CN102170129B - 一种基于大规模风电并网的电力系统低碳调度方法及其装置 - Google Patents
一种基于大规模风电并网的电力系统低碳调度方法及其装置 Download PDFInfo
- Publication number
- CN102170129B CN102170129B CN201110101927.0A CN201110101927A CN102170129B CN 102170129 B CN102170129 B CN 102170129B CN 201110101927 A CN201110101927 A CN 201110101927A CN 102170129 B CN102170129 B CN 102170129B
- Authority
- CN
- China
- Prior art keywords
- generator
- power
- value
- dispatching
- constraints
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/76—Power conversion electric or electronic aspects
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110101927.0A CN102170129B (zh) | 2011-04-22 | 2011-04-22 | 一种基于大规模风电并网的电力系统低碳调度方法及其装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110101927.0A CN102170129B (zh) | 2011-04-22 | 2011-04-22 | 一种基于大规模风电并网的电力系统低碳调度方法及其装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102170129A CN102170129A (zh) | 2011-08-31 |
CN102170129B true CN102170129B (zh) | 2014-02-26 |
Family
ID=44491155
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110101927.0A Active CN102170129B (zh) | 2011-04-22 | 2011-04-22 | 一种基于大规模风电并网的电力系统低碳调度方法及其装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102170129B (zh) |
Families Citing this family (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102361330B (zh) * | 2011-10-19 | 2014-03-05 | 北京四方继保自动化股份有限公司 | 风电场风电机组有功功率优化分配方法 |
CN103138255B (zh) * | 2011-11-25 | 2015-03-25 | 沈阳工业大学 | 一种包含统一潮流控制器的电力系统最优潮流的分解计算方法 |
CN102545258B (zh) * | 2012-01-12 | 2013-11-06 | 西安交通大学 | 一种大规模风电并网的电网优化规划方法 |
CN102622482B (zh) * | 2012-03-06 | 2013-10-09 | 中国科学院工程热物理研究所 | 一种基于二进制粒子群算法的风机优化布置方法 |
CN102779322B (zh) * | 2012-06-29 | 2015-07-29 | 西安理工大学 | 基于环境保护和经济效益的火电厂综合调度方法 |
CN102738835B (zh) * | 2012-07-17 | 2014-08-20 | 山西大学 | 基于多智能体的“风-火-水”协同调度方法 |
CN102820656B (zh) * | 2012-08-25 | 2014-11-26 | 华北电力大学(保定) | 风电机组同火电机组联合调度发电负荷的方法 |
CN102867239A (zh) * | 2012-09-12 | 2013-01-09 | 华电国际电力股份有限公司山东分公司 | 用于区域发电公司运营智能管控系统的低碳调度模块 |
CN103259291B (zh) * | 2013-05-13 | 2014-11-26 | 南京南瑞集团公司 | 一种大规模风电场光伏电站集中送出的光伏有功控制方法 |
CN103500283A (zh) * | 2013-10-11 | 2014-01-08 | 国家电网公司 | 基于故障树的电力变压器风险评估方法 |
CN104143838A (zh) * | 2013-11-01 | 2014-11-12 | 国家电网公司 | 一种含智能小区的电网动态调度方法 |
CN103577893B (zh) * | 2013-11-05 | 2017-09-05 | 国家电网公司 | 一种新能源与火电双向为高载能负荷供电的节能优化方法 |
CN104239961B (zh) * | 2014-07-16 | 2016-05-18 | 广东工业大学 | 一种基于纵横交叉算法的电力系统经济调度优化方法 |
CN104573875B (zh) * | 2015-01-27 | 2017-09-26 | 国家电网公司 | 一种低碳化的电源电网优化规划的方法 |
CN104578183B (zh) * | 2015-01-28 | 2017-02-22 | 国家电网公司 | 提高电力系统低碳化水平的联络线送电计划优化方法 |
CN104953624B (zh) * | 2015-07-27 | 2017-07-11 | 武汉大学 | 一种基于光伏预测误差模糊性的电力系统调度方法 |
CN105356461B (zh) * | 2015-11-26 | 2019-02-19 | 中国电力科学研究院 | 一种低压电网负荷不平衡治理项目碳减排量的核算方法 |
CN105488342B (zh) * | 2015-11-26 | 2019-02-19 | 中国电力科学研究院 | 一种配电网升压运行项目碳减排量的核算方法 |
CN106026189B (zh) * | 2015-12-15 | 2018-11-27 | 国网甘肃省电力公司电力科学研究院 | 一种低碳化智能园区源荷协调优化方法 |
CN105790265B (zh) * | 2016-04-21 | 2019-01-22 | 三峡大学 | 一种考虑交流潮流约束的不确定性机组组合模型及求解方法 |
CN106202833A (zh) * | 2016-08-10 | 2016-12-07 | 广东工业大学 | 电力调度方法和系统 |
CN106549412B (zh) * | 2016-11-24 | 2019-03-08 | 海南电力技术研究院 | 针对风电场并网的供电效益评估方法 |
CN107292423B (zh) * | 2017-05-27 | 2020-12-22 | 上海电力学院 | 基于不确定性方法的能效电厂优化配置及厂网规划方法 |
CN107579518B (zh) * | 2017-09-15 | 2019-02-26 | 山东大学 | 基于mhba的电力系统环境经济调度方法和装置 |
CN107732981B (zh) * | 2017-11-09 | 2020-12-18 | 安徽立卓智能电网科技有限公司 | 一种满足电网安全性的厂级agc系统分配策略优化方法 |
CN108764509B (zh) * | 2018-03-22 | 2021-06-01 | 国网天津市电力公司 | 一种对电源电网负荷三者之间进行相互协调优化的方法 |
CN109063916A (zh) * | 2018-08-13 | 2018-12-21 | 广东工业大学 | 一种风电功率预测方法、装置、设备及存储介质 |
CN112308433B (zh) * | 2020-11-03 | 2023-11-24 | 东北电力大学 | 一种风电电力调度方法及系统 |
CN113765154B (zh) * | 2021-08-30 | 2023-09-05 | 国网浙江省电力有限公司温州供电公司 | 一种高弹性电网源网荷储多元协同优化控制方法 |
CN113746144B (zh) * | 2021-11-08 | 2022-03-22 | 南京东博智慧能源研究院有限公司 | 一种源网荷实时交互的电碳控制方法及其智能管理系统 |
CN114565236B (zh) * | 2022-02-15 | 2023-04-18 | 石河子大学 | 一种双碳目标下的电力综合能源系统调度方法及装置 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101286643A (zh) * | 2008-06-12 | 2008-10-15 | 国网南京自动化研究院 | 具有电网接入控制功能的风电场能量管理系统 |
