CN102200341B - Integrated boiler castle - Google Patents

Integrated boiler castle Download PDF

Info

Publication number
CN102200341B
CN102200341B CN 201110189623 CN201110189623A CN102200341B CN 102200341 B CN102200341 B CN 102200341B CN 201110189623 CN201110189623 CN 201110189623 CN 201110189623 A CN201110189623 A CN 201110189623A CN 102200341 B CN102200341 B CN 102200341B
Authority
CN
China
Prior art keywords
waste heat
pipe
combustion chamber
room
heat apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 201110189623
Other languages
Chinese (zh)
Other versions
CN102200341A (en
Inventor
贺全顺
贺凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaozuo yushuen boiler environmental protection equipment Co.
Original Assignee
贺全顺
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 贺全顺 filed Critical 贺全顺
Priority to CN 201110189623 priority Critical patent/CN102200341B/en
Publication of CN102200341A publication Critical patent/CN102200341A/en
Application granted granted Critical
Publication of CN102200341B publication Critical patent/CN102200341B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Chimneys And Flues (AREA)
  • Treating Waste Gases (AREA)

Abstract

The invention discloses an integrated boiler castle, which mainly comprises a three-chamber integrated boiler, a waste heat device and a desulphurization fume-removal device, wherein the upper part of the three-chamber integrated boiler is an upper pot body; a third combustion chamber is arranged in the upper pot body; the middle section of the three-chamber integrated boiler is a main body; the lower part of the three-chamber integrated boiler is a base; a first combustion chamber and a second combustion chamber are arranged at the upper part of the main body; a check hole, a hot water outlet check hole and a hot water inlet are formed on two sides of the main body; a temperature meter is arranged on the third combustion chamber; a lower fume outlet and a lower sewage drainage pipe are arranged on the lower part of the main part; a top exhaust pipe is arranged on the upper pot body; upper exhaust pipes are arranged on the two sides of the three-chamber integrated boiler; the upper exhaust pipes are connected with U-shaped pipes; the U-shaped pipes are positioned inside the upper pot body; and a water level gauge is arranged on one side of the three-chamber integrated boiler. The integrated boiler castle can perform desulphurization, dust removal, purification and waste heat re-utilization on fume exhausted by a boiler, and has the advantages of high efficiency, energy conservation, high heat efficiency, low operating resistance, small occupation area, simple structure and low cost.

