CN102191778A - Construction method of immersed-tube compress soil-free underground continuous wall - Google Patents
Construction method of immersed-tube compress soil-free underground continuous wall Download PDFInfo
- Publication number
- CN102191778A CN102191778A CN2011100945534A CN201110094553A CN102191778A CN 102191778 A CN102191778 A CN 102191778A CN 2011100945534 A CN2011100945534 A CN 2011100945534A CN 201110094553 A CN201110094553 A CN 201110094553A CN 102191778 A CN102191778 A CN 102191778A
- Authority
- CN
- China
- Prior art keywords
- steel
- punching block
- construction
- construction method
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Foundations (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention relates to a construction method of an immersed-tube compress soil-free underground continuous wall, belonging to the field of construction methods of foundation treatment and foundation engineering. The construction method comprises the following steps of: firstly assembling soil dumping tubes at both sides of steel moulds; lifting the steel moulds, and sequentially and parallelly pressing a group of four steel moulds; placing steel reinforcement cages into the steel moulds; pouring concrete into the first steel mould, and pulling out the first steel mould in a vibrating way; after the first steel mould is pulled out, forming a first pile, and simultaneously pressing the fifth steel mould; repeating like that to form a second pile, a third pile and more piles so as to complete the construction of the segmental underground continuous wall. The construction method has the advantages of more reasonable stress and more efficient material utilization; and in addition, the invention has the characteristics of little field pollution and clean and neat environment because non-drilling pore-forming is adopted.
Description
Technical field
The invention belongs to the job practices of ground processing and Foundation Design, referring in particular to Submersed type does not have soil compaction construction of continuous concrete wall method.
Background technology
The job practices of tradition diaphragm wall is: by (dashing) groove equipment that digs of special use, along the periphery of underground structure, press preposition, excavate out or groove that drill goes out to have the certain width and the degree of depth, use mud off, and in groove, the reinforcing cage with certain rigidity is set; Then, use the catheter irrigation underwater concrete, build up a unit groove, carry out so piecemeal, the specific process joint is used in section construction, makes it to form underground continuous reinforced concrete wall.The shortcoming of this job practices is that engineering quantity is big, and is long in time limit, not environmental protection, and concrete quality lacks guarantee.
Summary of the invention
The present invention is just in order to overcome above-mentioned deficiency, the Submersed type that a kind of work efficiency height, short construction period is provided and ensures the quality of products does not have soil compaction construction of continuous concrete wall method, concrete enforcement like this: Submersed type does not have soil compaction construction of continuous concrete wall method, it is characterized in that construction sequence is as follows:
1) loads onto the casting pipe in the punching block both sides;
2) the lifting punching block is pressed into one group of four punching block successively side by side;
3) in punching block, place reinforcing cage;
4) concrete perfusion in first punching block is vibrating and is extracting first punching block;
5) pull out first punching block after, form first the stake, be pressed into the 5th punching block simultaneously;
6) repeat the 4-5 step, form second and third ... pile is finished the construction of continuous concrete wall of the section of one-tenth.
It is basic identical with traditional diaphragm wall on force mechanism that Submersed type does not have soil compaction construction of continuous concrete wall method, owing to changed the construction technology of traditional diaphragm wall, makes its more reasonable stress, more efficient on the material use.Simultaneously, owing to adopt non-drilling well pore-forming, the on-the-spot pollution lacked, and environment is clean, clean and tidy.
Description of drawings
Fig. 1 is a work progress schematic diagram of the present invention.
The specific embodiment
Submersed type does not have soil compaction construction of continuous concrete wall method, and construction sequence is as follows:
1) loads onto the casting pipe in the punching block both sides;
2) the lifting punching block is pressed into one group of four punching block successively side by side;
3) in punching block, place reinforcing cage;
4) concrete perfusion in first punching block is vibrating and is extracting first punching block;
5) pull out first punching block after, form first the stake, be pressed into the 5th punching block simultaneously;
6) repeat the 4-5 step, form second and third ... pile is finished the construction of continuous concrete wall of the section of one-tenth.
In this job practices, the concrete employing is done and is irritated rather than general underwater grouting, and concrete slump is bigger, adds concrete and adopts the vibration type perfusion, and concrete intensity is smash reliable in quality with stirring.
The diaphragm wall of making is a solid wall, bending resistance, shear-carrying capacity height, and the rigidity of structure is big, distortion is little, can reduce the sedimentation of foundation ditch surrounding ground, reduces the surrounding buildings thing is caused dysgenic risk; Need not in the construction to support, the convenient shoveling accelerated the shoveling process of pattern foundation pit supporting structure, shortened the duration; Reduced work such as soil excavation, outward transport, backfill, working procedure is few, and whole construction does not have mud and produces, on-the-spot clean civilization, and quality inspection, field control are comparatively easy.
This job practices is applied widely, also can be used for hydraulic engineering construction.
