CN102361356A - 一种变电所测控装置遥信量测试系统及其测试方法 - Google Patents
一种变电所测控装置遥信量测试系统及其测试方法 Download PDFInfo
- Publication number
- CN102361356A CN102361356A CN2011103335906A CN201110333590A CN102361356A CN 102361356 A CN102361356 A CN 102361356A CN 2011103335906 A CN2011103335906 A CN 2011103335906A CN 201110333590 A CN201110333590 A CN 201110333590A CN 102361356 A CN102361356 A CN 102361356A
- Authority
- CN
- China
- Prior art keywords
- measure
- remote signalling
- control device
- electric substation
- test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
Description
Claims (10)
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110333590.6A CN102361356B (zh) | 2011-10-28 | 2011-10-28 | 一种变电所测控装置遥信量测试系统及其测试方法 |
CN201310156076.9A CN103490505B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对站内soe测试的方法 |
CN201310156906.8A CN103368259B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对时间准确度的测试方法 |
CN201310156096.6A CN103490506B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对遥信响应时间的测试方法 |
CN201310154232.8A CN103368257B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对遥信风暴测试的方法 |
CN201310156028.XA CN103490504B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对站间soe测试的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110333590.6A CN102361356B (zh) | 2011-10-28 | 2011-10-28 | 一种变电所测控装置遥信量测试系统及其测试方法 |
Related Child Applications (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310154232.8A Division CN103368257B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对遥信风暴测试的方法 |
CN201310156076.9A Division CN103490505B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对站内soe测试的方法 |
CN201310156096.6A Division CN103490506B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对遥信响应时间的测试方法 |
CN201310156028.XA Division CN103490504B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对站间soe测试的方法 |
CN201310156906.8A Division CN103368259B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对时间准确度的测试方法 |
CN201310156900.0A Division CN103368258B (zh) | 2011-10-28 | 2011-10-28 | 一种变电所测控装置遥信量测试系统对遥信变位测试的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102361356A true CN102361356A (zh) | 2012-02-22 |
CN102361356B CN102361356B (zh) | 2014-05-28 |
Family
ID=45586621
Family Applications (6)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310154232.8A Active CN103368257B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对遥信风暴测试的方法 |
CN201310156076.9A Active CN103490505B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对站内soe测试的方法 |
CN201310156906.8A Active CN103368259B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对时间准确度的测试方法 |
CN201310156096.6A Active CN103490506B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对遥信响应时间的测试方法 |
CN201110333590.6A Active CN102361356B (zh) | 2011-10-28 | 2011-10-28 | 一种变电所测控装置遥信量测试系统及其测试方法 |
CN201310156028.XA Active CN103490504B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对站间soe测试的方法 |
Family Applications Before (4)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310154232.8A Active CN103368257B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对遥信风暴测试的方法 |
CN201310156076.9A Active CN103490505B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对站内soe测试的方法 |
CN201310156906.8A Active CN103368259B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对时间准确度的测试方法 |