Description

The integrated furnace fort
Technical field
The present invention relates to a kind of waste heat recovery desulfation dust-extraction device, relate in particular to a kind of can with the supporting use of boiler, be that flue gas with boiler emission carries out the integrated furnace fort that desulfurization, dedusting, purification, waste heat utilize again.
Background technology
At present, middle-size and small-size grate firing boiler will discharge a large amount of tail gas at work, because the discharge tail gas temperature is higher; Reach 350 degree-450 degree; Contain certain corrosive substance in the discharge tail gas, a large amount of heat energy freely is thrown into and causes great waste in the atmosphere, causes serious pollution to regional environment simultaneously; Influence resident's life, destroy ecological environment.
Summary of the invention
In sum, in order to overcome the deficiency of prior art, the purpose of this invention is to provide a kind of can with the supporting use of boiler, be that flue gas with boiler emission carries out the integrated furnace fort that desulfurization, dedusting, purification, waste heat utilize again.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is:
A kind of integrated furnace fort mainly is made up of three Room all-in-one ovens, waste heat apparatus, desulfurization smoke abatement device, wherein; Above the said three Room all-in-one ovens is upper pan body; Be provided with the 3rd combustion chamber in the upper pan body, the stage casing of three Room all-in-one ovens is that the following of body, three Room all-in-one ovens is base, is provided with the first combustion chamber charging aperture and the second combustion chamber inspection socket above the said body; The both sides of body are provided with inspection socket, go out hot water inspection socket and hot water inlet, and the 3rd combustion chamber is provided with thermometer; The bottom of body is provided with bottom exhanst gas outlet and down blow pipe, is provided with the top blast pipe above the upper pan body; The both sides of three Room all-in-one ovens are provided with the top blast pipe, and the top blast pipe is connected with U type pipe, and U type pipe is positioned at upper pan body inside, and a side of three Room all-in-one ovens is provided with the water level meter.
Said three Room all-in-one ovens are communicated with entering waste heat apparatus through heating cabinet with the inner product heat cal rod of waste heat apparatus through all-in-one oven bottom, three Room exhanst gas outlet with waste heat apparatus; The top of said waste heat apparatus is last smoke-box; The top of waste heat apparatus is provided with blast pipe and flue gas inspection socket; Said both sides in waste heat apparatus are provided with blast pipe, and a side of last smoke-box is provided with flue outlet; The waste heat apparatus set inside that a said side in waste heat apparatus is provided with the hot-water outlet has product heat cal rod, thermometer; Said inspection socket, the sewage draining exit of on waste heat apparatus, having; Be provided with dedusting base, spray equipment, dedusting pond below the waste heat apparatus; One side of dedusting base is provided with alkali adding tank, and the blow-off line of body bottom is connected with alkali adding tank, and alkali adding tank is communicated with spray equipment, and a side of waste heat apparatus is provided with water inlet pipe, and a side in dedusting pond is provided with the down blow mouth; Waste heat apparatus is communicated with through the flue outlet pipe with air-introduced machine; Be provided with the desulfurization smoke abatement device ashpit that falls below the desulfurization smoke abatement device; Air-introduced machine is communicated with the ashpit that falls, and on desulfurization smoke abatement device, is provided with the smoke abatement device, and the smoke abatement device comprises surplus smoke pipe, interior cap, flue and water pipe, chimney exhaust outlet; Desulfurization smoke abatement device is provided with tie-strut, and tie-strut is fixed on the flue outlet pipe.
The said nameplate that on body, is provided with.
The good effect of technical scheme of the present invention is:
This integrated furnace fort combines the multiple type of furnace, multiple province coal gas, and the advantage of deduster can be carried out the flue gas of boiler emission desulfurization, dedusting, purification, waste heat and utilized; Have energy-efficiently, the thermal efficiency is high, and running resistance is little; Floor space is little, and is simple in structure, cheap advantage.
Description of drawings
Fig. 1 is a structural representation of the present invention.
The specific embodiment
Can find out by Fig. 1; This integrated furnace fort mainly comprises three Room all-in-one ovens 1, waste heat apparatus 2, desulfurization smoke abatement device 3, and said three Room all-in-one ovens 1 top is upper pan body 14; Be provided with the 3rd combustion chamber 50 in the upper pan body 14; The stage casing of three Room all-in-one ovens 1 is that the following of body 19, three Room all-in-one ovens 1 is base 4, the said first combustion chamber charging aperture 8 and the second combustion chamber inspection socket 6 of on body 19, being provided with; Said both sides at body 19 are provided with inspection socket 7, go out hot water inspection socket 9 and hot water inlet 20, the three combustion chambers 50 are provided with thermometer 11; The said nameplate 10 that on body 19, is provided with, said bottom exhanst gas outlet 5 and the down blow pipe 21 of below body 19, being provided with, said top blast pipe 15 and the upper pan body thermometer 16 of on upper pan body 14, being provided with; Upper pan body 14 1 sides are provided with hot-water outlet pipe 17 and heat extraction pipe 18; Said both sides at three Room all-in-one ovens 1 are provided with top blast pipe 12; Be connected with U type pipe 49 on the top blast pipe 12, U type pipe 49 is positioned at upper pan body 14 inside, and a side of three Room all-in-one ovens 1 is provided with water level meter 13.
Said three Room all-in-one ovens 1 are communicated with entering waste heat apparatus 2 through heating cabinet 26 with waste heat apparatus 2 inner product heat cal rods 27 through three Room all-in-one ovens, 1 bottom exhanst gas outlet 5 with waste heat apparatus 2; The top of said waste heat apparatus 2 is last smoke-box 31; Said top in waste heat apparatus 2 is provided with blast pipe 30 and flue gas inspection socket 32; Said both sides in waste heat apparatus 2 are provided with blast pipe 29, and a said side at last smoke-box is provided with flue outlet 33; Also be provided with water level meter 28 on the waste heat apparatus 2; A said side in waste heat apparatus 2 is provided with hot-water outlet 25; Said set inside in waste heat apparatus 2 has product heat cal rod 34, thermometer 35; Said inspection socket 36, the sewage draining exit 37 of on waste heat apparatus 2, having; Said dedusting base 39, spray equipment 23, the dedusting pond 22 of below waste heat apparatus 2, being provided with; A said side at dedusting base 39 is provided with alkali adding tank 24; Said blow-off line 21 in body 19 bottoms is connected with alkali adding tank 24; Alkali adding tank 24 is communicated with spray equipment 23, and a said side in waste heat apparatus 2 is provided with water inlet pipe 38, and a said side in the dedusting pond is provided with down blow mouth 40; Said waste heat apparatus 2 is communicated with through flue outlet pipe 33 with air-introduced machine 41; Saidly below desulfurization smoke abatement device 3, be provided with ashpit 48; Air-introduced machine 41 is communicated with the ashpit 48 that falls, and on desulfurization smoke abatement device 3, is provided with smoke abatement device 45, and the smoke abatement device comprises surplus smoke pipe 46, interior cap 44, flue and water pipe 47, chimney exhaust outlet 43; Said desulfurization smoke abatement device 3 is provided with tie-strut 42, and tie-strut 42 is fixed on the flue outlet pipe.
During use, fuel is added fuel through charging aperture, the fuel after the burning is fallen down one deck and is burnt away; All-in-one oven top, three Room is the 3rd burning zone, after burnouting fuel 100%, need not artificial remove the gred; After carrying out blowdown in the three Room one bodies of heater; The dust of bottom gets in the second body waste heat apparatus dedusting pond automatically, and waste heat apparatus gets in the pond of desulfurization smoke abatement device bottom after the blowdown once more, does building vapour piece brick with the sand pump extraction at last and uses.

