CN103742146B - 墩柱式充填法采煤工艺 - Google Patents

墩柱式充填法采煤工艺 Download PDF

Info

Publication number
CN103742146B
CN103742146B CN201410021228.9A CN201410021228A CN103742146B CN 103742146 B CN103742146 B CN 103742146B CN 201410021228 A CN201410021228 A CN 201410021228A CN 103742146 B CN103742146 B CN 103742146B
Authority
CN
China
Prior art keywords
filling
coal
pier stud
stud type
unit
Prior art date
Application number
CN201410021228.9A
Other languages
English (en)
Other versions
CN103742146A (zh
Inventor
石建新
崔云德
王向宏
郭传军
韩吉玉
Original Assignee
淄博王煤矿业有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 淄博王煤矿业有限公司 filed Critical 淄博王煤矿业有限公司
Priority to CN201410021228.9A priority Critical patent/CN103742146B/zh
Publication of CN103742146A publication Critical patent/CN103742146A/zh
Application granted granted Critical
Publication of CN103742146B publication Critical patent/CN103742146B/zh

Links

Abstract

本发明涉及一种墩柱式充填法采煤工艺,其步骤如下:在壁式采煤工作面,分别沿其平行、垂直方向将采空区依次设计分割成若干个充填单元和留空单元;采用土工布防渗真空袋组成充填单元,并将其与浆体材料的制送自助一体化设备连接成连通器式的充填系统;用膨胀性浆体材料充满每个充填单元;当工作面的推进距离达到L+M时,重复上述步骤,直至一个采煤面结束。整个采空区形成由若干个墩柱式固结充填体为支点和直接顶或老顶岩体为天花板的房室空间结构。本工艺适用于厚度在1.3米以下煤层的充填开采,只需将10-20%的采空区充实,就能有效控制顶板不垮落和地表不沉降,使充填成本降到最低、充填作业时间缩到最短、采煤生产效率保持到最高。

