CN102364011A - 一种核岛底板钢筋绑扎方法 - Google Patents

一种核岛底板钢筋绑扎方法 Download PDF

Info

Publication number
CN102364011A
CN102364011A CN2011103759941A CN201110375994A CN102364011A CN 102364011 A CN102364011 A CN 102364011A CN 2011103759941 A CN2011103759941 A CN 2011103759941A CN 201110375994 A CN201110375994 A CN 201110375994A CN 102364011 A CN102364011 A CN 102364011A
Authority
CN
China
Prior art keywords
layer
steel bar
reinforcing bar
reinforcing steel
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011103759941A
Other languages
English (en)
Other versions
CN102364011B (zh
Inventor
徐屹
吴健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
Original Assignee
STATE NUCLEAR POWER ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by STATE NUCLEAR POWER ENGINEERING Co filed Critical STATE NUCLEAR POWER ENGINEERING Co
Priority to CN2011103759941A priority Critical patent/CN102364011B/zh
Publication of CN102364011A publication Critical patent/CN102364011A/zh
Application granted granted Critical
Publication of CN102364011B publication Critical patent/CN102364011B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

本发明提供了一种核岛底板钢筋绑扎方法,其特征在于,步骤为,用钢筋分别绑扎成第一层钢筋层及第二层钢筋层,用扎丝将第二层钢筋层与第一层钢筋层相互绑扎形成第一网片,随后绑扎第三层钢筋层,用支架将第三层钢筋层支撑在第一网片上,再用钢筋分别绑扎成第四层钢筋层及第五层钢筋层,用扎丝将第四层钢筋层与第五层钢筋层相互绑扎形成第二网片,最后,用支架将第二网片支撑在第一网片上,完成核岛底板的钢筋绑扎。本发明中的第一层钢筋层及第五层钢筋层的走向相同、第二层钢筋层及第四层钢筋层的走向相同,该结构能够很好得满足百万级千瓦及以上核岛底板对于钢筋绑扎的技术要求,解决百万级千瓦及以上核岛底板在混凝土浇筑前的钢筋绑扎问题。

