CN102313078A CN201110246400A CN201110246400A CN102313078A CN 102313078 A CN102313078 A CN 102313078A CN 201110246400 A CN201110246400 A CN 201110246400A CN 201110246400 A CN201110246400 A CN 201110246400A CN 102313078 A CN102313078 A CN 102313078A
Authority
CN
China
Prior art keywords
steel pipe
steel
construction
hydraulic jack
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201110246400A
Other languages
English (en)
Other versions
CN102313078B (zh
Inventor
周松
陈立生
葛金科
赵国强
王洪新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Original Assignee
Shanghai No2 Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No2 Municipal Engineering Co Ltd filed Critical Shanghai No2 Municipal Engineering Co Ltd
Priority to CN 201110246400 priority Critical patent/CN102313078B/zh
Publication of CN102313078A publication Critical patent/CN102313078A/zh
Application granted granted Critical
Publication of CN102313078B publication Critical patent/CN102313078B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及地下施工中的顶管推进技术领域,具体是涉及一种用于曲线钢顶管的施工方法。该方法通过在钢管节内环状设置若干液压油缸,并设置法兰盘来作为管节间和液压油缸和管节间的受力面,通过油缸的不均匀顶伸实现了钢管顶进曲线顶推。本发明的优点是:钢管顶管施工时可实现曲线的顶推,转向角度变换方便,管节结构构造简单,布置紧凑,成本较低,施工方便。