Description

墩柱式充填法采煤工艺
技术领域
[0001] 本发明涉及一种墩柱式充填法采煤工艺,适用于厚度在1.3米以下的煤层,属于 煤炭开采充填领域。
背景技术
[0002] 为了控制地表沉降及其环境损害,有些煤炭开采企业选用了全采全充的充填法采 煤工艺。这种充填法采煤工艺存在的主要不足是:一是因为需要充填的空间量相对较大,充 填材料供不应求的矛盾较为突出,充填工序材料成本的增加幅度也难以降到最低;二是因 为充填工作量相对较大,挤用了采煤工序的作业时间,采煤工作面原有的生产效率大幅度 降低。
发明内容
[0003] 根据以上现有技术中的不足,本发明要解决的技术问题是:提供一种适用于厚度 在1. 3米以下的煤层、能够以最少的充填量实现控制地表沉降及其环境损害的墩柱式充填 法采煤工艺。
[0004] 本发明所述的墩柱式充填法采煤工艺,该工艺按下述步骤进行:
[0005] ①在壁式采煤工作面,分别沿其平行和垂直方向将采空区依次设计分割成若干个 长方体的充填单元和留空单元:
[0006] 1)通过理论计算和现场观测,确认直接顶或老顶岩体的破断步距P ;
[0007] 2)设计每个充填单元的长度Μ和宽度N为2~3倍的采煤高度Η ;
[0008] 3)设计留空单元的平行和垂直跨度均为L = ΡΧ (1/2~2/3);
[0009] ②采用折径为R = 6Η的土工布防渗真空袋,组成充填单元;
[0010] ③将土工布防渗真空袋与浆体材料的制送自助一体化设备,连接成为一个连通 器式的充填系统,浆体材料的制送自助一体化设备是本单位已经授权的专利(专利号为 201320219898. 2);
[0011] ④利用膨胀性浆体材料进行充填,直至充满每个土工布防渗真空袋;
[0012] ⑤膨胀性浆体材料固结10~12小时后,充填体达到支撑能力;
[0013] ⑥当工作面的推进距离达到L+M时,重复第②~⑤的步骤,直至一个采煤面结束;
[0014] ⑦一个采煤面结束后,整个采空区形成了由若干个墩柱式固结充填体为支点和直 接顶或老顶岩体为天花板组成的房室空间结构。
[0015] 所述膨胀性浆体材料是由基料、膨胀剂、速凝剂、固化剂和水组成的料浆,固液比 为1 :1. 2~1. 5,膨胀率为10%以下,各原料按以下配比组成:
[0016] 咕料 500 ~650kg/rr^ 膨胀剂 :0:.7~lkg/m3 速凝剂 70~100kg/m3 固化剂. 20~50kg/m3 水 750 ~900kg/m\
[0017] 其中,所述的基料是粉煤灰、尾矿、赤泥和风积沙的一种或几种;膨胀剂是锌粉或 者石膏粉或两者的混合物;速凝剂是石灰;固化剂是水泥或者炉渣或两者的混合物。
[0018] 膨胀性浆体材料在充填结束后,2小时开始固化,8小时固化结束并实现10%以下 的体积膨胀达到充分接顶,24小时达到支撑强度1. 5Mpa,28天达到最终强度lOMpa以上。 因此,可以满足及时充填、快速凝固、充分接顶的要求。
[0019] 本方法控制顶板的原理是:
[0020] 以每个土工布防渗真空袋充填为单元的固结充填体为支点,以直接顶或老顶的岩 体为天花板,整个采空区形成了房室空间结构。由于每一个直接顶或老顶岩体梁的跨度小 于其破断步距,采空区的顶板不会垮落。因此,该方法能够保证顶板在整个开采过程中保持 原始的地质力学平衡状态,从而把地表沉降及其环境损害控制在允许的任意程度之内。
[0021] 本发明适用于厚度在1.3米以下的煤层。依据煤层的厚度和工作面的推进速度, 确定每个充填单元的几何尺寸;按照每个留空单元跨度小于直接顶或老顶岩体破断步距的 原则,确定充填单元和留空单元的数量。采用折径为R = 6H的土工布防渗真空袋,组成充 填单元。采用浆体材料的制送自助一体化设备和连通器式充填方法,使用膨胀性浆体材料 对充填单元进行充填。一个采煤面结束,整个采空区就形成了房室空间结构。本方法可以 用最小的充填成本将地表沉降及其环境损害控制在允许的任意程度之内,并保持采煤工作 面的劳动效率不降低,属于1. 3米以下煤层充填开采技术领域。
