CN102322008A - 一种路基沉降的补偿方法 - Google Patents

一种路基沉降的补偿方法 Download PDF

Info

Publication number
CN102322008A
CN102322008A CN201110195116A CN201110195116A CN102322008A CN 102322008 A CN102322008 A CN 102322008A CN 201110195116 A CN201110195116 A CN 201110195116A CN 201110195116 A CN201110195116 A CN 201110195116A CN 102322008 A CN102322008 A CN 102322008A
Authority
CN
China
Prior art keywords
quicklime
roadbed
bag
compensation method
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110195116A
Other languages
English (en)
Other versions
CN102322008B (zh
Inventor
葛折圣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong elephant Traffic Technology Co., Ltd.
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN 201110195116 priority Critical patent/CN102322008B/zh
Publication of CN102322008A publication Critical patent/CN102322008A/zh
Application granted granted Critical
Publication of CN102322008B publication Critical patent/CN102322008B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

本发明提供一种路基沉降的补偿方法,步骤如下:路基施工过程中,在通车后易发生沉降变形的路段,当路基填筑到距离路基顶面30cm~200cm高度时,在路基两侧砌筑挡土墙;在挡土墙内侧,路基全宽度范围内,分层、均匀铺筑袋装生石灰;在每个生石灰袋上预留橡胶管至路基外侧,作为后期注水通道;挡土墙的底面低于袋装生石灰铺筑底面20cm~100cm,挡土墙的顶面与路基顶面平齐;当路基发生沉降时,通过预留的橡胶管向生石灰袋中注水,生石灰吸水膨胀而顶起路面结构。本发明在路基外侧完成注水作业,施工时间短,施工过程不中断交通,对行车干扰少;施工不受天气和环境限制,发现沉降随时处理,且施工过程可控。

