CN102352686B - Hanging type undertile work frame - Google Patents

Hanging type undertile work frame Download PDF

Info

Publication number
CN102352686B
CN102352686B CN 201110322990 CN201110322990A CN102352686B CN 102352686 B CN102352686 B CN 102352686B CN 201110322990 CN201110322990 CN 201110322990 CN 201110322990 A CN201110322990 A CN 201110322990A CN 102352686 B CN102352686 B CN 102352686B
Authority
CN
China
Prior art keywords
montant
suspension under
under tile
long transverse
hanger bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201110322990
Other languages
Chinese (zh)
Other versions
CN102352686A (en
Inventor
钱根胜
方茂华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongling Ferrous Construction & Installation Steel Structure Co Ltd
Original Assignee
Tongling Ferrous Construction & Installation Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongling Ferrous Construction & Installation Steel Structure Co Ltd filed Critical Tongling Ferrous Construction & Installation Steel Structure Co Ltd
Priority to CN 201110322990 priority Critical patent/CN102352686B/en
Publication of CN102352686A publication Critical patent/CN102352686A/en
Application granted granted Critical
Publication of CN102352686B publication Critical patent/CN102352686B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention relates to a hanging type undertile work frame, which comprises a pair of hanging frames in the same structure and a support plate paved between the hanging frames, wherein each hanging frame comprises three vertical rods and a long transverse rod, the three vertical rods are mutually parallel, in addition, the bottom ends of the three vertical rods are sequentially and fixedly arranged on the long transverse rod, in addition, the vertical rod at the leftmost side and the vertical rod at the rightmost side are respectively positioned at the left end and the right end of the long transverse rod, the two vertical rods at the left side have the same height, the vertical rod positioned at the rightmost side is shorter than the two vertical rods at the left side, the top end of the vertical rod at the left side is fixedly provided with a U-shaped clamp groove with an upward notch, the top end of the vertical rod in the middle is provided with a downwards bent clamp hook, and both ends of the support plate are respectively and fixedly lapped on the long transverse rod of the two hanging frames and are positioned between the vertical rod in the middle and the vertical rod at the right side. The hanging type undertile work frame has the advantages that the structure is simple, the manufacturing cost is low, the hanging type undertile work frame slides along a purline and has no requirement on construction sites, and the flow operation can be carried out.