[0022] 本发明所具有的有益效果是:
[0023] 本墩柱式充填法采煤工艺,适用于厚度在1.3米以下煤层的充填开采,本方法只 需要将10-20 %的采空区充实,就能有效控制顶板不垮落和地表不沉降,由此,充填材料的 需求数量减到了最少,充填工艺的直接成本降到了最低,充填工序的作业时间缩到了最短, 采煤工序的生产效率保持到最高。
附图说明
[0024] 图1采煤工作面初始状态平面示意图;
[0025] 图2采煤工作面开始回采状态平面示意图;
[0026] 图3采煤工作面开始充填状态平面示意图;
[0027] 图4采煤工作面回采与充填状态平面示意图;
[0028] 图5采煤工作面充填结果平面示意图;
[0029] 图6采煤工作面充填结果垂直示意图。
[0030] 图中:1、煤层;2、采空区;3、工作面;4、充填单元;5、充填体;6、留空单元。
具体实施方式
[0031] 下面结合附图对本发明的实施例做进一步描述:
[0032] 具体结合厚度为1. 2米的4-2煤层1,对本发明墩柱式充填法采煤工艺作具体说 明:
[0033] ①顶板岩性分析及充填尺寸确定:
[0034] 煤4-2壁式采煤工作面3,相对位置在县级道路和村庄下面,其走向长度120米, 倾向长度600米,煤层1厚度Η平均为1.2米,倾角5°~1Γ。底板为1.5米厚的炭质泥 岩,顶板为4米厚的粉砂岩。经开采实测,初次来压步距即直接顶的破断步距Ρ为18~25 米;
[0035] ②设计每个充填单元4的宽度Ν为2~3米、长度Μ为3~4米,留空单元6的平 行和垂直跨度L为10~11米,沿平行工作面3方向均匀布置11个充填单元4和10个留 空单元6 ;
[0036] ③利用土工布防渗真空袋组成充填单元4,将土工布防渗真空袋与浆体材料的制 送自助一体化设备连接成为一个连通器式的充填系统,浆体材料的制送自助一体化设备是 本单位已经授权的专利(专利号为201320219898. 2);
[0037] ④用浆体材料的制送自助一体化设备向充填单元4充填膨胀性浆体材料,直至充 满充实每个充填单元4,其中,膨胀性浆体材料是由基料、膨胀剂、速凝剂、固化剂和水组成 的料浆。基料选用粉煤灰、赤泥和尾砂;膨胀剂选用锌粉和石膏粉的混合物,速凝剂选用石 灰,固化剂选用水泥和炉渣,各原料按以下配比组成:粉煤灰、赤泥和尾砂500~650kg,锌 粉0. 7~lkg,石霄粉5~10kg,石灰70~100kg,水泥和炉渔20~50kg,水750~900kg。 充填料浆固液比为1 :1. 2~1. 4,膨胀率为3~10 %。,此种膨胀性浆体材料能够在充填后 2小时开始固化,8小时固化结束并实现3~10%的体积膨胀达到充分接顶,12小时抗压强 度达到0. 8Mpa,24小时抗压强度达到1. 51Mpa,7天抗压强度达到5MPa,28天抗压强度可达 到 15. 7Mpa〇
[0038] ⑤待10~12小时后,膨胀性浆体材料实现膨胀性凝固,充填体5达到支撑能力;
[0039] ⑥当工作面3的推进距离达到L+M时,重复③~⑤的步骤,直到一个工作面3结 束。最终,在采空区2内形成了若干个均匀分布的墩柱式充填体5和房室式留空单元6。在 覆岩垂直剖面上,形成了以充填体5为支点、直接顶岩体为天花板组成的房室空间结构。由 于每一个直接顶岩体的跨度小于其破断步距P,采空区2的顶板不会垮落。
[0040] 通过采用本墩柱式充填法采煤工艺,充填率在11%左右。经观察测量达到以下效 果:在采煤高度1. 2米、埋藏深度310米、开采范围600米X 240米的情况下,地表沉降平均 为3~5毫米,相关道路和房屋没有受到破坏,采区回采率达到到99. 5%,生产效率与非充 填采煤面的180吨/日基本持平。

