CN102182243A - Underground pipeline or culvert maintenance vehicle - Google Patents

Underground pipeline or culvert maintenance vehicle Download PDF

Info

Publication number
CN102182243A
CN102182243A CN2011100411359A CN201110041135A CN102182243A CN 102182243 A CN102182243 A CN 102182243A CN 2011100411359 A CN2011100411359 A CN 2011100411359A CN 201110041135 A CN201110041135 A CN 201110041135A CN 102182243 A CN102182243 A CN 102182243A
Authority
CN
China
Prior art keywords
culvert
mechanical arm
underground pipeline
pipeline
workbench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011100411359A
Other languages
Chinese (zh)
Inventor
李吉雄
邓卫东
张立强
孔令云
陈天泉
程启华
王祺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Original Assignee
China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Chongqing Communications Research and Design Institute Co Ltd filed Critical China Merchants Chongqing Communications Research and Design Institute Co Ltd
Priority to CN2011100411359A priority Critical patent/CN102182243A/en
Publication of CN102182243A publication Critical patent/CN102182243A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to an underground pipeline or culvert maintenance vehicle, wherein an operation room is arranged in a vehicle body, and a mechanical arm is arranged on the vehicle body; a working table is arranged on the mechanical arm, and a control device for the mechanical arm and the working table is arranged in the operation room; a travel mechanism moving forward along a pipe wall is arranged on the working table, and a loading cradle head is arranged on the travel mechanism; and an industrial endoscope and a detachable or replaceable working head for maintaining a pipeline or a culvert are arranged on the loading cradle head. The maintenance vehicle can conveniently and rapidly reach a place of an accident, can be stably pulled over and is provided with a temporary warning sign for construction safety; no person is needed to enter the pipeline or the culvert with various kinds of risk factors to carry out maintenance, and maintenance can be carried out by the maintenance vehicle without digging or destroying a road surface and a culvert pipe structure; information is fed back through the endoscope and a detector head, and a predetermined program is selected to operate and replace various kinds of standard working heads, thus work efficiency is greatly improved, the safety of operation personnel is ensured.

