CN102172138A - Novel ecological side slope greening protective technology - Google Patents

Novel ecological side slope greening protective technology Download PDF

Info

Publication number
CN102172138A
CN102172138A CN2011100301537A CN201110030153A CN102172138A CN 102172138 A CN102172138 A CN 102172138A CN 2011100301537 A CN2011100301537 A CN 2011100301537A CN 201110030153 A CN201110030153 A CN 201110030153A CN 102172138 A CN102172138 A CN 102172138A
Authority
CN
China
Prior art keywords
bamboo
soil
side slope
grass
slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100301537A
Other languages
Chinese (zh)
Other versions
CN102172138B (en
Inventor
李志清
周应新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Highway Development & Investment Co.,Ltd
Yunnan Mengxin Highway Construction Headquarters
Institute of Geology and Geophysics of CAS
Original Assignee
Institute of Geology and Geophysics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Geology and Geophysics of CAS filed Critical Institute of Geology and Geophysics of CAS
Priority to CN2011100301537A priority Critical patent/CN102172138B/en
Publication of CN102172138A publication Critical patent/CN102172138A/en
Application granted granted Critical
Publication of CN102172138B publication Critical patent/CN102172138B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/22Improving land use; Improving water use or availability; Controlling erosion
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P60/00Technologies relating to agriculture, livestock or agroalimentary industries
    • Y02P60/40Afforestation or reforestation

Landscapes

  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention relates to a novel ecological side slope greening protective technology for solving the issue of ecological greening of a soil side slope and a rock side slope. The technology is characterized in that bamboo stakes and bamboo chips are used to protect the surface layer of the side slope; in addition, a modified soil is used to carry out culture greening; the modified soil consists of local soil and modifying agent; the modifying agent comprises sodium aluminate, polyacrylamide, polyacrylic resin and sodium silicate which are matched with soil according to the mass ratio of 1:2:1;3:93; the bamboo stakes are made of grown bamboos the ends of which enter the earth are cut sharp; the bamboo chips are made of bamboos with a diameter of 6-8 cm; the bamboos are cut open from the middle and made into bamboo chips with a length of 200-250cm; grass seeds are selected from ryegrass, festuca arundinacea and bushes are selected from indigofers amblyatha craib, fortune firethorn fruit and robinia pseudoacacia.