CN201310156096.6A Active CN103490506B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对遥信响应时间的测试方法 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310156028.XA Active CN103490504B (zh) | 2011-10-28 | 2011-10-28 | 一种利用变电所测控装置遥信量测试系统对站间soe测试的方法 |
Country Status (1)
Country | Link |
---|---|
CN (6) | CN103368257B (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102761320A (zh) * | 2012-07-13 | 2012-10-31 | 北京控制工程研究所 | 一种数字量遥测电路 |
CN103412558A (zh) * | 2013-07-30 | 2013-11-27 | 国电南瑞科技股份有限公司 | 继电保护测控装置自动测试系统及方法 |
CN103699103A (zh) * | 2013-12-30 | 2014-04-02 | 上海自动化仪表股份有限公司 | 分散控制系统中事件顺序记录的方法 |
CN104022914A (zh) * | 2014-04-26 | 2014-09-03 | 广西电网公司电力科学研究院 | 配网自动化终端功能检测的测试方法 |
CN106027178A (zh) * | 2016-06-15 | 2016-10-12 | 国网福建省电力有限公司 | 一种基于阶跃响应的电力调度自动化系统遥测传送时间测试方法 |
CN106053960A (zh) * | 2016-07-07 | 2016-10-26 | 南京大贺电力科技有限公司 | 电力自动化网络分析装置 |
CN107205056A (zh) * | 2017-08-02 | 2017-09-26 | 广东电网有限责任公司电力调度控制中心 | 一种远动装置延时响应调度主站的方法及系统 |
CN110134632A (zh) * | 2019-05-10 | 2019-08-16 | 北京和利时系统工程有限公司 | 一种校时处理的方法、装置及计算机存储介质 |
CN110837005A (zh) * | 2019-11-13 | 2020-02-25 | 国家电网有限公司 | 一种用于自动化及保护设备开出脉宽精度检测方法 |
CN110994792A (zh) * | 2019-12-05 | 2020-04-10 | 广东电网有限责任公司 | 一种用于电网设备复电时检测信号的系统 |
CN111211849A (zh) * | 2020-01-10 | 2020-05-29 | 武汉船舶通信研究所(中国船舶重工集团公司第七二二研究所) | 高频通信信道探测的方法和装置 |
CN112556749A (zh) * | 2020-11-30 | 2021-03-26 | 薛峰 | 一种冗余测控装置检测方法 |
CN113972736A (zh) * | 2021-10-13 | 2022-01-25 | 国网福建省电力有限公司电力科学研究院 | 一种电力二次设备运行状态信息交互方法及装置 |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104155557B (zh) * | 2014-09-04 | 2017-02-01 | 国家电网公司 | 变电站遥信遥控专用试验装置 |
CN104269938A (zh) * | 2014-10-25 | 2015-01-07 | 国家电网公司 | 用于厂站调度自动化设备故障的检测装置及方法 |
CN106569404B (zh) * | 2016-11-01 | 2019-04-12 | 国电南瑞科技股份有限公司 | 一种二次装置时钟失步在线监测系统及方法 |
CN109143072A (zh) * | 2017-06-28 | 2019-01-04 | 东软集团股份有限公司 | 一种电池管理系统的测试方法、装置及设备 |
US11570189B2 (en) * | 2018-12-07 | 2023-01-31 | Robert Bosch Gmbh | Simultaneously testing whether a plurality of electronic devices connected via a communication network correctly handle exceptions |
CN110187258B (zh) * | 2019-05-13 | 2024-04-02 | 国网宁夏电力有限公司培训中心 | 一种测控装置遥控回路测试仪 |
CN111639876B (zh) * | 2020-06-07 | 2022-05-17 | 电管家能源管理(上海)有限公司 | 一种主站连接与计算系统 |
CN111668938B (zh) * | 2020-06-17 | 2023-08-04 | 南京太司德智能电气有限公司 | 一种电力测控装置模拟遥控的实现方法 |
CN111769642A (zh) * | 2020-07-03 | 2020-10-13 | 积成软件有限公司 | 一种电源掉电时防止误发开入遥信变位信息的处理方法 |
CN111983444B (zh) * | 2020-08-28 | 2021-06-08 | 国网山东省电力公司郯城县供电公司 | 变配电综合自动化系统的断路器误动检测系统 |
CN112556750B (zh) * | 2020-11-30 | 2022-06-21 | 薛峰 | 一种集群测控装置的功能检测方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10191473A (ja) * | 1996-12-25 | 1998-07-21 | Mitsubishi Electric Corp | 監視制御システム |
CN1801023A (zh) * | 2005-11-14 | 2006-07-12 | 杨卫民 | 一种多事件顺序记录与测试系统 |
CN101192900A (zh) * | 2006-12-01 | 2008-06-04 | 武汉烽火网络有限责任公司 | 用于电信级以太网的应用前向纠错机制的通信方法和设备 |
CN201348514Y (zh) * | 2008-12-15 | 2009-11-18 | 北京国电智深控制技术有限公司 | 一种事件顺序记录测试信号发生器 |
CN202340147U (zh) * | 2011-10-28 | 2012-07-18 | 安徽省电力公司芜湖供电公司 | 一种变电所测控装置遥信量测试系统 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5179376A (en) * | 1991-02-28 | 1993-01-12 | Systems Analysis And Integration, Inc. | Substation load distribution monitor system |
JP2009065778A (ja) * | 2007-09-06 | 2009-03-26 | Tokyo Electric Power Co Inc:The | 電力系統監視制御システム |
EP2478380B1 (en) * | 2009-09-14 | 2017-08-09 | ABB Schweiz AG | A method and a system for simulation in a substation |