Description

一种路基沉降的补偿方法
技术领域
本发明涉及道路路基病害的治理方法,尤其是一种路基沉降的补偿方法。
背景技术
道路通车后,由于不良地基条件、劣质的路基填料、不当的施工工艺、气候和环境因素等多种原因导致的路基沉降现象非常普遍,严重影响了道路的使用性能,并威胁着交通安全。现有技术处治路基沉降(如开挖换填新的路基和路面材料、直接在路面上方填补路面材料等)存在以下不足:施工过程中需要封闭交通,严重干扰车辆通行,容易产生交通事故;施工受气候影响大,雨天无法施工,无法及时处治路基沉降。
发明内容
为克服上述相关技术的缺陷和不足,本发明的目的在于提供一种路基沉降的补偿方法,在不影响交通的前提下,全天候、及时地补偿路基沉降。
本发明目的通过下述技术方案得以实现:
(1)砌筑挡土墙,预埋袋装生石灰
路基施工过程中,在通车后易发生沉降变形的路段,当路基填筑到距离路基顶面30cm~200cm高度时,在路基两侧砌筑挡土墙;在挡土墙内侧,路基全宽度范围内,分层、均匀铺筑袋装生石灰;在每个生石灰袋上预留橡胶管至路基外侧,封闭管口,作为后期注水通道;挡土墙的底面低于袋装生石灰铺筑底面20cm~100cm,挡土墙的顶面与路基顶面平齐;
(2)向生石灰袋中注水,补偿路基沉降
   在道路使用过程中,当路基发生沉降时,通过预留的橡胶管向生石灰袋中注水,生石灰吸水膨胀而顶起路面结构。
生石灰的铺筑层数具体根据其铺筑底面与路基顶面的距离而确定。
所述生石灰为钙质生石灰或镁质生石灰,钙质生石灰中氧化钙含量、镁质生石灰中氧化镁的含量均为80%~98%,含水量均小于1%。
所述钙质生石灰或镁质生石灰采用密封、可变形的橡胶袋包装,每袋生石灰的质量为20kg~500kg。
所述每袋生石灰的注水量为每袋所装生石灰质量的5 %~30%。
与现有技术相比,本发明具有以下优点:
(1)现有技术施工过程中需要封闭交通,严重干扰车辆通行,容易产生交通事故;本发明在路基外侧完成注水作业,施工时间短,施工过程不中断交通,对行车干扰少;
(2)现有技术施工受气候影响大,雨天无法施工,无法及时处治路基沉降;本发明施工不受天气和环境限制,发现沉降随时处理;
(3)本发明施工过程可控,通过监测路表高程,调节注水速度和注水量,从而控制路面顶起速度和顶起量。
具体实施方式
下面结合实例对本发明作进一步详细说明,但不限于此。
实施例1
某高速公路K2+300~K2+320桥头路基段,长度为20m,路基顶面宽度为26m。路基施工过程中,当路基填筑到距离路基顶面80cm高度时,在路基两侧砌筑挡土墙。挡土墙的底面低于袋装生石灰铺筑底面50cm,挡土墙的顶面与路基顶面平齐。两座挡土墙之间的路基宽度为24m。
在挡土墙内侧路基全宽度范围内,分4层、每层均匀铺筑了1000袋生石灰。采用了钙质生石灰,氧化钙含量为80%;含水量为0.8%。
采用密封、可变形的橡胶袋包装生石灰。每袋生石灰的质量为250kg。在每个橡胶袋上连接一根橡胶管至路基外侧,封闭管口,作为后期注水通道。
该高速公路通车3年后,上述K2+300~K2+320桥头路基段由于地基下沉导致路表平均下沉了15cm,出现了严重的“跳车“现象。
通过预留的橡胶管,向生石灰袋中注水,生石灰吸水膨胀,顶起路面结构,从而补偿路面路基下沉量,恢复路表至设计高程。
注水过程中,监测路表高程,调节注水速度和注水量,以控制路面顶起速度和顶起量。每袋生石灰的平均注水量为每袋生石灰质量的8.5%,每袋生石灰的平均注水速度为1.5kg/分钟。
整个注水施工过程耗时15分钟。在不影响交通的前提下,迅速、及时地补偿了路基沉降,提高了道路使用性能,消除了交通安全隐患。
实施例2
    某高速公路K30+500~K30+540桥头路基段,长度为40m,路基顶面宽度为26m。路基施工过程中,当路基填筑到距离路基顶面60cm高度时,在路基两侧砌筑挡土墙。挡土墙的底面低于袋装生石灰铺筑底面20cm,挡土墙的顶面与路基顶面平齐。两座挡土墙之间的路基宽度为24m。
在挡土墙内侧路基全宽度范围内,分3层、每层均匀铺筑了2000袋生石灰。采用了镁质生石灰,氧化镁含量为98%;含水量为0.5%。
采用密封、可变形的橡胶袋包装生石灰。每袋生石灰的质量为300kg。在每个橡胶袋上连接一根橡胶管至路基外侧,封闭管口,作为后期注水通道。
该高速公路通车2年后,上述K30+500~K30+540桥头路基段由于地基下沉导致路表平均下沉了30cm,出现了严重的“跳车”现象。
通过预留的橡胶管,向生石灰袋中注水,生石灰吸水膨胀,顶起路面结构,从而补偿路面路基下沉量,恢复路表至设计高程。
注水过程中,监测路表高程,调节注水速度和注水量,以控制路面顶起速度和顶起量。每袋生石灰的平均注水量为每袋生石灰质量的30%,每袋生石灰的平均注水速度为9kg/分钟。
整个注水施工过程耗时10分钟。在不影响交通的前提下,迅速、及时地补偿了路基沉降,提高了道路使用性能,消除了交通安全隐患。

Claims (4)

1.一种路基沉降的补偿方法,其特征在于步骤如下:
(1)砌筑挡土墙,预埋袋装生石灰
路基施工过程中,在通车后易发生沉降变形的路段,当路基填筑到距离路基顶面30cm~200cm高度时,在路基两侧砌筑挡土墙;在挡土墙内侧,路基全宽度范围内,分层、均匀铺筑袋装生石灰;在每个生石灰袋上预留橡胶管至路基外侧,封闭管口,作为后期注水通道;挡土墙的底面低于袋装生石灰铺筑底面20cm~100cm,挡土墙的顶面与路基顶面平齐;
(2)向生石灰袋中注水,补偿路基沉降
路基发生沉降时,通过预留的橡胶管向生石灰袋中注水,生石灰吸水膨胀而顶起路面结构。
2. 根据权利要求1所述的补偿方法,其特征在于所述生石灰为钙质生石灰或镁质生石灰,钙质生石灰中氧化钙含量、镁质生石灰中氧化镁的含量为80%~98%,含水量均小于1%。
3.根据权利要求2所述的补偿方法,其特征在于所述钙质生石灰或镁质生石灰采用密封、可变形的橡胶袋包装,每袋生石灰的质量为20kg~500kg。
4.根据权利要求1至3之一所述的补偿方法,其特征在于所述每袋生石灰的注水量为每袋所装生石灰质量的5 %~30%。
CN 201110195116 2011-07-13 2011-07-13 一种路基沉降的补偿方法 Expired - Fee Related CN102322008B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110195116 CN102322008B (zh) 2011-07-13 2011-07-13 一种路基沉降的补偿方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110195116 CN102322008B (zh) 2011-07-13 2011-07-13 一种路基沉降的补偿方法

