CN102128983B - 输配电线路相位测定方法 - Google Patents

输配电线路相位测定方法 Download PDF

Info

Publication number
CN102128983B
CN102128983B CN2011100275176A CN201110027517A CN102128983B CN 102128983 B CN102128983 B CN 102128983B CN 2011100275176 A CN2011100275176 A CN 2011100275176A CN 201110027517 A CN201110027517 A CN 201110027517A CN 102128983 B CN102128983 B CN 102128983B
Authority
CN
China
Prior art keywords
phase
transformer station
line
circuit
resistance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011100275176A
Other languages
English (en)
Other versions
CN102128983A (zh
Inventor
林奇惠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Fujian Electric Power Co Ltd
Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd
Taining Power Supply Co of State Grid Fujian Electric Power Co Ltd
Original Assignee
Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd
Taining Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd, Taining Power Supply Co of State Grid Fujian Electric Power Co Ltd filed Critical Sanming Power Supply Co of State Grid Fujian Electric Power Co Ltd
Priority to CN2011100275176A priority Critical patent/CN102128983B/zh
Publication of CN102128983A publication Critical patent/CN102128983A/zh
Application granted granted Critical
Publication of CN102128983B publication Critical patent/CN102128983B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

本发明公开了一种输配电线路相位测定方法,其通过在需测试的变电站的出线刀闸线路侧或电缆头上,两侧线路上均挂一组三相短路接地线,并假设线路的两侧分别为甲、乙变电站,且甲、乙两侧上的各相位分别为A、B、C相位,假设乙变电站为已知的系统相位,甲变电站的相位为待定相位,测试工作在甲变电站进行,通过拆除甲变电站该线路上三相短路接地线,再轮翻拆除乙变电站线路上的接地导线,进行摇测电阻,即可在线路两端未送电的情况下做相位测量,确保线路相位与系统相位吻合,并可摇测导线与地之间的绝缘电阻值。

Description

输配电线路相位测定方法
技术领域
    本发明涉及一种相位测定方法,特别是一种输配电线路相位测定方法。
背景技术
由于电气设备的运行条件限制,要求输、配电线路在投运前必须做好相位测量工作。新架设的输、配电线路,由于其中有转角、分段、换位等,尤其是在两端有电缆接入的情况下,更容易造成相位跳错,甚至还可能出现线路分段未接通的情况。测量相位,一般多采用核相器,但必须在线路两侧有电源的情况下,在某断开点进行测试,一些35KV以下线路两端送电并不方便,在一端缺电源的情况下,就无法进行相位的比对测量。
发明内容
本发明的目的在于克服现有技术的不足之处,而提供一种可在35KV及以下线路两端未送电的情况下做好相位测量,确保线路相位与系统相位吻合的输配电线路相位测定方法。
一种输配电线路相位测定方法,其步骤为:在测定前让线路处于检修状态下,测试地点在变电站线路出线刀闸线路侧或电缆头上,两侧线路上均挂一组三相短路接地线,并假设线路的两侧分别为甲、乙变电站,且甲、乙两侧上的各相位分别为A、B、C相位,假设乙变电站为已知的系统相位,甲变电站的相位为待定相位,测试工作在甲变电站进行,测试开始时;(1)先通知乙变电站人员测试工作开始,拆除甲变电站该线路上三相短路接地线,用兆欧表分别摇测AB、BC、CA三种组合的电阻,此时,由于乙变电站线路侧三相短路接地,故测试出的三种组合的电阻值均应为0,说明该线路三相均已全线接通,如果此时出现较大电阻值,说明:1、可能乙变电站线路侧三相短路接地未接好;2、线路有分段点未接通,应重新对全线路进行检查,直到找出原因;
(2)通知乙变电站人员,取下C相接地线,这时分别摇测AB、BC、CA三种组合的电阻,此时,由于乙变电站线路侧A、B两相短路接地,测出电阻为0的组合即为AB组合,而另一相就是C相,且由C相组成的CA、CB组合由于乙变电站C相未接地,其电阻均不为0,有较大的阻值,这样,就确定了甲变电站的C相相位,并可摇测C、A或B对地之间的绝缘电阻值;
(3)重复(2)步骤,轮流挂好C相或B相接地线,取下B相或A相接地线,依据步骤(2)的方法进行操作判断,即可在线路两端未送电的情况下做相位测量,确保线路相位与系统相位吻合,并可摇测导线与地之间的绝缘电阻值。
输关电阻值指的是:根据线路对地绝缘电阻和所接避雷器、变压器的不同而异,一般在1500ΜΩ以上。
所述的线路处于检修状态指的是线路两侧开关、刀闸均在断开位置,并在两侧变电站该线路出线刀闸线路侧挂三相短路接地线。
综上所述的,本发明相比现有技术有如下优点:
新架设的输、配电线路,在带电测量相位有困难时,经过以上测量方法,能确保:1)线路是全线导通的;2)线路两侧相位是一致的;3)可摇测出确定的线路导线对地绝缘电阻。 
附图说明
   图1是本发明的线路甲、乙两侧的假设相位示意图。
具体实施方式
下面结合实施例对本发明进行更详细的描述。
实施例1 
一种输配电线路相位测定方法,其步骤为:在测定前让线路处于检修状态下,测试地点在变电站线路出线刀闸线路侧,两侧线路上均挂一组三相短路接地线,并假设线路的两侧分别为甲、乙变电站,且甲、乙两侧上的各相位分别为A、B、C相位,假设乙变电站为已知的系统相位,甲变电站的相位为待定相位,测试工作在甲变电站进行,测试开始时;(1)先通知乙变电站人员测试工作开始,拆除甲变电站该线路上三相短路接地线,用兆欧表分别摇测AB、BC、CA三种组合的电阻,此时,由于乙变电站线路侧三相短路接地,故测试出的三种组合的电阻值均应为0,说明该线路三相均已全线接通,如果此时出现较大(根据线路对地绝缘电阻和所接避雷器、变压器的不同而异,一般在1500ΜΩ以上)电阻值,说明:1、可能乙变电站线路侧三相短路接地未接好;2、线路有分段点未接通,应重新对全线路进行检查,直到找出原因;
(2)通知乙变电站人员,取下C相接地线,这时分别摇测AB、BC、CA三种组合的电阻,此时,由于乙变电站线路侧A、B两相短路接地,测出电阻为0的组合即为AB组合,而另一相就是C相,且由C相组成的CA、CB组合由于乙变电站C相未接地,其电阻均不为0,有较大的阻值,这样,就确定了甲变电站的C相相位。并可摇测C与A或B(地)之间的绝缘电阻值。
(3)通知乙变电站人员,挂好C相接地线,取下B相接地线。这时分别摇测AB、BC、CA三种组合的电阻,此时,由于乙变电站线路侧A、C两相短路接地,测出电阻为0的组合即为AC组合,而另一相就是B相,且由B相组成的BA、BC组合由于乙变电站B相未接地,其电阻均不为0,有较大的阻值,这样,就确定了甲变电站的B相相位。并可摇测B与A或C(地)之间的绝缘电阻值。
(4)通知乙变电站人员,挂好B相接地线,取下A相接地线。这时分别摇测AB、BC、CA三种组合的电阻,此时,由于乙变电站线路侧B、C两相短路接地,测出电阻为0的组合即为BC组合,而另一相就是A相,且由A相组成的AB、AC组合由于乙变电站A相未接地,其电阻均不为0,有较大的阻值,这样,就确定了甲变电站的A相相位。并可摇测A与B或C(地)之间的绝缘电阻值。
本实施例未述部分与现有技术相同。

