CN102212991A - Method for modifying surface of hard smooth bank protection body - Google Patents

Method for modifying surface of hard smooth bank protection body Download PDF

Info

Publication number
CN102212991A
CN102212991A CN2011100436888A CN201110043688A CN102212991A CN 102212991 A CN102212991 A CN 102212991A CN 2011100436888 A CN2011100436888 A CN 2011100436888A CN 201110043688 A CN201110043688 A CN 201110043688A CN 102212991 A CN102212991 A CN 102212991A
Authority
CN
China
Prior art keywords
bank protection
shore protection
smooth
hard
lake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100436888A
Other languages
Chinese (zh)
Inventor
王超
王沛芳
侯俊
钱进
敖燕辉
彭志诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN2011100436888A priority Critical patent/CN102212991A/en
Publication of CN102212991A publication Critical patent/CN102212991A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Revetment (AREA)
  • Artificial Fish Reefs (AREA)

Abstract

The invention relates to a method for modifying the surface of a hard smooth bank protection body. The method comprises the following steps of: pre-preparing manual imitation stone blocks; placing the manual imitation stone blocks on the surface of the hard smooth river/lake bank protection orderly, arranging a plurality of the manual imitation stone blocks to fully cover the surface of the hard smooth river/lake bank protection; fixing the manual imitation stone blocks on the surface of the hard smooth river/lake bank protection by using expansion bolts. By the method, the defects of great waste of labor power, material resources and financial resources, energy consumption, time consumption and the like caused by removing the already-constructed hard smooth reinforced concrete bank protection and re-constructing a new bank protection are overcome. The original smooth bank protection is prevented from being removed, an environment condition of a natural bank protection is imitated to a certain extent, near-nature project modification is realized, the cost is simultaneously saved, the roughness of the bank protection is increased, the washing of water flow to the bank protection is relieved, the inhabitation of small-size spiral shells and small-size fishes is promoted, a near-nature survival occasion is provided for aquatic organisms, and the quality can be effectively controlled.

