CN102154959A - Operating mechanism for extracting rail ballast - Google Patents
Operating mechanism for extracting rail ballast Download PDFInfo
- Publication number
- CN102154959A CN102154959A CN201010121873XA CN201010121873A CN102154959A CN 102154959 A CN102154959 A CN 102154959A CN 201010121873X A CN201010121873X A CN 201010121873XA CN 201010121873 A CN201010121873 A CN 201010121873A CN 102154959 A CN102154959 A CN 102154959A
- Authority
- CN
- China
- Prior art keywords
- conveying device
- frame
- side slope
- working
- discharge end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The invention provides an operating mechanism for extracting rail ballast. The operating mechanism comprises a convex frame, a side slope excavating mechanism is hung below the raised part in the middle of the frame, and a first conveying system is arranged between the side slope excavating mechanism and a total conveying device; and one end of an excavating harrow chain extends below the raised part of the frame, the other end, namely a discharge end, of the excavating harrow chain extends is placed above one end of the frame, and a second conveying system is arranged between the discharge end of the excavating harrow chain and the total conveying device. Compared with the prior art, the full-section cyclic excavating chain and the side slope excavating mechanism are arranged on a space as short as possible, and the mechanisms are reasonably arranged under the limited space, so that full-section excavation and side slope excavation can be simultaneously finished, or only side slope excavation is performed as operation required, the purposes of efficiently extracting the ballast and conveying the ballast are fulfilled, and the application range is wide.
Description
Technical field
The present invention relates to a kind of railroad track servicing machine, specifically is a kind of Working mechanism that extracts orbit ballast.
Background technology
For existing ballast cleaning machine, generally have only the circulating digging mechanism of a full section of cover, it is general to extract ballast aggregate efficient; The machinery that two cover digging mechanisms are installed is that two cover digging mechanisms are installed in respectively in two working vehicles, and it is big to take up room, the cost height.
Summary of the invention
Goal of the invention of the present invention is to provide a kind of and arranges a circulating digger chain of full section and a cover side slope digging mechanism on short as far as possible space, also thereby the ballast aggregate that extracts can be delivered to the Working mechanism that the external world provides the extraction orbit ballast of higher operating efficiency.
Technical program of the present invention lies in: comprise a convex frame, the side slope digging mechanism hangs on below, frame intermediate projections position, between side slope digging mechanism and the total conveying device first induction system is arranged; Excavate the rake chain and be assemblied in the guide groove, an end of guide groove stretches into the projection below of frame, and the other end is that its discharge end places frame one end top, between guide groove discharge end and the total conveying device second induction system is arranged.
Between guide groove and frame, be equipped with and change the height that excavates the rake chain and perpendicular to the adjusting device of the position of orbital direction.
Said first induction system comprises conveying device A, conveying device B.Conveying device A is bearing on the side slope digging mechanism, and conveying device B storage end is positioned at the frame below and places the discharging opening of conveying device A, and conveying device B discharge end is corresponding with total conveying device storage end.
Be equipped with between said conveying device A and the side slope digging mechanism and be used to adjust the hydraulic cylinder that conveying device A angle changes throwing quarrel distance.
Said second induction system comprises conveying device C, conveying device D, conveying device C is positioned at central rack top and corresponding with the discharge end of quarrel bucket, the quarrel bucket is corresponding with the discharge end that excavates the rake chain, the discharge end of conveying device C is corresponding with the storage end of conveying device D, conveying device D places the upper right side of frame, and conveying device D discharge end is corresponding with total conveying device storage end.
Side slope digging mechanism and excavate ballast aggregate that the rake chain extracts respectively by entering total conveying device behind conveying device A, conveying device B, conveying device C, the conveying device D is dished out by total conveying device again or storage cart is hung by the company of being thrown into.
The below, intermediate projections position of frame is provided with rail-lifting equipment, and is hung with first working driver chamber, second working driver chamber.First working driver chamber excavates rake chain and rail-lifting equipment the place ahead along the operator to being positioned at, second working driver chamber along the operator to being positioned at side slope digging mechanism the place ahead.
Compared with prior art, the present invention arranges a circulating digger chain of full section and a cover side slope digging mechanism on short as far as possible space, with each mechanism rational deployment under limited space, can finish full section excavation and side slope simultaneously excavates, or when job requirements, only carry out side slope and excavate, reach the high efficiency extraction ballast aggregate, carry the ballast aggregate purpose, and applied widely.
Description of drawings
Fig. 1 is a structural representation of the present invention.