Claims (6)

1. 一种墩柱式充填法采煤工艺,其特征在于:按下述步骤进行: ① 在壁式采煤工作面(3),分别沿其平行和垂直方向将采空区依次设计分割成若干个 长方体的充填单元(4)和留空单元(6): 1) 通过理论计算和现场观测,确认直接顶或老顶岩体的破断步距P ; 2) 设计每个充填单元(4)的长度M和宽度N为2~3倍的采煤高度H ; 3) 设计留空单元(6)的平行和垂直跨度均为L = PX (1/2~2/3); ② 采用折径为R = 6H的土工布防渗真空袋,组成充填单元(4); ③ 将土工布防渗真空袋与浆体材料的制送自助一体化设备,连接成为一个连通器式的 充填系统; ④ 利用膨胀性浆体材料进行充填,直至充满每个土工布防渗真空袋; ⑤ 膨胀性浆体材料固结10~12小时后,充填体(5)达到支撑能力; ⑥ 当工作面(3)的推进距离达到L+M时,重复第②~⑤的步骤,直至一个采煤面结束; ⑦ 一个采煤面结束后,整个采空区(2)形成了由若干个墩柱式固结充填体(5)为支点 和直接顶或老顶岩体为天花板组成的房室空间结构。
2. 根据权利要求1所述的墩柱式充填法采煤工艺,其特征在于:所述的膨胀性浆体 材料是由基料、膨胀剂、速凝剂、固化剂和水组成的料浆,固液比为I :1. 2~1. 5,膨胀率为 10%以下,各原料按以下配比组成: 基料 500 ~650kg/m3 膨胀剂 0.7~lkg/m3 速凝剂 70~IOOkgZm3 固化剂 20~50kg/m3 水 750 ~900kg/m\
3. 根据权利要求2所述的墩柱式充填法采煤工艺,其特征在于:所述的基料是粉煤灰、 尾矿、赤泥和风积沙的一种或几种。
4. 根据权利要求2所述的墩柱式充填法采煤工艺,其特征在于:所述的膨胀剂是锌粉 或者石膏粉或两者的混合物。
5. 根据权利要求2所述的墩柱式充填法采煤工艺,其特征在于:所述的速凝剂是石灰。
6. 根据权利要求2所述的墩柱式充填法采煤工艺,其特征在于:所述的固化剂是水泥 或者炉渣或两者的混合物。
CN201410021228.9A 2014-01-17 2014-01-17 墩柱式充填法采煤工艺 CN103742146B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410021228.9A CN103742146B (zh) 2014-01-17 2014-01-17 墩柱式充填法采煤工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410021228.9A CN103742146B (zh) 2014-01-17 2014-01-17 墩柱式充填法采煤工艺

Publications (2)

Publication Number Publication Date
CN103742146A CN103742146A (zh) 2014-04-23
CN103742146B true CN103742146B (zh) 2016-02-03

Family

ID=50499200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410021228.9A CN103742146B (zh) 2014-01-17 2014-01-17 墩柱式充填法采煤工艺

Country Status (1)

Country Link
CN (1) CN103742146B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104405437B (zh) * 2014-10-08 2016-05-18 中国矿业大学 一种固体充填与综采混合式工作面开采方法
CN106121645B (zh) * 2016-06-24 2018-05-04 太原理工大学 一种台阶式构造充填复采残采区遗留煤柱群的方法
CN106150545B (zh) * 2016-08-05 2018-05-04 太原理工大学 一种根据顶板垮落特征进行采空区部分充填的方法
CN106150546B (zh) * 2016-08-05 2018-05-04 太原理工大学 一种根据地表沉陷特征进行采空区部分充填的方法
CN106761858B (zh) * 2017-01-09 2019-03-19 广东安元矿业勘察设计有限公司 横撑支柱空场法的支护回采与充填新工艺
CN108915764B (zh) * 2018-07-09 2019-04-30 中国矿业大学 一种预留巷道胶结充填回收房式煤柱的方法
CN108863285B (zh) * 2018-08-20 2020-11-13 中钢集团马鞍山矿山研究总院股份有限公司 一种复合尾矿砂塑性防渗材料及其施工工艺
CN109595029B (zh) * 2018-11-16 2019-08-09 山东科技大学 坚硬顶板条件下采空区局部充填支撑结构体及其构筑方法
CN110130896A (zh) * 2019-06-26 2019-08-16 中国矿业大学 一种工作面柱式充填开采方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2246618C1 (ru) * 2003-12-08 2005-02-20 Государственное образовательное учреждение высшего профессионального образования Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (технический университет) Способ управления труднообрушаемой кровлей
RU2364722C1 (ru) * 2008-04-16 2009-08-20 Государственное образовательное учреждение высшего профессионального образования "Сибирский государственный индустриальный университет" Способ разработки мощных крутых пластов с литой твердеющей закладкой
CN101725352A (zh) * 2009-12-04 2010-06-09 中国矿业大学 一种固体充填综采回收房式煤柱方法
CN102011588A (zh) * 2010-11-30 2011-04-13 淄博市王庄煤矿 控制上覆岩层移动变形的中厚煤层房柱式充填开采方法
CN102155225A (zh) * 2011-03-11 2011-08-17 中国矿业大学 煤矿气体充填开采方法
CN102619543A (zh) * 2011-12-02 2012-08-01 淄博市王庄煤矿 移动式液压密闭充填装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2246618C1 (ru) * 2003-12-08 2005-02-20 Государственное образовательное учреждение высшего профессионального образования Санкт-Петербургский государственный горный институт им. Г.В. Плеханова (технический университет) Способ управления труднообрушаемой кровлей
RU2364722C1 (ru) * 2008-04-16 2009-08-20 Государственное образовательное учреждение высшего профессионального образования "Сибирский государственный индустриальный университет" Способ разработки мощных крутых пластов с литой твердеющей закладкой
CN101725352A (zh) * 2009-12-04 2010-06-09 中国矿业大学 一种固体充填综采回收房式煤柱方法
CN102011588A (zh) * 2010-11-30 2011-04-13 淄博市王庄煤矿 控制上覆岩层移动变形的中厚煤层房柱式充填开采方法
CN102155225A (zh) * 2011-03-11 2011-08-17 中国矿业大学 煤矿气体充填开采方法
CN102619543A (zh) * 2011-12-02 2012-08-01 淄博市王庄煤矿 移动式液压密闭充填装置