Claims (1)

1.一种输配电线路相位测定方法,其步骤为:在测定前让线路处于检修状态下,测试地点在变电站线路出线刀闸线路端或电缆头上,两端线路上均挂一组三相短路接地线,并假设线路的两端分别为甲、乙变电站,且甲、乙两端上的各相位分别为A、B、C相相位,假设乙变电站为已知的系统相位,甲变电站的相位为待定相位,测试工作在甲变电站进行,测试开始时:(1)先通知乙变电站人员测试工作开始,拆除甲变电站该线路上三相短路接地线,用2500伏特兆欧表分别摇测AB相、BC相、CA相三种组合的电阻,此时,由于乙变电站线路端三相短路接地,故测试出的三种组合的电阻值均应为0,说明该线路三相均已全线接通,如果此时出现较大电阻值,说明:乙变电站线路端三相短路接地未接好或线路有分段点未接通,应重新对全线路进行检查,直到找出原因;
(2)通知乙变电站人员,取下C相接地线,这时分别摇测AB相、BC相、CA相三种组合的电阻,此时,由于乙变电站线路端A、B两相短路接地,测出电阻为0的组合即为AB相组合,而另一相就是C相,且由C相组成的CA相、CB相组合由于乙变电站C相未接地,其电阻均不为0,有较大的阻值,这样,就确定了甲变电站的C相相位,并摇测C相对地之间的绝缘电阻值;
(3)挂好C相取下B相接地线,依据(2)步骤的方法进行操作判断,再挂好B相取下A相接地线,依据(2)步骤的方法进行操作判断,即可在线路两端未送电的情况下做相位测量,确保线路相位与系统相位吻合,并摇测线路与地之间的绝缘电阻值。
CN2011100275176A 2011-01-25 2011-01-25 输配电线路相位测定方法 Active CN102128983B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100275176A CN102128983B (zh) 2011-01-25 2011-01-25 输配电线路相位测定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100275176A CN102128983B (zh) 2011-01-25 2011-01-25 输配电线路相位测定方法

