CN102277999A - Large-section portal steel structure holding pole - Google Patents

Large-section portal steel structure holding pole Download PDF

Info

Publication number
CN102277999A
CN102277999A CN2011101114237A CN201110111423A CN102277999A CN 102277999 A CN102277999 A CN 102277999A CN 2011101114237 A CN2011101114237 A CN 2011101114237A CN 201110111423 A CN201110111423 A CN 201110111423A CN 102277999 A CN102277999 A CN 102277999A
Authority
CN
China
Prior art keywords
section
steel structure
steel work
principal
principal post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101114237A
Other languages
Chinese (zh)
Other versions
CN102277999B (en
Inventor
毕建全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Transmission and Transformation Engineering Corp
Original Assignee
Tianjin Electric Power Transmission and Transformation Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Electric Power Transmission and Transformation Engineering Corp filed Critical Tianjin Electric Power Transmission and Transformation Engineering Corp
Priority to CN201110111423.7A priority Critical patent/CN102277999B/en
Publication of CN102277999A publication Critical patent/CN102277999A/en
Application granted granted Critical
Publication of CN102277999B publication Critical patent/CN102277999B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention relates to a large-section portal steel structure holding pole comprising the lower section, the standard section, the cross beam section, the upper section and the base of a steel structure, a lifting tackle, a corner block, a hanger and a pulling rope. The lower section, the standard section, the cross beam section and the upper section of the steel structure are integrally connected together from bottom to top to form a main post. The holding pole is in the form of a portal steel structure frame composed of two parallel main posts and a cross beam; the cross beam is hinged between the cross beam sections of the two main posts; a supporting beam is hinged to the top ends of the two main posts; and the bottom end of the lower section is hinged to the base. The large-section portal steel structure holding pole related to the invention is scientific and rational in integrated structure design, wide in application range, and low in limitation by complex topographic conditions, therefore, the holding pole can be popularized to the lifting of a wind generating set and capable of effectively solving the problem that a large-scale lifting appliance is incapable of entering a wind power generation site.