CN101917023A (zh) * | 2010-09-01 | 2010-12-15 | 国网电力科学研究院 | 用于风电场监控系统的风电有功功率自动控制方法 |
CN101931241B (zh) * | 2010-09-21 | 2013-04-17 | 许继集团有限公司 | 风电场并网协调控制方法 |
-
2011
- 2011-04-22 CN CN201110101927.0A patent/CN102170129B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN102170129A (zh) | 2011-08-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102170129B (zh) | 一种基于大规模风电并网的电力系统低碳调度方法及其装置 | |
Mansour-Saatloo et al. | A risk-averse hybrid approach for optimal participation of power-to-hydrogen technology-based multi-energy microgrid in multi-energy markets | |
Cai et al. | Techno-economic analysis of wind curtailment/hydrogen production/fuel cell vehicle system with high wind penetration in China | |
CN102694391B (zh) | 风光储联合发电系统日前优化调度方法 | |
CN102496968A (zh) | 间歇式能源与常规能源协调调度模式下发电计划优化方法 | |
CN103414206A (zh) | 一种考虑安全约束的水光火联合优化发电计划优化方法 | |
CN109586284B (zh) | 考虑弃能约束的送端电力系统随机生产模拟方法及应用 | |
Hu et al. | Optimal dispatch of combined heat and power units based on particle swarm optimization with genetic algorithm | |
CN108075471A (zh) | 基于随机性电源出力预测的多目标约束优化电网调度策略 | |
Hu et al. | Adaptive time division power dispatch based on numerical characteristics of net loads | |
CN104239960A (zh) | 考虑抽水蓄能机组的发电计划优化方法 | |
CN112488374B (zh) | 一种基于时序生产模拟的广义需求响应优化配比研究方法 | |
CN112884265B (zh) | 一种应用于城市电网网源协调的智能管理方法 | |
CN115207911A (zh) | 一种基于电价激励的工业厂级及微网负荷优化调度方法 | |
Han et al. | Analysis of economic operation model for virtual power plants considering the uncertainties of renewable energy power generation | |
Xv et al. | Day-ahead scheduling with renewable generation considering shared energy storage | |
CN114091917A (zh) | 冷热电联供型微电网动态环保经济调度方法及系统 | |
Ma et al. | Multi-Point Layout Planning of Multi-Energy Power Supplies Based on Time-series Production Simulation | |
Shahmoradi et al. | Resource Scheduling in a Smart Grid with Renewable Energy Resources and Plug-In Vehicles by MINLP Method | |
Azami et al. | Optimal Smart Home Scheduling with Considering Hybrid Resource Management | |
Lu et al. | Research on the Day-Ahead Dispatch Strategy for Multi-Energy Power Systems Considering Wind and PV Uncertainty | |
Sui et al. | Optimization of Monthly Power Generation Plan for Thermal Power Units Considering Access of Large-scale New Energy | |
Fan et al. | Research on Optimal Operation and Capacity Configuration of Energy Storage Based on Pumped Storage Station | |
Yang et al. | Multi-stage Planning of Village Energy System in Carbon-Green Power Coordinated Trading Market Considering Linear Robust Battery Dispatch Formulation | |
Shi et al. | Multi-objective optimal dispatch considering wind power and interactive load for power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: ELECTRIC POWER RESEARCH INSTITUTE, STATE GRID QING Effective date: 20141121 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Gong Qingwu Inventor after: Chen Daojun Inventor after: Liu Dong Inventor after: Zhao Jian Inventor after: Zhang Haining Inventor after: Meng Kefeng Inventor after: Li Chunlai Inventor after: Yang Libin Inventor after: Kong Xiangpeng Inventor before: Gong Qingwu Inventor before: Chen Daojun Inventor before: Liu Dong Inventor before: Zhao Jian |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: GONG QINGWU CHEN DAOJUN LIU DONG ZHAO JIAN TO: GONG QINGWU CHEN DAOJUN LIUDONG ZHAO JIAN ZHANG HAINING MENG KEFENG LI CHUNLAI YANG LIBIN KONG XIANGPENG |
|
TR01 | Transfer of patent right |
Effective date of registration: 20141121 Address after: 430072 Hubei Province, Wuhan city Wuchang District of Wuhan University Luojiashan Patentee after: Wuhan University Patentee after: Electric Power Research Institute of State Grid Qinghai Electric Power Company Address before: 430072 Hubei Province, Wuhan city Wuchang District of Wuhan University Luojiashan Patentee before: Wuhan University |