CN102146681A CN 201110037854 CN201110037854A CN102146681A CN 102146681 A CN102146681 A CN 102146681A CN 201110037854 CN201110037854 CN 201110037854 CN 201110037854 A CN201110037854 A CN 201110037854A CN 102146681 A CN102146681 A CN 102146681A
Authority
CN
China
Prior art keywords
subaqueous
tunnel
new
pipeline
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110037854
Other languages
Chinese (zh)
Other versions
CN102146681B (en
Inventor
朱建业
盛林峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HU PANCHENG
Original Assignee
HU PANCHENG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HU PANCHENG filed Critical HU PANCHENG
Priority to CN 201110037854 priority Critical patent/CN102146681B/en
Publication of CN102146681A publication Critical patent/CN102146681A/en
Application granted granted Critical
Publication of CN102146681B publication Critical patent/CN102146681B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a new subaqueous tunnel or pipeline digging method, and belongs to the field of civil engineering bridge construction. The water is partitioned by using partition equipment on a route where a subaqueous tunnel needs to be dug, the middle water is pumped out, a long subaqueous zone is exposed, then a big open trench can be dug, and the tunnel is cast, or prefabricated pipes are laid in the open trench, wherein the partition equipment can be used for over two times. The construction is convenient, the project progress is quickened, and the method is easily implemented in subaqueous underground tunnels (pipelines) of shallow water areas and particularly can be used for the tunnels across the rivers.

Description

A kind of new subaqueous tunnel or pipeline are dug method
Technical field
The present invention is that method is dug in a kind of new subaqueous tunnel, belongs to civil engineering bridge road construction field.
Background technology
Present bottom cutting method all is to adopt the method for digging a hole, and this method is very traditional, but shortcoming is the method constructional difficulties of digging a hole, and programming is slower, and every day, driving had only seldom several meters.
Summary of the invention
At the tradition method constructional difficulties of digging a hole, the shortcoming that programming is slow the invention provides the new method of a cover, can reduce difficulty of construction greatly, improves programming.
Technical scheme of the present invention may further comprise the steps: 1. dig on the route of subaqueous tunnel at needs, with xegregating unit water is separated, water in the middle of finding time exposes a long water-bed area.
2. a big open drain just can be excavated in the bottom of being exposed in the middle of xegregating unit, is building the tunnel, perhaps lays prefabricated pipe in the open drain.Utilize the water xegregating unit like this,, can also construct simultaneously by sliver, both significantly reduced difficulty of construction, can increase programming greatly again just as on the level land, buying pipeline.
3. as the waters ship's navigation is arranged, can section construction.
4. if water xegregating unit isolation performance is bad, the above xegregating unit in available two roads or then add water pumper and improve pumpage.
Described xegregating unit is watertight shutter and supports cabinet that watertight shutter separates water, supports the inboard that cabinet is installed in watertight shutter, supports watertight shutter, makes watertight shutter can bear the pressure of water.
Transportable crosspiece is all arranged in the middle of the described support cabinet and bottom, can further facilitate excacation.
Outstanding advantage of the present invention:
Easy construction, programming is accelerated; In the shallow water-bed subterranean tunnel (pipeline) in waters, more easily realize, be particularly useful for the tunnel that crosses the river, river.
Description of drawings
The front elevational schematic of Fig. 1 water proof device structure
The schematic top plan view of Fig. 2 water proof device structure
1 for supporting cabinet among the figure, and 2 is watertight shutter, and 3 is middle crosspiece.
The specific embodiment
Concrete as Fig. 1, shown in Figure 2.Dig at needs on the route of subaqueous tunnel, laying watertight shutter 2 separates water, support cabinet 1 and support watertight shutter 2, make it can bear the pressure of water, water in the middle of finding time then, expose a long water-bed area in the middle of the watertight shutter 2, just can excavate a big open drain, in building tunnel or open drain, lay prefabricated pipe.If the dash performance of one deck watertight shutter 2 is bad, can re-lay the multilayer watertight shutter.Support the bottom of cabinet 1 and have only crosspiece, do not have base plate, can slowly move down, thereby when thinking that the depths is excavated, support the position that cabinet can be supported on watertight shutter all the time along with the degree of depth of excavating.In the middle of the support cabinet 1 shown in Fig. 2 a crosspiece 3 is arranged, crosspiece 3 can move, and moves along with pushing ahead of excacation, has made things convenient for the cutting in tunnel.

