CN102182173A - Underground water back-filling regulation and control device - Google Patents

Underground water back-filling regulation and control device Download PDF

Info

Publication number
CN102182173A
CN102182173A CN 201110119178 CN201110119178A CN102182173A CN 102182173 A CN102182173 A CN 102182173A CN 201110119178 CN201110119178 CN 201110119178 CN 201110119178 A CN201110119178 A CN 201110119178A CN 102182173 A CN102182173 A CN 102182173A
Authority
CN
China
Prior art keywords
water inlet
water
underground
filling
telescopic pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110119178
Other languages
Chinese (zh)
Other versions
CN102182173B (en
Inventor
董金志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN 201110119178 priority Critical patent/CN102182173B/en
Publication of CN102182173A publication Critical patent/CN102182173A/en
Application granted granted Critical
Publication of CN102182173B publication Critical patent/CN102182173B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to an underground water back-filling regulation and control device. The underground water back-filling regulation and control device comprises a water collecting well, a water inlet main pipe, water inlet branch pipes and back-filling wells, wherein the input end of the water inlet main pipe is communicated with the water collecting well, the output end of the water inlet main pipe is communicated with the input ends of a plurality of the water inlet branch pipes, and the output end of each water inlet branch pipe is communicated with the corresponding back-filling well; the underground water back-filling regulation and control device is characterized in that sleeve pipes are buried in the back-filling wells, and water outlet holes are formed at the parts below 500mm of the sleeve pipes which are buried underground; the output ends of the water inlet branch pipes are positioned at the bottom parts in the sleeve pipes; a pressurizing pump, a main pipe valve and a main flowmeter are arranged on the water inlet main pipe; and a branch valve and a sub-flowmeter are arranged on each water inlet branch pipe. The underground water back-filling regulation and control device has the characteristics of being simple in structure and being capable of regulating and controlling the back-filling flow rate.