Fig. 2 is a side slope digging mechanism scheme of installation.
Fig. 3 is the lateral view of Fig. 2.
The specific embodiment
As shown in Figure 1, the construction machinery (1) that excavates orbit ballast comprises the convex frame (2) of utilizing rail travelling mechanism traveling in orbit, frame (2) is the structure of the low intermediate projections in two, frame (2) intermediate projections is abdicated the circulating ballast excavating rake of the full section chain (9) that the direction along ng a path surround orbit is put in the space, excavating rake chain (9) is assemblied in the guide groove (8), guide groove (8) is bearing in the left back end of frame (2) top, be equipped with between guide groove (8) and the frame (2) and can change the height that excavates rake chain (9) and perpendicular to the adjusting device of the position of orbital direction, its effect is only to carry out will excavating rake chain (9) when side slope is excavated in job requirements to pack up, and the present invention does not carry out full section and excavates.The ballast aggregate that excavates rake chain (9) extraction enters conveying device C (3) by quarrel bucket (6), conveying device C (3) is bearing in top, frame (2) middle part as the storage end that excavates rake chain (9), conveying device D (4) is bearing in the upper right side of frame (2) as the storage end of conveying device C (3), along operator the place ahead to conveying device C (3), the while is the feeding end of the total conveying device (5) of conduct also.The side slope digging mechanism (11) that direction along ng a path can extract ballast aggregate continuously hangs on below, frame (2) intermediate projections position, conveying device A (15) is bearing on the side slope digging mechanism (11) as the storage end of side slope digging mechanism (11), can adjust its angle by hydraulic cylinder (17) and change throwing quarrel distance, conveying device B (12) is bearing on the frame (2) as the storage end of conveying device A (15), its storage end is positioned at frame (2) below near side slope digging mechanism (11), discharge end is positioned at frame (2) top, the discharge end of conveying device D (4) below and the total conveying device (5) of conduct, its discharging opening, is gone up the ballast aggregate mixing company of the being thrown into sieve clinging that will extract in total conveying device (5) and is divided device or storage cart (not shown) to being positioned at conveying device D (4) discharging opening rear along the operator.Side slope digging mechanism (11) excavates rake chain (9) the place ahead along the operator to being positioned at.Rail-lifting equipment (7), first working driver chamber (10), second working driver chamber (13) hang on frame (2) intermediate projections part lower end, rail-lifting equipment (7) excavates the rear of harrowing chain (9) along the operator to being positioned at, its function is to promote rail and sleeper height, be convenient to extract ballast aggregate, first working driver chamber (10) excavates rake chain (9) and rail-lifting equipment (7) the place ahead along the operator to being positioned at, and is used for observing the operation situation of excavating rake chain (9) and rail-lifting equipment (7).Second working driver chamber (13) along the operator to being positioned at side slope digging mechanism (11) the place ahead, conveying device B (12) below, the operation situation that is used to observe side slope digging mechanism (11), conveying device A (15), conveying device B (12).Beam is (16), and wheel is to being (14).
Among Fig. 2, Fig. 3, side slope digging mechanism (11) hangs on below, frame intermediate projections position by beam (16), between conveying device A (15) and the side slope digging mechanism (11) hydraulic cylinder (17) is housed.
Claims (8)
1. Working mechanism that extracts orbit ballast, it is characterized in that: comprise a convex frame (2), side slope digging mechanism (11) hangs on below, frame (2) intermediate projections position, between side slope digging mechanism (11) and the total conveying device (5) first induction system is arranged; Excavate rake chain (9) and be assemblied in the guide groove (8), an end of guide groove (8) stretches into the projection below of frame (2), and the other end is that its discharge end places frame one end top, between guide groove (8) discharge end and the total conveying device (5) second induction system is arranged.
2. the Working mechanism of extraction orbit ballast according to claim 1 is characterized in that: said frame (2) is the structure of the low intermediate projections in two.
3. the Working mechanism of extraction orbit ballast according to claim 1 is characterized in that: be equipped with between guide groove (8) and frame (2) and can change the height that excavates rake chain (9) and perpendicular to the adjusting device of the position of orbital direction.
4. the Working mechanism of extraction orbit ballast according to claim 1, it is characterized in that: said first induction system comprises conveying device A (15), conveying device B (12), conveying device A (15) is bearing on the side slope digging mechanism (11), conveying device B (12) storage end is positioned at frame (2) below and places the discharging opening of conveying device A (15), and conveying device B (12) discharge end is corresponding with total conveying device (5) storage end.