Description

用于曲线钢顶管的施工方法
技术领域
本发明涉及地下施工中的顶管推进技术领域,具体是涉及一种用于曲线钢顶管的施工方法。
背景技术
顶管施工技术是一种较好保护环境的敷设地下管线的非开挖技术。它在不扰动或轻微扰动管外土层结构的条件下,借助于主顶油泵等顶进设备的推力,将工具管或掘进机从工作井穿过沿线土层进入接收井;与此同时,将紧随其后的管道依次连接并埋设到连接这两个井的管线土层中的敷设地下管道的施工方法。适用于顶管的管材一般有混凝土管(含普通混凝土管、钢筋混凝土管、钢筒混凝土管)、钢管、玻璃钢夹砂管。
在地下顶管施工过程中,由于地下结构、建筑物对应管线的影响,所以顶管的轴线需要设计成曲线。对于钢筋混凝土管道顶管,管道是由于是管节构成的,管节之间是活动的接口,比较适应曲线管道的形成。而对于钢管顶进,预制钢管在顶管工作井下焊接成整体再顶进,不具有许多活动的接口,也就无法形成曲线管道。
发明内容
本发明的目的是根据上述现有技术的不足之处,提供一种用于曲线钢顶管的施工方法,通过在钢管节内环状设置若干液压油缸,并设置法兰盘来作为管节间和液压油缸和管节间的受力面,通过油缸的不均匀顶伸实现了钢管顶进曲线顶推。
本发明目的实现由以下技术方案完成:
一种用于曲线钢顶管的施工方法,涉及一种由至少二个首尾相接的钢管节构成的钢顶管结构,所述钢管节一端为插口端,另一端为承口端,其特征在于:所述承口端和插口端的端部分别焊接有法兰盘,且二者之间通过螺栓连接固定,该方法至少包括下列步骤:
在所述钢管节承口端设置若干数量的液压油缸,将所述液压油缸的后座与所述钢管节的内壁固定连接,将所述液压油缸的活塞杆穿越所述钢管节承口端法兰盘并与相邻钢管节插口端法兰盘栓接;
拧松承口端法兰盘与相邻钢管节插口端法兰盘之间的连接螺栓,根据顶管预定管线的曲率值,控制对应位置的液压油缸顶升;将所述液压油缸顶升所形成的法兰盘间的局部张开缝隙内塞入垫片,拧紧所述连接螺栓,之后进行顶管机顶进。
所述方法至少还包括下列步骤:根据所述钢管节将进入的预定管线曲率变化值,控制对应位置的液压油缸顶升,并在所述液压油缸顶升所形成的法兰盘间的局部张开缝隙内塞入或抽出垫片。
所述法兰盘和钢管节内壁之间焊接有垂直于二者的肋板。
所述若干数量的液压油缸沿钢管节内壁中心对称设置,并均布,且各液压油缸的活塞杆与相邻钢管节插口端法兰盘栓接的部位沿所述插口端法兰盘的盘面边缘处中心对称设置,并均布。
所述油缸包括两个主位油缸和四个辅助位油缸,所述的两个主位油缸以所述钢管节14的中心线为中心对称分布,四个辅助位油缸分别位于所述两个主位油缸两侧,并以45°夹角对称分布。
所述油缸的设置数量为四个,且分别以所述钢管节的中心线为中心,以90°夹角对称分布。
所述承口端法兰盘与相邻钢管节插口端法兰盘之间设置有木垫圈。
本发明的优点是:钢管顶管施工时可实现曲线的顶推,转向角度变换方便,管节结构构造简单,布置紧凑,成本较低,施工方便。 
附图说明
附图1为本发明实施例结构示意图;
附图2为液压油缸布置示意图I;
附图3为液压油缸布置示意图II。
具体实施方式
以下结合附图通过实施例对本发明特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1-3所示,图中标记1-16分别为:钢管节1、插口端2、承口端3、插口端法兰盘4、承口端法兰盘5、开孔6、连接孔7、油缸底座8、液压油缸9、木垫圈10、木垫片11、楔型橡胶密封圈12、肋板13、钢管节14、主位油缸15、辅助位油缸16。
参见图1,本实施例涉及的施工方法主要通过一种钢管节结构来实现的。
该钢管节结构由首尾相接的钢管节1和钢管节14构成,钢管节1、14一端为插口端2,另一端为承口端3。采用上述结构后,相邻钢管节1和14间,钢管节1的插口端2插装入钢管节14的承口端3内,插口端2和承口端3之间设置楔型橡胶密封圈12进行止水密封。由此,采用上述结构即可在顶管施工的时候成为活动的柔性管节结构。为提供顶管施工时两个相邻钢管节1和14之间的受力面,钢管节14的承口端3处的内壁上焊接有承口端法兰盘5,插口端2的内壁上焊接有插口端法兰盘4。插口端法兰盘4和承口端法兰盘5间通过木垫圈10间隔以起到缓冲作用,以增加传力面,避免应力集中损坏管接头部分。插口端法兰盘4和承口端法兰盘5之间通过螺栓连接固定。
结合上述的管节结构,本实施例的施工方法步骤如下:
在承口端3设置六个液压油缸9,将液压油缸9的油缸后座8与钢管节14的内壁焊接固定,将液压油缸9的活塞杆穿越承口端法兰盘5上的开口6,并通过连接孔7与相邻钢管节1的插口端法兰盘4栓接。图2显示的是一种液压油缸9的布置方式。图中液压油缸9的数量为六个,其中两个为主位油缸15,剩余四个为辅助位油缸16,两个主位油缸15以钢管节14的中心线为中心对称分布,四个辅助位油缸16分别位于两个主位油缸15两侧,并以该中心线为中心以45°夹角对称分布。采用上述结构,六个液压油缸9分为左右两侧,可单独使用任意一侧的三个液压油缸9,实现左或右方向的转向。当将钢管节1整体旋转90°时,也可调整为上、下方向的转向结构。
参见图3,其显示的是另一种液压油缸9的布置方式。图中液压油缸9的数量为四个,且分别以钢管节14的中心线为中心对称分布,以90°夹角对称分布。比上述图2中的油缸布置方式减少了两个油缸,故此四个液压油缸9以均布的方式分布在钢管节1内,在使用时,控制两个相邻液压油缸9顶伸即可实现钢管节1与14向上、下、左或右方向转向结构。
拧松承口端法兰盘5与插口端法兰盘2之间的连接螺栓,根据顶管预定管线的曲率值,控制对应位置的液压油缸9顶伸;将液压油缸9顶伸所形成的法兰盘间的局部张开缝隙内塞入木垫片11,拧紧连接螺栓,之后进行顶管机的顶进。
在整个顶进过程中,根据所述钢管节1将进入的预订管线曲率变化值,控制对应位置的液压油缸9顶升,并在所述液压油缸9顶升所形成的法兰盘间的局部张开缝隙内塞入或抽出木垫片11。
为增加钢管节1上插口端法兰盘4和承口端法兰盘5的环向刚度,减少钢管节1在顶进期间接头处的变形,插口端法兰盘4和钢管节1内壁之间、承口端法兰盘5和钢管节14内壁之间均焊接有垂直于二者的肋板13。

Claims (7)

