CN106053960A - 电力自动化网络分析装置 - Google Patents
电力自动化网络分析装置 Download PDFInfo
- Publication number
- CN106053960A CN106053960A CN201610530891.0A CN201610530891A CN106053960A CN 106053960 A CN106053960 A CN 106053960A CN 201610530891 A CN201610530891 A CN 201610530891A CN 106053960 A CN106053960 A CN 106053960A
- Authority
- CN
- China
- Prior art keywords
- module
- converter
- port
- power
- voltage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R27/00—Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
- G01R27/28—Measuring attenuation, gain, phase shift or derived characteristics of electric four pole networks, i.e. two-port networks; Measuring transient response
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
本发明公开了一种电力自动化网络分析装置,其包括分析装置、远动装置、网络交换机和测控装置,所述分析装置与远动装置相互连接,远动装置和测控装置分别通过以太网与所述网络交换机相连;所述分析装置包括电源模块、处理器、存储模块、通信模块、实时时钟模块、显示模块和端口模块,所述电源模块、存储模块、通信模块、实时时钟模块、显示模块和端口模块分别与处理器相连。本发明监测精度高,实时准确;通过对遥测信号进行分析,能够分析出是哪一台测控装置出现问题,并快速找到发生问题的源头。
Description
技术领域
本发明涉及一种电力自动化网络分析装置,属于电力调度及监控技术领域。
背景技术
随着电力系统智能化的发展,电力系统通信网络越来越复杂,目前供电运维部门经常会遇到两方面的困扰,第一,当通信网络故障发生时,如何快速准确定位该故障;第二,如何通过对通信网络的数据进行监控和管理,尽量减少毫无意义的垃圾数据,实现变电站自动化网络的高效运行。
中调或地调对各地区的220kV及以上变电站的遥测数据精度、遥信上报的准确性要求非常高,各项数据指标直接影响各地区的同业对标指标。中调或地调在运行当中时常发现某些变电站的电压或功率数值存在瞬时或长时跳变,个别或全部遥信无规律上送的现象,发生的周期和时间都不固定,往往站内测控装置和故障录波器等设备均无相应的记录,分析时,往往不能确定是远动测控设备发生问题还是实际电压、功率等遥测值确实存在突变、遥信确实实际发生。
这类问题已经严重影响地区的状态考核指标。但这类缺陷查找时往往因为缺乏历史数据支撑而变得非常困难。为迅速查找到电流、电压、功率无故突变、遥信经常误发的机理,进而排除缺陷,研发电力自动化网络分析装置,该装置具备不间断的记录远动机发给调度端(中调、地调)的遥测及遥信数据;能对远动数据进行存储和录波;数据有时间报头;存储的数据要保留180天以上;能对规约报文进行解析,并能把有故障报文翻译成文字和十进制的数字,普通的保护和运行人员都能看懂;在出现故障时,能够分析出是哪一台测控装置出现问题,能够找到发生问题的源头。当调度端发现异常数据突变时,可以调取当时的历史数据记录,并提供给相关厂家当作分析依据,进而能快速排除掉故障,保证电网稳定安全运行。
发明内容
为克服现有技术的不足,本发明提供了一种电力自动化网络分析装置。
本发明采取的技术方案是:一种电力自动化网络分析装置,其包括分析装置、远动装置、网络交换机和测控装置,所述分析装置与远动装置相互连接,远动装置和测控装置分别通过以太网与所述网络交换机相连;所述分析装置包括电源模块、处理器、存储模块、通信模块、实时时钟模块、显示模块和端口模块,所述电源模块、存储模块、通信模块、实时时钟模块、显示模块和端口模块分别与处理器相连。
进一步的,所述测控装置包括电压互感器、电流互感器、模数转换模块、数据传输模块和定位模块,所述模数转换模块包括电压模/数转换器和电流模/数转换器,所述电压互感器的输出端连接电压模/数转换器的输入端,电压模/数转换器的输出端连接至数据传输模块,所述电流互感器的输出端连接电流模/数转换器的输入端,电流模/数转换器的输出端连接至数据传输模块。
进一步的,所述远动装置还分别与远方调度主机和数据库服务器相连。
进一步的,所述分析装置还与二次运推主机相连。
进一步的,所述端口模块包括高速数据监听端口和USB端口,高速数据监听端口包括两个RJ45网口。
本发明的有益效果是:
(1)可以对网络中的各种协议报文实时监测,所有报文记录都能按时间和测控装置序号,进行查找分析。能够接收对时指令,实时监测网络及各种通讯状态。
(2)对历史报文进行解析,并能把有故障报文翻译成文字和十进制的数字,普通的保护和运行人员都能看懂。
(3)不间断的记录远动机发给调度端(中调、地调)的遥测及遥信数据;能对远动数据进行存储和录波;数据有时间报头;存储的数据可以保留180天以上。
(4)监测精度高,实时准确;通过对遥测信号进行分析,能够分析出是哪一台测控装置出现问题,能够快速找到发生问题的源头。
(5)可根据,点位、时间,检索数据库,列表显示信息,并将遥测数据信息形成曲线输出。列表显示内容能智能判断出遥测数据信息不合格点,并高亮显示。同时输出原始报文。
附图说明
图1是本发明的整体结构示意图。
图2是分析装置结构示意图。
图3是测控装置结构示意图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