Description

Underground pipeline or culvert tool car
Technical field
The present invention relates to a kind of engineering maintenance vehicle, concrete relate to a kind of maintenance vehicle of detecting, dredge and safeguarding underground narrow pipeline or culvert of being used to.
Background technology
Behind underground pipeline or culvert obstruction or the cracking, the solution in past is " belly breaking ", and not only road " is marred by a scar, etc. " influences traffic, and needs to drop into sizable manpower, material resources and financial resources, and the engineering time is longer, obstruction.Particularly can't directly be detected on maintenance to the minor diameter water-conveyance culvert or pipe because of personnel, usually be negligent of maintenance, time one length causes engineering accident easily, causes great loss.For a long time, people wish to finish pipeline or culvert always and repair under the prerequisite of not excavating road, particularly to the repairing and the mediation of the less culvert pipe of caliber etc.
Therefore, be badly in need of a kind of engineering truck, can be at the less culvert pipe of road surface underground pipeline or culvert, particularly caliber, can't directly enter under the situation that culvert pipe overhauls the constructor, can play the effect of maintenance.
Summary of the invention
The object of the present invention is to provide a kind of underground pipeline or culvert tool car, be equipped with video equipment on this project car, operating equipment is operated by the demonstration of video display apparatus in the operating room of operating personnel on engineering truck, reaches the purpose of maintenance underground pipeline or culvert.
For achieving the above object, the technical solution adopted in the present invention is: a kind of underground pipeline or culvert tool car, comprise car body, be provided with operating room in the car body, described car body is provided with mechanical arm, the power set of mechanical arm are arranged in the car body, mechanical arm is provided with workbench, the control device of mechanical arm and workbench is arranged in the operating room, workbench is provided with the walking mechanism that moves ahead along tube wall, walking mechanism is provided with the load-carrying The Cloud Terrace, and the load-carrying The Cloud Terrace is provided with dismountable working head of industrial endoscope and service conduits or culvert.
Adopt the technique effect that technique scheme reached to be: this underground pipeline or culvert tool car are owing to himself be to have the vehicle that power can be advanced, therefore can arrive accident spot quickly and easily, behind the place of arrival, do not need personnel to overhaul, industrial endoscope search pipeline or culvert by the waterproof that is provided with on the mechanical arm on the car, by industrial endoscope image data is fed back to operating personnel in the operating room, operate according to the image data that obtains, enter pipeline or culvert is dredged or repaired by the workbench on the mechanical arm, replaced manually-operated fully, can avoid excavating the road surface when particularly the less culvert pipe of caliber being operated and carry out loaded down with trivial details operation, can on the basis of not destroying road surface and culvert pipe structure, overhaul it, improved operating efficiency greatly, reduced work difficulty, saved cost, reduced time because of service conduits or the traffic congestion that culvert caused.
Further, under situation with a varied topography, need bending mechanical arm in order to enter baroque pipeline or culvert, therefore described mechanical arm is provided with the hinge that at least one makes the mechanical arm bending.The hinge that flexible mechanical arm is set can make it can be crooked under the prerequisite that does not change the mechanical arm globality, reaches the purpose in the maintenance of complex-terrain and complicated pipeline or culvert.
Further, for pipeline or the culvert that makes this tool car can tackle under the various situations stops up, realize by removable working head, described working head comprise cutter, draft tube, welded pipe line or the culvert of the playpipe of the Churn drill, electric hammer or the pneumatic drill that smash stone, impact mud, the excavation hand that grasps obstruction, cutting metal spare welding gun, repairing and reinforcing tube wall gas cell formula template or fill slurry and coagulate the mould capsule soon, paste lining cutting or blocking is filled and led up the instrument in crack, radar or other scanning sensing device of measurement and positioning.Object at different blocking pipes or culvert is changed different working heads, repairs the pipeline or the also replaceable corresponding work head of going up of culvert of type at difference.
Further, when needs welding or cutting, if exist flammable gas and liquid, the danger that may occur exploding in pipeline or the culvert.Described workbench is provided with gas and liquid-detecting.Can be when detecting gas or liquid in prior detector tube road or the culvert, prevent the danger such as blast that may occur.
Further, for the process record with maintenance gets off, the convenient analysis or data record later is provided with the recording apparatus of recording video data in the described operating room.The video content record of industrial endoscope is got off, can carry out the storage and the analysis of data effectively, after also can be used as to staff straining's image data.
Description of drawings
The present invention is further detailed explanation below in conjunction with the drawings and specific embodiments:
Fig. 1 is the structural representation of the embodiment of the invention.
The specific embodiment
As shown in Figure 1, a kind of underground pipeline or culvert tool car, comprise car body 1, the front portion of car body 1 is a driver's cabin, in the back of driver's cabin an operating room 2 is arranged, the functional unit and the display screen that use for the operator are arranged in the operating room 2, there is a telescopic mechanical arm 3 back of operating room 2 on the described car body 1, mechanical arm 3 is connected with The Cloud Terrace 6 on the car body 1, and there is a hinge junction between The Cloud Terrace 6 and the mechanical arm 3.The front end of mechanical arm 3 is a workbench, and the power set of workbench are arranged in the car body 1, and the controller of workbench is arranged in the operating room 2; Workbench is divided into Athey wheel 7, loading The Cloud Terrace 6 and working head 5, and Athey wheel 7 can be sent to workbench the maintenance place in pipeline or the culvert by in the inside pipe wall conduct.On the loading The Cloud Terrace 6 by bolt the industrial endoscope 4 of a waterproof, this industrial endoscope 4 is connected by the display screens in transmission line and the control room 2.This working head 5 is dismountable design, fix by screw thread with loading The Cloud Terrace 6, working head 5 be divided into Churn drill, electric hammer or the pneumatic drill that smashes stone, the playpipe of impact mud, the excavation hand that grasps obstruction, cutting metal spare cutter, sucking-off foreign material and liquid draft tube, welded pipe line or culvert welding gun, repairing and reinforcing tube wall gas cell formula template or fill slurry and coagulate the mould capsule soon, paste lining cutting or blocking is filled and led up the instrument in crack, radar or other scanning sensing device of measurement and positioning.Change different working heads 5 at the object of different blocking pipes or culvert, repair the also replaceable corresponding work 5 that goes up of the pipeline of type or culvert at difference; At different pipelines or culvert obstruction, corresponding work 5 can be changed, to overhaul.In addition, also be provided with gas, liquid sensor on the loading The Cloud Terrace 6, be used to detect inflammable and explosive gas and the liquid of waiting.
During use, by the arm 3 of operating machine, workbench is probeed in pipeline or the culvert, by the situation in industrial waterproof endoscope 4 observation pipelines or the culvert, when need repair and dredge, mechanical arm 3 is further stretched in the pipe, utilize working head 5 dredging pipelines or culvert, reaching does not need artificial maintenance, mediation and the purpose of repairing.
Above-described only is preferred implementation of the present invention; should be understood that; for a person skilled in the art; under the prerequisite that does not break away from structure of the present invention; can also make some distortion and improvement; can customized outfit electronic such as working head; pneumatic; the Churn drill of power-actuated various types such as hydraulic pressure; hammer; pick; pricker; shearing fibre; rope; geotextiles; woven bag; cutter; pincers; hook; shovel; bucket; welding; cutting; melt pitch; load; mud draws water; draw clearly; cleaning; slag absorbing; plugging air bag; whitewashing; perfusion; brushing; paste; pneumatic jacking; the mounting or dismounting mould; lining cutting is reinforced; utensils such as curing are quickened in the electric heating blowing; these also should be considered as protection scope of the present invention, and these can not influence effect of the invention process and practical applicability.