Description

Underground water recharging, regulating and controlling device
Technical field
The present invention relates to a kind of underground water recharging, regulating and controlling device.
Background technology
One, groundwater recharge Construction Control present situation
At present domestic aspect groundwater recharge, though some scholars are arranged in research, it is ripe that is that all right, and also there are different understanding in phreatic extraction and supply mechanism, and country does not also form any codes and standards in this respect.Though some area (as Shanghai, Shaanxi and other places) has also carried out some groundwater recharge examples, and the relevant technologies rules have been formed, but mainly carry out, having little significance of a certain concrete deep foundation ditch surrounding buildings thing sedimentation of direct guidance for solving regional bulk settling or agricultural production.
In addition, the domestic water that simultaneously descends at deep foundation pit precipitation recharges, case history itself is actually rare, and in the various references groundwater recharge control technology is put down in writing seldom, to how regulating control effectively recharge flow, recharge the pressure aspect, not proposing effective measure, is to belong to gravity flow to recharge basically, and effect is recharged in very difficult assurance.
Two, the necessity of groundwater recharge
1, technology necessity:
It is more and more general to carry out deep foundation pit construction around intensive building.In this case, not only to consider the foundation pit dewatering problem, also to consider owing to excessive precipitation causes the uneven subsidence of foundation ditch surrounding soil or original building, otherwise can cause soil mass of foundation pit or existing building thing crack, member fracture even structural collapse.In addition, if the underground water of smoking is not in a large number recharged, also can cause a large amount of wastes of freshwater resources.
2, economic necessity:
For excessive loss does not take place underground water in preventing on foundation ditch surrounding soil or the original building ground, way has two: the one, around foundation ditch, adopt the mode of cement mixing pile water-stop curtain, and prevent that underground water from flowing into foundation ditch; The 2nd, adopt the groundwater recharge method, in soil layer, form a reversing cone of depression opposite with the precipitation well point, make the radius of influence of precipitation well point be no more than the scope of recharging the well point, groundwater table is remained unchanged substantially, soil layer pressure still is in the original equilibrium state, thereby prevents that effectively the precipitation well point is to the influence of building on every side.
Engineering practice shows, adopt the recharge well scheme than cement mixing pile economy many, reach 35%~45%, still, when adopting the groundwater recharge method, the control of recharging effect is had relatively high expectations.
Summary of the invention
The object of the present invention is to provide a kind of underground water recharging, regulating and controlling device simple in structure, regulatable.
To achieve these goals, the technical solution used in the present invention is: underground water recharging, regulating and controlling device, it comprises collecting well, the water inlet person in charge, water inlet arm, recharge well, the input that water inlet is responsible for is connected with collecting well, the output that water inlet is responsible for is connected with the input of a plurality of water inlet arms respectively, and the output of each water inlet arm is connected with corresponding recharge well; It is characterized in that: be embedded with telescopic pipe in the recharge well, telescopic pipe is imbedded underground 500mm and is had weep hole with the lower part; The output of water inlet arm is positioned at the bottom of telescopic pipe; Water inlet is responsible for and is provided with force (forcing) pump, is responsible for valve, main flow meter; Each water inlet arm is provided with arm valve, shunt volume meter.
The present invention is by setting up telescopic pipe, and is provided with force (forcing) pump on water inlet is responsible for, is responsible for valve, main flow meter; Each water inlet arm is provided with the arm valve, equipment and instrument such as shunt volume meter, make the whole device that pipeline forms similar " syringe " that recharges, regulate and control recharge water pressure and flow by force (forcing) pump and valve, also can be according to flow meter and manometric reading, draw and recharge pressure, recharge the relation of flow and soil permeability coefficient, accomplished under the situation that does not increase expense, need much design discharges just can reach the effect of much flows, changed and just taked gravity flow to recharge at present, recharge the Passive Control present situation that effect is difficult to guarantee, play the initiatively effect of regulation and control.
The invention has the beneficial effects as follows:
1, not high, practical to geology hydrological data data accuracy requirement.
To some recharge well, may since soil layer recharge transmission coefficient or pervious layer thickness is less, under the situation that gravity flow is recharged, actual water recharge capacity (flow) is less than the design water recharge capacity when (flow), at this moment do not need to consider that actual geological hydrology condition recomputates the adjustment design and recharges flow, but recharge hydraulic pressure in the increase recharge well, and increase the actual flow that recharges, allow it still reach former design and recharge flow.
Use this regulation device, only need to regulate the valve (the adjustable flow that recharges) on the arm of respectively intaking, to needs supercharging and self-flow recharging well, what all can meet design requirement recharges flow, practical.
2, apparatus structure is simple, and is with low cost.
This device only needs (or some, decide on a recharge well quantity) force (forcing) pump and some valves, flow meter, pressure meter and water pipe to get final product, and many wells can a shared pump, and is with low cost.
3, construction, test are carried out simultaneously, can draw some important geology hydrologic parameters easily, for the similar engineering construction is accumulated experience.
In pressure process, can draw the relation curve that soil recharges flow and osmotic pressure at an easy rate by the reading on pressure meter and the flow meter, recharge transmission coefficient thereby draw easily.
4, can effectively realize falling the filling balance, groundwater table is remained unchanged substantially, soil layer pressure still is in the original equilibrium state before and after precipitation, thereby has controlled the sedimentation of foundation ditch surrounding soil or existing building thing.
Description of drawings
Fig. 1 is a floor map of the present invention;
Fig. 2 is an elevational schematic view of the present invention;
Among the figure: 1-precipitation outlet pipe, 2-precipitation outlet pipe flow meter, 3-collecting well, the 4-person in charge of intaking, 5-force (forcing) pump, 6-is responsible for valve, 7-main flow meter, the 8-arm of intaking, 9-arm valve, 10-shunt volume meter, the 11-recharge well, 12-pressure meter, 13-telescopic pipe, 14-impervious layer, the various soil layers of 15-.
The specific embodiment
As Fig. 1, shown in Figure 2, underground water recharging, regulating and controlling device, it comprises collecting well 3, water inlet is responsible for 4, force (forcing) pump 5, be responsible for valve 6, main flow meter 7, water inlet arm 8, arm valve 9, shunt volume meter 10, recharge well 11, pressure meter 12, telescopic pipe 13, the water inlet person in charge 4 input is connected with collecting well 3, the water inlet person in charge 4 output is connected with the input of a plurality of water inlet arms 8 respectively, and (described a plurality of water inlet arms are 2-10, adopt 4 among present embodiment Fig. 1, concrete number is determined as required), the output of each water inlet arm 8 be connected with corresponding recharge well 11 (arm 8 of intaking is corresponding one by one with the number of recharge well 11); Be embedded with telescopic pipe 13 (backfill has graded broken stone around the telescopic pipe, and graded broken stone is various soil layers 15, and the below of telescopic pipe is an impervious layer 14) in the recharge well 11 outward, telescopic pipe 13 is imbedded underground 500mm and is had weep hole (twining the close order safety net in 2 roads outward) with the lower part; The output of water inlet arm 8 is positioned at the bottom of telescopic pipe 13; Water inlet is responsible for 4 and is provided with force (forcing) pump (force (forcing) pump adopts automatic force (forcing) pump, or claims automatic pressure pump) 5, person in charge's valve 6, main flow meter 7; Each water inlet arm 8 is provided with arm valve 9, shunt volume meter 10.
The top cover of bringing water tap, pressure meter pore into is stamped in the upper end of described telescopic pipe, and the output of water inlet arm 8 passes into water tap, and the lower end of manometer tube is passed the pressure meter pore and is positioned at telescopic pipe 13, and the upper end of manometer tube links to each other with pressure meter 12.
The diameter of described telescopic pipe 13 is 219mm, and the diameter of described weep hole is 10mm (weep hole is the plum blossom shape and arranges).
Precipitation outlet pipe 1 is connected with collecting well 3, and precipitation outlet pipe 1 is provided with precipitation outlet pipe flow meter 2.