Description

Suspension under tile falsework
Technical field
The present invention relates to a kind of building implements, specifically be a kind of watt at the bottom of falsework.
Background technology
At present, in order to satisfy the under tile construction of steel-structure factory building, way is to set up full hall scaffold or adopt the assembling adjustable shelf usually.Set up full hall scaffold and completely take one with steel pipe exactly, the people steps down in the top of scaffold and carries out the under tile construction, but it is smooth that the prerequisite of setting up full hall scaffold is that the place needs, and also will rent materials such as steel pipe, fastener, springboard, safety net, and also want 10-20 people's cooperation when moving at every turn.The assembling adjustable shelf is to comprise organizing movably shelf more, every group of bottom shelf is equipped with universal wheel, and its requirement to the planeness in place is stricter, owing to be that many group shelfs connect together, even adorned universal wheel below, facts have proved, mobile still very difficult, need machinery or a large amount of personnel to cooperate equally, in addition, when mobile scaffold, the under tile installation exercise must stop, and that is to say and can not install continuously.
Summary of the invention
The technical problem to be solved in the present invention provides a kind of simple in structure and suspension under tile falsework that the construction plant is not required.
The present invention solves the problems of the technologies described above by the following technical solutions: a kind of suspension under tile falsework comprises the hanger bracket that a pair of structure is identical, and is laid on the gripper shoe between the described hanger bracket.
The present invention further is specially:
Described each hanger bracket comprises three montants and a long transverse lever, three montants are parallel to each other and its bottom is fixed on the long transverse lever successively, and the montant of the leftmost side and rightmost side montant lay respectively at the two ends, the left and right sides of long transverse lever, wherein Zuo Ce two montants are contour, the montant that is positioned at the rightmost side is shorter than two montants in left side, a U-shaped draw-in groove is fixed on the top of the montant in described left side, notch upwards, the top of the montant of described centre is provided with a decurved trip, the two ends of described gripper shoe fixedly ride over respectively on the long transverse lever of two hanger brackets, between the montant on the montant of centre and right side.
Described each hanger bracket also comprises first, second hyphen bar, between the montant of the top of the montant of the rightmost side and centre the first hyphen bar is arranged fixedly, and the second hyphen bar is fixed in the upper end between two montants in left side, and first, second hyphen bar is parallel to long transverse lever.
One side top of U-shaped draw-in groove is installed with a bolt.
Described hanger bracket adopts fine steel tube to be welded.
When described gripper shoe is metal sheet, welding or by screw locking between hanger bracket.
When the top of gripper shoe is plank, its bottom fixing metal support bar, support bar directly welds or locks between hanger bracket by screw.
Connect with at least one vertical pole between two hanger brackets.
Fix a vertical pole between two montants of the leftmost side of two hanger brackets, fix a vertical pole between the middle montant.
The top of the montant of described centre is provided with a decurved trip, and a horizontal angle steel is also fixed in the bottom of described trip.
The invention has the advantages that: 1, simple in structure, cost of manufacture is cheap: as long as several fine steel tubes, and produce once, can be repeatedly used, compare with conventional method, every square metre of this cost can be saved about 4 yuan; 2, the construction plant is not required: scaffold all is aerial suspension, does not influence ground construction, thereby more can save the whole duration; 3, conveniently moving: owing to be to slide along purlin, so the purlin tie rod can not be in the way, and in addition, can stride across crossbeam smoothly; 4, can carry out continuous productive process: facts have proved, as long as two people move shelf specially, just can guarantee that 8 people carry out under tile and uninterruptedly install, the duration fast 1/3rd; 5, safety has abundant guarantee: by the test of treble power, establish steel cable in addition again for operating personnel's hanging safety belt before suspension bracket uses, safety belt hanging point and suspension bracket are two stress systems, guarantee safety.
Description of drawings
Fig. 1 is the decomposition chart of the first embodiment of the present invention.
Fig. 2 is the combination assumption diagram of the first embodiment of the present invention.
Fig. 3 is the use schematic diagram of the first embodiment of the present invention.
Fig. 4 is the combination assumption diagram of the second embodiment of the present invention.
Fig. 5 is the decomposition chart of the third embodiment of the present invention.
Fig. 6 is the combination assumption diagram of the third embodiment of the present invention.
Fig. 7 is the combination assumption diagram of fourth embodiment of the invention.
The specific embodiment
First embodiment
See also Figure 1 and Figure 2, suspension under tile falsework of the present invention comprises the identical hanger bracket of a pair of structure 1,2, and is laid on the gripper shoe 3 between the described hanger bracket 1,2.
Here the structure with one of them hanger bracket 1 describes.Described hanger bracket 1 comprises three montants 12,14,16 and one long transverse lever 17, two hyphen bars 18,19, three montants 12,14,16 are parallel to each other and its bottom is fixed on the long transverse lever 17 successively, and the montant 12 of the leftmost side and rightmost side montant 16 lay respectively at the two ends, the left and right sides of long transverse lever 17.Zuo Ce two montants 12,14 contour wherein, be positioned at the montant 16 on right side than two montants 12 in left side, 14 short, between the montant 14 of the top of the montant 16 on right side and centre hyphen bar 18 is arranged fixedly, a hyphen bar 19 is also fixed in upper end between two montants 12,14 in left side, and hyphen bar 18,19 is parallel to long transverse lever 17.A U-shaped draw-in groove 122 is fixed on the top of the montant 12 in described left side, and notch makes progress, and a side of U-shaped draw-in groove 122 is installed with a bolt 124.The top of the montant 14 of described centre is provided with a decurved trip 142.
The two ends of described gripper shoe 3 fixedly ride over respectively on the long transverse lever 17 of hanger bracket 1 and hanger bracket 2, between the montant 16 on the montant 14 of centre and right side.
Described hanger bracket 1,2 adopts Metal Material Welding to form, when described gripper shoe 3 is metal sheet, can directly be welded between the hanger bracket 1,2 or by screw and lock between hanger bracket 1,2, when gripper shoe 3 tops are plank, by at its bottom fixing metal support bar, and then directly be welded on support bar between the hanger bracket 1,2 or by the screw locking between hanger bracket 1,2.
See also shown in Figure 3, when the roof is that two purlins are when being used, the trip 142 on montant 14 tops of centre is stuck in the top of the purlin 4 that combines, and the U-shaped draw-in groove 122 on montant 12 tops in left side is stuck in the bottom of the purlin 4 that combines, and bolt 124 is positioned at the top of purlin 4.The people stands on the gripper shoe 3, namely can set up the roof under tile.Many group suspension under tile falseworks use simultaneously.Because the people stands on the gripper shoe 3, and gripper shoe 3 is positioned at the right side of whole suspension under tile falsework, so the left side of suspension under tile falsework can be inclined upwardly, at this moment namely withstand on the bottom of purlin 4 by the trench bottom of U-shaped draw-in groove 122, play the effect of balance.When the under tile directly over the people is put up, namely can set up the position in advance to moving suspension under tile falsework along purlin, moving to, namely can proceed the construction of under tile.In order to guarantee safety, can establish steel cable on the roof in addition, use for operating personnel's hanging safety belt.
Second embodiment
See also shown in Figure 4ly, the difference of itself and first embodiment only is, two hanger brackets 1, the 2nd, the structure that is fixed together.Be to connect with at least one vertical pole between the hanger bracket 1,2, fix a vertical pole 5 between the montant as the left side among Fig. 4, fix a vertical pole 6 between the middle montant.
The 3rd embodiment
See also Fig. 5 and shown in Figure 6, the difference of itself and first embodiment only is that the top of the montant 14 of described centre is provided with a decurved trip 144, and a horizontal angle steel 146 is also fixed in the bottom of described trip 144.
When the structure applications of this kind suspension under tile falsework is single C type purlin in the purlin when the roof, during use, the trip 144 on montant 14 tops of centre is hung over the following notch of C type purlin, angle steel 146 is pressed in down on the notch.Arranging of angle steel 146 mainly is in order to increase the contact area of suspension under tile falsework and purlin, to reduce unit pressure.
The 4th embodiment
See also shown in Figure 7ly, the difference of itself and the 3rd embodiment only is, two hanger brackets 1, the 2nd, the structure that is fixed together.Be to connect with at least one vertical pole between the hanger bracket 1,2, fix a vertical pole 7 between the montant as the left side among Fig. 7, fix a vertical pole 8 between the middle montant.