Claims (6)

1. underground pipeline or culvert tool car, comprise car body, be provided with operating room in the car body, described car body is provided with mechanical arm, and the power set of mechanical arm are arranged in the car body, it is characterized in that, mechanical arm is provided with workbench, and the control device of mechanical arm and workbench is arranged in the operating room, and workbench is provided with the walking mechanism that moves ahead along tube wall, walking mechanism is provided with the load-carrying The Cloud Terrace, and the load-carrying The Cloud Terrace is provided with dismountable working head of industrial endoscope and service conduits or culvert.
2. underground pipeline as claimed in claim 1 or culvert tool car is characterized in that: described mechanical arm is provided with at least one hinge that makes the mechanical arm bending.
3. underground pipeline as claimed in claim 1 or 2 or culvert tool car is characterized in that: described working head comprises the drill bit that smashes stone, impact the gas cell formula template of the welding gun of cutter, draft tube, welded pipe line or the culvert of the playpipe of mud, the excavation hand that grasps obstruction, cutting metal, repairing and reinforcing tube wall or fill slurry and coagulate the mould capsule soon, paste lining cutting or blocking is filled and led up the instrument in crack, the radar of measurement and positioning.
4. underground pipeline as claimed in claim 3 or culvert tool car is characterized in that: described workbench is provided with gas and liquid-detecting.
5. underground pipeline as claimed in claim 4 or culvert tool car is characterized in that: the recording apparatus that is provided with recording video data in the described operating room.
6. underground pipeline as claimed in claim 3 or culvert tool car is characterized in that: the described drill bit that smashes stone is any one in Churn drill, electric hammer and the pneumatic drill.
CN2011100411359A 2011-02-18 2011-02-18 Underground pipeline or culvert maintenance vehicle Pending CN102182243A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100411359A CN102182243A (en) 2011-02-18 2011-02-18 Underground pipeline or culvert maintenance vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100411359A CN102182243A (en) 2011-02-18 2011-02-18 Underground pipeline or culvert maintenance vehicle

Publications (1)

Publication Number Publication Date
CN102182243A true CN102182243A (en) 2011-09-14

Family

ID=44568520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100411359A Pending CN102182243A (en) 2011-02-18 2011-02-18 Underground pipeline or culvert maintenance vehicle

Country Status (1)

Country Link
CN (1) CN102182243A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088359A (en) * 2014-06-07 2014-10-08 冯政 Manufacture and use methods of blow-off pipeline dredging drill
CN105854576A (en) * 2016-05-30 2016-08-17 万亨 Flue gas treatment tower and treatment system
CN106638930A (en) * 2017-01-17 2017-05-10 成都启立辰智科技有限公司 Sewer desilting and dredging device
CN109732555A (en) * 2019-01-30 2019-05-10 华能汕头海门发电有限责任公司 A kind of robot system of robot arm end effector that playing leak stopping with twirl
CN109973784A (en) * 2017-12-27 2019-07-05 核动力运行研究所 A kind of channel bend inspection machine people