CN201828585U (zh) * | 2010-10-20 | 2011-05-11 | 国电南瑞科技股份有限公司 | 便携式变电站同步对时及soe信号发生仪 |
CN102437654B (zh) * | 2011-12-31 | 2014-01-15 | 国电南京自动化股份有限公司 | 一种基于监控系统的站域控制实现方法 |
-
2011
- 2011-10-28 CN CN201310154232.8A patent/CN103368257B/zh active Active
- 2011-10-28 CN CN201310156076.9A patent/CN103490505B/zh active Active
- 2011-10-28 CN CN201310156906.8A patent/CN103368259B/zh active Active
- 2011-10-28 CN CN201310156096.6A patent/CN103490506B/zh active Active
- 2011-10-28 CN CN201110333590.6A patent/CN102361356B/zh active Active
- 2011-10-28 CN CN201310156028.XA patent/CN103490504B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10191473A (ja) * | 1996-12-25 | 1998-07-21 | Mitsubishi Electric Corp | 監視制御システム |
CN1801023A (zh) * | 2005-11-14 | 2006-07-12 | 杨卫民 | 一种多事件顺序记录与测试系统 |
CN101192900A (zh) * | 2006-12-01 | 2008-06-04 | 武汉烽火网络有限责任公司 | 用于电信级以太网的应用前向纠错机制的通信方法和设备 |
CN201348514Y (zh) * | 2008-12-15 | 2009-11-18 | 北京国电智深控制技术有限公司 | 一种事件顺序记录测试信号发生器 |
CN202340147U (zh) * | 2011-10-28 | 2012-07-18 | 安徽省电力公司芜湖供电公司 | 一种变电所测控装置遥信量测试系统 |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102761320A (zh) * | 2012-07-13 | 2012-10-31 | 北京控制工程研究所 | 一种数字量遥测电路 |
CN102761320B (zh) * | 2012-07-13 | 2014-10-08 | 北京控制工程研究所 | 一种数字量遥测电路 |
CN103412558A (zh) * | 2013-07-30 | 2013-11-27 | 国电南瑞科技股份有限公司 | 继电保护测控装置自动测试系统及方法 |
CN103412558B (zh) * | 2013-07-30 | 2016-01-13 | 国电南瑞科技股份有限公司 | 继电保护测控装置自动测试系统及方法 |
CN103699103A (zh) * | 2013-12-30 | 2014-04-02 | 上海自动化仪表股份有限公司 | 分散控制系统中事件顺序记录的方法 |
CN103699103B (zh) * | 2013-12-30 | 2016-08-17 | 上海自动化仪表有限公司 | 分散控制系统中事件顺序记录的方法 |
CN104022914A (zh) * | 2014-04-26 | 2014-09-03 | 广西电网公司电力科学研究院 | 配网自动化终端功能检测的测试方法 |
CN106027178B (zh) * | 2016-06-15 | 2018-05-04 | 国网福建省电力有限公司 | 一种基于阶跃响应的电力调度自动化系统遥测传送时间测试方法 |
CN106027178A (zh) * | 2016-06-15 | 2016-10-12 | 国网福建省电力有限公司 | 一种基于阶跃响应的电力调度自动化系统遥测传送时间测试方法 |
CN106053960A (zh) * | 2016-07-07 | 2016-10-26 | 南京大贺电力科技有限公司 | 电力自动化网络分析装置 |
CN107205056B (zh) * | 2017-08-02 | 2020-02-18 | 广东电网有限责任公司电力调度控制中心 | 一种远动装置延时响应调度主站的方法及系统 |
CN107205056A (zh) * | 2017-08-02 | 2017-09-26 | 广东电网有限责任公司电力调度控制中心 | 一种远动装置延时响应调度主站的方法及系统 |
CN110134632B (zh) * | 2019-05-10 | 2021-06-18 | 北京和利时系统工程有限公司 | 一种校时处理的方法、装置及计算机存储介质 |
CN110134632A (zh) * | 2019-05-10 | 2019-08-16 | 北京和利时系统工程有限公司 | 一种校时处理的方法、装置及计算机存储介质 |
CN110837005A (zh) * | 2019-11-13 | 2020-02-25 | 国家电网有限公司 | 一种用于自动化及保护设备开出脉宽精度检测方法 |
CN110837005B (zh) * | 2019-11-13 | 2022-06-21 | 国家电网有限公司 | 一种用于自动化及保护设备开出脉宽精度检测方法 |
CN110994792A (zh) * | 2019-12-05 | 2020-04-10 | 广东电网有限责任公司 | 一种用于电网设备复电时检测信号的系统 |
CN110994792B (zh) * | 2019-12-05 | 2023-08-04 | 广东电网有限责任公司 | 一种用于电网设备复电时检测信号的系统 |
CN111211849A (zh) * | 2020-01-10 | 2020-05-29 | 武汉船舶通信研究所(中国船舶重工集团公司第七二二研究所) | 高频通信信道探测的方法和装置 |
CN111211849B (zh) * | 2020-01-10 | 2022-06-17 | 武汉船舶通信研究所(中国船舶重工集团公司第七二二研究所) | 高频通信信道探测的方法和装置 |
CN112556749A (zh) * | 2020-11-30 | 2021-03-26 | 薛峰 | 一种冗余测控装置检测方法 |
CN113972736A (zh) * | 2021-10-13 | 2022-01-25 | 国网福建省电力有限公司电力科学研究院 | 一种电力二次设备运行状态信息交互方法及装置 |
Also Published As
Publication number | Publication date |
---|---|
CN103368259B (zh) | 2015-11-04 |
CN103368257B (zh) | 2015-08-05 |
CN103490505A (zh) | 2014-01-01 |
CN103490505B (zh) | 2016-02-24 |
CN103368259A (zh) | 2013-10-23 |
CN102361356B (zh) | 2014-05-28 |
CN103490504B (zh) | 2015-07-15 |
CN103490506A (zh) | 2014-01-01 |
CN103368257A (zh) | 2013-10-23 |
CN103490504A (zh) | 2014-01-01 |
