CN2911015Y - Diving tunnel - Google Patents

Diving tunnel Download PDF

Info

Publication number
CN2911015Y
CN2911015Y CN 200620019619 CN200620019619U CN2911015Y CN 2911015 Y CN2911015 Y CN 2911015Y CN 200620019619 CN200620019619 CN 200620019619 CN 200620019619 U CN200620019619 U CN 200620019619U CN 2911015 Y CN2911015 Y CN 2911015Y
Authority
CN
China
Prior art keywords
tunnel
diving
land
pipeline
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620019619
Other languages
Chinese (zh)
Inventor
张志坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620019619 priority Critical patent/CN2911015Y/en
Application granted granted Critical
Publication of CN2911015Y publication Critical patent/CN2911015Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a diving tunnel crossing rivers, lakes and shallow seas, which is the connection that the land import, the underwater tunnel, the land export connect sequentially in the underwater tunnel. The diving Tunnel set an underwater pipelines whose both ends are respectively connected with the land import and export. the internal pipe is supported by steel bar, the external thereof is enwraped with steel net, round bamboo, felt, finally, iron sheet is used to seal the external pipe and make it not leak. The steps of builting diving tunnel are: place the underwater pipeline in the water, drain away water inside the pipe from the land import and export, reinforce the inner wall of pipeline with steel bar, pour cement, reserve various pipelines on the bottom and lay the road at last.

Description

The diving tunnel
Technical field
The utility model relates to a kind of traffic tunnel of building in rivers, lake and shallow sea, is a kind of excavation diving tunnel of native stone under water of need not digging at the bottom.
Background technology
At present, knownly cross the river to wear the subaqueous tunnel in lake or coastal waters (shallow sea) be to be formed by connecting by land import, subaqueous tunnel, land outlet.The subaqueous tunnel is in the mudstone of certain distance under water, dig earlier and excavate cavitation, re-lay reinforcing bar, casting cement forms, it is the great engineering that a technical difficulty is big, investment is big, many local rivers, lake and shallow seas, build bridge to be difficult for, to build the subaqueous tunnel and suffer from technology, manpower, financial resources again and limit, have to heave a sigh by Wang Yang (water).
Summary of the invention
The lake is worn in existing river and the deficiency that the subaqueous tunnel technical difficulty is big, investment is big is built in the shallow sea in order to overcome, the utility model provides a kind of diving tunnel, excavation is dug in the mudstone under water in this tunnel, but directly the tunnel is laid on the bottom, reduce the engineering difficulty effectively, saved investment, shortened the duration.
The technical scheme that its technical problem that solves the utility model adopts is: in the subaqueous tunnel, land import, subaqueous tunnel, land outlet connect, and a submarine pipeline is set, and pipe ends is imported and exported with land respectively be connected.In the pipeline for reinforced bar support, the sealing that is wrapped outward, its internal diameter and land import and export are equal to.In the pipeline, about 3 meters at every interval is provided with a steelframe circle that is supported by movable disk, travel(l)ing rest.Wear from inside to outside on the steelframe circle and prick the compound steel rib, a plurality of steel rings are set on the outer reinforcement bar, form a saturating empty reinforcing bar pipeline.Pipeline outer wall wraps up with steel mesh, circle bamboo, asphaltic felt, and outermost layer wraps up welded seal, also available superpower plastic film environmental sealing with the book iron sheet.Steel mesh can increase stress surface, and the circle bamboo is light, the property of bearing is arranged, both can bear pressure, again can be suitably crooked, and asphaltic felt is waterproof but also can relax outer pressure to round bamboo not only.The book iron sheet of sealing can prevent that sealing infiltrates in the pipeline.Place submarine pipeline,, dig and push water-bed mud grooving shape aside, will tie up wrapped pipe with special ship and slowly sink under water earlier along pipeline rout.During sinking, initial one section is not finely wrapped up, and allows in the water inlet pipe road, to keep the pipeline internal and external pressure balance.After treating at the bottom of whole pipeline cascading waters, lift The initial segment parcel back submerged again.Then, from the land import and export water in the pump drainage main road simultaneously, and inner-walls of duct reinforced steel, casting cement become the tunnel, remove movable disk, travel(l)ing rest, give when staying various cable tubing the bottom, and road surface pavement can be built up the diving tunnel in rivers, lake and shallow sea.
The beneficial effects of the utility model are, can build up traffic tunnel under water not digging under the situation of excavating water-bed mudstone tunnel, and engineering and technical difficulty are little, small investment, and benefit is obvious.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the utility model diving tunnel design sketch.
Fig. 2 is diving tunnel the 1st an embodiment outer wall integument constructional drawing.
Fig. 3 is the saturating empty reinforcing bar pipeline constructional drawing of diving the 2nd embodiment in tunnel.
Fig. 4 is the 3rd the embodiment cross section constructional drawing in diving tunnel.
Fig. 5 is Fig. 3 movable disk, travel(l)ing rest and steelframe ring structure figure.
Fig. 6 is diving constructing tunnel figure.
1. diving tunnels are are 2. imported and exported, 3. water, 4. mud among the figure, 5. the face of land, 6. steelframe circle, 7. reinforcement bar, 8. steel ring, 9. steel mesh is 10. justified bamboo, 11. asphaltic felt, 12. book iron sheets, 13. the reinforced concrete pipiline wall, 14. traffic tracks, 15. cable tubings, 16. reinforced hole, 17. movable disk, 18. travel(l)ing rests, 19. mobile chain, 20. cranes, 21. ships.
The specific embodiment
In embodiment illustrated in fig. 2, on the reinforcing bar pipeline, steelframe circle (6), steel ring (8), reinforcement bar (7) connect, and reinforcement bar (7), steel mesh (9), circle bamboo (10), asphaltic felt (11) connect from inside to outside, and outermost is book iron sheet (a 12) parcel.
In another embodiment shown in Figure 3, on the reinforcing bar pipeline, steelframe circle (6), travel(l)ing rest (18), movable disk (17) connect, and steelframe circle (6), reinforced hole (16), reinforcement bar (7), steel ring (8) connect.
In the 3rd embodiment shown in Figure 4, in the diving tunnel, from inside to outside, reinforcing bar mixes mud tubes wall (13), steel mesh (9), circle bamboo (10), asphaltic felt (11), book iron sheet (12) is linked in sequence, and traffic track (14), cable tubing (15), reinforcing bar mix mud tubes wall (13) and connect.