如图1和图2所示,一种电力自动化网络分析装置,其包括分析装置1、远动装置2、网络交换机3和测控装置4,所述分析装置1与远动装置2相互连接,远动装置2和测控装置4分别通过以太网与所述网络交换机3相连;所述分析装置1包括电源模块9、处理器8、存储模块10、通信模块14、实时时钟模块12、显示模块13和端口模块11,所述电源模块9、存储模块10、通信模块14、实时时钟模块12、显示模块13和端口模块11分别与处理器8相连。
如图3所示,所述测控装置4包括电压互感器15、电流互感器16、模数转换模块、数据传输模块17和定位模块18,所述模数转换模块包括电压模/数转换器19和电流模/数转换器20,所述电压互感器15的输出端连接电压模/数转换器19的输入端,电压模/数转换器19的输出端连接至数据传输模块17,所述电流互感器16的输出端连接电流模/数转换器20的输入端,电流模/数转换器20的输出端连接至数据传输模块17。
作为优选,所述远动装置2还分别与远方调度主机6和数据库服务器7相连。所述分析装置1还与二次运推主机5相连。所述端口模块11包括高速数据监听端口和USB端口,高速数据监听端口包括两个RJ45网口。
本发明采用嵌入式实时操作系统,配置大容量的存储模块,采用先进的技术,将通讯、采集等软件功能硬件化,确保装置具有足够的数据采集精度和数据处理能力,并且系统更稳定可靠。
以上显示和描述了本发明的基本原理、主要特征和优点。本领域的普通技术人员应该了解,上述实施例不以任何形式限制本发明的保护范围,凡采用等同替换等方式所获得的技术方案,均落于本发明的保护范围内。
本发明未涉及部分均与现有技术相同或可采用现有技术加以实现。
Claims (5)
1.一种电力自动化网络分析装置,其特征在于:包括分析装置(1)、远动装置(2)、网络交换机(3)和测控装置(4),所述分析装置(1)与远动装置(2)相互连接,远动装置(2)和测控装置(4)分别通过以太网与所述网络交换机(3)相连;所述分析装置(1)包括电源模块(9)、处理器(8)、存储模块(10)、通信模块(14)、实时时钟模块(12)、显示模块(13)和端口模块(11),所述电源模块(9)、存储模块(10)、通信模块(14)、实时时钟模块(12)、显示模块(13)和端口模块(11)分别与处理器(8)相连。
2.根据权利要求1所述的电力自动化网络分析装置,其特征在于:所述测控装置(4)包括电压互感器(15)、电流互感器(16)、模数转换模块、数据传输模块(17)和定位模块(18),所述模数转换模块包括电压模/数转换器(19)和电流模/数转换器(20),所述电压互感器(15)的输出端连接电压模/数转换器(19)的输入端,电压模/数转换器(19)的输出端连接至数据传输模块(17),所述电流互感器(16)的输出端连接电流模/数转换器(20)的输入端,电流模/数转换器(20)的输出端连接至数据传输模块(17)。
3.根据权利要求1所述的电力自动化网络分析装置,其特征在于:所述远动装置(2)还分别与远方调度主机(6)和数据库服务器(7)相连。
4.根据权利要求1所述的电力自动化网络分析装置,其特征在于:所述分析装置(1)还与二次运推主机(5)相连。
5.根据权利要求1所述的电力自动化网络分析装置,其特征在于:所述端口模块(11)包括高速数据监听端口和USB端口,高速数据监听端口包括两个RJ45网口。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610530891.0A CN106053960A (zh) | 2016-07-07 | 2016-07-07 | 电力自动化网络分析装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610530891.0A CN106053960A (zh) | 2016-07-07 | 2016-07-07 | 电力自动化网络分析装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106053960A true CN106053960A (zh) | 2016-10-26 |
Family
ID=57185762
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610530891.0A Pending CN106053960A (zh) | 2016-07-07 | 2016-07-07 | 电力自动化网络分析装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106053960A (zh) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4741023A (en) * | 1986-12-23 | 1988-04-26 | General Electric Company | On-line test and diagnostic system for power system stabilizer |
CN101719694A (zh) * | 2009-12-16 | 2010-06-02 | 北京四方继保自动化股份有限公司 | 一种数字化变电站网络通信记录分析装置 |
CN102361356A (zh) * | 2011-10-28 | 2012-02-22 | 安徽省电力公司芜湖供电公司 | 一种变电所测控装置遥信量测试系统及其测试方法 |
CN102882741A (zh) * | 2012-09-20 | 2013-01-16 | 辽宁省电力有限公司丹东供电公司 | 便携式远动通道故障检测装置 |
CN202997707U (zh) * | 2012-12-26 | 2013-06-12 | 崔健 | 一种电网智能预警监测装置 |
US20140247055A1 (en) * | 2011-09-29 | 2014-09-04 | Korea Electric Power Corporation | System and method for detecting an abnormal waveform in a power distribution system |