Description

Big section door shape steel work pole
Technical field
The invention belongs to power domain, relate to the upright used pole of iron tower of group of UHV transmission line construction, especially a kind of big section door shape steel work pole.
Background technology
The stayed tower of extra-high voltage (V-type, a door shape) group cube formula has nothing in common with each other both at home and abroad at present, send the history of five more than ten years of power transformation industry and the accumulation of construction experience and the group tower mode of the constituent parts that precipitation makes to have nothing in common with each other, but generally speaking at group power Guywire tower nothing more than several forms such as formula herringbone pole group is upright, split lifting, integral hoisting that have integral body to fall.On the basis of these several lifting forms, need use respectively according to actual conditions, be subjected to the restriction of complex-terrain simultaneously, Zu Zhuan quilt plays the place that tower crane spare can only be assembled in permission sometimes.For example, in the 750KV interconnection engineering of Qinghai-Tibet, the integral body upright engineering of formula herringbone pole group that falls bans use of, and can only adopt split lifting or integral hoisting.
Lifting capacity is big, lifting is unstable, cost is higher, the defective of easy deformation but integral hoisting exists, moreover for most lifting situation, the split lifting is main means.And existing split lifting exists lifting inefficiency, more, the dangerous higher shortcoming of work high above the ground.
By retrieval, do not find publication document related with the present patent application as yet.
Summary of the invention
The objective of the invention is to overcome the deficiencies in the prior art, provide a kind of and lift the efficient height, lifting is safe and reliable big
Section door shape steel work pole.
The present invention solves its technical problem and is achieved through the following technical solutions:
A kind of big section door shape steel work pole, hypomere, standard paragraphs, beam segments, epimere and the pedestal, lifting tackles, corner block, suspender, the pull rope that comprise steel work, the hypomere of steel work, standard paragraphs, beam segments, epimere connect as one the formation principal post from bottom to top, the door shape steel structure frame form that two parallel principal posts of described pole and crossbeam constitute, common hinge dress crossbeam between the beam segments of two principal posts, hinge is adorned a brace summer on the top of two principal posts, and the bottom hinge of hypomere is contained on the pedestal.
And, the parallel pull bar that crosses the river that is equipped with between the principal post of crossbeam lower end.
And, in the principal post both sides of corresponding each draw rod positions that crosses the river, the principal post both sides of beam segments, the principal post both sides of brace summer a pair of lateral conductor is installed all.
And, at crossbeam and both sides principal post upper end two diagonal members are installed.
And described brace summer is a seamless steel pipe.
Advantage of the present invention and beneficial effect are:
1, the present invention adopts a shape steel structural form, two principal post tops are provided with crossbeam and steel pipe brace summer, the three roads pull bar that crosses the river also is set between two principal posts, former and later two are set on crossbeam play sling point, be hinged between crossbeam, brace summer and the principal post, the bottom of principal post is a free bearing, and the hinge of two positions dress has overcome two principal posts because the problem of immerge discrepancy in elevation when the basic discrepancy in elevation and lifting.Overall construction design is scientific and reasonable, can realize the principal post integral hoisting of Guywire tower and the integral hoisting of crossbeam fully.
2, the scope of application of the present invention is wide, is subjected to the restriction of MODEL OVER COMPLEX TOPOGRAPHY less, can be generalized to the lifting of wind power generating set, can effectively solve the problem that large-scale hanging device can't enter the wind-power electricity generation building site.
Description of drawings
Fig. 1 is a structural front view of the present invention.
The specific embodiment
The invention will be further described below by specific embodiment, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
A kind of big section door shape steel work pole, hypomere 10, standard paragraphs 8, beam segments 6, epimere 3 and the pedestal 11, lifting tackles 16, corner block 15, suspender 12, the pull rope 14 that comprise steel work, the hypomere of steel work, standard paragraphs, beam segments, epimere connect as one the formation principal post from bottom to top, this pole is the door shape steel structure frame form that two parallel principal posts and crossbeam constitute, adopt hinge plate 5 common hinge dress crossbeams 4 between the beam segments of two principal posts, hinge is adorned a brace summer 1 on the top of two principal posts, and this brace summer is a seamless steel pipe; The bottom hinge of hypomere is contained on the pedestal.
(can according to the actual conditions desired location) installs lifting tackles at a certain position of the hypomere of crossbeam, this lifting tackles is by suspender lifting iron tower parts, the power resources of this assembly pulley are in the pull rope through corner block, and this pull rope is connected with winch or other pulling equipment; Lifting tackles is two of front and back, and the present embodiment accompanying drawing only demonstrates one, and another is in its back.
Principal post of the present invention and pedestal, principal post and crossbeam, principal post and brace summer are hinge dress form, thus, can realize not being subjected to the place restriction and at the lifting operation of certain angle.In order to stablize total, the parallel pull bar 9 that crosses the river that is equipped with in the present embodiment accompanying drawing is three between the principal post of crossbeam lower end.
In order to stablize total, a pair of lateral conductor 7 all is installed in the principal post both sides of corresponding each draw rod positions that crosses the river, the principal post both sides of beam segments, the principal post both sides of brace summer.
In order to keep the intensity of crossbeam, two diagonal members 2 also are installed at crossbeam and both sides principal post upper end.
Instantiation of the present invention:
59.6 meters of pole principal post length, section are 1000*1000mm, and main material is Q345, and auxilliary material is q235.
The crossbeam length of pole is 5.8 meters, and section is 1000*1000mm, and main material is Q345, and auxilliary material is q235.
The seamless steel pipe of brace summer diameter 120*5,6.3 meters of total lengths.
The crossbeam height is 55 meters, is provided with the three roads pull bar that crosses the river between two principal posts.

Claims (5)

1. one kind big section door shape steel work pole, it is characterized in that: hypomere, standard paragraphs, beam segments, epimere and the pedestal, lifting tackles, corner block, suspender, the pull rope that comprise steel work, the hypomere of steel work, standard paragraphs, beam segments, epimere connect as one the formation principal post from bottom to top, the door shape steel structure frame form that two parallel principal posts of described pole and crossbeam constitute, common hinge dress crossbeam between the beam segments of two principal posts, hinge is adorned a brace summer on the top of two principal posts, and the bottom hinge of hypomere is contained on the pedestal.
2. big section door shape steel work pole according to claim 1 is characterized in that: the parallel pull bar that crosses the river that is equipped with between the principal post of crossbeam lower end.
3. big section door shape steel work pole according to claim 1 is characterized in that: in the principal post both sides of corresponding each draw rod positions that crosses the river, the principal post both sides of beam segments, the principal post both sides of brace summer a pair of lateral conductor is installed all.
4. big section door shape steel work pole according to claim 1 is characterized in that: at crossbeam and both sides principal post upper end two diagonal members are installed.
5. big section door shape steel work pole according to claim 1, it is characterized in that: described brace summer is a seamless steel pipe.
CN201110111423.7A 2011-04-29 2011-04-29 Large-section portal steel structure holding pole Active CN102277999B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110111423.7A CN102277999B (en) 2011-04-29 2011-04-29 Large-section portal steel structure holding pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110111423.7A CN102277999B (en) 2011-04-29 2011-04-29 Large-section portal steel structure holding pole

