CN102364247A - Large-scale high efficiency three-waste boiler combustion chamber - Google Patents

Large-scale high efficiency three-waste boiler combustion chamber Download PDF

Info

Publication number
CN102364247A
CN102364247A CN2011101737632A CN201110173763A CN102364247A CN 102364247 A CN102364247 A CN 102364247A CN 2011101737632 A CN2011101737632 A CN 2011101737632A CN 201110173763 A CN201110173763 A CN 201110173763A CN 102364247 A CN102364247 A CN 102364247A
Authority
CN
China
Prior art keywords
combustion chamber
furnace
boiler
wastes
cloth wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011101737632A
Other languages
Chinese (zh)
Inventor
孟广银
陈卫国
王志勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG RUNYIN BIOCHEMICAL CO Ltd
Original Assignee
SHANDONG RUNYIN BIOCHEMICAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG RUNYIN BIOCHEMICAL CO Ltd filed Critical SHANDONG RUNYIN BIOCHEMICAL CO Ltd
Priority to CN2011101737632A priority Critical patent/CN102364247A/en
Publication of CN102364247A publication Critical patent/CN102364247A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Air Supply (AREA)

Abstract

The invention discloses a large-scale high efficiency three-waste boiler combustion chamber. A film-type water-cooling wall is arranged on the top of the combustion chamber. A fire resistant casting material is coated on the outer side of the combustion chamber. The middle part of the combustion chamber is a cylindrical steel housing. Firebricks are coated on the inner side of the combustion chamber. The firebricks have a heat storing function. A barrier wall water cooling unit is arranged on the inner side of the firebricks. Another barrier wall water cooling unit is arranged at the center of the combustion chamber. The barrier wall water cooling units are heated from the two sides, and the evaporation capacity of the water cooling units takes 2/3 of that of the whole boiler. The central water cooling unit carries out water circulation separately, such that maintenance is convenient to carry out. A rectangular separate-chamber air distribution boiler bottom is arranged on the bottom of the combustion chamber. The rectangular boiler bottom is divided into 4 combustion zones, wherein the structure is beneficial for coal distribution, air distribution and slag discharging. Four feeding pipes and four spark lighters respectively penetrate into the four rectangular air distribution chambers. The bottom of the combustion chamber is provided with a slag discharging port, such that a linear arrangement is formed. Waste slag and waste gas are combusted in the combustion chamber, such that high-temperature flue gas is produced. The high-temperature flue gas is delivered from the combustion chamber into a cyclone separator, and large particles are separated from the flue gas in the cyclone separator. The large particles are delivered back to the combustion chamber to be combusted, until the carbon content in the boiler bottom residual slag is reduced to below 1%.

