CN102182167A - Stayed bidirectional portal opening and closing machine for dam gate - Google Patents

Stayed bidirectional portal opening and closing machine for dam gate Download PDF

Info

Publication number
CN102182167A
CN102182167A CN 201110095317 CN201110095317A CN102182167A CN 102182167 A CN102182167 A CN 102182167A CN 201110095317 CN201110095317 CN 201110095317 CN 201110095317 A CN201110095317 A CN 201110095317A CN 102182167 A CN102182167 A CN 102182167A
Authority
CN
China
Prior art keywords
track
door frame
gate
carriage
trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110095317
Other languages
Chinese (zh)
Other versions
CN102182167B (en
Inventor
陈霞
罗文强
唐松智
王春
孙鲁安
杜伟峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN2011100953174A priority Critical patent/CN102182167B/en
Publication of CN102182167A publication Critical patent/CN102182167A/en
Application granted granted Critical
Publication of CN102182167B publication Critical patent/CN102182167B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a stayed bidirectional portal machine for a dam gate. The stayed bidirectional portal machine comprises a cart operating mechanism, a portal, a main trolley arranged at the top of the portal and lifting mechanisms; the cart operating mechanism consists of a track trolley, a balance beam arranged on the track trolley, and a supporting seat arranged on the balance beam; the track trolley is connected with the balance beam through a rotary bearing; the lifting mechanisms are two sets of winches symmetrically arranged on the main trolley, and the longitudinal midline of a fixed pulley beam and the longitudinal midline of a fixed pulley in each set of winch are arranged eccentrically; and a pull rod passing shaft system is arranged on the portal. The trolley frame can rotate relative to the balance beam is ensured, the wheels can adapt to the circular track all the time, and deflection of the wheels is avoided. Two winding drums are connected through a coupling, so that vector closed-loop electric synchronization of the two sets of winches is realized, and the two sets of winches are not limited by the volume of the lifting mechanisms and the number of steel wire ropes. Through the pull rod passing shaft system, the labor intensity of operators is lightened, and the opening and closing operation time of the gate is shortened.