Description

A kind of novel ecological greening side slope guard technology
Technical field
The present invention is a kind of greening side slope means of defence, belongs to civil engineering design and construction field.
Background technology
Along with the large scale investment of national basis facility, China's highway projects, state highway project go into operation in a large number, and route selection passes through greenbelt, forms a large amount of bare side slopings, and vegetation is destroyed, even degenerate.Highway engineering side slope protection design scheme often adopts cement concrete constructions more, though reached the purpose of engineering protection, aspect ecological protection, show not good enough, rocky slope especially, ecological protection is a great problem especially.Purpose of the present invention just is based on the environmental protection greening to be considered, adopts pollution-free, environmental guard technology, and rocky slope, soil-slope are afforested protection, in short as far as possible time inner sealing side slope, promotes vegetation to produce the ecology recovering environment.
Summary of the invention
The object of the invention provides a kind of novel ecological greening side slope guard technology, is used to solve soil-slope or rocky slope ecological afforestation protection question.
Technical solution of the present invention, a kind of novel ecological greening side slope guard technology, it is characterized in that utilizing bamboo stake and bamboo chip to carry out the protection of side slope top layer, utilize a kind of conditioned soil to cultivate greening, conditioned soil is made up of local loam and modifying agent, modifying agent comprises sodium aluminate, polyacrylamide, polyacrylic resin, sodium silicate, be pressed powder, sodium aluminate, polyacrylamide, polyacrylic resin, sodium silicate and loam were according to mass ratio 1: 2: 1: be configured at 3: 93, the polyacrylamide ion degree requires greater than 25%, molecular weight requires to be lower than 2,500,000, and polyacrylic resin viscosity is less than 10 -2The sodium silicate modulus requires between 2.0~2.5, the bamboo stake is adult bamboo, and it is 4~6cm that diameter requires, and the side of burying is whittled into pointed, it is the bamboo of 6~8cm that bamboo chip adopts diameter, cut open from the centre, every section bamboo chip length is 200~250cm, and grass-seed is adopted perennial ryegrass, Festuca Arundinacea and Bermuda grass, shrub is adopted and spends more lily magnolia, torch fruit and locust tree, and concrete guard technology comprises the steps:
(1) excavation slope, brush slope, unwrapping wire put domaticly, and top, slope and toe place are provided with the drain ditch, and the classification side slope is provided with stage for heaping debris and drain ditch;
(2) for the weathering rocky slope, dig out the cave point on the side slope surface, the some degree of depth in cave is 4~6cm, spacing is 10~20cm;
(3) with in the vertical domatic wedging soil of bamboo stake, embedded depth is not less than 30cm, and the domatic bamboo pile length that exposes is 10~15cm, bamboo stake horizontal direction is spaced apart 100~120cm, vertical direction is spaced apart 80~100cm, and level and vertical direction are arranged on the line, forms rectangular grid shape structure;
(4) the bamboo chip along continuous straight runs is placed in the bamboo stake, the arcwall face of bamboo chip is near the bamboo stake, and the edge of bamboo chip is near domatic, and with bamboo stake and bamboo chip colligation, bamboo chip lap-joint adopts the nature contact with straw rope;
(5) with sodium aluminate, polyacrylamide, polyacrylic resin, four kinds of powder of sodium silicate, by mass ratio 1: 2: 1: 3 mixed stirring, be configured to modifying agent, modifying agent and local loam are stirred by mass ratio at 7: 93, be configured to conditioned soil, its medium loam water content requires to be not more than 10%, and keeps the agglomerate diameter size to be not more than 3cm;
(6) three kinds of grass-seed perennial ryegrasses, Festuca Arundinacea, Bermuda grass are mixed with conditioned soil, mixing 50~60 gram grass-seeds according to every cubic metre of volume soil is configured, simultaneously, again three kinds of shrubs are spent more lily magnolia, torch fruit, locust tree mixes with conditioned soil, mix 40~50 according to every cubic metre of volume soil and restrain shrubs and be configured;
(7) will configure the conditioned soil of grass-seed and shrub, on three side slopes of evenly sowing grass seeds by duster of branch, sow grass seeds by duster at every turn according to from left to right, from top to bottom, the order of each grid carries out, the thickness that conditioned soil is cultivated in control is 5~6cm, and hide conditioned soil with nonwoven, treat regularly to prune after grass grows, to promote the growth of shrub.
Advantage of the present invention:
Construction is simple, gathers materials on the spot, and environmental protection, energy savings satisfies the requirement of ecological side slope protection.
The scope of application of the present invention:
Be applicable to the various soil properties or the decomposed rock slope greening ecological protection that run in the civil engineering.
Description of drawings:
Fig. 1 is the side slope protection generalized section.Po Ding drain ditch 1, bamboo chip 2, bamboo stake 3, sough 4 are wherein arranged.
Fig. 2 is the side slope protection floor map.Bamboo chip 2, bamboo stake 3 are wherein arranged.
Embodiment:
Embodiment: certain decomposed rock matter slope ecological method for greening side slope is as follows,
1. certain is high 6 meters, ratio of slope is that 1: 1, length are 30 meters weathering rocky slope, carries out the top layer ecological afforestation;
2. prepare 150m 3Local loam is prepared 1.6m 3Sodium aluminate, 3.2m 3Polyacrylamide, 1.6m 3Polyacrylic resin, 4.8m 3Four kinds of powder of sodium silicate stir, then with 150m 3Local loam stirs, and is configured to improve the soil that looses, with weight be respectively 7.5kg perennial ryegrass, Festuca Arundinacea, Bermuda grass, spend more lily magnolia, torch fruit, locust tree and mix standby with the diffusing soil of the improvement for preparing;
3. excavation slope, the brush slope, unwrapping wire put domaticly, and top, slope and toe place are provided with the drain ditch, dig out the cave point on the side slope surface, and the some degree of depth in cave is 5cm, and spacing is 15cm;
4. be that embedded depth is 40cm in the vertical domatic wedging soil of bamboo stake of 5cm with diameter, the domatic bamboo pile length that exposes is 15cm, bamboo stake horizontal direction is spaced apart 120cm, vertical direction is spaced apart 100cm, and level and vertical direction are arranged on the line, forms rectangular grid shape structure;
5. be the bamboo of 7cm with diameter, cut open from the centre, the bamboo chip along continuous straight runs is placed in the bamboo stake that the arcwall face of bamboo chip is near the bamboo stake, the edge of bamboo chip is near domatic, and with bamboo stake and bamboo chip colligation, bamboo chip lap-joint adopts the nature contact with straw rope;
6. will configure the conditioned soil of grass-seed and shrub, on three side slopes of evenly sowing grass seeds by duster of branch, sow grass seeds by duster at every turn according to from left to right, from top to bottom, the order of each grid carries out, the thickness that conditioned soil is cultivated in control is 6cm, and hide conditioned soil with nonwoven, treat regularly to prune after grass grows, to promote the growth of shrub.