1.一种用于曲线钢顶管的施工方法,涉及一种由至少二个首尾相接的钢管节构成的钢顶管结构,所述钢管节一端为插口端,另一端为承口端,其特征在于:所述承口端和插口端的端部分别焊接有法兰盘,且二者之间通过螺栓连接固定,该方法至少包括下列步骤:
在所述钢管节承口端设置若干数量的液压油缸,将所述液压油缸的后座与所述钢管节的内壁固定连接,将所述液压油缸的活塞杆穿越所述钢管节承口端法兰盘并与相邻钢管节插口端法兰盘栓接;
拧松承口端法兰盘与相邻钢管节插口端法兰盘之间的连接螺栓,根据顶管预定管线的曲率值,控制对应位置的液压油缸顶升;将所述液压油缸顶升所形成的法兰盘间的局部张开缝隙内塞入垫片,拧紧所述连接螺栓,之后进行顶管机顶进。
2.根据权利要求1所述的一种用于曲线钢顶管的施工方法,其特征在于,所述方法至少还包括下列步骤:根据所述钢管节将进入的预定管线曲率变化值,控制对应位置的液压油缸顶升,并在所述液压油缸顶升所形成的法兰盘间的局部张开缝隙内塞入或抽出垫片。
3.根据权利要求1所述的一种用于曲线钢顶管的施工方法,其特征在于:所述法兰盘和钢管节内壁之间焊接有垂直于二者的肋板。
4.根据权利要求1所述的一种用于曲线钢顶管的施工方法,其特征在于:所述若干数量的液压油缸沿钢管节内壁中心对称设置,并均布,且各液压油缸的活塞杆与相邻钢管节插口端法兰盘栓接的部位沿所述插口端法兰盘的盘面边缘处中心对称设置,并均布。
5.根据权利要求3所述的一种用于曲线钢顶管的施工方法,其特征在于:所述油缸包括两个主位油缸和四个辅助位油缸,所述的两个主位油缸以所述钢管节14的中心线为中心对称分布,四个辅助位油缸分别位于所述两个主位油缸两侧,并以45°夹角对称分布。
6.根据权利要求3所述的一种用于曲线钢顶管的施工方法,其特征在于:所述油缸的设置数量为四个,且分别以所述钢管节的中心线为中心,以90°夹角对称分布。
7.根据权利要求1所述的一种用于曲线钢顶管的施工方法,其特征在于:所述承口端法兰盘与相邻钢管节插口端法兰盘之间设置有木垫圈。
CN 201110246400 2011-08-25 2011-08-25 用于曲线钢顶管的施工方法 Active CN102313078B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110246400 CN102313078B (zh) 2011-08-25 2011-08-25 用于曲线钢顶管的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110246400 CN102313078B (zh) 2011-08-25 2011-08-25 用于曲线钢顶管的施工方法

Publications (2)

Publication Number Publication Date
CN102313078A true CN102313078A (zh) 2012-01-11
CN102313078B CN102313078B (zh) 2012-11-14

Family

ID=45426510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110246400 Active CN102313078B (zh) 2011-08-25 2011-08-25 用于曲线钢顶管的施工方法

Country Status (1)

Country Link
CN (1) CN102313078B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103225511A (zh) * 2013-03-29 2013-07-31 上海市城市排水有限公司 一种预制混凝土装配式顶管后座
CN103557026A (zh) * 2013-10-28 2014-02-05 煤科集团沈阳研究院有限公司 一种基于顶管掘进装置解决上隅角瓦斯的方法
CN105065005A (zh) * 2015-08-18 2015-11-18 上海隧道工程有限公司 曲线管节夹紧推进装置
CN105546215A (zh) * 2012-03-02 2016-05-04 上海市政工程设计研究总院(集团)有限公司 一种装配式曲线钢顶管节头的顶进方法
CN106641440A (zh) * 2016-12-20 2017-05-10 北京首钢建设集团有限公司 一种横向穿越铁路线地下管道顶进施工方法
CN115355366A (zh) * 2022-08-22 2022-11-18 华能霞浦核电有限公司 用于取排水的大直径垂直顶升立管及其施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4299375A (en) * 1978-10-16 1981-11-10 Schosek William O Underground pipe installing device
CN1065713A (zh) * 1991-04-12 1992-10-28 冯树刚 弹性顶管穿越地层方法及其装置
US5795101A (en) * 1996-07-26 1998-08-18 Bill; Frank N. Pipe laying robot apparatus and method for installing pipe
CN1760457A (zh) * 2005-11-08 2006-04-19 陈绍华 地下管线防护警示带

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4299375A (en) * 1978-10-16 1981-11-10 Schosek William O Underground pipe installing device
CN1065713A (zh) * 1991-04-12 1992-10-28 冯树刚 弹性顶管穿越地层方法及其装置
US5795101A (en) * 1996-07-26 1998-08-18 Bill; Frank N. Pipe laying robot apparatus and method for installing pipe
CN1760457A (zh) * 2005-11-08 2006-04-19 陈绍华 地下管线防护警示带