Description

What be used for the dam body gate tiltedly draws two-way gantry gate hoists
Technical field
The present invention relates to the dam body gate hoist, especially relate to be used for the dam body gate tiltedly draw two-way gantry gate hoists.
Background technology
Tiltedly draw two-way gantry gate hoists to be widely used on the building of Hydraulic and Hydro-Power Engineering porous mouth.Be used at present tiltedly drawing two-way gantry gate hoists on the dam crest arc-shaped rail, its structure is mainly by traveling mechanism of the larger traveller, be arranged on door frame on the traveling mechanism of the larger traveller, be arranged on the main carriage on the door frame and the lifting mechanism that is arranged on the main carriage is formed by supporting base.The deficiency of its existence mainly shows as:
1, because gantry gate hoists run on the arc track, the axle center of each wheel of traveling mechanism of the larger traveller set of wheels makes the wheelspan that is positioned on inside and outside two tracks not wait all by the track circular arc center of curvature.Adopt at present usually the different wheels of upstream and downstream sidecar wheel footpath, identical and do not produce slip with the angular speed of wheel on the outside track in guaranteeing, simultaneously for easily manufactured, it is contour that four door frame supporting legs are designed to, and adjusts by the height of the balancing stand on the traveling mechanism of the larger traveller.At present adopt sliding bearing to be connected between the bogie frame of traveling mechanism of the larger traveller and the equalizer bar, to adapt to the trace rotation of wheel on arc track; Sliding bearing structure is simple, and is easy for installation, but phenomenon such as sliding bearing exists that operation is dumb, wheel gnawing rail and noise are bigger.
2, because arranging, the part gate slot has gradient, when adopting gantry gate hoists to open and close gate, the direction of tiltedly drawing of main carriage lifting mechanism wire rope becomes certain included angle with the plummet direction, and must remain unchanged during work to guarantee that gate normally opens and closes along the inclination gate slot.The lifting mechanism of the oblique pull gate of conventional lifting arranges it is that reel, fixed pulley are arranged on the main carriage body panel, and equalizer pulley hangs under the main carriage frame, establishes one group of leading block simultaneously below the fixed pulley beam, satisfies the requirement of tiltedly drawing with vertical lifting gate.But when the lifting mechanism capacity is big, wire rope quantity is more, when tiltedly drawing direction and plummet angular separation big, the setting of leading block is comparatively difficult; Remove stressed complexity, safeguard outside the inconvenience that wire rope very easily produces the disorder cable phenomenon, influences security of operation.
3, how oblique pull gate on the dam body realizes by the pull bar that is arranged on the gate if opening and closing, every fan brake pull bar that door is joined has more than tens joints, between pull bar and the pull bar, be connected by bearing pin between pull bar and the gate, need be during lift gate by joint dismounting pull bar, need pull bar be installed by joint during closed shutter, and each bearing pin weight reaches the hundreds of kilogram, the many employings of operation that wear off of bearing pin are at present manually finished, for dam body with many fan brakes door, wear off axle and operate that labour intensity is big well imagines, and the operating time is long, can not satisfy dam flood control flood control time requirement.
Summary of the invention
The object of the invention be to provide a kind of cart is stable, main carriage hoists handling safety is reliable, the pull bar bearing pin wears off operating machine be used for the dam body gate tiltedly draw two-way gantry gate hoists,
For achieving the above object, the present invention can take following technical proposals:
Of the present invention be used for the dam body gate tiltedly draw the bidirectional gate machine, it comprises the traveling mechanism of the larger traveller that is arranged on the arc track and door frame disposed thereon, and is arranged on the described door frame top platform track by the main carriage of Driven by Hydraulic Cylinder and is arranged on lifting mechanism on the described main carriage; Described traveling mechanism of the larger traveller by the track chassis, be arranged on equalizer bar on the described track chassis, be arranged on the supporting base that is used to support door frame on the described equalizer bar and constitute; Described track chassis is connected with equalizer bar by floating bearing; The external toothing of described floating bearing is connected with equalizer bar by bolt, and ring gear is connected by the bogie frame of bolt with the track chassis; Described lifting mechanism is to be arranged symmetrically in the cover of two on main carriage hoist engine, and the spool shaft of described two cover hoist engines is connected by shaft coupling, is separately installed with incremental encoder, stall switch, temperature detecting resistance on the motor of every cover hoist engine; The fixed pulley beam longitudinal midline of every cover hoist engine and fixed pulley longitudinal midline arranged off-centre disposed thereon; Door frame is provided with pull bar and wears off axle system; Described pull bar wears off axle system and forms by being set in place the pillar cantilever crane on door frame upstream side lower transverse beam and wearing off shaft device; The described shaft device that wears off is made up of carriage and the flexible push rod that is horizontally set on the described carriage.