CN204231030U (zh) * | 2014-12-01 | 2015-03-25 | 国家电网公司 | 一种传输故障检测器及电网调度自动化系统 |
CN105515198A (zh) * | 2016-01-08 | 2016-04-20 | 国网浙江省电力公司 | 远程智能巡检系统及方法 |
CN205809183U (zh) * | 2016-07-07 | 2016-12-14 | 南京大贺电力科技有限公司 | 电力自动化网络分析装置 |
-
2016
- 2016-07-07 CN CN201610530891.0A patent/CN106053960A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4741023A (en) * | 1986-12-23 | 1988-04-26 | General Electric Company | On-line test and diagnostic system for power system stabilizer |
CN101719694A (zh) * | 2009-12-16 | 2010-06-02 | 北京四方继保自动化股份有限公司 | 一种数字化变电站网络通信记录分析装置 |
US20140247055A1 (en) * | 2011-09-29 | 2014-09-04 | Korea Electric Power Corporation | System and method for detecting an abnormal waveform in a power distribution system |
CN102361356A (zh) * | 2011-10-28 | 2012-02-22 | 安徽省电力公司芜湖供电公司 | 一种变电所测控装置遥信量测试系统及其测试方法 |
CN102882741A (zh) * | 2012-09-20 | 2013-01-16 | 辽宁省电力有限公司丹东供电公司 | 便携式远动通道故障检测装置 |
CN202997707U (zh) * | 2012-12-26 | 2013-06-12 | 崔健 | 一种电网智能预警监测装置 |
CN204231030U (zh) * | 2014-12-01 | 2015-03-25 | 国家电网公司 | 一种传输故障检测器及电网调度自动化系统 |
CN105515198A (zh) * | 2016-01-08 | 2016-04-20 | 国网浙江省电力公司 | 远程智能巡检系统及方法 |
CN205809183U (zh) * | 2016-07-07 | 2016-12-14 | 南京大贺电力科技有限公司 | 电力自动化网络分析装置 |
Non-Patent Citations (1)
Title |
---|
芮新花: "《电力工程》", 31 December 2008 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107180314B (zh) | 一种基于一二次系统关联关系的运维业务模型建模方法 | |
CN103512619A (zh) | 一种变压器状态信息智能监控系统及方法 | |
CN110337626A (zh) | 用于检测变电站中的错误数据注入的系统和方法 | |
CN111884347B (zh) | 多源电力信息融合的电力数据集中控制系统 | |
CN106603274B (zh) | 一种基于多维通信数据的配电网故障定位方法 | |
CN110768845A (zh) | 一种智能变电站过程层虚拟连接故障定位系统 | |
CN104753173A (zh) | 一种自动诊断电网ems系统遥测数据传输故障的方法 | |
CN103926896A (zh) | 一种基于网络的井下隔爆电源监控系统及其方法 | |
CN103915898A (zh) | 一种智能变电站网络的运维方法 | |
CN106787169A (zh) | 一种多数据源比较技术诊断变电站遥测故障的方法 | |
CN105093047A (zh) | 电力线路载流量监测预警系统 | |
CN104750092B (zh) | 一种工控系统遥控/遥调命令传输故障的自动诊断方法 | |
CN110174564A (zh) | 电能质量监测装置接入主站的现场检测系统及其检测方法 | |
CN109142993A (zh) | 一种适用于直流电源系统的多功能绝缘检测仪 | |
CN203595760U (zh) | 一种绝缘子安全状况检测系统 | |
CN107819328A (zh) | 一种电网故障数据的存储方法及装置 | |
CN111509857A (zh) | 一种低压配变免停电快捷监测系统及方法 | |
CN204906004U (zh) | 一种网络分层分布式的智能区域电网 | |
EP3097620B1 (en) | Synchrophasor data management systems and methods | |
CN104483564B (zh) | 电力计量自动化终端故障数据记录装置及记录方法 | |
CN204244203U (zh) | 一种测试继电保护测试仪触发延时的系统 | |
CN205809183U (zh) | 电力自动化网络分析装置 | |
CN201438637U (zh) | 一种用于电力配电自动化系统的故障捕获终端 | |
Kezunovic et al. | Merging PMU, operational, and non-operational data for interpreting alarms, locating faults and preventing cascades | |
CN203164360U (zh) | 一种变电设备绝缘在线监测系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161026 |
|
RJ01 | Rejection of invention patent application after publication |