Claims (1)

1. novel ecological greening side slope guard technology, it is characterized in that utilizing bamboo stake and bamboo chip to carry out the protection of side slope top layer, utilize conditioned soil to cultivate greening, this conditioned soil is made up of local loam and modifying agent, this modifying agent comprises sodium aluminate, polyacrylamide, polyacrylic resin, sodium silicate, be pressed powder, sodium aluminate, polyacrylamide, polyacrylic resin, sodium silicate and loam were according to mass ratio 1: 2: 1: be configured at 3: 93, the polyacrylamide ion degree requires greater than 25%, molecular weight requires to be lower than 2,500,000, and polyacrylic resin viscosity is less than 10 -2The sodium silicate modulus requires between 2.0~2.5, it is the bamboo of 4~6cm that diameter is adopted in the bamboo stake, the bamboo stake side of burying is whittled into pointedly, and it is the bamboo of 6~8cm that bamboo chip adopts diameter, and bamboo is cut open from the centre, every section bamboo chip length is 200~250cm, grass-seed is adopted perennial ryegrass, Festuca Arundinacea and Bermuda grass, and shrub is adopted and spends more lily magnolia, torch fruit and locust tree, and concrete guard technology comprises the steps:
(1) excavation slope, brush slope, unwrapping wire put domaticly, and top, slope and toe place are provided with the drain ditch, and the classification side slope is provided with stage for heaping debris and drain ditch;
(2) for the weathering rocky slope, dig out the cave point on the side slope surface, the some degree of depth in cave is 4~6cm, spacing is 10~20cm;
(3) with in the vertical domatic wedging soil of bamboo stake, embedded depth is not less than 30cm, and the domatic bamboo pile length that exposes is 10~15cm, bamboo stake horizontal direction is spaced apart 100~120cm, vertical direction is spaced apart 80~100cm, and level and vertical direction are arranged on the straight line, forms rectangular grid shape structure;
(4) the bamboo chip along continuous straight runs is placed in the bamboo stake, the arcwall face of bamboo chip is near the bamboo stake, and the edge of bamboo chip is near domatic, and with bamboo stake and bamboo chip colligation, bamboo chip lap-joint adopts the nature contact with straw rope;
(5) with sodium aluminate, polyacrylamide, polyacrylic resin, four kinds of powder of sodium silicate, by mass ratio 1: 2: 1: 3 mixed stirring, be configured to modifying agent, modifying agent and local loam are stirred by mass ratio at 7: 93, be configured to conditioned soil, its medium loam water content requires to be not more than 10%, and keeps the agglomerate diameter size to be not more than 3cm;
(6) three kinds of grass-seed perennial ryegrasses, Festuca Arundinacea, Bermuda grass are mixed with conditioned soil, mixing 50~60 gram grass-seeds according to every cubic metre of volume soil is configured, simultaneously, again three kinds of shrubs are spent more lily magnolia, torch fruit, locust tree mixes with conditioned soil, mix 40~50 according to every cubic metre of volume soil and restrain shrubs and be configured;
(7) will configure the conditioned soil of grass-seed and shrub, on three side slopes of evenly sowing grass seeds by duster of branch, sow grass seeds by duster at every turn according to from left to right, from top to bottom, the order of each grid carries out, the thickness that conditioned soil is cultivated in control is 5~6cm, and hide conditioned soil with nonwoven, treat regularly to prune after grass grows, to promote the growth of shrub.
CN2011100301537A 2011-01-28 2011-01-28 Novel ecological side slope greening protective technology Expired - Fee Related CN102172138B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100301537A CN102172138B (en) 2011-01-28 2011-01-28 Novel ecological side slope greening protective technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100301537A CN102172138B (en) 2011-01-28 2011-01-28 Novel ecological side slope greening protective technology