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105546215A (zh) * 2012-03-02 2016-05-04 上海市政工程设计研究总院(集团)有限公司 一种装配式曲线钢顶管节头的顶进方法
CN105546215B (zh) * 2012-03-02 2017-11-24 上海市政工程设计研究总院(集团)有限公司 一种装配式曲线钢顶管节头的顶进方法
CN103225511A (zh) * 2013-03-29 2013-07-31 上海市城市排水有限公司 一种预制混凝土装配式顶管后座
CN103557026A (zh) * 2013-10-28 2014-02-05 煤科集团沈阳研究院有限公司 一种基于顶管掘进装置解决上隅角瓦斯的方法
CN103557026B (zh) * 2013-10-28 2015-12-30 煤科集团沈阳研究院有限公司 一种基于顶管掘进装置解决上隅角瓦斯的方法
CN105065005A (zh) * 2015-08-18 2015-11-18 上海隧道工程有限公司 曲线管节夹紧推进装置
CN105065005B (zh) * 2015-08-18 2017-08-04 上海隧道工程有限公司 曲线管节夹紧推进装置
CN106641440A (zh) * 2016-12-20 2017-05-10 北京首钢建设集团有限公司 一种横向穿越铁路线地下管道顶进施工方法
CN115355366A (zh) * 2022-08-22 2022-11-18 华能霞浦核电有限公司 用于取排水的大直径垂直顶升立管及其施工方法

Also Published As

Publication number Publication date
CN102313078B (zh) 2012-11-14

Similar Documents

Publication Publication Date Title
CN102313078B (zh) 用于曲线钢顶管的施工方法
CN203702167U (zh) 一种复合管片结构
CN102338244A (zh) 用于顶管的钢管节结构
CN102072359A (zh) 曲线钢顶管管节及顶进方法
CN205171549U (zh) 管廊预制件及预制式综合管廊
CN203176535U (zh) 一种接力顶进钢管的中继间装置
CN103397843A (zh) 一种微型非开挖水平钻孔设备
CN105546215B (zh) 一种装配式曲线钢顶管节头的顶进方法
CN205776342U (zh) 一种装配式预制综合管廊管节连接结构
CN103362517A (zh) 一种装配式顶管
CN202215842U (zh) 用于顶管的钢管节结构
CN105715867A (zh) 一种拖顶结合球墨铸铁管道铺设方法
CN202360889U (zh) 矩形顶管管节的连接装置
CN204852606U (zh) 一种曲线顶管管节承插口连接形式
CN103526777A (zh) 沉管隧道用半刚性管节
CN105569074A (zh) 一种装配式预制综合管廊管节连接结构
CN213953599U (zh) 一种适用于长距离顶管的接力顶进装置
CN102494188B (zh) 矩形顶管管节的预应力装置及其施工方法
CN204739357U (zh) 海洋复合软管弯曲限制器
CN202834386U (zh) 三维双曲线钢顶管轴线形成过渡装置
CN201708512U (zh) 大口径防渗电缆顶管
CN202206099U (zh) 一种电缆隧道顶管施工隧道管节的连接防水结构
CN205842072U (zh) 一种大口径pvc管材承插处防脱出装置
CN218407464U (zh) 一种钢护筒快速连接装置
CN101834423A (zh) 一种大口径防渗电缆顶管

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 200232 Xuhui District, Liuzhou Wu Road, Lane No. 13, No. 3, No.

Applicant after: Shanghai urban construction Municipal Engineering (Group) Co., Ltd.

Address before: 200232 Xuhui District, Liuzhou Wu Road, Lane No. 13, No. 3, No.

Applicant before: Shanghai No.2 Municipal Engineering Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI NO.2 MUNICIPAL ENGINEERING CO., LTD. TO: SHANGHAI URBAN CONSTRUCTION MUNICIPAL ENGINEERING (GROUP) CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI CEMENT TUBE MANUFACTORY

Free format text: FORMER OWNER: SHANGHAI UBAN CONSTRUCTION GROUP MUNICIPAL ENGINEERING (GROUP) CO., LTD.

Effective date: 20130731

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200232 XUHUI, SHANGHAI TO: 200241 MINHANG, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20130731

Address after: 200241 No. 5, Chengjiang Road, Shanghai, Minhang District

Patentee after: SHANGHAI NO.2 MUNICIPAL ENGINEERING CO., LTD.

Address before: 200232 Xuhui District, Liuzhou Wu Road, Lane No. 13, No. 3, No.

Patentee before: Shanghai urban construction Municipal Engineering (Group) Co., Ltd.

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151228

Address after: Putuo District road 200065 Shanghai City No. 1565 building room 2001.

Patentee after: Shanghai urban construction Municipal Engineering (Group) Co., Ltd.

Address before: 200241 No. 5, Chengjiang Road, Shanghai, Minhang District

Patentee before: SHANGHAI NO.2 MUNICIPAL ENGINEERING CO., LTD.