Description

一种核岛底板钢筋绑扎方法
技术领域
 本发明涉及一种对百万级千瓦及以上核岛底板钢筋进行绑扎的方法。
背景技术
目前仅有针对百万级以下核电站的核岛底板的钢筋技术。由于百万级以下的核电站在钢筋等级、检验标准方面处于一个较低的水平。虽然在民用建筑领域也有钢筋绑扎技术,但是,核电站不同于一般的民用建筑,其有着更为严格的要求,因此,对于民用领域的钢筋绑扎技术,其对钢筋的等级要求普遍较低,也不能适用于百万级千瓦及以上的核电站。
发明内容
本发明的目的是提供一种适用于百万级千瓦及以上核岛底板的钢筋绑扎方法。
为了达到上述目的,本发明的技术方案是提供了一种核岛底板钢筋绑扎方法,其中,在底板上需要预留一个正十六边形的大坑,在底板上围绕该大坑形成一圆弧段,其特征在于,步骤为:
步骤1、将第一层钢筋严格按定位线放置的垫块上,将钢筋摆放平整并对齐后,用套筒将钢筋连接成整体,形成第一层钢筋层,第一层钢筋层的形状与底板相同,且第一层钢筋层内的每根钢筋为南北走向或东西走向;
步骤2、用套筒将第二层钢筋连接成整体,形成第二层钢筋层,第二层钢筋层的形状与底板相同,第二层钢筋层内的每根钢筋的走向垂直于第一层钢筋层内钢筋的走向,用扎丝将第二层钢筋层与第一层钢筋层相互绑扎形成第一网片;
步骤3、用套筒将第三层钢筋连接成整体,形成第三层钢筋层,第三层钢筋层的形状至少能将圆弧段完全覆盖且不遮住大坑,第三层钢筋层内的每根钢筋为环向,用支架将第三层钢筋层支撑在第一网片上,其位置与圆弧段在底板上的位置相对应;
步骤4、用套筒将第四层钢筋连接成整体,形成第四层钢筋层,第四层钢筋层的形状与去掉第三层钢筋层所占面积及大坑的底板相同,第四层钢筋层内的每根钢筋的走向平行于第二层钢筋层内钢筋的走向;
步骤5、用套筒将第五层钢筋连接成整体,形成第五层钢筋层,第五层钢筋层的形状与第四层钢筋层相同,第五层钢筋层内的每根钢筋的走向垂直于第四层钢筋层内钢筋的走向,再用扎丝将第四层钢筋层与第五层钢筋层相互绑扎形成第二网片;
步骤6、用支架将第二网片支撑在第一网片上,完成核岛底板的钢筋绑扎。
优选地,所述扎丝为18号或20号扎丝。
优选地,所述支架由多个单榀支架通过斜撑连接而成,斜撑为直径是20mm的钢筋,单榀支架的尺寸为6000mm×1500mm,相邻两榀之间的间距为2000-2020mm,单榀支架由直径是25mm的钢筋制作。
本发明中的第一层钢筋层及第五层钢筋层为南北走向、第二层钢筋层及第四层钢筋层为东西走向,其两层钢筋层之间通过支架支撑,该结构能够很好得满足百万级千瓦及以上核岛底板对于钢筋绑扎的技术要求,解决百万级千瓦及以上核岛底板在混凝土浇筑前的钢筋绑扎问题。
附图说明
图1为底板示意图;
图2为第三层钢筋层示意图;
图3为支架部分示意图。
具体实施方式
为使本发明更明显易懂,兹以一优选实施例,并配合附图作详细说明如下。
本实施例所记载了一种核岛底板钢筋绑扎方法,其中,如图1所示,在底板1上需要预留一个正十六边形的大坑2,在底板1上围绕该大坑2形成一圆弧段3,其步骤为:
步骤1、将第一层钢筋严格按定位线放置的垫块上,将钢筋摆放平整并对齐后,用套筒将钢筋连接成整体,形成第一层钢筋层,第一层钢筋层的形状与底板1相同,且第一层钢筋层内的每根钢筋为南北走向;
步骤2、用套筒将第二层钢筋连接成整体,形成第二层钢筋层,第二层钢筋层的形状与底板1相同,第二层钢筋层内的每根钢筋为东西走向,用扎丝将第二层钢筋层与第一层钢筋层相互绑扎形成第一网片,扎丝选用18号或20号扎丝;
步骤3、用套筒将第三层钢筋连接成整体,形成第三层钢筋层,第三层钢筋层的形状至少能将圆弧段3完全覆盖且不遮住大坑2。在本实施例中,第三层钢筋层的形状如图2所示,其弧度大于圆弧段3的弧度,为215°。第三层钢筋层内的每根钢筋为环向,用支架将第三层钢筋层支撑在第一网片上,其位置与圆弧段3在底板1上的位置相对应;
如图3所示,支架由多个单榀支架通过斜撑连接而成,斜撑为直径是20mm的钢筋,单榀支架的尺寸为6000mm×1500mm,相邻两榀之间的间距为2000-2020mm,单榀支架由直径是25mm的钢筋制作。
步骤4、用套筒将第四层钢筋连接成整体,形成第四层钢筋层,第四层钢筋层的形状与去掉第三层钢筋层所占面积及大坑2的底板1相同,第四层钢筋层内的每根钢筋为东西走向;
步骤5、用套筒将第五层钢筋连接成整体,形成第五层钢筋层,第五层钢筋层的形状与第四层钢筋层相同,第五层钢筋层内的每根钢筋为南北走向,再用扎丝将第四层钢筋层与第五层钢筋层相互绑扎形成第二网片;
步骤6、用支架将第二网片支撑在第一网片上,完成核岛底板的钢筋绑扎。

Claims (3)