Description

The smooth shore protection of hard surface remodeling method
Technical field
The present invention relates to a kind of method of improving the riverbank bank protection, the smooth shore protection of particularly a kind of hard surface remodeling method.
Background technology
In the training works in lake, river, often construct the smooth concrete revetment of standardized hard rectilinear or ramp type.Such bank protection work for control flood and drain flooded fields, the water and soil conservation aspect played energetically effect, but this hard shore protection itself has isolated getting in touch between shore protection and the aquatic ecosystem fully, originally depending on the animals and plants and the microorganism that grow with water bank band can't survive, cause the biological chain of rivers and lakes to be destroyed, thereby cause the deterioration of whole aquatic ecosystem, deteriorating water quality.Such as a large amount of construction of the smooth shore protection of Taihu Lake Huan Hu embankment hard, destroyed original lakeside, Taihu Lake band ecosystem, also be simultaneously the major incentive that Taihu Lake water quality sharply worsens.
At present, people no longer only emphasize that the antiscour power, wind and wave resistance of shore protection washes in a pan erosion intensity etc. in the bank protection work construction of lake, river.Utilize the material of natural materials as bank protection; carry out the ecology typed bank revetment construction in conjunction with engineering, biological and ecological idea, emphasize that safety, stability, view, ecological property, naturality and the hydrophilic perfect adaptation of lake, river shore protection have become water conservancy and environmentalist's common recognition.
But before the present invention, the steel concrete hard smooth hard shore protection of having built well exists in a large number, and lack respond well to its remodeling method, again construct new shore protection if remove, be undoubtedly waste for resource, and need great human and material resources of cost and financial resources, engineering quantity is great, takes great energy time-consuming.
Summary of the invention
Purpose of the present invention just is to overcome above-mentioned defective, proposes the smooth shore protection of hard surface remodeling method.
Technical scheme of the present invention is:
The smooth shore protection of hard surface remodeling method, its major technique step is:
(1) prefabricated artificial imitated piece stone;
(2) will manually copy piece stone is placed on the smooth shore protection of the hard surface, lake, river;
(3) a plurality of artificial imitated piece stones are arranged in order, be covered with the smooth shore protection of hard surface, lake, river;
(4) will manually copy piece stone with expansion bolt is fixed on the smooth shore protection of the hard surface, lake, river.
The invention has the advantages that:
(1) method of the present invention can avoid removing original smooth shore protection, and has imitated the habitat conditions of natural shore protection to a certain extent, has realized near naturalized engineered when saving cost.
(2) method of the present invention is after transforming shore protection, makes original smooth shore protection surface irregularity, increased the roughness of shore protection, alleviated current washing away for shore protection.
(3) recess that forms between piece crack of stone crack of method of the present invention helps perching of small-sized spiral shell and small fishes, for aquatile provides nearly naturalized existence place.
(4) method of the present invention has been saved building stones owing to do not remove original shore protection, is specially adapted to the shore protection improvement project in the area of building stones shortage.
(5) method of the present invention is constructed very convenient simply, only needs in the punching of the surface of smooth shore protection, will manually copy piece stone body and function expansion bolt again and fix and get final product easy operating.
(6) the piece stone among the present invention can be by prefabrication and batch process, and quality can be effectively controlled.
Other advantages of the present invention and effect will go on to say below.
Description of drawings
Fig. 1---the present invention is the facade structures schematic diagram of imitated piece stone body manually.
Fig. 2---the present invention is the plane structure schematic diagram of imitated piece stone body manually.
Fig. 3---the present invention is the side structure schematic diagram of imitated piece stone body manually.
Fig. 4---the present invention is the side cross-sectional schematic of imitated piece stone body manually.
Number in the figure is represented:
Artificial imitated piece stone 1, rivet hole 2.
The specific embodiment
The present invention proposes the smooth shore protection of a kind of hard surface remodeling method, and its technical thought is by artificial imitated piece stone being installed in the smooth shore protection of hard surface, being increased the specific surface of the smooth shore protection of hard, for adhering to of river microorganism provides bigger space.Simultaneously, the convex-concave surface of imitated piece stone can change the water flow structure of shore protection near surface, for aquatic animal particularly mollusk such as fish and spiral shell streamy habitat conditions is provided and has perched the breeding space.
Mode below by embodiment is elaborated to technical solution of the present invention, but protection scope of the present invention is not limited to described embodiment.
As Fig. 1, Fig. 2, Fig. 3, shown in Figure 4:
Artificial imitated piece stone 1 customizes in factory in advance, and its surface is concaveconvex shape, and average distance is greater than 8cm between convex peak and the spill minimum point; Be drilled with rivet hole 2 on 1 four jiaos in the artificial imitated piece stone.
At the smooth shore protection of hard scene according to the size of artificial imitated piece stone 1 at the shore protection surface drilling, pass rivet hole 2 on the artificial imitated piece stone 1 by expansion bolt by rivet again, will manually copy piece stone 1 and be fixed on the surface, hard concrete riverbank; Artificial imitated piece stone 1 can be built by eco-concrete and be formed, and its length of side size is according to the characteristics determined of the smooth shore protection of hard surface, generally can make 50X50cm square of standard.
Use procedure declaration of the present invention:
When current flow through, by the smooth shore protection body of the transformed hard of this method, having a large amount of microorganisms behind certain hour adheres at the recess of the concaveconvex shape on artificial imitated piece stone 1 surface, average distance is greater than the shape of 8cm between artificial imitated piece stone 1 rugged irregular surface and convex peak and the spill minimum point, can perch to all kinds of little mollusks the habitat is provided, comprise that mollusks such as attracting part small fishes and spiral shell perches, improved the ecological functions of original shore protection, the reparation of going down for a long time for water bank band has positive effect.
The present invention increases the specific surface of the smooth shore protection of hard, for adhering to of river microorganism provides bigger space.The convex-concave surface of artificial imitated piece stone 1 changes the water flow structure of shore protection near surface, for aquatic animal particularly mollusk such as fish and spiral shell streamy habitat conditions is provided and has perched the breeding space.

Claims (3)

1. the smooth shore protection of hard surface remodeling method, its step is:
(1) prefabricated artificial imitated piece stone;
(2) will manually copy piece stone is placed on the smooth shore protection of the hard surface, lake, river;
(3) a plurality of artificial imitated piece stones are arranged in order, be covered with the smooth shore protection of hard surface, lake, river;
(4) will manually copy piece stone with expansion bolt is fixed on the smooth shore protection of the hard surface, lake, river one by one.
2. the smooth shore protection of hard according to claim 1 surface remodeling method is characterized in that described artificial imitated piece stone planar profile is square, and the imitative nature piece stone in surface presents concaveconvex shape, rivet hole is set on its four jiaos.
3. the smooth shore protection of hard according to claim 1 surface remodeling method is characterized in that average distance is greater than 8cm between described artificial imitated piece stone convex peak and the spill minimum point.
CN2011100436888A 2011-02-23 2011-02-23 Method for modifying surface of hard smooth bank protection body Pending CN102212991A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100436888A CN102212991A (en) 2011-02-23 2011-02-23 Method for modifying surface of hard smooth bank protection body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100436888A CN102212991A (en) 2011-02-23 2011-02-23 Method for modifying surface of hard smooth bank protection body