Also Published As

Publication number Publication date
CN103742146A (zh) 2014-04-23

Similar Documents

Publication Publication Date Title
AU2013358812B2 (en) Solid-filling coal mining method with two pre-excavated tunnels for advancing
Chen et al. An overview of integrated surface subsidence-reducing technology in mining areas of China
CN101858217B (zh) 房柱变换式盘区上向分层充填采矿法
CN102720508B (zh) 粉土粉砂地层连续下穿密集建筑物盾构施工方法
CN103615285B (zh) 一种利于充填接顶的采场进路布置方式及方法
CN102011589B (zh) 一种适于井下二步骤回采的采场底部结构及其生产工艺
CN102748029B (zh) 一种分段采矿方法
CN102146679B (zh) 复杂地质地段土压平衡盾构通过中间风井施工方法
CN104196537A (zh) 一种三条平行的超小净距地铁隧道施工方法
CN105201513A (zh) 一种轨道交通的竖井施工方法
CN102678121B (zh) 无盘区中深孔留矿分层控顶嗣后充填采矿法
CN104594899A (zh) 一种沿空掘巷窄煤柱合理宽度的确定方法
CN101864957B (zh) 大量放矿同步充填无顶柱留矿采矿方法
CN106930763B (zh) 一种充填复采特厚煤层残采区护巷煤柱的方法
CN103016053B (zh) 一种采空区局部充填控制地表沉陷的方法
CN103821558B (zh) 煤矿采空区充填采矿及沿空留巷充填工艺
CN103145354B (zh) 一种无熟料复合型尾砂固结剂及其制备方法和应用
CN105971606B (zh) 一种巨厚煤层长壁工作面开采方法
CN102536315B (zh) 一种钾盐矿采空区的充填方法
CN102155261B (zh) 一种利用矿山固体废弃物的膏体联合充填方法
CN101939078A (zh) Co2截存的土壤稳定化组合物
CN101424195B (zh) 煤矿半煤岩巷道掘进矸石巷旁充填的方法
CN206174997U (zh) 一种采动覆岩走向分区隔离注浆充填结构
CN103470267A (zh) 一种长大隧道快速施工工艺
CN103388488B (zh) 薄煤层沿空留巷充填方法

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
GR01 Patent grant
C14 Grant of patent or utility model