Publications (2)

Publication Number Publication Date
CN102172138A true CN102172138A (en) 2011-09-07
CN102172138B CN102172138B (en) 2012-11-07

Family

ID=44515535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100301537A Expired - Fee Related CN102172138B (en) 2011-01-28 2011-01-28 Novel ecological side slope greening protective technology

Country Status (1)

Country Link
CN (1) CN102172138B (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704499A (en) * 2012-06-06 2012-10-03 中国科学院地质与地球物理研究所 Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams
CN102817338A (en) * 2012-09-14 2012-12-12 河海大学 Drainage ditch compound section wrapping type grass mat slope protection method for coastal reclamation areas
CN103806456A (en) * 2014-03-03 2014-05-21 中国科学院地质与地球物理研究所 Rock-soil body side slope corrosion resistance and ecological restoration protection method
CN104863149A (en) * 2015-05-21 2015-08-26 东华理工大学 Humid environment earthen site slump damage flexible drainage bamboo fiber rod reinforcement method
CN105145257A (en) * 2015-09-15 2015-12-16 管天球 High-efficiency paraphlomis javanica var.coronata forest building method
CN107396722A (en) * 2016-12-07 2017-11-28 青海富腾生态科技有限公司 A kind of greening method in high and cold mining area
CN108951667A (en) * 2018-07-09 2018-12-07 重庆大学产业技术研究院 A kind of green ecological side slope integrated reinforcing method
CN109837916A (en) * 2019-03-13 2019-06-04 湖北工业大学 The wooden sash side slope ecological renovation method of assemble type
CN110219310A (en) * 2019-06-03 2019-09-10 四川大学 Drainage pipe combines the frame grid type vegetation soil cement bank protecting method and facility of the multi-functional reinforced bands that draw water
CN111926772A (en) * 2020-08-13 2020-11-13 深圳市豪科园林有限公司 Biological filtration slope protection for river ecological restoration and construction method thereof
WO2021175263A1 (en) * 2020-03-03 2021-09-10 中国铁道科学研究院集团有限公司铁道建筑研究所 Fully-ecological slope spray-seeding structure and construction method
CN115211325A (en) * 2022-07-15 2022-10-21 广东中煤江南工程勘测设计有限公司 Abrupt slope mountain afforestation structure for bank protection
CN115253880A (en) * 2022-08-26 2022-11-01 珠海市清创智慧海绵技术研究院有限公司 Manufacturing process and preparation device of granular bioretention facility growth medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003082672A (en) * 2001-09-12 2003-03-19 Ibiden Greentec Co Ltd Structure of slope face
CN101401513A (en) * 2008-05-14 2009-04-08 云南恒达市政园林工程有限公司 Ecological recovery technique for bamboo splits grid
CN101502223A (en) * 2009-03-31 2009-08-12 云南路桥股份有限公司 Slope soil-establishing greening apparatus and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003082672A (en) * 2001-09-12 2003-03-19 Ibiden Greentec Co Ltd Structure of slope face
CN101401513A (en) * 2008-05-14 2009-04-08 云南恒达市政园林工程有限公司 Ecological recovery technique for bamboo splits grid
CN101502223A (en) * 2009-03-31 2009-08-12 云南路桥股份有限公司 Slope soil-establishing greening apparatus and method