Claims (3)

1, a kind of diving tunnel, in the subaqueous tunnel, land import, subaqueous tunnel, land outlet are linked in sequence, and it is characterized in that; The land import is connected with water-bed pipeline one end, and the water-bed pipeline other end is connected with the land outlet.
2, diving according to claim 1 tunnel, it is characterized in that: water-bed pipeline is a saturating empty reinforcing bar pipeline, and it is outer be that steel mesh, circle bamboo, asphaltic felt wrap up, and outermost is book iron sheet environmental sealing, does not seep water; In it movable disk, travel(l)ing rest, steelframe circle, reinforcement bar, steel ring connection.
3, diving according to claim 1 tunnel is characterized in that: water-bed inner-walls of duct is that reinforcing bar mixes earth, the bottom is the traffic track.
CN 200620019619 2006-06-16 2006-06-16 Diving tunnel Expired - Fee Related CN2911015Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620019619 CN2911015Y (en) 2006-06-16 2006-06-16 Diving tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620019619 CN2911015Y (en) 2006-06-16 2006-06-16 Diving tunnel

Publications (1)

Publication Number Publication Date
CN2911015Y true CN2911015Y (en) 2007-06-13

Family

ID=38132873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620019619 Expired - Fee Related CN2911015Y (en) 2006-06-16 2006-06-16 Diving tunnel

Country Status (1)

Country Link
CN (1) CN2911015Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894447A (en) * 2017-01-11 2017-06-27 中铁隧道勘测设计院有限公司 A kind of structure type in Seafloor sightseeing tunnel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894447A (en) * 2017-01-11 2017-06-27 中铁隧道勘测设计院有限公司 A kind of structure type in Seafloor sightseeing tunnel

Similar Documents

Publication Publication Date Title
CN101148890B (en) Bridge caisson composite pile foundation and reverse construction method thereof
CN101962958B (en) Bridge composite foundation consisting of open caisson and pile and construction method
CN103015456B (en) Rapid pit-in-pit form erecting method in foundation slab of buried concrete structure
CN103726495B (en) Coastal waters deep foundation pit supporting structure and construction method thereof
US20160376762A1 (en) Construction method for planting hollow columns in a seabed of a marine environment for supporting waterborne structures thereon
CN1256531C (en) Construction method for river crossing pipeline
CN101205721A (en) Method for surrounding water by combination of steel cofferdam and heavy-pressure rotary-spraying pile in deep-water low-pile cap construction
CN111851587B (en) Telescopic vibration-damping anchor-tying type suspension tunnel end connecting device and construction method
CN109137943B (en) Earth filling construction process for sea reclamation
CN204311435U (en) One is revolved and is dug occlusion steel concrete impervious wall
CN205205844U (en) Member is used in construction of tubular well precipitation in elevator foundation ditch or sump pit
CN112253847B (en) Pipeline construction method for sand geological water network area
CN2911015Y (en) Diving tunnel
CN108018854A (en) A kind of Ecotype Concrete support pile
CN206928281U (en) Pretensioning prestressed concrete porous hollow ecology stake
CN201580547U (en) Pontoon applicable to excavation operation on water surface
CN101603299B (en) Broken line type dam joint structure and construction method thereof
CN210369276U (en) Combined water pump house of underground tunnel
CN103775735A (en) Construction method for pipeline crossing river
Chen et al. Application of new concept waterproofing in Xiang’an undersea tunnel, China
CN2679245Y (en) Underwater ditcher for pipeline-crossing river
CN216618771U (en) Underwater immersed tube structure
RU2465408C1 (en) Method to construct and repair water conduits and headers of shallow waste water on bottom of rivers and water reservoirs
CN203247473U (en) Tooth-wall-type all-vertical-piled transparent entering sea route structure
CN215594119U (en) Open cut riverbed type river-crossing tunnel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070613