CN102162335A - 在地面钻穿含水砂层中地下结构的成孔工法 - Google Patents
在地面钻穿含水砂层中地下结构的成孔工法 Download PDFInfo
- Publication number
- CN102162335A CN102162335A CN2011100355838A CN201110035583A CN102162335A CN 102162335 A CN102162335 A CN 102162335A CN 2011100355838 A CN2011100355838 A CN 2011100355838A CN 201110035583 A CN201110035583 A CN 201110035583A CN 102162335 A CN102162335 A CN 102162335A
- Authority
- CN
- China
- Prior art keywords
- underground structure
- hole
- pore
- worker method
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本发明公开了一种在地面钻穿含水砂层中地下结构的成孔工法,至少包括:步骤一,在地下结构上与设计透孔处对应的内表面处设置密封承压层;从地面向地下结构钻孔,施工至地下结构的顶面并在顶面上形成一工艺孔;步骤二,从地面穿过含水砂层,向工艺孔打设一保护管并使保护管与工艺孔衔接;步骤三,在保护管中下钻件,打穿地下结构;步骤四,继续将钻件中的锥形磨合件压入透孔,直至打穿密封承压层。本发明由于采用上述施工步骤改善了现有成孔工法的防水效果。本发明还由于采用了特别设计的钻件,在该钻件中包括一段锥形磨合件,利用该锥形磨合件与透孔内壁挤压磨合,使透孔的内壁与该锥形磨合件的外表面紧密贴合,从而大大提高了成孔工艺的防水性。
Description
技术领域
本发明涉及地下工程技术领域,尤其涉及一种在地面钻穿含水砂层中地下结构的成孔工法。
背景技术
在建筑施工、地下管线、地铁隧道等工程技术领域,经常需要对位于地面以下的结构进行施工作业。但由于很多地区地质条件不利、城镇中心区域地面建筑密布、地下设施复杂、管线密集交错等各种客观条件影响,实施地下工程的难度非常巨大。
中国专利申请CN1179498公开了一种“用于更新地下管道的打孔设备和打孔方法”,该专利申请用以在已有管道上打孔。如图1所示,该设备带有一冲击钻头组件2和一安装在一结构上的导向件3,相对于导向件3冲击钻头是可动的,并在导向件3的前面连接有一个转动和牵引钻杆5,用以从打孔设备的进给方向通过导向件3向打孔设备提供旋转和进给运动,绕钻头5设置有一个可由钻杆5的转动带动旋转的螺旋输送器6,用以沿已有管道从打孔位置向前输送切屑。
上述现有的打孔设备及打孔方法在应用于地基土质良好的施工环境时,施工效果较好。但应用于例如含水砂层等地基土质较差的施工环境时,由于未充分考虑防水效果,容易造成地下结构透水。
因此,本领域的技术人员致力于开发一种具有良好防水效果的成孔工法。
发明内容
有鉴于现有技术的上述缺陷,本发明所要解决的技术问题是提供一种防水效果良好的在地面钻穿含水砂层中地下结构的成孔工法。
为实现上述目的,本发明提供了一种在地面钻穿含水砂层中地下结构的成孔工法,用于在所述地下结构上形成一透孔,至少包括以下步骤:步骤一,在所述地下结构上与设计透孔处对应的内表面处设置密封承压层;从地面向所述地下结构钻孔,施工至所述地下结构的顶面并在所述顶面上形成一工艺孔;步骤二,从地面穿过所述含水砂层,向所述工艺孔打设一保护管并使所述保护管与所述工艺孔衔接;步骤三,在所述保护管中下钻件,打穿所述地下结构;步骤四,继续将所述钻件中的锥形磨合件压入所述透孔,直至打穿所述密封承压层。
较佳地,所述步骤四中,所述透孔的内表面被所述锥形磨合件挤磨形成相同角度的锥形。
较佳地,所述锥形磨合件固定设置在所述钻件的钻杆与钻头之间。
较佳地,所述密封承压层包括密封层与承压层。
较佳地,所述密封层为环氧树脂层。
较佳地,所述密封层中还设置有注浆导管。
较佳地,所述密封层中还包括麻丝和/或棉布。
较佳地,所述承压层为钢结构件,与所述地下结构固定连接。
较佳地,所述地下结构为管片。
较佳地,所述工艺孔的深度大致为所述地下结构的厚度的三分之一。
本发明由于采用上述施工步骤,通过设置保护管,改善了现有成孔工法的防水效果。本发明还由于采用了特别设计的钻件,在该钻件中包括一段锥形磨合件,利用该锥形磨合件与透孔内壁挤压磨合,使透孔的内壁与该锥形磨合件的外表面紧密贴合,从而大大提高了成孔工艺的防水性。
以下将结合附图对本发明的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本发明的目的、特征和效果。
附图说明
图1是现有技术中一种打孔设备在使用状态的结构示意图;
图2是本发明一具体实施例在初始阶段的施工结构示意图;
图3是图2所示实施例在下钻件阶段的施工结构示意图;
图4是图2所示实施例在打穿透孔状态的结构示意图。
具体实施方式
本发明提供了一种在地面钻穿含水砂层中地下结构的成孔工法,用于在地下结构上形成一透孔。本实施例中,前述地下结构为管片。
本发明一具体实施例至少包括以下步骤:
步骤一,如图2所示,在管片1上与设计透孔处对应的内表面处设置密封承压层2。密封承压层2包括密封层21与承压层22。
其中,密封层21为环氧树脂层,密封层21中还交叉设置有一根或多根注浆导管211,以及麻丝或棉布(图2中未示出)。承压层22为钢结构件,与管片1通过螺栓等固定连接。
从地面A向管片1钻孔,施工至管片1的顶面,并在其顶面上形成一工艺孔11。工艺孔11的深度大致为管片1的厚度的三分之一。
步骤二,从地面A穿过含水砂层B,向工艺孔11打设一保护管12,并使保护管12与工艺孔11衔接。
步骤三,如图3所示,在保护管12中下钻件3,打穿管片1。特别地,本工法中采用的钻件3,在钻件3的钻杆31与钻头33之间固定设置有锥形磨合件32。
步骤四,如图4所示,继续将钻件3中的锥形磨合件32压入透孔,直至打穿密封承压层2。透孔的内表面被锥形磨合件32挤磨形成相同角度的锥形。
由于透孔的内表面与锥形磨合件32的外壁为具有相同角度的锥形,两者之间具有良好的密闭性。因此,即使有少量含水砂层B中的水透过保护管12与工艺孔11之间的缝隙进入透孔中,也由于透孔的内表面与锥形磨合件32的外壁之间良好的密闭性而不会透水。本发明的工法因而具有良好的防水效果。
进一步地,由于密封承压层2中还布设了麻丝或棉布,及注浆导管211,通过及时注入环氧树脂形成密封层21,本发明的工法具有更佳的防水效果。
在本发明的其他实施方式中,前述地下结构也可以是其他需要钻透的永久结构。
在本发明的其他实施方式中,也可以采用聚氨酯或速凝水泥等替代环氧树脂,具有大致相同的密封效果。
以上详细描述了本发明的较佳具体实施例。应当理解,本领域的普通技术无需创造性劳动就可以根据本发明的构思作出诸多修改和变化。因此,凡本技术领域中技术人员依本发明的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在本发明的权利要求保护范围内。
Claims (10)
1.一种在地面钻穿含水砂层中地下结构的成孔工法,用于在所述地下结构上形成一透孔,至少包括以下步骤:
步骤一,在所述地下结构上与设计透孔处对应的内表面处设置密封承压层;从地面向所述地下结构钻孔,施工至所述地下结构的顶面并在所述顶面上形成一工艺孔;
步骤二,从地面穿过所述含水砂层,向所述工艺孔打设一保护管并使所述保护管与所述工艺孔衔接;
步骤三,在所述保护管中下钻件,打穿所述地下结构;
步骤四,继续将所述钻件中的锥形磨合件压入所述透孔,直至打穿所述密封承压层。
2.如权利要求1所述的成孔工法,其特征在于:所述步骤四中,所述透孔的内表面被所述锥形磨合件挤磨形成相同角度的锥形。
3.如权利要求1所述的成孔工法,其特征在于:所述锥形磨合件固定设置在所述钻件的钻杆与钻头之间。
4.如权利要求1所述的成孔工法,其特征在于:所述密封承压层包括密封层与承压层。
5.如权利要求4所述的成孔工法,其特征在于:所述密封层为环氧树脂层。
6.如权利要求5所述的成孔工法,其特征在于:所述密封层中还设置有注浆导管。
7.如权利要求5所述的成孔工法,其特征在于:所述密封层中还包括麻丝和/或棉布。
8.如权利要求4所述的成孔工法,其特征在于:所述承压层为钢结构件,与所述地下结构固定连接。
9.如权利要求1所述的成孔工法,其特征在于:所述地下结构为管片。
10.如权利要求1所述的成孔工法,其特征在于:所述工艺孔的深度大致为所述地下结构的厚度的三分之一。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100355838A CN102162335A (zh) | 2011-02-10 | 2011-02-10 | 在地面钻穿含水砂层中地下结构的成孔工法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011100355838A CN102162335A (zh) | 2011-02-10 | 2011-02-10 | 在地面钻穿含水砂层中地下结构的成孔工法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102162335A true CN102162335A (zh) | 2011-08-24 |
Family
ID=44463757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011100355838A Pending CN102162335A (zh) | 2011-02-10 | 2011-02-10 | 在地面钻穿含水砂层中地下结构的成孔工法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102162335A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577987A (zh) * | 2018-11-30 | 2019-04-05 | 陕西中能煤田有限公司 | 外套套管的冻结管穿斜井井壁施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1078013A (zh) * | 1993-05-15 | 1993-11-03 | 连云港先达新技术工程公司 | 一种砾石土快速成孔法 |
