823231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100436303A Pending CN102383430A (zh) | 2011-02-23 | 2011-02-23 | 中掘预应力离心管桩(方桩)桩底承载力提高法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102383430A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110777777A (zh) * | 2019-11-05 | 2020-02-11 | 沙焕焕 | 一种长螺旋取土回拌水泥土复合桩的施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5921817A (ja) * | 1982-07-27 | 1984-02-03 | Dainichi Concrete Kogyo Kk | 埋め込み杭施工装置 |
JPH037755U (zh) * | 1989-06-12 | 1991-01-24 | ||
JP3007755U (ja) * | 1994-03-14 | 1995-02-28 | 近畿コンクリート工業株式会社 | 拡大ヘッド |
JPH08291682A (ja) * | 1995-02-20 | 1996-11-05 | Mitani Sekisan Co Ltd | 杭穴掘削ヘッド及びこれを用いた中掘工法 |
JP2000291002A (ja) * | 1999-04-12 | 2000-10-17 | Tenox Corp | 合成杭の施工方法及びその方法に使用される鋼管杭並びに合成杭 |
JP2004270440A (ja) * | 2003-02-17 | 2004-09-30 | Mitani Sekisan Co Ltd | 基礎杭の造成方法及び既製杭 |
CN101314945A (zh) * | 2008-07-02 | 2008-12-03 | 江伟 | 高压旋喷扩大头预应力管桩及其组合方法 |
-
2011
- 2011-02-23 CN CN2011100436303A patent/CN102383430A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5921817A (ja) * | 1982-07-27 | 1984-02-03 | Dainichi Concrete Kogyo Kk | 埋め込み杭施工装置 |
JPH037755U (zh) * | 1989-06-12 | 1991-01-24 | ||
JP3007755U (ja) * | 1994-03-14 | 1995-02-28 | 近畿コンクリート工業株式会社 | 拡大ヘッド |
JPH08291682A (ja) * | 1995-02-20 | 1996-11-05 | Mitani Sekisan Co Ltd | 杭穴掘削ヘッド及びこれを用いた中掘工法 |
JP2000291002A (ja) * | 1999-04-12 | 2000-10-17 | Tenox Corp | 合成杭の施工方法及びその方法に使用される鋼管杭並びに合成杭 |
JP2004270440A (ja) * | 2003-02-17 | 2004-09-30 | Mitani Sekisan Co Ltd | 基礎杭の造成方法及び既製杭 |
CN101314945A (zh) * | 2008-07-02 | 2008-12-03 | 江伟 | 高压旋喷扩大头预应力管桩及其组合方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110777777A (zh) * | 2019-11-05 | 2020-02-11 | 沙焕焕 | 一种长螺旋取土回拌水泥土复合桩的施工方法 |
CN110777777B (zh) * | 2019-11-05 | 2021-02-12 | 沙焕焕 | 一种长螺旋取土回拌水泥土复合桩的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201212147Y (zh) | 长螺旋旋喷搅拌桩复合钻具 | |
CN105604001B (zh) | 劲芯水泥土筒桩及施工方法和筒形旋搅钻具 | |
CN104234042A (zh) | 混凝土桩的成桩装置及其施工方法 | |
CN105714773B (zh) | 一种地基处理方法 | |
CN105113498A (zh) | 高强劲芯复合桩施工方法 | |
CN206784372U (zh) | 注浆成型扩底桩 | |
CN109267567B (zh) | 一种桩端和桩侧可转换注浆的钢管桩及其浇筑工艺 | |
CN205907679U (zh) | 现浇劲芯搅拌桩 | |
CN104763345A (zh) | 一种建筑地基的施工装置及其施工方法 | |
CN110438985A (zh) | 钻孔灌注桩桩基持力层补强加固施工方法 | |
CN106996104A (zh) | 注浆成型扩底桩及其施工方法 | |
CN107574818A (zh) | 螺钉钻挤灌注桩施工方法及组合螺钉钻头 | |
CN104153357A (zh) | 复合桩的施工方法 | |
CN105544579B (zh) | 一种桩基的施工方法 | |
CN104594339B (zh) | 混凝土桩的施工方法 | |
CN207260138U (zh) | 高压旋喷搅拌承载桩的钻杆及具有其的装置 | |
CN105113492A (zh) | 一种适用于粘性土、砂土、粉土地基的组合桩施工方法 | |
CN105507336A (zh) | 一种利用降水井形成复合地基的方法 | |
CN206571424U (zh) | 高压扩底螺杆钻孔装置及其桩端扩大头 | |
CN111577144A (zh) | 一种具有压浆作用的双向搅拌桩搅拌头 | |
CN102383430A (zh) | 中掘预应力离心管桩(方桩)桩底承载力提高法 | |
CN206246052U (zh) | 挤土旋喷扩底桩成型装置 | |
CN111197306A (zh) | 一种双高压旋喷搅拌钻头及其施工方法 | |
CN204825912U (zh) | 复合桩双管路输料钻具 | |
CN205188933U (zh) | 一种利用降水井形成的复合地基 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C53 | Correction of patent of invention or patent application | ||
CB02 | Change of applicant information |
Address after: 200000, B, Lane 518, Lane 1, Heng Yong Road, Shanghai, Jiading District 502-1 Applicant after: Shanghai Chengdi Construction Co., Ltd. Address before: 200000 room 1, building 188, 126 Nanan Road, Anting Town, Shanghai, Jiading District Applicant before: Shanghai Chengdi Construction Development Co., Ltd. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: SHANGHAI CHENGDI CONSTRUCTION DEVELOPMENT CO., LTD. TO: SHANGHAI CHENGDI CONSTRUCTION CO., LTD. |
|
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120321 |