Claims (4)

1. new subaqueous tunnel or pipeline are dug method, it is characterized in that:, isolate from water the place of required construction with xegregating unit, again in isolated area oprn-work, build or lay the subaqueous tunnel.
2. new subaqueous tunnel according to claim 1 or pipeline are dug method, it is characterized in that: above xegregating unit in available two roads or increase water pumper improve pumpage.
3. dig method according to claims 1 described new subaqueous tunnel or pipeline, it is characterized in that: described xegregating unit is watertight shutter and supports cabinet, supports the inboard that cabinet is installed in watertight shutter, supports watertight shutter.
4. dig method according to claims 1 described new subaqueous tunnel or pipeline, it is characterized in that: transportable crosspiece is all arranged in the middle of the described support cabinet and bottom.
CN 201110037854 2011-02-09 2011-02-09 New subaqueous tunnel or pipeline digging method Expired - Fee Related CN102146681B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110037854 CN102146681B (en) 2011-02-09 2011-02-09 New subaqueous tunnel or pipeline digging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110037854 CN102146681B (en) 2011-02-09 2011-02-09 New subaqueous tunnel or pipeline digging method

Publications (2)

Publication Number Publication Date
CN102146681A true CN102146681A (en) 2011-08-10
CN102146681B CN102146681B (en) 2013-01-30

Family

ID=44421137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110037854 Expired - Fee Related CN102146681B (en) 2011-02-09 2011-02-09 New subaqueous tunnel or pipeline digging method

Country Status (1)

Country Link
CN (1) CN102146681B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1992013142A1 (en) * 1991-01-17 1992-08-06 Comte Charles L Under-water cell
CN101173499A (en) * 2007-11-22 2008-05-07 广西壮族自治区公路桥梁工程总公司 Method and device for subaqueous construction of bridge pier
CN101871205A (en) * 2010-06-25 2010-10-27 中国水电顾问集团华东勘测设计研究院 Cylindrical shell construction platform for underwater operation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1992013142A1 (en) * 1991-01-17 1992-08-06 Comte Charles L Under-water cell
CN101173499A (en) * 2007-11-22 2008-05-07 广西壮族自治区公路桥梁工程总公司 Method and device for subaqueous construction of bridge pier
CN101871205A (en) * 2010-06-25 2010-10-27 中国水电顾问集团华东勘测设计研究院 Cylindrical shell construction platform for underwater operation

Also Published As

Publication number Publication date
CN102146681B (en) 2013-01-30

Similar Documents

Publication Publication Date Title
CN105298507B (en) A kind of underground pipe gallery construction method of top open cut bottom tunneler construction
CN103726495B (en) Coastal waters deep foundation pit supporting structure and construction method thereof
CN102704957A (en) Shed-frame method for shallowly burying large-sized underground structure construction
CN205530280U (en) Novel prefabricated two walls unification foundation ditch enclosure system
Render Geohydrology of the metropolitan Winnipeg area as related to groundwater supply and construction
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN108755719A (en) Seabed municipal tunnel over strait cofferdam open cutting construction method
Chiotis et al. Geological aspects on the sustainability of ancient aqueducts of Athens
CN102146681B (en) New subaqueous tunnel or pipeline digging method
RU2686206C1 (en) Method of erection of underground structures along river bed or canal
CN101141054A (en) Compaction grouting method for preventing land subsidence after non-digging horizontal drilling
CN108755724A (en) The external water drainage waterproof method of pipe gallery
CN108119150A (en) The method of dark-excavated passageway in weak soil
CN107476325B (en) The open caisson construction method of sewage treatment
Lolos The Hadrianic aqueduct in Corinth
TW201512494A (en) Method for anchoring immersed tube on sea floor
CN103696438A (en) Double-amplitude type hybrid construction method for underground engineering
KR100538398B1 (en) The method of construction (KY-5 Pipejacking and propulsion method) and apparatus for propulsion based on soft and weak layer soil
CN203022005U (en) Protective structure of tidal flat reclamation district deep foundation pit retaining and protecting structure
CN212202085U (en) Close-adhesion type open-and-underground excavation combined subway station structure
CN2911015Y (en) Diving tunnel
JP2002021098A (en) Cut and cover tunneling method
Sheehan et al. Secrets of the shaabiyat Recent developments in the archaeology of the (urban) oasis landscape of Al Ain
Friedman et al. The geotechnics of infrastructure development in Dublin, Ireland
Deng et al. Tai Tam Tuk reservoir dam in Hong Kong: historical background and site selection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130130