Publications (2)

Publication Number Publication Date
CN102277999A true CN102277999A (en) 2011-12-14
CN102277999B CN102277999B (en) 2014-12-17

Family

ID=45103695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110111423.7A Active CN102277999B (en) 2011-04-29 2011-04-29 Large-section portal steel structure holding pole

Country Status (1)

Country Link
CN (1) CN102277999B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103532048A (en) * 2013-10-18 2014-01-22 上海送变电工程公司 Quickly combined large lattice type crossing frame
CN103669978A (en) * 2013-12-24 2014-03-26 国家电网公司 Multifunctional hoop device for assembling embracing rods
CN108952309A (en) * 2018-08-15 2018-12-07 江苏省送变电有限公司 Big cross-section lattice formula steel pipe pole formal dress hoisting device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007223805A (en) * 2006-02-21 2007-09-06 Shanghai Zhenhua Port Machinery (Group) Co Ltd Tire type portal container crane utilizing general electric power feeding
CN201217616Y (en) * 2008-05-29 2009-04-08 中国化学工程第十一建设公司 Multifunctional full-hydraulic door frame lifting device
CN101709605A (en) * 2009-12-03 2010-05-19 浙江省送变电工程公司 Amplitude variation type pull wire of holding rod
CN201793330U (en) * 2010-06-02 2011-04-13 中建钢构有限公司 Gantry hanger frame device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007223805A (en) * 2006-02-21 2007-09-06 Shanghai Zhenhua Port Machinery (Group) Co Ltd Tire type portal container crane utilizing general electric power feeding
CN201217616Y (en) * 2008-05-29 2009-04-08 中国化学工程第十一建设公司 Multifunctional full-hydraulic door frame lifting device
CN101709605A (en) * 2009-12-03 2010-05-19 浙江省送变电工程公司 Amplitude variation type pull wire of holding rod
CN201793330U (en) * 2010-06-02 2011-04-13 中建钢构有限公司 Gantry hanger frame device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103532048A (en) * 2013-10-18 2014-01-22 上海送变电工程公司 Quickly combined large lattice type crossing frame
CN103532048B (en) * 2013-10-18 2016-05-11 上海送变电工程公司 A kind of large-scale lattice crossing frame of Rapid Combination
CN103669978A (en) * 2013-12-24 2014-03-26 国家电网公司 Multifunctional hoop device for assembling embracing rods
CN108952309A (en) * 2018-08-15 2018-12-07 江苏省送变电有限公司 Big cross-section lattice formula steel pipe pole formal dress hoisting device

Also Published As

Publication number Publication date
CN102277999B (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN201864516U (en) Lifting appliance special for overhauling isolating switch
CN102277999B (en) Large-section portal steel structure holding pole
CN202299574U (en) Plug-in type communication base station lifting tower
CN204625045U (en) A kind of steel structure hoisting door shaped stent formula hanging apparatus
CN201512983U (en) Double-triangle rod standing device
CN202785387U (en) Indoor cantilever crane
CN203411903U (en) Cable saddle structure of horizontal drawing rope bridge
CN206590793U (en) Connect arm assembly and the movable arm tower crane comprising the device in the air
CN203112390U (en) Super-lifting device of crane and all-terrain crane
CN201252365Y (en) Construction charged crossover device of ultra-high and special-high voltage transmission line
CN203781677U (en) Trial mass device of crane
CN202072412U (en) Large cross-section portal steel structure holding pole
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN203445520U (en) Live spanning device
CN203624822U (en) Marine hanging beam with variable stay bar crotch
CN204265208U (en) A kind of segment lifting appliance
CN205165660U (en) Novel preparation of acting as go -between device
CN204282890U (en) A kind of transformer station Steel Structure beam structure
CN204778496U (en) Platform sling structure of tower crane
CN202226567U (en) Lifter
CN202575684U (en) Prefabricated-slab hoisting tool
CN201883728U (en) DC filter structural frame for converter station
CN205901172U (en) Nearly pole of transmission line overhauls corridor hanger device
CN205206456U (en) Two backcrossing of tight type of excelling in is flowed with four times steel pipe towers in tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121120

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121120

Address after: 300161 Tianjin City Hedong District Weiguo Road No. 122

Applicant after: Tianjin Electric Power Transmission & Transformation Engineering Corp.

Applicant after: State Grid Corporation of China

Address before: 300161 Tianjin City Hedong District Weiguo Road No. 122

Applicant before: Tianjin Electric Power Transmission & Transformation Engineering Corp.

C14 Grant of patent or utility model
GR01 Patent grant