Description

The efficient three wastes boiler furnace of a kind of maximization
Technical field the present invention relates to water-tube boiler, fixed bed coal gas producer, powder coal gasification furnace waste reside comprehensive utilization, directly relates to the efficient three wastes boiler furnace of a kind of novel largeization.
Background technology China has more than 540 tame nitrogen fertilizer plants now, and boiler, fixed bed coal gas producer, powder coal gasification furnace will produce a large amount of waste residues and waste gas, and wherein combustible such as waste residue, waste gas accounts for 10-20%.Around the comprehensive utilization of waste residue, the domestic boiler using waste slag of researching and developing various ways, ubiquitous problem is, waste residue must the bituminous coal of blending more than 60%, and makes combustion adjuvant with synthetic ammonia emptying gas, increased CO 2, SO 2Discharge capacity.Carry the volume solid particle in the flue gas secretly and wash away boiler component, service life is short, researches and develops a kind of combustion slag, combustion waste gas, and New-type boiler clean, efficient, that the life-span is long is very necessary.
Summary of the invention the object of the invention will provide a kind of maximization efficient three wastes boiler furnace exactly, need not mix bituminous coal in the waste residue combustion process, and reduces SO 2Discharge capacity, efficient height, long service life.
The objective of the invention is to realize like this: the efficient three wastes boiler furnace of a kind of maximization, have three wastes combustion chamber, an enclosed water-cooled part, the membrane wall furnace roof at the bottom of the rectangle cavity-separating cloth wind furnace, is connected cyclone dust collectors with garden, combustion chamber old name for the Arabian countries in the Middle East ground at the bottom of the cloth wind furnace.
As further scheme of the present invention, said three wastes combustion chamber, middle part connect cylindrical steel housing; Inner lining refractory, heat resisting brick is when normally using; Heat resisting brick has the heat accumulation function; Burn immediately when fuel gas gets into the red combustion chamber of burning, effectively avoided furnace bottom not have naked light, the explosion danger after fuel gas gets into; Housing peripheral hardware annular blowing-out gas endless tube, vane pipe, secondary wind endless tube and four feed pipes; Four igniters feed four combustion zones respectively, and the bottom is provided with ash discharging hole.
As further scheme again of the present invention, the high-temperature flue gas in said enclosed water-cooled part combustion chamber is to an enclosed water-cooled part side towards the fire and carry on the back the two-sided heating of fiery face, helps dwindling the burner area; Center, combustion chamber water-cooled part overcomes because after maximizing, the excessive generation cloth of combustion chamber diameter, cloth wind, cloth fire uneven phenomenon, and center, combustion chamber water-cooled part has increased 25% disengagement area, and boiler capacity is had increased significantly.
As further again scheme of the present invention, said membrane wall furnace roof, the membrane wall furnace roof, it is big to adapt to the furnace roof area, installs, overhauls convenient and swift.
As further again scheme of the present invention, at the bottom of the said rectangle cavity-separating cloth wind furnace, it is big to have overcome furnace bottom at the bottom of the rectangle cavity-separating cloth wind furnace, and the defective that cloth wind is irregular is divided into 4 air compartments to furnace bottom, and each air compartment is blown separately, makes cloth wind even, and it is effective to seethe with excitement.During igniting, after these two chamber burnings, ignite all the other two chambeies gradually in two chambeies of point; Make big furnace bottom igniting easy operating, improved the original igniting initial stage, fire is little, and wind is big, the shortcoming of bad operation.Rectangle divides at the bottom of the cloth wind furnace of chamber, and coal supply, the line style of slagging tap arrange that coal supply is slagged tap and easily is automated.
As further more again scheme of the present invention, be connected with garden, combustion chamber old name for the Arabian countries in the Middle East ground at the bottom of the said cloth wind furnace, the side's of making furnace bottom and column type combustion chamber cylindrical shell are excessively slick and sly.
As a kind of improvement project of the present invention, said cyclone dust collectors get off the particles settling in the high-temperature flue gas, turn back to burner hearth, further burn, and make that phosphorus content is reduced to below 1% in the furnace bottom residue.
Because combustion chamber of the present invention is divided into four combustion districts, the powdery waste residue is combustion-supporting high temperature and producing gas blower, preheated air, and efficient burning generation high-temperature gas need not mix bituminous coal, has reduced SO 2Discharging.
Appended drawings is the structural representation of a kind of efficient three wastes boiler furnace that maximizes of the present invention, below in conjunction with accompanying drawing patent of the present invention is described further.
Specific embodiment accompanying drawing shows the structure of a kind of efficient three wastes boiler furnace that maximizes of the present invention, has three wastes combustion chamber 1, an enclosed water-cooled part 2; Membrane wall furnace roof 3; At the bottom of the rectangle cavity-separating cloth wind furnace 4, be connected 5, cyclone dust collectors 6 with garden, combustion chamber old name for the Arabian countries in the Middle East ground at the bottom of the cloth wind furnace.Said three wastes combustion chamber 1, middle part connect cylindrical steel housing, inner lining refractory; Heat resisting brick, when normally using, heat resisting brick has the heat accumulation function; Burn immediately when fuel gas gets into the red combustion chamber of burning, effectively avoided furnace bottom not have naked light, the explosion danger after fuel gas gets into; Housing peripheral hardware annular blowing-out gas endless tube, vane pipe, secondary wind endless tube and four feed pipes; Four igniters feed four combustion zones respectively, and the bottom is provided with ash discharging hole.High-temperature flue gas in said enclosed water-cooled part 2 combustion chamber is to an enclosed water-cooled part side towards the fire and carry on the back the two-sided heating of fiery face, helps dwindling the burner area; Center, combustion chamber water-cooled part overcomes because after maximizing, the excessive generation cloth of combustion chamber diameter, cloth wind, cloth fire uneven phenomenon, and center, combustion chamber water-cooled part has increased 25% disengagement area, and boiler capacity is had increased significantly.Said membrane wall furnace roof 3, the membrane wall furnace roof, it is big to adapt to the furnace roof area, installs, overhauls convenient and swift.At the bottom of the said rectangle cavity-separating cloth wind furnace 4, it is big to have overcome furnace bottom at the bottom of the rectangle cavity-separating cloth wind furnace, and the defective that cloth wind is irregular is divided into 4 air compartments to furnace bottom, and each air compartment is blown separately, makes cloth wind even, and it is effective to seethe with excitement.During igniting, after these two chamber burnings, ignite all the other two chambeies gradually in two chambeies of point; Make big furnace bottom igniting easy operating, improved the original igniting initial stage, fire is little, and wind is big, the shortcoming of bad operation.Rectangle divides at the bottom of the cloth wind furnace of chamber, and coal supply, the line style of slagging tap arrange that coal supply is slagged tap and easily is automated.Be connected 5 with garden, combustion chamber old name for the Arabian countries in the Middle East ground at the bottom of the said cloth wind furnace, the side's of making furnace bottom and column type combustion chamber cylindrical shell are excessively slick and sly.Said cyclone dust collectors 6 get off the particles settling in the high-temperature flue gas, turn back to burner hearth, further burn, and make that phosphorus content is reduced to below 1% in the furnace bottom residue.