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2642855Y (en) * 2003-09-13 2004-09-22 张卿 Wired remote control intelligent dredging cleaner for sewage pipeline
CN2856218Y (en) * 2005-08-31 2007-01-10 佟圣英 Mud clearing car for sewage pipe network
CN200955195Y (en) * 2006-09-29 2007-10-03 河北理工大学 Cable controlled middle-small drain-water pipeline automatic dredging apparatus
CN200958244Y (en) * 2006-10-04 2007-10-10 佟圣英 Draining pipeline dredging engineering vehicle
CN201003211Y (en) * 2006-11-17 2008-01-09 陈三思 Clutch digging type pipe dredger
CN201704787U (en) * 2009-09-30 2011-01-12 重庆大学 Large-diameter sewage conduit dredging system
CN202065611U (en) * 2011-02-18 2011-12-07 招商局重庆交通科研设计院有限公司 Underground pipeline or culvert maintenance car

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2642855Y (en) * 2003-09-13 2004-09-22 张卿 Wired remote control intelligent dredging cleaner for sewage pipeline
CN2856218Y (en) * 2005-08-31 2007-01-10 佟圣英 Mud clearing car for sewage pipe network
CN200955195Y (en) * 2006-09-29 2007-10-03 河北理工大学 Cable controlled middle-small drain-water pipeline automatic dredging apparatus
CN200958244Y (en) * 2006-10-04 2007-10-10 佟圣英 Draining pipeline dredging engineering vehicle
CN201003211Y (en) * 2006-11-17 2008-01-09 陈三思 Clutch digging type pipe dredger
CN201704787U (en) * 2009-09-30 2011-01-12 重庆大学 Large-diameter sewage conduit dredging system
CN202065611U (en) * 2011-02-18 2011-12-07 招商局重庆交通科研设计院有限公司 Underground pipeline or culvert maintenance car

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104088359A (en) * 2014-06-07 2014-10-08 冯政 Manufacture and use methods of blow-off pipeline dredging drill
CN105854576A (en) * 2016-05-30 2016-08-17 万亨 Flue gas treatment tower and treatment system
CN105854576B (en) * 2016-05-30 2018-03-16 万亨 A kind of fume treatment tower and processing system
CN106638930A (en) * 2017-01-17 2017-05-10 成都启立辰智科技有限公司 Sewer desilting and dredging device
CN109973784A (en) * 2017-12-27 2019-07-05 核动力运行研究所 A kind of channel bend inspection machine people
CN109732555A (en) * 2019-01-30 2019-05-10 华能汕头海门发电有限责任公司 A kind of robot system of robot arm end effector that playing leak stopping with twirl
CN109732555B (en) * 2019-01-30 2023-09-26 华能汕头海门发电有限责任公司 Robot system with twisting and plugging mechanical arm end effector

Similar Documents

Publication Publication Date Title
US8858124B2 (en) Excavation system
CN102182243A (en) Underground pipeline or culvert maintenance vehicle
US20100326481A1 (en) Mobile method for servicing or cleaning a utility sewer or drainage pipe
CN110645041B (en) Coal mine collapse roadway pipe jacking rescue equipment and installation method thereof
CN205172584U (en) Excavation platform truck with tunnel face dust fall function
CN101570802B (en) Replacing method of blast furnace shell and water wall
US20130051922A1 (en) Method and device for laying pipelines in the ground
US20220235658A1 (en) Travelling-type tunnel hard-rock micro-damage cutting equipment and construction method associated therewith
SE536651C2 (en) Procedure, systems and rock drilling systems for installation of pipes at rock drilling
CN109025816B (en) Construction method for long spiral leading hole of prestressed pipe pile with ultra-deep and ultra-thick compact sand layer
CN202065611U (en) Underground pipeline or culvert maintenance car
CN107387093A (en) A kind of shallow buried covered excavation system and construction method suitable for soft soil layer
CN208280207U (en) A kind of Novel tunnel reparation driving loading machine
CN105888678B (en) A kind of intelligent excavation push-bench
CN110173274A (en) A kind of head is removed obstacles method
CN117307036A (en) Underground large-diameter drilling equipment and construction method
CN104060640A (en) Dredger-used blockage-proof special mud discharging steel pipe and sewage discharging and dredging treating method of dredger
CN110700626A (en) Multifunctional combined mechanical arm device and method for breaking and removing dirt in engineering
JP2001082071A (en) Tunnel widening method and device
CN108457665B (en) Milling and digging type tunneling loader
CN207177907U (en) Formula driving loading machine is dug in milling
US5407252A (en) Method and apparatus for scaling mine roofs and ribs
JP5547047B2 (en) Existing pipe recovery method and equipment
CN112196577B (en) Double-power-driven intelligent tunnel maintenance train
CN210977579U (en) Colliery tunnel push pipe rescue equipment that collapses

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110914