Publications (2)

Publication Number Publication Date
CN102322008A true CN102322008A (zh) 2012-01-18
CN102322008B CN102322008B (zh) 2013-09-25

Family

ID=45449834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110195116 Expired - Fee Related CN102322008B (zh) 2011-07-13 2011-07-13 一种路基沉降的补偿方法

Country Status (1)

Country Link
CN (1) CN102322008B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102995513A (zh) * 2012-11-21 2013-03-27 北京航空航天大学 利用膨胀材料准确调控新老路基差异沉降的地基处理方法
CN102995551A (zh) * 2012-11-21 2013-03-27 北京航空航天大学 一种调整在役公路路桥结合部桥面路面差异沉降的方法
CN103031792A (zh) * 2013-01-05 2013-04-10 北京航空航天大学 一种抬升既有公路路基沉降的方法及其装置
CN103469700A (zh) * 2013-09-30 2013-12-25 华东交通大学 过渡段用液压无级自动沉降补偿装置
CN103469724A (zh) * 2012-06-08 2013-12-25 辽宁省交通规划设计院 一种带可控沉降的基础体系的钢构桥梁及其施工方法
CN106066393A (zh) * 2016-07-01 2016-11-02 山东交通学院 一种桥头沉降补偿量测试装置及测试方法
CN107761497A (zh) * 2017-11-05 2018-03-06 韩少鹏 一种防沉降路基结构
CN107761495A (zh) * 2017-10-26 2018-03-06 雨发建设集团有限公司 一种预埋膨胀袋补偿路基沉降施工方法
CN107841913A (zh) * 2017-11-05 2018-03-27 韩少鹏 一种防沉降路基施工方法
CN111472221A (zh) * 2020-04-15 2020-07-31 陕西融创交通科技有限公司 一种路基沉降处理方法
CN113481777A (zh) * 2021-07-21 2021-10-08 中国路桥工程有限责任公司 快速公交行车路基
CN115162084A (zh) * 2022-06-22 2022-10-11 浙江工业大学 一种新建公路路桥过渡段差异沉降自补偿预防桥头跳车的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05239459A (ja) * 1992-02-27 1993-09-17 Central Japan Railway Co 路盤材および強化路盤工法
CN1328190A (zh) * 2000-06-14 2001-12-26 荆学松 高填土路基桥头跳车的防治方法
CN2501908Y (zh) * 2000-06-14 2002-07-24 荆学松 预防高填土路基桥头跳车的台背
CN101851928A (zh) * 2010-06-08 2010-10-06 中国科学院地质与地球物理研究所 一种湿陷性黄土边坡工程改良防护方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05239459A (ja) * 1992-02-27 1993-09-17 Central Japan Railway Co 路盤材および強化路盤工法
CN1328190A (zh) * 2000-06-14 2001-12-26 荆学松 高填土路基桥头跳车的防治方法
CN2501908Y (zh) * 2000-06-14 2002-07-24 荆学松 预防高填土路基桥头跳车的台背
CN101851928A (zh) * 2010-06-08 2010-10-06 中国科学院地质与地球物理研究所 一种湿陷性黄土边坡工程改良防护方法