Publications (1)

Publication Number Publication Date
CN102212991A true CN102212991A (en) 2011-10-12

Family

ID=44744505

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100436888A Pending CN102212991A (en) 2011-02-23 2011-02-23 Method for modifying surface of hard smooth bank protection body

Country Status (1)

Country Link
CN (1) CN102212991A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11210003A (en) * 1998-01-23 1999-08-03 Kfc Ltd Linear-element mooring anchor and connecting fixing construction method of fieldstone using the same
KR100503878B1 (en) * 2002-02-26 2005-07-27 주식회사 우일 이알에스 Ecological block and method for building bank protection of river using the same
KR100543100B1 (en) * 2005-09-08 2006-01-20 고민관 A waste matter block of plant
CN1760461A (en) * 2004-10-15 2006-04-19 崔琼文 Water-breaking block and fabricating method and construction method thereof
KR100778372B1 (en) * 2007-08-30 2007-11-22 주식회사 한국종합기술 Shore protection block capable of adjusting location
CN101235631A (en) * 2008-03-12 2008-08-06 河海大学 Porous concrete ecological capsule slope protection method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11210003A (en) * 1998-01-23 1999-08-03 Kfc Ltd Linear-element mooring anchor and connecting fixing construction method of fieldstone using the same
KR100503878B1 (en) * 2002-02-26 2005-07-27 주식회사 우일 이알에스 Ecological block and method for building bank protection of river using the same
CN1760461A (en) * 2004-10-15 2006-04-19 崔琼文 Water-breaking block and fabricating method and construction method thereof
KR100543100B1 (en) * 2005-09-08 2006-01-20 고민관 A waste matter block of plant
KR100778372B1 (en) * 2007-08-30 2007-11-22 주식회사 한국종합기술 Shore protection block capable of adjusting location
CN101235631A (en) * 2008-03-12 2008-08-06 河海大学 Porous concrete ecological capsule slope protection method

Similar Documents

Publication Publication Date Title
CN201640196U (en) Combined type step-shaped artificial fish reef
CN103960179B (en) Artificial ecology barrier reef
Chou Artificial reefs of Southeast Asia-Do they enhance or degrade the marine environment?
CN107459151A (en) A kind of water lacks the method for river biodiversity restoration
CN109169459B (en) Ecological friendly artificial mimicry coral reef body
CN105152345B (en) Repair the method for having the Lake Water ecosystem
KR100985893B1 (en) Hexagonal concrete reef
CN1778689A (en) Method for recovering underwater ecosystem of a river
CN103314889B (en) Construction method for enclosure structure unit of water-area ecological breeding pasture as well as enclosure structure unit and application thereof
CN203884433U (en) Triangular-prism-shaped artificial fish shelter
CN104430078A (en) Coastal zone sea area oyster larva enhancement and releasing adhesive substrate device and building method
Kamble et al. Artificial floating island: Solution to river water pollution in India. Case study: Rivers in Pune City
Perricone et al. Nature-based and bioinspired solutions for coastal protection: an overview among key ecosystems and a promising pathway for new functional and sustainable designs
CN104396802A (en) Manufacturing method for constructing novel artificial fish reef by using low-carbon environment-friendly material
CN107950451A (en) A kind of inland river artificial marine habitat structure and its design method
CN202310874U (en) Reef-associated ecological environment member applicable to sea area with muddy substrate
CN203976469U (en) A kind of microorganism bed mud can be recycled is grown device surely
CN104798707B (en) Artificial fish reef construction method using sandy beach in estuary intertidal waters as foundation
CN107751071B (en) Round platform type mudflat construction reef and construction method thereof
CN102212991A (en) Method for modifying surface of hard smooth bank protection body
Chen et al. Marine fish cage culture in China
CN113216073B (en) Coastal wetland construction and reclamation method for ecological reclamation of enclosed sea
CN114108706A (en) Marine foundation erodees multiple protection system
CN208080311U (en) Four cellular type circular platform type beach combination structure reef
KR200207913Y1 (en) Artificialreef

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20111012