Claims (4)

1. underground water recharging, regulating and controlling device, it comprises that (4) are responsible in collecting well (3), water inlet, intake arm (8), recharge well (11), the input that (4) are responsible in water inlet is connected with collecting well (3), the output that (4) are responsible in water inlet is connected with the input of a plurality of water inlet arms (8) respectively, and the output of each water inlet arm (8) is connected with corresponding recharge well (11); It is characterized in that: be embedded with telescopic pipe (13) in the recharge well (11), telescopic pipe (13) is imbedded underground 500mm and is had weep hole with the lower part; The output of water inlet arm (8) is positioned at the bottom of telescopic pipe (13); Water inlet is responsible for (4) and is provided with force (forcing) pump (5), is responsible for valve (6), main flow meter (7); Each water inlet arm (8) is provided with arm valve (9), shunt volume meter (10).
2. underground water recharging, regulating and controlling device according to claim 1, it is characterized in that: the top cover of bringing water tap, pressure meter pore into is stamped in the upper end of described telescopic pipe, the output of water inlet arm (8) passes into water tap, the lower end of manometer tube is passed the pressure meter pore and is positioned at telescopic pipe (13), and the upper end of manometer tube links to each other with pressure meter (12).
3. underground water recharging, regulating and controlling device according to claim 1 is characterized in that: the diameter of described telescopic pipe (13) is 219mm, and the diameter of described weep hole is 10mm.
4. underground water recharging, regulating and controlling device according to claim 1 is characterized in that: described a plurality of water inlet arms are 2-10.
CN 201110119178 2010-04-30 2011-04-29 Underground water back-filling regulation and control device Expired - Fee Related CN102182173B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110119178 CN102182173B (en) 2010-04-30 2011-04-29 Underground water back-filling regulation and control device

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201010167244A CN101845810A (en) 2010-04-30 2010-04-30 Underground water recharging, regulating and controlling device
CN201010167244.0 2010-04-30
CN 201110119178 CN102182173B (en) 2010-04-30 2011-04-29 Underground water back-filling regulation and control device

Publications (2)

Publication Number Publication Date
CN102182173A true CN102182173A (en) 2011-09-14
CN102182173B CN102182173B (en) 2012-12-26

Family

ID=42770610

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201010167244A Pending CN101845810A (en) 2010-04-30 2010-04-30 Underground water recharging, regulating and controlling device
CN 201110119178 Expired - Fee Related CN102182173B (en) 2010-04-30 2011-04-29 Underground water back-filling regulation and control device

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201010167244A Pending CN101845810A (en) 2010-04-30 2010-04-30 Underground water recharging, regulating and controlling device

Country Status (1)

Country Link
CN (2) CN101845810A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216325A (en) * 2021-06-01 2021-08-06 中铁四局集团有限公司 Water replenishing and anti-settling method for peripheral stratum of underground station

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195134A (en) * 2013-04-25 2013-07-10 四川大学 Body-building type underground water perfusion device
CN103345278A (en) * 2013-06-25 2013-10-09 葛洲坝集团试验检测有限公司 Constant head mass-flow seepage deformation water pressure automatic control device
CN104865372B (en) * 2015-06-12 2016-10-19 济南轨道交通集团有限公司 The test method of model assay systems is recharged in the indoor on simulation artesian water stratum
CN107700505A (en) * 2017-09-12 2018-02-16 上海建工建集团有限公司 Deep foundation pit precipitation, purification, recharge integral system and control method
CN112197450A (en) * 2020-10-21 2021-01-08 吴和平 Partitioned multi-well recharging device utilizing shallow geothermal energy
CN112195945A (en) * 2020-10-22 2021-01-08 中国电建集团贵阳勘测设计研究院有限公司 Deep foundation pit construction method for keeping groundwater dynamically balanced
CN116147690B (en) * 2023-04-19 2023-07-14 北京城建集团有限责任公司 Dynamic recharging test system and method for resource recharging group well effect