Claims (7)

1. the efficient three wastes boiler furnace that maximizes is characterized in that having three wastes combustion chamber (1), an enclosed water-cooled part (2), and membrane wall furnace roof (3) at the bottom of the rectangle cavity-separating cloth wind furnace (4), is connected (5), cyclone dust collectors (6) with garden, combustion chamber old name for the Arabian countries in the Middle East ground at the bottom of the cloth wind furnace.
2. according to the efficient three wastes boiler furnace of claims 1 said a kind of maximization, it is characterized in that three wastes combustion chamber (1), the middle part connects cylindrical steel housing; Inner lining refractory, heat resisting brick is when normally using; Heat resisting brick has the heat accumulation function; Burn immediately when fuel gas gets into the red combustion chamber of burning, effectively avoided furnace bottom not have naked light, the explosion danger after fuel gas gets into; Housing peripheral hardware annular blowing-out gas endless tube, vane pipe, secondary wind endless tube and four feed pipes; Four igniters feed four combustion zones respectively, and the bottom is provided with ash discharging hole.
3. according to the efficient three wastes boiler furnace of the said a kind of maximization of claim 1, it is characterized in that high-temperature flue gas in enclosed water-cooled part (2) combustion chamber to an enclosed water-cooled part side towards the fire and carry on the back the two-sided heating of fiery face, helps dwindling the burner area; Center, combustion chamber water-cooled part overcomes because after maximizing, the excessive generation cloth of combustion chamber diameter, cloth wind, cloth fire uneven phenomenon, and center, combustion chamber water-cooled part has increased 25% disengagement area, and boiler capacity is had increased significantly.
4. according to the efficient three wastes boiler furnace of claims 1 said a kind of maximization, it is characterized in that membrane wall furnace roof (3), the membrane wall furnace roof, it is big to adapt to the furnace roof area, installs, overhauls convenient and swift.
5. according to the efficient three wastes boiler furnace of claims 1 said a kind of maximization; It is characterized in that (4) at the bottom of the rectangle cavity-separating cloth wind furnace that it is big to have overcome furnace bottom at the bottom of the rectangle cavity-separating cloth wind furnace, the defective that cloth wind is irregular; Be divided into 4 air compartments to furnace bottom; Each air compartment is blown separately, makes cloth wind even, and it is effective to seethe with excitement.During igniting, after these two chamber burnings, ignite all the other two chambeies gradually in two chambeies of point; Make big furnace bottom igniting easy operating, improved the original igniting initial stage, fire is little, and wind is big, the shortcoming of bad operation.Rectangle divides at the bottom of the cloth wind furnace of chamber, and coal supply, the line style of slagging tap arrange that coal supply is slagged tap and easily is automated.
6. according to the efficient three wastes boiler furnace of claims 1 said a kind of maximization, it is characterized in that being connected (5) with garden, combustion chamber old name for the Arabian countries in the Middle East ground at the bottom of the cloth wind furnace, the side's of making furnace bottom and column type combustion chamber cylindrical shell are excessively slick and sly.
7. according to the efficient three wastes boiler furnace of claims 1 said a kind of maximization; It is characterized in that cyclone dust collectors (6), the particles settling in the high-temperature flue gas is got off, turn back to burner hearth; Further burn, make that phosphorus content is reduced to below 1% in the furnace bottom residue.
CN2011101737632A 2011-06-27 2011-06-27 Large-scale high efficiency three-waste boiler combustion chamber Pending CN102364247A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011101737632A CN102364247A (en) 2011-06-27 2011-06-27 Large-scale high efficiency three-waste boiler combustion chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011101737632A CN102364247A (en) 2011-06-27 2011-06-27 Large-scale high efficiency three-waste boiler combustion chamber