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704499A (en) * 2012-06-06 2012-10-03 中国科学院地质与地球物理研究所 Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams
CN102704499B (en) * 2012-06-06 2014-06-18 中国科学院地质与地球物理研究所 Green slope reinforcing protection method using staggered platform bamboo-wood ladder lattice beams
CN102817338A (en) * 2012-09-14 2012-12-12 河海大学 Drainage ditch compound section wrapping type grass mat slope protection method for coastal reclamation areas
CN103806456A (en) * 2014-03-03 2014-05-21 中国科学院地质与地球物理研究所 Rock-soil body side slope corrosion resistance and ecological restoration protection method
CN103806456B (en) * 2014-03-03 2015-07-01 中国科学院地质与地球物理研究所 Rock-soil body side slope corrosion resistance and ecological restoration protection method
CN104863149A (en) * 2015-05-21 2015-08-26 东华理工大学 Humid environment earthen site slump damage flexible drainage bamboo fiber rod reinforcement method
CN104863149B (en) * 2015-05-21 2017-02-08 东华理工大学 Humid environment earthen site slump damage flexible drainage bamboo fiber rod reinforcement method
CN105145257A (en) * 2015-09-15 2015-12-16 管天球 High-efficiency paraphlomis javanica var.coronata forest building method
CN107396722A (en) * 2016-12-07 2017-11-28 青海富腾生态科技有限公司 A kind of greening method in high and cold mining area
CN108951667A (en) * 2018-07-09 2018-12-07 重庆大学产业技术研究院 A kind of green ecological side slope integrated reinforcing method
CN109837916A (en) * 2019-03-13 2019-06-04 湖北工业大学 The wooden sash side slope ecological renovation method of assemble type
CN109837916B (en) * 2019-03-13 2021-01-12 湖北工业大学 Ecological restoration method for side slope of split wooden sash
CN110219310A (en) * 2019-06-03 2019-09-10 四川大学 Drainage pipe combines the frame grid type vegetation soil cement bank protecting method and facility of the multi-functional reinforced bands that draw water
WO2021175263A1 (en) * 2020-03-03 2021-09-10 中国铁道科学研究院集团有限公司铁道建筑研究所 Fully-ecological slope spray-seeding structure and construction method
CN111926772A (en) * 2020-08-13 2020-11-13 深圳市豪科园林有限公司 Biological filtration slope protection for river ecological restoration and construction method thereof
CN115211325A (en) * 2022-07-15 2022-10-21 广东中煤江南工程勘测设计有限公司 Abrupt slope mountain afforestation structure for bank protection
CN115253880A (en) * 2022-08-26 2022-11-01 珠海市清创智慧海绵技术研究院有限公司 Manufacturing process and preparation device of granular bioretention facility growth medium