5. the Working mechanism of extraction orbit ballast according to claim 4 is characterized in that: the hydraulic cylinder (17) that is used to adjust conveying device A (15) angle change throwing quarrel distance is housed between said conveying device A (15) and the side slope digging mechanism (11).
6. the Working mechanism of extraction orbit ballast according to claim 1, it is characterized in that: said second induction system comprises conveying device C (3), conveying device D (4), conveying device C (3) is positioned at top, frame (2) middle part and corresponding with the discharge end of quarrel bucket (6), and quarrel bucket (6) is corresponding with the discharge end that excavates rake chain (9); The discharge end of conveying device C (3) is corresponding with the storage end of conveying device D (4), and conveying device D (4) places the upper right side of frame (2), and conveying device D (4) discharge end is corresponding with total conveying device (5) storage end.
7. the Working mechanism of extraction orbit ballast according to claim 1, it is characterized in that: the below, intermediate projections position of said frame (2) is provided with rail-lifting equipment (7), and be hung with first working driver chamber (10), second working driver chamber (13), first working driver chamber (10) excavates rake chain (9) and rail-lifting equipment (7) the place ahead along the operator to being positioned at, second working driver chamber (13) along the operator to being positioned at side slope digging mechanism (11) the place ahead.
8. the Working mechanism of extraction orbit ballast according to claim 1 is characterized in that: said side slope digging mechanism (11) excavates rake chain (9) the place ahead along the operator to being positioned at.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010121873XA CN102154959A (en) | 2010-02-11 | 2010-02-11 | Operating mechanism for extracting rail ballast |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201010121873XA CN102154959A (en) | 2010-02-11 | 2010-02-11 | Operating mechanism for extracting rail ballast |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102154959A true CN102154959A (en) | 2011-08-17 |
Family
ID=44436613
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201010121873XA Pending CN102154959A (en) | 2010-02-11 | 2010-02-11 | Operating mechanism for extracting rail ballast |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102154959A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103797190A (en) * | 2011-09-15 | 2014-05-14 | 弗兰茨普拉塞铁路机械工业股份有限公司 | Machine for removing ballast from track |
CN103797190B (en) * | 2011-09-15 | 2016-11-30 | 弗兰茨普拉塞铁路机械工业股份有限公司 | For removing the machine of orbit ballast |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4892151A (en) * | 1983-12-22 | 1990-01-09 | Franz Plasser Bahnbaumaschinen-Industrie Gmbh | Ballast cleaning machine |
US5347933A (en) * | 1993-01-05 | 1994-09-20 | Loram Maintenance Of Way, Inc. | Railway ballast cleaning machine with integrated hopper car |
CN1100161A (en) * | 1993-03-04 | 1995-03-15 | 弗兰茨普拉沙铁路机械工业股份有限公司 | A ballast grading machine |
CN1145430A (en) * | 1995-09-04 | 1997-03-19 | 弗兰茨普拉塞铁路机械工业股份有限公司 | Machinery for repairing rail base |
JPH11117206A (en) * | 1997-08-20 | 1999-04-27 | Franz Plasser Bahnbaumas Ind Gmbh | Track work machine with laser reference system and method for restoring track position |
US5926981A (en) * | 1996-08-14 | 1999-07-27 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Track work machine for excavating material from a track bed |
CN2522459Y (en) * | 2002-01-21 | 2002-11-27 | 中国铁道建筑总公司昆明机械厂 | Slope screening-clearing machine |
CN2703783Y (en) * | 2002-08-23 | 2005-06-08 | 弗兰茨普拉塞铁路机械工业股份有限公司 | Mechanism for renewing track macadam roadbed |
CN1928236A (en) * | 2005-09-09 | 2007-03-14 | 襄樊金鹰轨道车辆有限责任公司 | Digging mechanism for railway turnout ballast |
CN2878459Y (en) * | 2006-04-14 | 2007-03-14 | 昆明中铁大型养路机械集团有限公司 | Slope screen scarifier with vertical chain-type digging mechanism |