Described carriage is by forming with the diameter of axle arc transverse slat that adapts and the riser that is vertically set on described transverse slat rear and front end; Offer the circular arc gap downwards at middle part, described front end riser upper edge, offer a plurality of dowel holes around described circular arc gap; Described flexible push rod is the flexible push rod of electrodynamic type.
Advantage of the present invention mainly is presented as:
1, the track chassis is except that adopting methods such as the big trundle of existing wide tread, frequency control, creatively floating bearing applied to being connected of equalizer bar and bogie frame; Guaranteed that bogie frame can rotate with respect to equalizer bar, made wheel can adapt to arc orbit all the time, avoided the deflection of wheel.Made full use of that floating bearing can bear axially simultaneously, the advantage of radial load and overturning moment, the vertical stress component when vertical force when having solved traveling mechanism of the larger traveller and can bear vertical lifting, inclined pull hoisting and the difficult problem of horizontal component, be rolling bearing because of it again, frictional resistance is little and rotate flexibly, it is big to have overcome the sliding bearing frictional resistance, easily gnaws the big shortcoming of rail and noise.
2, lifting mechanism adopts two suspension centres to arrange, by equalizer bar two suspension centres is become single suspension centre and is connected with pull bar or gate.Connect by shaft coupling between two reels of two suspension centres, realized that the mechanical rigid of two cover lifting mechanisms is synchronous, the tail end of two motors is all installed incremental encoder, stall switch and temperature detecting resistance, and is electric synchronously to realize two cover hoist engine vector closed loops.Fixed pulley beam longitudinal midline and fixed pulley longitudinal midline arranged off-centre disposed thereon, be about to fixed pulley beam center relative fixed pulley off-centring certain distance, do not interfere to guarantee door machine wire rope and fixed pulley beam when vertical lifting and the inclined pull hoisting, both satisfied the functional requirement of gantry gate hoists, avoided being provided with the trouble of leading block again, be not subjected to the restriction of lifting mechanism capacity and wire rope quantity, stress condition is good, connect simple, easy for installation.
3, the pull bar that is provided with on the door frame wears off axle system, has alleviated labor intensity of operating personnel greatly, has improved pull bar and has worn off an operating efficiency, has shortened the gate opening/closing operating time.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is the plan structure schematic diagram of main carriage of the present invention.
Fig. 4 is the structural representation of traveling mechanism of the larger traveller of the present invention.
Fig. 5 is the structural representation of lifting mechanism of the present invention.
Fig. 6 is the left view of Fig. 5.
Fig. 7 is the structural representation that wears off shaft device of the present invention.
Fig. 8 is the left view of Fig. 7.
The specific embodiment
Shown in Fig. 1,2,3,4, of the present invention be used for the dam body gate tiltedly draw the bidirectional gate machine, it comprises the traveling mechanism of the larger traveller that is arranged on the arc track and door frame 1 disposed thereon, and is arranged on the main carriage 4 that is driven by hydraulic cylinder 3 on the described door frame 1 top platform track 2 and is arranged on lifting mechanism on the described main carriage 4; Described traveling mechanism of the larger traveller by track chassis 5, be arranged on equalizer bar 6 on the described track chassis 5, be arranged on the supporting base 7 that is used to support door frame 1 on the described equalizer bar 6 and constitute; Described track chassis 5 is connected with equalizer bar 6 by floating bearing 8; The external toothing of described floating bearing 8 is connected with equalizer bar 6 by bolt, and ring gear is connected by the bogie frame of bolt with track chassis 5; Described lifting mechanism is to be arranged symmetrically in the cover of two on the main carriage 4 hoist engine, and the spool shaft of described two cover hoist engines is connected by shaft coupling 9, is separately installed with incremental encoder, stall switch, temperature detecting resistance on the motor of every cover hoist engine; Shown in Fig. 5,6, longitudinal midline 13 arranged off-centre of fixed pulley beam 10 longitudinal midlines 11 of every cover hoist engine and fixed pulley 12 disposed thereon; As shown in Figure 1, door frame 1 is provided with pull bar and wears off axle system; Described pull bar wears off axle system and forms by being set in place the pillar cantilever crane 14 on door frame 1 upstream side lower transverse beam and wearing off shaft device; Shown in Fig. 7,8, the described shaft device that wears off is made up of carriage and the flexible push rod 15 that is horizontally set on the described carriage; Described carriage is by forming with the diameter of axle arc transverse slat 16 that adapts and the riser 17,18 that is vertically set on described transverse slat rear and front end; Offer the circular arc gap downwards at middle part, described front end riser 17 upper edges, offer a plurality of dowel holes 19 around described circular arc gap; Described flexible push rod 15 is the flexible push rod of electrodynamic type.