Publications (1)

Publication Number Publication Date
CN102364247A true CN102364247A (en) 2012-02-29

Family

ID=45690828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011101737632A Pending CN102364247A (en) 2011-06-27 2011-06-27 Large-scale high efficiency three-waste boiler combustion chamber

Country Status (1)

Country Link
CN (1) CN102364247A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6119607A (en) * 1997-05-09 2000-09-19 Corporation De L'ecole Polytechnique Granular bed process for thermally treating solid waste in a flame
CN2457459Y (en) * 2001-01-07 2001-10-31 彭思尧 Fluidized mixed burning furnace for three wastes of synthetic ammonia gas production
CN201221766Y (en) * 2008-03-05 2009-04-15 阜阳市节能化工工程有限公司 Circulation reverse burning type mixed combusting furnace

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6119607A (en) * 1997-05-09 2000-09-19 Corporation De L'ecole Polytechnique Granular bed process for thermally treating solid waste in a flame
CN2457459Y (en) * 2001-01-07 2001-10-31 彭思尧 Fluidized mixed burning furnace for three wastes of synthetic ammonia gas production
CN201221766Y (en) * 2008-03-05 2009-04-15 阜阳市节能化工工程有限公司 Circulation reverse burning type mixed combusting furnace

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
彭思尧: "造气三废流化混燃炉的配置", 《化肥设计》 *
白林波: "造气炉三废混燃余热发电", 《节能与环保》 *

Similar Documents

Publication Publication Date Title
CN101504144B (en) Three-phase multi-functional mixed combustion furnace
CN103542415A (en) Smoke pyrolysis kiln-furnace-combined type sludge incinerator
CN101196296A (en) Method and apparatus for biomass ebullition, gasification and combustion
CN203099808U (en) Horizontal type circulating fluidized bed boiler capable of combusting tobacco waste
CN101793391B (en) Automatic high-efficient biomass granular fuel combustor
CN101070490A (en) Non-electric multifunction integrated circulation purifying gas generator
CN103759412A (en) Biomass boiler with automatic feeding function
CN201875689U (en) Novel multifunctional combustor
CN203880691U (en) Chimney-free multifunctional oil/gas-fired boiler
CN206768043U (en) A kind of vaporizer with roll-type fire grate
CN201396765Y (en) Organic particle and combustible household garbage gasifying incinerator
CN102141254B (en) Solid fuel gasification and combustion device and boiler
CN201916893U (en) Internal division type mix combustion furnace
CN102364247A (en) Large-scale high efficiency three-waste boiler combustion chamber
CN101545636A (en) Process and device for reclaiming blown gas made from coal and by oxygen-enriched combustion
CN201225756Y (en) Spherical briquette boiler
CN102022737B (en) Biomass vaporization gas-powder mixed combustor
CN1209573C (en) Garbage incinerator integrating fluidized incineration and moving cold slag into one integral and method
CN206768041U (en) A kind of energy-saving biomass solid fuel gas producer device
CN201093503Y (en) Middle thermal value coal gas and powder dual-purpose combustor
CN201373554Y (en) New energy gasified no-chimney energy-saving environment-friendly boiler
CN101907301B (en) Material-gathering device of burner and combustion stove thereof
US7013816B2 (en) Method for gasifying large pieces of solid fuels, especially bales of biomass
CN205746762U (en) Biomass steam generator
CN107043640A (en) A kind of vaporizer and gasification process with roll-type fire grate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120229