Claims (1)
1. Submersed type does not have soil compaction construction of continuous concrete wall method, it is characterized in that construction sequence is as follows:
1) loads onto the casting pipe in the punching block both sides;
2) the lifting punching block is pressed into one group of four punching block successively side by side;
3) in punching block, place reinforcing cage;
4) concrete perfusion in first punching block is vibrating and is extracting first punching block;
5) pull out first punching block after, form first the stake, be pressed into the 5th punching block simultaneously;
6) repeat the 4-5 step, form second and third ... pile is finished the construction of continuous concrete wall of the section of one-tenth.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100945534A CN102191778A (en) | 2011-04-15 | 2011-04-15 | Construction method of immersed-tube compress soil-free underground continuous wall |
CN2012100992629A CN102605764A (en) | 2011-04-15 | 2012-04-08 | Construction method for immersed tube type underground continuous wall without compacting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100945534A CN102191778A (en) | 2011-04-15 | 2011-04-15 | Construction method of immersed-tube compress soil-free underground continuous wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102191778A true CN102191778A (en) | 2011-09-21 |
Family
ID=44600576
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100945534A Pending CN102191778A (en) | 2011-04-15 | 2011-04-15 | Construction method of immersed-tube compress soil-free underground continuous wall |
CN2012100992629A Pending CN102605764A (en) | 2011-04-15 | 2012-04-08 | Construction method for immersed tube type underground continuous wall without compacting |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012100992629A Pending CN102605764A (en) | 2011-04-15 | 2012-04-08 | Construction method for immersed tube type underground continuous wall without compacting |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN102191778A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561342A (en) * | 2012-02-10 | 2012-07-11 | 中国水利水电第五工程局有限公司 | Multifunctional composite mould pipe for construction of underground diaphragm wall |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE790580A (en) * | 1971-10-26 | 1973-02-15 | Vyzk Ustav Inzhenerskikh | PROCESS AND ARRANGEMENT FOR THE PRODUCTION OF UNDERGROUND PILES AND BLADES |
CN1296568C (en) * | 2002-01-04 | 2007-01-24 | 张国梁 | Construction method of concrete pile |
CN1200178C (en) * | 2003-05-28 | 2005-05-04 | 姜贤放 | Column pile and sheet pile joined body construction method and its special equipment |
CN101560766B (en) * | 2009-05-13 | 2011-03-02 | 江苏东大鸿基科技有限公司 | Grid-like underground continuous wall plate and production method thereof |
CN101979777B (en) * | 2010-09-29 | 2013-01-16 | 卫龙武 | Construction method of combined underground continuous wallboard of cast-in-place hollow square pile |
-
2011
- 2011-04-15 CN CN2011100945534A patent/CN102191778A/en active Pending
-
2012
- 2012-04-08 CN CN2012100992629A patent/CN102605764A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102561342A (en) * | 2012-02-10 | 2012-07-11 | 中国水利水电第五工程局有限公司 | Multifunctional composite mould pipe for construction of underground diaphragm wall |
Also Published As
Publication number | Publication date |
---|---|
CN102605764A (en) | 2012-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201883438U (en) | Pit-in-foundation-pit steel sheet pile foundation pit supporting structure | |
CN202689008U (en) | Supporting structure for double-row prefabricated high-strength concrete thin-walled steel pipe pile foundation pit | |
CN106677205A (en) | Fabricated special-shaped steel pipe pile combined retaining wall | |
CN102817372A (en) | Construction method of underground deep foundation concrete by reverse formworks | |
CN108612086A (en) | A kind of crack geotechnical boring cast-in-place pile construction method | |
CN202689009U (en) | Steel sheet pile and tubular pile combined foundation pit supporting structure | |
CN102359112A (en) | Method for bracing foundation pit by using steel box piles | |
CN101666085B (en) | Prefabricated part composite cement soil wall and construction method thereof | |
WO2017133373A1 (en) | Small-diameter pile cluster used for pile foundation, and method for construction thereof | |
CN204825867U (en) | As composite pile structure of secretly digging garage stand | |
CN208379572U (en) | A kind of anti-settling processing constructing device based on cutting edge formula propelling method | |
CN201531021U (en) | Prefabricated member cement-treated-soil drilling and filling pile | |
CN102191778A (en) | Construction method of immersed-tube compress soil-free underground continuous wall | |
CN215329921U (en) | Simple closed soil nail connecting joint | |
CN110004942A (en) | A kind of large span integral supporting structure and its construction method | |
CN101666086B (en) | Cement cast-in-situ pile of prefabricated part and construction method thereof | |
CN109972644B (en) | Open caisson device for pushing and construction method thereof | |
CN110359525B (en) | Static pressure prefabricated assembled water pool and construction method thereof | |
CN113756371A (en) | Concrete density construction method at horizontal seam of waterproof concrete | |
CN210031875U (en) | Open caisson device for pushing | |
CN113585336A (en) | Quick construction method of sinking type concrete mixing station in soft foundation environment | |
CN201908303U (en) | Square frame-shaped steel cavity concrete cast-in-situ well sinking protecting wall | |
CN202247856U (en) | Earth borrowing annular pile for foundation treatment and underground foundation | |
CN201873990U (en) | Dry soil-withdrawing engaged rectangle cast-in-place pile piling device | |
CN202323934U (en) | Hole forming device for cast-in-situ triangular composite foundation pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20110921 |