Claims (4)

1. an integrated furnace fort mainly is made up of three Room all-in-one ovens, waste heat apparatus, desulfurization smoke abatement device, it is characterized in that: said three Room all-in-one oven epimeres are upper pan body; Be provided with the 3rd combustion chamber in the upper pan body; The stage casing of three Room all-in-one ovens is that the hypomere of body, three Room all-in-one ovens is provided with base, and the bottom of body is provided with first combustion chamber and second combustion chamber, and a side of body is provided with inspection socket, goes out the hot water inspection socket; Opposite side is provided with the hot water inlet, and the 3rd combustion chamber is provided with thermometer; The bottom of body is provided with bottom exhanst gas outlet and down blow pipe, is provided with the top blast pipe above the upper pan body; The both sides of three Room all-in-one ovens are provided with the top blast pipe, and the top blast pipe is connected with U type pipe, and U type pipe is positioned at upper pan body inside, and a side of three Room all-in-one ovens is provided with the water level meter.
2. integrated furnace fort according to claim 1; It is characterized in that: three Room all-in-one ovens are communicated with the inner product heat cal rod of waste heat apparatus through heating cabinet through all-in-one oven bottom, three Room exhanst gas outlet with waste heat apparatus; The top of said waste heat apparatus is last smoke-box; The top of waste heat apparatus is provided with blast pipe and flue gas inspection socket, and the both sides of waste heat apparatus are provided with blast pipe, and a side of last smoke-box is provided with the flue outlet pipe; One side of waste heat apparatus is provided with the hot-water outlet, and the waste heat apparatus set inside has product heat cal rod, thermometer; Have inspection socket, sewage draining exit on the waste heat apparatus; The bottom of waste heat apparatus is provided with dedusting base, spray equipment, dedusting pond; One side of dedusting base is provided with alkali adding tank, and the down blow pipe of all-in-one oven body bottom, three Room is connected with alkali adding tank, and alkali adding tank is communicated with spray equipment, and a side of waste heat apparatus is provided with water inlet pipe, and a side in dedusting pond is provided with the down blow mouth; Waste heat apparatus is communicated with through the flue outlet pipe with air-introduced machine; Be provided with the desulfurization smoke abatement device ashpit that falls below the desulfurization smoke abatement device; Air-introduced machine is communicated with the ashpit that falls, and on desulfurization smoke abatement device, is provided with the smoke abatement device, and the smoke abatement device comprises surplus smoke pipe, interior cap, flue and water pipe, chimney exhaust outlet; Desulfurization smoke abatement device is provided with tie-strut, and tie-strut is fixed on the flue outlet pipe.
3. integrated furnace fort according to claim 1 is characterized in that: first combustion chamber is provided with the first combustion chamber charging aperture, and second combustion chamber is provided with the second combustion chamber inspection socket.
4. integrated furnace fort according to claim 1, it is characterized in that: body is provided with nameplate.
CN 201110189623 2011-07-07 2011-07-07 Integrated boiler castle Active CN102200341B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110189623 CN102200341B (en) 2011-07-07 2011-07-07 Integrated boiler castle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110189623 CN102200341B (en) 2011-07-07 2011-07-07 Integrated boiler castle