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001323447A (en) * 2000-05-19 2001-11-22 Takenaka Komuten Co Ltd Method for washing rechargeable well to prevent its clogging
JP2005002659A (en) * 2003-06-11 2005-01-06 East Japan Railway Co Groundwater circulation system in excavation of ground, and construction method for measure against groundwater in excavation of ground
CN1945164A (en) * 2006-10-31 2007-04-11 张延军 Engineering abandoned water lowering well type water source heat pump pipe well
CN201367577Y (en) * 2008-12-30 2009-12-23 上海长凯岩土工程有限公司 Groundwater recharge well
CN101608445A (en) * 2009-07-10 2009-12-23 上海隧道工程股份有限公司 A kind of engineering underground raw water recharging method
CN201738296U (en) * 2010-04-30 2011-02-09 中国一冶集团有限公司 Groundwater recharging regulating device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001323447A (en) * 2000-05-19 2001-11-22 Takenaka Komuten Co Ltd Method for washing rechargeable well to prevent its clogging
JP2005002659A (en) * 2003-06-11 2005-01-06 East Japan Railway Co Groundwater circulation system in excavation of ground, and construction method for measure against groundwater in excavation of ground
CN1945164A (en) * 2006-10-31 2007-04-11 张延军 Engineering abandoned water lowering well type water source heat pump pipe well
CN201367577Y (en) * 2008-12-30 2009-12-23 上海长凯岩土工程有限公司 Groundwater recharge well
CN101608445A (en) * 2009-07-10 2009-12-23 上海隧道工程股份有限公司 A kind of engineering underground raw water recharging method
CN201738296U (en) * 2010-04-30 2011-02-09 中国一冶集团有限公司 Groundwater recharging regulating device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216325A (en) * 2021-06-01 2021-08-06 中铁四局集团有限公司 Water replenishing and anti-settling method for peripheral stratum of underground station

Also Published As

Publication number Publication date
CN102182173B (en) 2012-12-26
CN101845810A (en) 2010-09-29

Similar Documents

Publication Publication Date Title
CN102182173B (en) Underground water back-filling regulation and control device
CN201738296U (en) Groundwater recharging regulating device
CN204780819U (en) Reverse pre -buried french drain row system of oozing of tailing dam
CN107587516B (en) A kind of efficient sealing resistance sand precipitation composite system of Follow-up type and its construction method
CN110044710B (en) Test simulation device for subsidence of soil hole under precipitation funnel
CN104900130B (en) A kind of Foundation Pit Pouring demonstrator and its Foundation Pit Pouring experiment research
CN104847010B (en) A kind of miniature groundwater reservoir in city and construction method
CN104005363A (en) Three-dimensional underground pressure-bearing water flow-subway tunnel structure interaction simulating device
CN103091214A (en) Under-dam seepage flow experiment apparatus
CN105242028A (en) Model test device of soil mass stratification and sedimentation caused by high building load and underground water pumping and infusing and test method
CN206132761U (en) Monitoring groundwater seepage flow, subside fill integrative indoor test device
CN106706416A (en) Test device capable of simulating basement bottom plate stress under effect of pressure water and use method thereof
CN206470116U (en) A kind of experimental rig for simulating the lower basement bottom board stress of artesian water effect
CN103389260A (en) Laboratory simulation test method for researching underground water seepage obstruction caused by pile foundation
CN114486683B (en) Test device for simulating pumping water in foundation pit and recharging groundwater outside foundation pit
CN107386307A (en) Foundation ditch inner structure anti-floating system and its construction method
CN203249668U (en) Dam body saturation line monitoring model testing device
CN205875353U (en) Sponge well of rainwater conversion groundwater is led and is oozed structure
CN210090196U (en) Precipitation funnel soil cavity collapse test analogue means down
CN109723025A (en) A kind of underground structure boundary seepage flow test device and its application method
CN103352700B (en) Method for preventing shaft from cracking in alleviation water-bearing layer by utilizing automatic supply water loss method
KR101752813B1 (en) The Water Level Maintenance Apparatus Of Underground Water
CN206627512U (en) A kind of device for measuring soil layering specific yield
CN114839126A (en) Test device for simulating and testing back water pressure of karst tunnel
CN112031811B (en) Cliff water injection plugging system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121226

CF01 Termination of patent right due to non-payment of annual fee