1.一种核岛底板钢筋绑扎方法,其中,在底板(1)上需要预留一个正十六边形的大坑(2),在底板(1)上围绕该大坑(2)形成一圆弧段(3),其特征在于,步骤为:
步骤1、将第一层钢筋严格按定位线放置的垫块上,将钢筋摆放平整并对齐后,用套筒将钢筋连接成整体,形成第一层钢筋层,第一层钢筋层的形状与底板(1)相同,且第一层钢筋层内的每根钢筋为南北走向或东西走向;
步骤2、用套筒将第二层钢筋连接成整体,形成第二层钢筋层,第二层钢筋层的形状与底板(1)相同,第二层钢筋层内的每根钢筋的走向垂直于第一层钢筋层内钢筋的走向,用扎丝将第二层钢筋层与第一层钢筋层相互绑扎形成第一网片;
步骤3、用套筒将第三层钢筋连接成整体,形成第三层钢筋层,第三层钢筋层的形状至少能将圆弧段(3)完全覆盖且不遮住大坑(2),第三层钢筋层内的每根钢筋为环向,用支架将第三层钢筋层支撑在第一网片上,其位置与圆弧段(3)在底板(1)上的位置相对应;
步骤4、用套筒将第四层钢筋连接成整体,形成第四层钢筋层,第四层钢筋层的形状与去掉第三层钢筋层所占面积及大坑(2)的底板(1)相同,第四层钢筋层内的每根钢筋的走向平行于第二层钢筋层内钢筋的走向;
步骤5、用套筒将第五层钢筋连接成整体,形成第五层钢筋层,第五层钢筋层的形状与第四层钢筋层相同,第五层钢筋层内的每根钢筋的走向垂直于第四层钢筋层内钢筋的走向,再用扎丝将第四层钢筋层与第五层钢筋层相互绑扎形成第二网片;
步骤6、用支架将第二网片支撑在第一网片上,完成核岛底板的钢筋绑扎。
2.如权利要求1所述的一种核岛底板钢筋绑扎方法,其特征在于,所述扎丝为18号或20号扎丝。
3.如权利要求1所述的一种核岛底板钢筋绑扎方法,其特征在于,所述支架由多个单榀支架通过斜撑连接而成,斜撑为直径是20mm的钢筋,单榀支架的尺寸为6000mm×1500mm,相邻两榀之间的间距为2000-2020mm,单榀支架由直径是25mm的钢筋制作。
CN2011103759941A 2011-11-23 2011-11-23 一种核岛底板钢筋绑扎方法 Active CN102364011B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103759941A CN102364011B (zh) 2011-11-23 2011-11-23 一种核岛底板钢筋绑扎方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103759941A CN102364011B (zh) 2011-11-23 2011-11-23 一种核岛底板钢筋绑扎方法

Publications (2)

Publication Number Publication Date
CN102364011A true CN102364011A (zh) 2012-02-29
CN102364011B CN102364011B (zh) 2013-11-06

Family

ID=45690602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103759941A Active CN102364011B (zh) 2011-11-23 2011-11-23 一种核岛底板钢筋绑扎方法

Country Status (1)

Country Link
CN (1) CN102364011B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112195959A (zh) * 2020-09-22 2021-01-08 中国人民解放军63926部队 一种异型筏板扇形网片式钢筋绑扎施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03221665A (ja) * 1990-01-26 1991-09-30 Shimizu Corp 鉄筋の結束方法と装置
CN1594833A (zh) * 2004-06-25 2005-03-16 清华大学 钢板—混凝土组合衬砌
JP2006233588A (ja) * 2005-02-25 2006-09-07 Public Works Research Institute 定着部材付鉄筋及びその製造方法
US20080178554A1 (en) * 2007-01-29 2008-07-31 Mckay Gary Dan Concrete Reinforcement Support Chair
CN101294420A (zh) * 2008-05-04 2008-10-29 中国建筑第六工程局有限公司 锥底浸麦特殊结构层施工方法
CN201176598Y (zh) * 2007-12-28 2009-01-07 浙江环宇建设集团有限公司 地铁隧道正上方基础底板钢筋笼
CN101718090A (zh) * 2009-11-16 2010-06-02 中冶天工建设有限公司 钢筋混凝土灌注桩大直径钢筋笼的施工工艺
CN102041809A (zh) * 2010-11-17 2011-05-04 中国核工业华兴建设有限公司 核电站核岛筏基施工方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03221665A (ja) * 1990-01-26 1991-09-30 Shimizu Corp 鉄筋の結束方法と装置
CN1594833A (zh) * 2004-06-25 2005-03-16 清华大学 钢板—混凝土组合衬砌
JP2006233588A (ja) * 2005-02-25 2006-09-07 Public Works Research Institute 定着部材付鉄筋及びその製造方法
US20080178554A1 (en) * 2007-01-29 2008-07-31 Mckay Gary Dan Concrete Reinforcement Support Chair
CN201176598Y (zh) * 2007-12-28 2009-01-07 浙江环宇建设集团有限公司 地铁隧道正上方基础底板钢筋笼
CN101294420A (zh) * 2008-05-04 2008-10-29 中国建筑第六工程局有限公司 锥底浸麦特殊结构层施工方法
CN101718090A (zh) * 2009-11-16 2010-06-02 中冶天工建设有限公司 钢筋混凝土灌注桩大直径钢筋笼的施工工艺
CN102041809A (zh) * 2010-11-17 2011-05-04 中国核工业华兴建设有限公司 核电站核岛筏基施工方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
严跃兰: "岭澳核电站核岛粗钢筋连接中机械接头与锚固块的应用", 《建筑技术》 *
张彩霞: "田湾核电一期工程核岛厂房钢筋接头及技术要求", 《价值工程》 *
许立山;刘梅;穆大鹏: "CCTV主楼底板HRB400直径50mm钢筋施工技术", 《施工技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112195959A (zh) * 2020-09-22 2021-01-08 中国人民解放军63926部队 一种异型筏板扇形网片式钢筋绑扎施工方法