Also Published As

Publication number Publication date
CN102172138B (en) 2012-11-07

Similar Documents

Publication Publication Date Title
CN102172138B (en) Novel ecological side slope greening protective technology
CN204305674U (en) Anchor pole grid is utilized to carry out shale side slope plantation greening structure
CN202652889U (en) Spontaneous combustion coal gangue mountain comprehensive treatment system
CN102733401B (en) Method for treating dump slope of surface mine
CN103806454A (en) Method for pollution control and vegetation recovery of metal sulfide ore solid waste storage yard
CN110249813B (en) Method for greening high and steep rocky slope in mining pit
CN102444134A (en) Slope protecting method based on slope with soil layer as upper part and rock layer as lower part
CN106900322A (en) The engineering wound-surface Ecological recovery technology of moss crust
CN103924605A (en) Sash girder ecological slope protection structure and construction method thereof
CN101509257A (en) Method for growing balsamroot grass to fix soil to protect slope
CN102691306B (en) Environment-friendly and energy-saving slope protection bamboo-wood lattice beam for mountain highway
CN102160482B (en) Salt-resistant type terrace planting method for seaside salt wasteland
CN103340114A (en) Multilayer plant-cultivating bag made of linen
CN101502223A (en) Slope soil-establishing greening apparatus and method
CN101401513A (en) Ecological recovery technique for bamboo splits grid
CN210275361U (en) Mountain hilly area wind-powered electricity generation field sandy soil afforestation resumes construction structures
CN104094693A (en) Greening method for controlling and discharging salt stepwise in coastal saline area
CN206599772U (en) A kind of cover type biological checkboard
CN102498772A (en) Method for in-situ improvement of dredger fill into soil for planting
CN203840816U (en) Rock slope vegetation restoration structure
CN201794080U (en) Greening slope protection network
CN205205839U (en) Rock matter side slope is planted and is given birth to ecological protective structure of bag
CN104294829A (en) Rock slope combined type protective structure and method
CN105544567B (en) A kind of civil engineering structure of the full slope greening engineering method of steep rocky slope
CN203569573U (en) Ecological water intercepting ditch

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: INST OF GEOLOGY AND GEOPHYSICS, CHINESE ACADEMY OF

Effective date: 20120705

Owner name: YUNNAN HIGHWAY DEVELOPMENT + INVESTMENT CO., LTD.

Free format text: FORMER OWNER: INST OF GEOLOGY AND GEOPHYSICS, CHINESE ACADEMY OF SCIENCES

Effective date: 20120705

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Zhiqing

Inventor after: Yue Ruiqiang

Inventor after: Zhou Yingxin

Inventor after: Wei Ya

Inventor after: Wei Kejie

Inventor after: Wang Jue

Inventor after: Hu Ruilin

Inventor after: Zhang Ruwen

Inventor after: Wang Gao

Inventor after: Yang Qiang

Inventor before: Li Zhiqing

Inventor before: Zhou Yingxin

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100029 NO.19, BEITUCHENG ROAD(WEST), CHAOYANG DISTRICT, BEIJING CITY TO: 650220 QIANXING ROAD, XISHAN DISTRICT, KUNMING CITY, YUNNAN PROVINCE

Free format text: CORRECT: INVENTOR; FROM: LI ZHIQING ZHOU YINGXIN TO: LI ZHIQING ZHOU YINGXIN WEI YA WEI KEJIE WANG JUE HU RUILIN ZHANG RUWEN WANG GAO YANG QIANG YUE RUIQIANG

TA01 Transfer of patent application right

Effective date of registration: 20120705

Address after: 650220, Yunnan, Kunming Province Xishan District, Tai Hing Road, opposite the big business

Applicant after: Yunnan Highway Development & Investment Co.,Ltd

Co-applicant after: Institute of Geology and Geophysics, Chinese Academy of Sciences

Co-applicant after: Yunnan Mengxin Highway Construction Headquarters

Address before: 100029 Beijing city Chaoyang District Beitucheng West Road No. 19

Applicant before: Institute of Geology and Geophysics, Chinese Academy of Sciences

C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20110907

Assignee: Beijing Zhongdiwushi Geological Engineering & Technology Co., Ltd.

Assignor: Yunnan Mengxin Highway Construction Headquarters

Contract record no.: 2015990000095

Denomination of invention: Novel ecological side slope greening protective technology

Granted publication date: 20121107

License type: Common License

Record date: 20150311

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121107

Termination date: 20160128

EXPY Termination of patent right or utility model