Claims (9)

1. suspension under tile falsework, it is characterized in that: comprise the hanger bracket that a pair of structure is identical, and be laid on gripper shoe between the described hanger bracket, each described hanger bracket comprises three montants and a long transverse lever, three montants are parallel to each other and its bottom is fixed on the long transverse lever successively, and the montant of the leftmost side and rightmost side montant lay respectively at the two ends, the left and right sides of long transverse lever, wherein Zuo Ce two montants are contour, the montant that is positioned at the rightmost side is shorter than two montants in left side, a U-shaped draw-in groove is fixed on the top of the montant of the described leftmost side, notch upwards, the top of middle montant is provided with a decurved trip, the two ends of described gripper shoe fixedly ride over respectively on the long transverse lever of two hanger brackets, between the montant on the montant of centre and right side.
2. suspension under tile falsework according to claim 1, it is characterized in that: each described hanger bracket also comprises first, second hyphen bar, between the montant of the top of the montant of the rightmost side and centre the first hyphen bar is arranged fixedly, the second hyphen bar is fixed in upper end between two montants in left side, and first, second hyphen bar is parallel to long transverse lever.
3. suspension under tile falsework according to claim 1 and 2, it is characterized in that: a side top of U-shaped draw-in groove is installed with a bolt.
4. suspension under tile falsework according to claim 1 is characterized in that: described hanger bracket adopts fine steel tube to be welded.
5. suspension under tile falsework according to claim 4, it is characterized in that: described gripper shoe is metal sheet, welding or by the screw locking between hanger bracket.
6. suspension under tile falsework according to claim 4, it is characterized in that: the top of gripper shoe is plank, its bottom fixing metal support bar, support bar directly weld or by the screw locking between hanger bracket.
7. suspension under tile falsework according to claim 1 is characterized in that: connect with at least one vertical pole between two hanger brackets.
8. suspension under tile falsework according to claim 7 is characterized in that: fix a vertical pole between two montants of the leftmost side of two hanger brackets, fix a vertical pole between the middle montant.
9. suspension under tile falsework according to claim 1, it is characterized in that: the top of the montant of described centre is provided with a decurved trip, and a horizontal angle steel is also fixed in the bottom of described trip.
CN 201110322990 2011-10-21 2011-10-21 Hanging type undertile work frame Expired - Fee Related CN102352686B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110322990 CN102352686B (en) 2011-10-21 2011-10-21 Hanging type undertile work frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110322990 CN102352686B (en) 2011-10-21 2011-10-21 Hanging type undertile work frame