Publications (2)

Publication Number Publication Date
CN102128983A CN102128983A (zh) 2011-07-20
CN102128983B true CN102128983B (zh) 2012-11-21

Family

ID=44267142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100275176A Active CN102128983B (zh) 2011-01-25 2011-01-25 输配电线路相位测定方法

Country Status (1)

Country Link
CN (1) CN102128983B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102879657B (zh) * 2012-10-09 2015-07-01 国家电网公司 一种线路相序核对方法
CN103983853B (zh) * 2014-05-09 2018-03-20 国家电网公司 一种高压电缆交叉互联系统相位检查方法
CN104062502B (zh) * 2014-06-20 2017-11-17 国家电网公司 一种高压电缆交叉互联系统相位检查方法
CN105891613A (zh) * 2014-11-19 2016-08-24 国家电网公司 利用工频参数测试仪测量输电线路相序的方法
CN107688136B (zh) * 2017-07-31 2020-08-18 国网山东省电力公司电力科学研究院 一种特高压长距离输电线路接地点判断与定位方法
CN107394734B (zh) * 2017-08-30 2018-11-20 国网湖南省电力公司 35kV配电网线路的交流融冰方法
CN107658978A (zh) * 2017-09-13 2018-02-02 河南省三禾电气有限公司 一种智能配变终端设备以及智能配网设备监控系统
CN111983522B (zh) * 2020-08-26 2023-01-06 广东韶钢松山股份有限公司 电缆检测方法

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000162258A (ja) * 1998-11-30 2000-06-16 Tohoku Electric Power Co Inc 検相器
CN101644730B (zh) * 2009-08-25 2012-04-25 广东电网公司广州供电局 一种线路核相方法
CN101923114B (zh) * 2010-07-15 2013-04-17 安徽省电力公司宣城供电公司 中压配电线路环网电阻定相法

Also Published As

Publication number Publication date
CN102128983A (zh) 2011-07-20

Similar Documents

Publication Publication Date Title
CN102128983B (zh) 输配电线路相位测定方法
JP5695889B2 (ja) 単一のクランプを使用して鉄塔のアース接地抵抗を測定する方法
CN106463944B (zh) 用于检测变压器的断相条件的方法
US8912803B2 (en) Electrostatic shielding technique on high voltage diodes
CN101403779B (zh) 一种高压输电线路参数测量装置及系统
CN201327509Y (zh) 一种高压输电线路参数测量装置及系统
CN107329050B (zh) 一种线路故障检测方法、检测装置及检测系统
CN105445567B (zh) 全封闭式gis系统的核相方法
CN104007354B (zh) 10kV氧化锌避雷器与电缆的整组试验电路和方法
CN109283421A (zh) 一种铁路牵引变电所低电压通电检测试验方法及装置
KR102070650B1 (ko) 테스트 플러그용 단락점검장치
EP2196812A1 (en) Monitoring device for detecting earth faults
CN202330518U (zh) 架空输电线路参数测试用防感应电操作箱
CN102830327A (zh) 小电流接地系统单相接地故障线的判别方法和装置
CN204597008U (zh) 一种防虚接电流试验接线端子
CN104466788B (zh) 配电架空线路的检测方法和装置
CN104833902A (zh) 桥架敷设电缆低阻值故障点定位方法
Tremblay et al. Using voltage sag measurements for advanced fault location and condition-based maintenance
CN202837479U (zh) 线缆的高压绝缘测试装置
CN202221434U (zh) 一种绝缘摇表测量辅助操作平台
CN103954889A (zh) 基于钳形电流传感器的电容型设备绝缘参数带电测试方法
CN205385160U (zh) 一种便携式接地线带电报警装置
CN103983853A (zh) 一种高压电缆交叉互联系统相位检查方法
KR101873005B1 (ko) 3상 4선식 활선 절연 저항 측정용 영상 변류 장치
CN202837471U (zh) 小电流接地系统单相接地故障线的判别装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: FUJIAN PROVINCE ELETRIC POWER CO., LTD. SANMING POWER SUPPLY BUREAU

Effective date: 20121207

Owner name: FUJIAN ELECTRIC POWER CO., LTD. FUJIAN PROVINCE EL

Free format text: FORMER OWNER: FUJIAN TAINING POWER SUPPLY CO., LTD.

Effective date: 20121207

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 365000 SANMING, FUJIAN PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20121207

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Fujian Electric Power Co., Ltd.

Patentee after: Sanming Electricity Bureau of Fujian Electric Power Co., Ltd.

Patentee after: Fujian Taining County Power Supply Co., Ltd.

Address before: Fujian 365000 Sanming City province Meliet District listed Street No. 1032

Patentee before: Sanming Electricity Bureau of Fujian Electric Power Co., Ltd.

Patentee before: Fujian Taining County Power Supply Co., Ltd.