Claims (2)

  1. One kind be used for the dam body gate tiltedly draw the bidirectional gate machine, it comprises the traveling mechanism of the larger traveller that is arranged on the arc track and door frame (1) disposed thereon, and is arranged on described door frame (1) top platform track (2) and goes up the main carriage (4) that is driven by hydraulic cylinder (3) and be arranged on lifting mechanism on the described main carriage (4); Described traveling mechanism of the larger traveller by track chassis (5), be arranged on equalizer bar (6) on the described track chassis (5), be arranged on the supporting base (7) that is used to support door frame (1) on the described equalizer bar (6) and constitute; It is characterized in that: described track chassis (5) is connected with equalizer bar (6) by floating bearing (8); The external toothing of described floating bearing (8) is connected with equalizer bar (6) by bolt, and ring gear is connected by the bogie frame of bolt with track chassis (5); Described lifting mechanism is for being arranged symmetrically in the cover of two on the main carriage (4) hoist engine, and the spool shaft of described two cover hoist engines is connected by shaft coupling (9), is separately installed with incremental encoder, stall switch, temperature detecting resistance on the motor of every cover hoist engine; Longitudinal midline (13) arranged off-centre of fixed pulley beam (10) longitudinal midline (11) of every cover hoist engine and fixed pulley (12) disposed thereon; Door frame (1) is provided with pull bar and wears off axle system; Described pull bar wears off axle system and forms by being set in place the pillar cantilever crane (14) on door frame (1) upstream side lower transverse beam and wearing off shaft device; The described shaft device that wears off is made up of carriage and the flexible push rod (15) that is horizontally set on the described carriage.
  2. According to claim 1 described be used for the dam body gate tiltedly draw the bidirectional gate machine, it is characterized in that: described carriage is made up of arc transverse slat (16) that adapts with the diameter of axle and the riser (17,18) that is vertically set on described transverse slat rear and front end; Offer the circular arc gap downwards at middle part, described front end riser (17) upper edge, offer a plurality of dowel holes (19) around described circular arc gap; Described flexible push rod (15) is the flexible push rod of electrodynamic type.
CN2011100953174A 2011-04-16 2011-04-16 Stayed bidirectional portal opening and closing machine for dam gate Active CN102182167B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100953174A CN102182167B (en) 2011-04-16 2011-04-16 Stayed bidirectional portal opening and closing machine for dam gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100953174A CN102182167B (en) 2011-04-16 2011-04-16 Stayed bidirectional portal opening and closing machine for dam gate

Publications (2)

Publication Number Publication Date
CN102182167A true CN102182167A (en) 2011-09-14
CN102182167B CN102182167B (en) 2012-04-18

Family

ID=44568445

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100953174A Active CN102182167B (en) 2011-04-16 2011-04-16 Stayed bidirectional portal opening and closing machine for dam gate

Country Status (1)

Country Link
CN (1) CN102182167B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102556869A (en) * 2011-12-30 2012-07-11 大连华锐重工集团股份有限公司 Mechanism for lifting two rotary drums
CN103573999A (en) * 2013-09-16 2014-02-12 上海船厂船舶有限公司 Lubricating systems for walking wheel opening gears of crane and crane comprising lubricating systems
CN106013002A (en) * 2016-07-04 2016-10-12 黄河勘测规划设计有限公司 One-way gantry gate hoist with function of two-way gantry gate hoist
CN108532556A (en) * 2018-06-04 2018-09-14 安徽省六安恒源机械有限公司 Headstock gear
CN111123768A (en) * 2019-12-12 2020-05-08 国网浙江省电力有限公司紧水滩水力发电厂 Dam crest portal crane auxiliary alignment system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1186728A1 (en) * 1984-04-05 1985-10-23 Ленинградское Специальное Конструкторское Бюро "Ленгидросталь" Arrangement for lifting hydraulic gate
CN101672027A (en) * 2009-09-28 2010-03-17 杜培文 Portal crane
CN202023178U (en) * 2011-04-16 2011-11-02 黄河勘测规划设计有限公司 Slantingly pulling two-way gantry hoist for dam body gate