Publications (2)

Publication Number Publication Date
CN102200341A CN102200341A (en) 2011-09-28
CN102200341B true CN102200341B (en) 2012-12-26

Family

ID=44661211

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110189623 Active CN102200341B (en) 2011-07-07 2011-07-07 Integrated boiler castle

Country Status (1)

Country Link
CN (1) CN102200341B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4393814A (en) * 1981-04-08 1983-07-19 Raymond Sievert Multi-fueled boiler
CN1123394A (en) * 1995-09-18 1996-05-29 韩克武 Multiple burn boiler
CN2375861Y (en) * 1999-05-26 2000-04-26 蒋旭升 Steam boiler
CN201340071Y (en) * 2009-01-07 2009-11-04 贺全顺 Multifunctional energy-saving and environment-friendly waste heat boiler
CN201340073Y (en) * 2008-12-24 2009-11-04 沈兆君 Coal fired boiler
CN102022823A (en) * 2011-01-04 2011-04-20 岳宝元 Boiler
CN202195584U (en) * 2011-07-07 2012-04-18 贺全顺 One-piece boiler

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20070078624A (en) * 2006-01-27 2007-08-01 박 성 호 Water pipe type steam and hot-water boiler

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4393814A (en) * 1981-04-08 1983-07-19 Raymond Sievert Multi-fueled boiler
CN1123394A (en) * 1995-09-18 1996-05-29 韩克武 Multiple burn boiler
CN2375861Y (en) * 1999-05-26 2000-04-26 蒋旭升 Steam boiler
CN201340073Y (en) * 2008-12-24 2009-11-04 沈兆君 Coal fired boiler
CN201340071Y (en) * 2009-01-07 2009-11-04 贺全顺 Multifunctional energy-saving and environment-friendly waste heat boiler
CN102022823A (en) * 2011-01-04 2011-04-20 岳宝元 Boiler
CN202195584U (en) * 2011-07-07 2012-04-18 贺全顺 One-piece boiler

Also Published As

Publication number Publication date
CN102200341A (en) 2011-09-28

Similar Documents

Publication Publication Date Title
CN201327039Y (en) Equipment for generating hot steam water by harmless combustion of garbage
CN202195584U (en) One-piece boiler
CN105115152A (en) Hot water boiler with preheating water tank
CN204460683U (en) From dedusting dump grate biomass fuel multitubular boiler
CN105090921A (en) Energy-saving environmentally-friendly steam boiler
CN102200341B (en) Integrated boiler castle
CN207621994U (en) A kind of energy-saving boiler
CN105157222A (en) Energy-saving and dust-removing coal-fired boiler
CN205002357U (en) Boiler with preheating water tank
CN106594709A (en) Smoke removing type vertical boiler equipment with biomass as energy fuel
CN105352173A (en) Boiler capable of purifying flue gas
CN201187871Y (en) Household vertical fire tube energy-saving hot water boiler
CN201237349Y (en) Boiler
CN201449002U (en) Coal-fired hot water boiler
CN205897147U (en) Garbage incinerator
KR101496298B1 (en) Vertical type thermal oil boiler for refuse derived fuel
CN204478001U (en) A kind of biomass steam generator
KR101496299B1 (en) Boiler for refuse derived fuel coupled with thermal oil boiler and steam boiler
CN102563617A (en) Efficient chimney-free energy-saving boiler with far infrared heat pipe
CN202008220U (en) Vertical atmospheric pressure boiler
CN2639716Y (en) Back burn gas furnace for reforming boiler
CN102798212A (en) Energy-saving and environmentally-friendly boiler
CN102261734A (en) Horizontal chamber-combustion biomass boiler
CN213810569U (en) High-temperature-resistant coating structure for power plant boiler
CN201973874U (en) Efficient energy saving and emission reduction constant-pressure fire and water tube tea bath heating boiler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIAOZUO YUSHUN BOILER ENVIRONMENTAL PROTECTION EQU

Free format text: FORMER OWNER: HE QUANSHUN

Effective date: 20140102

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20140102

Address after: The middle of the West often Fulu Qinyang city in Henan province 464550

Patentee after: Jiaozuo yushuen boiler environmental protection equipment Co.

Address before: 464550 Henan city of Jiaozuo province Qinyang City Qin Huai Xi Lu Qinyuan Road intersection south Qinyang yushuen boiler environmental protection equipment factory

Patentee before: He Quanshun