JPH0932093A (ja) * | 1995-07-20 | 1997-02-04 | Tomotake Shigemori | 既設管等に対する取付管の取付方法 |
CN1259606A (zh) * | 1999-01-01 | 2000-07-12 | 中国有色第十五冶金建设公司第一工程公司 | 一种深基坑砂卵砾石层套管成孔新工艺 |
JP2009102836A (ja) * | 2007-10-22 | 2009-05-14 | Metropolitan Expressway Co Ltd | 土木工事用シール工法 |
CN201330402Y (zh) * | 2008-12-19 | 2009-10-21 | 河海大学 | 管片内压式减压井管 |
-
2011
- 2011-02-10 CN CN2011100355838A patent/CN102162335A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1078013A (zh) * | 1993-05-15 | 1993-11-03 | 连云港先达新技术工程公司 | 一种砾石土快速成孔法 |
JPH0932093A (ja) * | 1995-07-20 | 1997-02-04 | Tomotake Shigemori | 既設管等に対する取付管の取付方法 |
CN1259606A (zh) * | 1999-01-01 | 2000-07-12 | 中国有色第十五冶金建设公司第一工程公司 | 一种深基坑砂卵砾石层套管成孔新工艺 |
JP2009102836A (ja) * | 2007-10-22 | 2009-05-14 | Metropolitan Expressway Co Ltd | 土木工事用シール工法 |
CN201330402Y (zh) * | 2008-12-19 | 2009-10-21 | 河海大学 | 管片内压式减压井管 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109577987A (zh) * | 2018-11-30 | 2019-04-05 | 陕西中能煤田有限公司 | 外套套管的冻结管穿斜井井壁施工方法 |
CN109577987B (zh) * | 2018-11-30 | 2024-05-10 | 陕西中能煤田有限公司 | 外套套管的冻结管穿斜井井壁施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105317396B (zh) | 一种地面注浆钻孔内浆液混合装置及其使用方法 | |
CN109881692B (zh) | 预先装配式降水井 | |
CN110566120B (zh) | 煤矿井下煤层底板硬岩多动力定向组合钻具及其成孔方法 | |
CN203655249U (zh) | 一种地浸采铀工艺井 | |
CN106246099A (zh) | 螺旋挤土潜孔嵌岩装置及成桩方法 | |
CN104975868A (zh) | 基于定向钻进的顶板高位走向大直径长钻孔瓦斯抽采方法 | |
CN106001092A (zh) | 原位化学注入修复单井多层注入系统 | |
CN103161405B (zh) | 矿用井下探放高压岩溶水钻孔施工的套管隔离地层破碎带方法 | |
CN201129177Y (zh) | 钻杆后退分段注浆装置 | |
CN111677448A (zh) | 不稳定地层可变径套管护孔钻进工艺 | |
CN1982651A (zh) | 井下大面积长时间顶板暴露采场超长锚杆注浆方法 | |
CN203702071U (zh) | 竖井探水注浆施工的防突水顶钻装置 | |
CN201025046Y (zh) | 翼片式扩孔套管跟管钻具 | |
CN104264679B (zh) | 一种输电铁塔基础大口径水下灌注桩施工方法 | |
CN103835647A (zh) | 一种漂卵石层的钻进方法 | |
CN211851743U (zh) | 一种矿山治水钻进防喷器的钻杆固定装置 | |
CN109322621B (zh) | 一种破碎层固管注浆方法 | |
CN205762953U (zh) | 原位化学注入修复单井多层注入系统 | |
CN210118111U (zh) | 单动双管冲击取芯钻具 | |
CN204626390U (zh) | 一种用于四重高压旋喷的钻具分流器 | |
CN102162335A (zh) | 在地面钻穿含水砂层中地下结构的成孔工法 | |
CN207934841U (zh) | 煤矿井下打钻和冲孔过程中的防喷降尘装置 | |
CN111140167A (zh) | 一种砂砾岩含水层下煤层开采的直通放水钻孔施工方法 | |
CN102828692A (zh) | 套管式螺旋钻机气压钻进法 | |
CN201943600U (zh) | 在地面钻穿含水砂层中地下结构的成孔专用钻件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110824 |