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469724A (zh) * 2012-06-08 2013-12-25 辽宁省交通规划设计院 一种带可控沉降的基础体系的钢构桥梁及其施工方法
CN103469724B (zh) * 2012-06-08 2016-01-06 辽宁省交通规划设计院 一种带可控沉降的基础体系的钢构桥梁及其施工方法
CN102995513A (zh) * 2012-11-21 2013-03-27 北京航空航天大学 利用膨胀材料准确调控新老路基差异沉降的地基处理方法
CN102995551A (zh) * 2012-11-21 2013-03-27 北京航空航天大学 一种调整在役公路路桥结合部桥面路面差异沉降的方法
CN102995513B (zh) * 2012-11-21 2016-01-13 北京航空航天大学 利用膨胀材料准确调控新老路基差异沉降的地基处理方法
CN103031792A (zh) * 2013-01-05 2013-04-10 北京航空航天大学 一种抬升既有公路路基沉降的方法及其装置
CN103031792B (zh) * 2013-01-05 2015-09-02 北京航空航天大学 一种抬升既有公路路基沉降的方法及其装置
CN103469700A (zh) * 2013-09-30 2013-12-25 华东交通大学 过渡段用液压无级自动沉降补偿装置
CN106066393A (zh) * 2016-07-01 2016-11-02 山东交通学院 一种桥头沉降补偿量测试装置及测试方法
CN107761495A (zh) * 2017-10-26 2018-03-06 雨发建设集团有限公司 一种预埋膨胀袋补偿路基沉降施工方法
CN107761497A (zh) * 2017-11-05 2018-03-06 韩少鹏 一种防沉降路基结构
CN107841913A (zh) * 2017-11-05 2018-03-27 韩少鹏 一种防沉降路基施工方法
CN107761497B (zh) * 2017-11-05 2019-11-05 江苏惠淳建设有限公司 一种防沉降路基结构
CN111472221A (zh) * 2020-04-15 2020-07-31 陕西融创交通科技有限公司 一种路基沉降处理方法
CN113481777A (zh) * 2021-07-21 2021-10-08 中国路桥工程有限责任公司 快速公交行车路基
CN113481777B (zh) * 2021-07-21 2022-06-24 中国路桥工程有限责任公司 快速公交行车路基
CN115162084A (zh) * 2022-06-22 2022-10-11 浙江工业大学 一种新建公路路桥过渡段差异沉降自补偿预防桥头跳车的方法
CN115162084B (zh) * 2022-06-22 2024-04-09 浙江工业大学 一种新建公路路桥过渡段差异沉降自补偿预防桥头跳车的方法

Also Published As

Publication number Publication date
CN102322008B (zh) 2013-09-25

Similar Documents

Publication Publication Date Title
CN102322008B (zh) 一种路基沉降的补偿方法
CN102155226B (zh) 中厚及以上煤层的巷道式充填开采方法
CN103742146B (zh) 墩柱式充填法采煤工艺
CN104358198B (zh) 一种纤维加筋固化土改良重载铁路路基的方法
CN103215863B (zh) 高速铁路无砟轨道抬升高聚物注浆方法
CN106761782A (zh) 一种在富水粉土地层中盾构下穿运营隧道的掘进施工方法
CN101949122B (zh) 正常通车情况下路堤横向钻孔轻质置换控制沉降的方法
CN202945519U (zh) 一种控制运营期路堤沉降的加固结构
CN113235340B (zh) 一种横向引孔膨胀顶升处治桥头跳车方法
CN102953390A (zh) 临水深厚淤泥区域的吹填施工场界围堰加固方法
CN104179105A (zh) 一种逆作法刚性桩复合地基施工方法
CN203383118U (zh) 路桥过渡段气垫层路基
CN100516367C (zh) 跨河大桥水中墩土工充泥管袋围堰及其制备方法
CN107841913B (zh) 一种防沉降路基施工方法
CN2501908Y (zh) 预防高填土路基桥头跳车的台背
CN203960701U (zh) 软土路基新老路基路面衔接处的差异沉降协调结构
CN103742147A (zh) 连续梁桥式充填法采煤工艺
CN102644266B (zh) 一种采用劈裂锚杆桩加固桥台区域软土层路面的方法
CN101672182B (zh) 盾构穿越地下结构物的方法
CN109537393A (zh) 一种市政工程道路铺设结构
CN115045163A (zh) 一种钢纤维自密实水泥及其应用、一种公路路面及其施工方法
CN203128966U (zh) 用于过渡段的cfg桩的褥垫层复合地基
CN109826176B (zh) 用于沿海特殊淤泥地质的管沟工程施工工艺
CN105862595A (zh) 钢桥与道路连接台背施工工艺
CN211199940U (zh) 一种防止桥头跳车的加筋土挡土墙路基结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160329

Address after: 510065, No. 9, Heping Road, Guangdong, Guangzhou, two, Yuexiu District

Patentee after: Guangdong elephant Traffic Technology Co., Ltd.

Address before: 510640 Tianhe District, Guangdong, No. five road, No. 381,

Patentee before: South China University of Technology

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925

Termination date: 20170713

CF01 Termination of patent right due to non-payment of annual fee