CN103490506B (zh) | 2016-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102361356B (zh) | 一种变电所测控装置遥信量测试系统及其测试方法 | |
CN102055544B (zh) | 电力系统二次设备时间同步监测系统及监测方法 | |
CN109900994B (zh) | 智能变电站二次回路综合性能测试系统及工作方法 | |
CN201867455U (zh) | 电子式互感器测试系统 | |
CN104935079A (zh) | 一种智能变电站站域保护系统及功能调试方法 | |
CN110048507B (zh) | 一种配电自动化系统的自动巡检方法及系统 | |
CN102721882A (zh) | 一种智能化与常规变电站光纤纵差保护通道联调试验方法 | |
CN202340147U (zh) | 一种变电所测控装置遥信量测试系统 | |
CN103412477A (zh) | 保障电网全网时间同步的授时系统 | |
Knezev et al. | Automated circuit breaker monitoring | |
CN108169584B (zh) | 设备的测试方法、装置、系统、存储介质和处理器 | |
CN110763937A (zh) | 基于电磁暂态实时仿真的智能变电站测试平台及方法 | |
CN102200559B (zh) | 一种区域远方备自投测试方法以及相关设备 | |
CN104734338A (zh) | 变电站的时钟监测方法、装置和系统 | |
CN103576014A (zh) | 变电站的时钟监测装置和监测方法 | |
CN202353575U (zh) | 一种时间同步实时监测装置 | |
CN103368258B (zh) | 一种变电所测控装置遥信量测试系统对遥信变位测试的方法 | |
CN202615137U (zh) | 电力系统的统一授时装置 | |
CN106849346B (zh) | 一种测试配电自动化设备对时功能与守时性能的系统 | |
CN214041605U (zh) | 具有高低压同步测量与保护的边缘计算系统和配电终端 | |
CN102928688A (zh) | 多点同步测试馈线故障自动隔离的方法 | |
CN112180212A (zh) | 具有高低压同步测量与保护的边缘计算系统、方法和终端 | |
CN202008512U (zh) | 一种区域远方备自投动模测试仪 | |
CN109709477A (zh) | 一种混连模式下继电保护装置的测试系统 | |
Wang et al. | Substation Point-to-Point Closed-Loop Intelligent Debugging Scheme Using Substation Telecontrol Automation Technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Effective date: 20121226 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20121226 Address after: 241000 Zhongshan North Road, Jinghu, Anhui, No. 18, Applicant after: ANHUI WUHU POWER SUPPLY Co. Applicant after: State Grid Corporation of China Address before: 241000 Zhongshan North Road, Jinghu, Anhui, No. 18, Applicant before: ANHUI WUHU POWER SUPPLY Co. |
|
ASS | Succession or assignment of patent right |
Free format text: FORMER OWNER: STATE ELECTRIC NET CROP. Effective date: 20131016 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20131016 Address after: 241000 Zhongshan North Road, Jinghu, Anhui, No. 18, Applicant after: ANHUI WUHU POWER SUPPLY Co. Address before: 241000 Zhongshan North Road, Jinghu, Anhui, No. 18, Applicant before: ANHUI WUHU POWER SUPPLY Co. Applicant before: State Grid Corporation of China |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: STATE GRID WUHU POWER SUPPLY CO., LTD. OF ANHUI ELECTRIC POWER CO., LTD. Effective date: 20140505 Owner name: STATE GRID WUHU POWER SUPPLY CO., LTD. OF ANHUI EL Effective date: 20140505 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C56 | Change in the name or address of the patentee |
Owner name: STATE GRID WUHU POWER SUPPLY CO., LTD. OF ANHUI EL Free format text: FORMER NAME: ANHUI ELECTRIC POWER CORPORATION, WUHU POWER SUPPLY COMPANY |
|
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 241000 WUHU, ANHUI PROVINCE TO: 100031 XICHENG, BEIJING |
|
CP03 | Change of name, title or address |
Address after: 241000 No. 18, Zhongshan North Road, Anhui, Wuhu Patentee after: STATE GRID ANHUI WUHU POWER SUPPLY Co. Address before: 241000 Zhongshan North Road, Jinghu, Anhui, No. 18, Patentee before: ANHUI WUHU POWER SUPPLY Co. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20140505 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Patentee after: State Grid Corporation of China Patentee after: STATE GRID ANHUI WUHU POWER SUPPLY Co. Address before: 241000 No. 18, Zhongshan North Road, Anhui, Wuhu Patentee before: STATE GRID ANHUI WUHU POWER SUPPLY Co. |