CN2880892Y (en) * | 2005-07-28 | 2007-03-21 | 襄樊金鹰轨道车辆有限责任公司 | Railway switch ballast cleaning machine |
CN2915918Y (en) * | 2006-03-03 | 2007-06-27 | 昆明中铁大型养路机械集团有限公司 | Highly-efficient slope screen scarifier |
CN201634966U (en) * | 2010-02-11 | 2010-11-17 | 襄樊金鹰轨道车辆有限责任公司 | Operation mechanism for extracting rail ballast |
-
2010
- 2010-02-11 CN CN201010121873XA patent/CN102154959A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4892151A (en) * | 1983-12-22 | 1990-01-09 | Franz Plasser Bahnbaumaschinen-Industrie Gmbh | Ballast cleaning machine |
US5347933A (en) * | 1993-01-05 | 1994-09-20 | Loram Maintenance Of Way, Inc. | Railway ballast cleaning machine with integrated hopper car |
CN1100161A (en) * | 1993-03-04 | 1995-03-15 | 弗兰茨普拉沙铁路机械工业股份有限公司 | A ballast grading machine |
CN1145430A (en) * | 1995-09-04 | 1997-03-19 | 弗兰茨普拉塞铁路机械工业股份有限公司 | Machinery for repairing rail base |
US5926981A (en) * | 1996-08-14 | 1999-07-27 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Track work machine for excavating material from a track bed |
JPH11117206A (en) * | 1997-08-20 | 1999-04-27 | Franz Plasser Bahnbaumas Ind Gmbh | Track work machine with laser reference system and method for restoring track position |
CN2522459Y (en) * | 2002-01-21 | 2002-11-27 | 中国铁道建筑总公司昆明机械厂 | Slope screening-clearing machine |
CN2703783Y (en) * | 2002-08-23 | 2005-06-08 | 弗兰茨普拉塞铁路机械工业股份有限公司 | Mechanism for renewing track macadam roadbed |
CN2880892Y (en) * | 2005-07-28 | 2007-03-21 | 襄樊金鹰轨道车辆有限责任公司 | Railway switch ballast cleaning machine |
CN1928236A (en) * | 2005-09-09 | 2007-03-14 | 襄樊金鹰轨道车辆有限责任公司 | Digging mechanism for railway turnout ballast |
CN2915918Y (en) * | 2006-03-03 | 2007-06-27 | 昆明中铁大型养路机械集团有限公司 | Highly-efficient slope screen scarifier |
CN2878459Y (en) * | 2006-04-14 | 2007-03-14 | 昆明中铁大型养路机械集团有限公司 | Slope screen scarifier with vertical chain-type digging mechanism |
CN201634966U (en) * | 2010-02-11 | 2010-11-17 | 襄樊金鹰轨道车辆有限责任公司 | Operation mechanism for extracting rail ballast |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103797190A (en) * | 2011-09-15 | 2014-05-14 | 弗兰茨普拉塞铁路机械工业股份有限公司 | Machine for removing ballast from track |
CN103797190B (en) * | 2011-09-15 | 2016-11-30 | 弗兰茨普拉塞铁路机械工业股份有限公司 | For removing the machine of orbit ballast |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108049266B (en) | A kind of railway changes pillow device and its operational method | |
CN201793253U (en) | Impact-free gangue continuous loading machine used for mine | |
CN102410017B (en) | Supporting type integrated tunneling-anchoring machine | |
CN102733803A (en) | Compound cantilever excavator | |
CN103052750B (en) | For the equipment that cleaning is ballast bed | |
CN101812974A (en) | Lifting platform of construction vehicle | |
CN202391424U (en) | Supporting type comprehensive bolter miner | |
CN208379658U (en) | A kind of bull-dozer | |
CN207647510U (en) | A kind of pick of coal working face, dress, shield change system | |
CN102330555A (en) | Tunnelling equipment | |
CN206111195U (en) | Bulldozing car for tunnel construction | |
CN105714865A (en) | Tunnel repair machine for coal mine | |
CN201634966U (en) | Operation mechanism for extracting rail ballast | |
CN201660814U (en) | Screen scarifier | |
CN102587907B (en) | Two-arm gangue discharge system | |
CN101200905B (en) | Sump silt cleaner | |
CN102154959A (en) | Operating mechanism for extracting rail ballast | |
CN104624347A (en) | Movable excavation crushing station | |
CN201598540U (en) | Ballast cleaner | |
CN201785684U (en) | Combined excavation screen cleaning machine | |
CN201610506U (en) | Construction equipment for replacing ballasts of track | |
CN201785685U (en) | Full face excavation screen scarifier | |
CN2915918Y (en) | Highly-efficient slope screen scarifier | |
CN201785780U (en) | Integrated high-efficiency excavator | |
CN207177907U (en) | Formula driving loading machine is dug in milling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20110817 |