Publications (2)

Publication Number Publication Date
CN102352686A CN102352686A (en) 2012-02-15
CN102352686B true CN102352686B (en) 2013-07-03

Family

ID=45576317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110322990 Expired - Fee Related CN102352686B (en) 2011-10-21 2011-10-21 Hanging type undertile work frame

Country Status (1)

Country Link
CN (1) CN102352686B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107762133A (en) * 2017-11-17 2018-03-06 北京源深节能技术有限责任公司 The specific purpose tool of installation photovoltaic component on cable wire
CN113982241A (en) * 2021-11-22 2022-01-28 安徽科汇金属网架有限公司 Gate-type steel constructs processing and uses safety device
CN115012638A (en) * 2022-07-08 2022-09-06 上海外高桥造船有限公司 Scaffold

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202248825U (en) * 2011-10-21 2012-05-30 铜陵有色建安钢构有限责任公司 Suspension type concave tile working frame

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004101912A2 (en) * 2003-05-16 2004-11-25 Denis Paquette Safety restraint system
CN201169906Y (en) * 2008-03-22 2008-12-24 烟建集团有限公司 Adjustable bracket for scaffold
CN201386383Y (en) * 2009-04-15 2010-01-20 河南泰宏房屋营造有限公司 Mobile suspended scaffold for decorating exterior walls
CN201786007U (en) * 2010-06-22 2011-04-06 浙江中南建设集团钢结构有限公司 Aerial operation hanging basket

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202248825U (en) * 2011-10-21 2012-05-30 铜陵有色建安钢构有限责任公司 Suspension type concave tile working frame

Also Published As

Publication number Publication date
CN102352686A (en) 2012-02-15

Similar Documents

Publication Publication Date Title
CN204151692U (en) A kind of modular assembly formula connection system for guide rail
CN102352686B (en) Hanging type undertile work frame
CN104060844A (en) Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof
CN208950265U (en) A kind of steel structure support moulding bed, full hall scaffold support device
CN202248825U (en) Suspension type concave tile working frame
CN111591936A (en) Method for installing condenser with high foundation at bottom of concrete frame in plant
CN204400502U (en) Bottle gouard moved by hands support
CN101487292B (en) Oriented sliding and rotating support and construction method for factory building columns with steel structure
CN104060809B (en) A kind of roofing daylighting glass steelframe installs equipment and operation method thereof
CN102913007B (en) Steel reinforcement processing shed and construction method therefor
CN204531180U (en) Control the stiff skeleton of large-scale component reinforcing bar binding precision
CN203430009U (en) Construction hanging basket
CN201208688Y (en) Fixture for welding large-sized H section steel structural part
CN201627358U (en) Large-section pressure pipeline concrete construction deformed steel formwork
CN204552051U (en) The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN210600469U (en) Assembled series pipeline support
CN104675020A (en) Stiff skeleton and method for controlling steel bar binding precision of large member by using stiff skeleton
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN208310404U (en) Modular suspension moso bamboo ecology enclosure wall
CN202705932U (en) T-beam reinforced hanger frame structure
CN212295583U (en) Self-clamping type hoistway operation platform
CN202214976U (en) Steel wire rope support device
CN202064535U (en) Support for mounting solar photovoltaic module
CN206126696U (en) A detachable indoor hoist for buckling restrained brace
CN214939216U (en) Square stand staple bolt steel form

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20171021

CF01 Termination of patent right due to non-payment of annual fee