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1186728A1 (en) * 1984-04-05 1985-10-23 Ленинградское Специальное Конструкторское Бюро "Ленгидросталь" Arrangement for lifting hydraulic gate
CN101672027A (en) * 2009-09-28 2010-03-17 杜培文 Portal crane
CN202023178U (en) * 2011-04-16 2011-11-02 黄河勘测规划设计有限公司 Slantingly pulling two-way gantry hoist for dam body gate

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《水利电力机械》 20071231 张庆军; 汤双清 山秀水电站2×800kN双向门机的设计 第19-22页 全文 , 第07期 2 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102556869A (en) * 2011-12-30 2012-07-11 大连华锐重工集团股份有限公司 Mechanism for lifting two rotary drums
CN103573999A (en) * 2013-09-16 2014-02-12 上海船厂船舶有限公司 Lubricating systems for walking wheel opening gears of crane and crane comprising lubricating systems
CN103573999B (en) * 2013-09-16 2016-10-05 上海船厂船舶有限公司 Crane travelling wheel exposed gear lubricating system and include its crane
CN106013002A (en) * 2016-07-04 2016-10-12 黄河勘测规划设计有限公司 One-way gantry gate hoist with function of two-way gantry gate hoist
CN106013002B (en) * 2016-07-04 2017-12-08 黄河勘测规划设计有限公司 Possesses the one-way door type headstock gear of two-way gantry gate hoists function
CN108532556A (en) * 2018-06-04 2018-09-14 安徽省六安恒源机械有限公司 Headstock gear
CN111123768A (en) * 2019-12-12 2020-05-08 国网浙江省电力有限公司紧水滩水力发电厂 Dam crest portal crane auxiliary alignment system and method
CN111123768B (en) * 2019-12-12 2021-02-12 国网浙江省电力有限公司紧水滩水力发电厂 Dam crest portal crane auxiliary alignment system and method

Also Published As

Publication number Publication date
CN102182167B (en) 2012-04-18

Similar Documents

Publication Publication Date Title
CN107420119B (en) Quick uninstallation device of shield constructs quick-witted section of jurisdiction
CN102471042B (en) Traveling crane
CN102182167B (en) Stayed bidirectional portal opening and closing machine for dam gate
CN105936477B (en) A kind of lightweight Multifunctional container gantry crane and its anti-shake method
CN106892360B (en) Winding type segment crane suitable for large shield machine
CN109835819A (en) Tunnel Mobile crane
CN209702099U (en) Tunnel Mobile crane
KR101239990B1 (en) Mini crane
CN105883635A (en) Travel trolley of container gantry crane and method for quickly changing wheels
CN105947898B (en) A kind of lifting mechanism and its method for arranging of container crane dispersed placement
CN106081924A (en) A kind of lightweight Multifunctional container gantry crane and assemble method thereof
CN113202020A (en) Arch rib maintenance vehicle suitable for box type arch rib inspection
CN209322235U (en) A kind of anti-skidding clamping device of mine hoist
CN107344697A (en) Cable boom hoisting
CN202023178U (en) Slantingly pulling two-way gantry hoist for dam body gate
CN213085256U (en) Single-beam portal crane with suspended trolley
CN205636494U (en) HZQY900 type fortune frame all -in -one
CN214359875U (en) Promote electronic monospar gantry crane who prevents rocking
CN211687988U (en) Segment assembling bridge girder erection machine hoisting trolley
CN210363811U (en) Straddle type track beam transporter
CN210195779U (en) Hoisting device for shield machine
CN211619795U (en) Complex environment heavy equipment transportation device
CN210286537U (en) Four-point crane for hoisting bin cover of transport ship
CN104326414B (en) A kind of from sliding weight carrier
CN106365058A (en) Portal crane for assembling motor with weight being above 100T

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: Yellow River Engineering Consulting Co., Ltd.

CP01 Change in the name or title of a patent holder