Also Published As

Publication number Publication date
CN102364011B (zh) 2013-11-06

Similar Documents

Publication Publication Date Title
CN104785683A (zh) 大直径桩基钢筋笼立式全环向定位胎架装置系统及施工工艺
CN103790265A (zh) 一种预制装配式钢管混凝土芯柱加劲剪力墙的制作装配方法
CN201962932U (zh) 建筑施工分段式悬挑外脚手架
CN104175398A (zh) 制作预制箱梁钢筋骨架的胎具及方法
CN105484164A (zh) 一种跨式贝雷梁支架及其施工方法
CN205474844U (zh) 一种跨式贝雷梁支架
CN102812190A (zh) 螺旋形剪切增强体以及利用该剪切增强体的平板钢筋的配筋结构
CN205801957U (zh) 预制墙板立式存放架
CN102364011B (zh) 一种核岛底板钢筋绑扎方法
CN101633483B (zh) 一种钢结构网架整体提升装置
CN203320812U (zh) 混凝土抗裂钢筋网
CN201942994U (zh) 一种桥梁支座垫块
CN202865751U (zh) 硫磺砂浆临时支座
CN201554034U (zh) 逆作施工后浇带水平嵌固支撑结构
CN102465605A (zh) 建筑底板钢筋支架方法
CN103243848B (zh) 现浇混凝土楼板或楼盖的施工工艺及采用的弹性支撑构件
CN202731316U (zh) 保护钢筋网片免受踩踏的操作平台
CN207314126U (zh) 桥墩封顶支撑盖板
CN202431008U (zh) 一种圈梁钢筋辅助绑扎工具
CN205595677U (zh) 一种变电站110kV GIS室新型预留预埋结构
CN201241309Y (zh) 钢管梁高架桥
CN209429552U (zh) 一种直立式混凝土构件钢筋笼胎具
CN203684541U (zh) 控制建筑现浇板上下排钢筋间距的异向工字形钢筋撑铁
CN102877414A (zh) 通用化三角挂篮和托架安装结构及其施工方法
CN207811053U (zh) 一种防磕碰热处理吊具框

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210126

Address after: No. 29 Hong Cao Road, Xuhui District, Shanghai

Patentee after: SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE Co.,Ltd.

Address before: 200233 No.2, Lane 888, Tianlin Road, Xuhui District, Shanghai

Patentee before: STATE NUCLEAR POWER ENGINEERING Co.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 29 Hong Cao Road, Xuhui District, Shanghai

Patentee after: Shanghai Nuclear Engineering Research and Design Institute Co.,Ltd.

Address before: No. 29 Hong Cao Road, Xuhui District, Shanghai

Patentee before: SHANGHAI NUCLEAR ENGINEERING RESEARCH & DESIGN INSTITUTE Co.,Ltd.