CN105891613A - 利用工频参数测试仪测量输电线路相序的方法 - Google Patents

利用工频参数测试仪测量输电线路相序的方法 Download PDF

Info

Publication number
CN105891613A
CN105891613A CN201410686404.0A CN201410686404A CN105891613A CN 105891613 A CN105891613 A CN 105891613A CN 201410686404 A CN201410686404 A CN 201410686404A CN 105891613 A CN105891613 A CN 105891613A
Authority
CN
China
Prior art keywords
phase
circuit
power
line
phase sequence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410686404.0A
Other languages
English (en)
Inventor
陈长安
陈军
宋翔林
张丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hubei Electric Power Co Huanggang Power Supply Corp Transmission And Transformation Engineering Of Huanggang Dongyuan Electric Utility Group Co Ltd
State Grid Corp of China SGCC
Huanggang Power Supply Co of State Grid Hubei Electric Power Co Ltd
Original Assignee
State Grid Hubei Electric Power Co Huanggang Power Supply Corp Transmission And Transformation Engineering Of Huanggang Dongyuan Electric Utility Group Co Ltd
State Grid Corp of China SGCC
Huanggang Power Supply Co of State Grid Hubei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Hubei Electric Power Co Huanggang Power Supply Corp Transmission And Transformation Engineering Of Huanggang Dongyuan Electric Utility Group Co Ltd, State Grid Corp of China SGCC, Huanggang Power Supply Co of State Grid Hubei Electric Power Co Ltd filed Critical State Grid Hubei Electric Power Co Huanggang Power Supply Corp Transmission And Transformation Engineering Of Huanggang Dongyuan Electric Utility Group Co Ltd
Priority to CN201410686404.0A priority Critical patent/CN105891613A/zh
Publication of CN105891613A publication Critical patent/CN105891613A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

本发明公开了一种利用工频线路参数测试仪测量高压架空输电线路相序的方法,它解决了:线路相序人工逐基转角塔核对,花费时间越长、易出错的问题。本发明特征在于:利用工频线路参数测试仪测量单相回路电流及电压,可判定回路是否畅通。步骤:在回路的首端开路、未端接地条件下,通过对首端加测量电流,观察仪器采集该回路升压后,反馈的输出电流数值及电压数值,判定该回路的首端和末端是否在同一回路内。若输出电流上升至设置的额定电流输出值(3A或5A),则判定单相首端和末端在同一回路,即该相送电侧和受电侧相序一致;若输出电流接近于零,则判定线路首端和末端不在同一回路,即判定该相送电侧和受电侧相序错误。

Description

利用工频参数测试仪测量输电线路相序的方法
一、技术领域
本发明属于供电线路运行和维修的管理方法,尤其是涉及到一种利用工频参数测试仪测量线路相序的方法。
二、背景技术
现在的线路多存在π开接入、换位、换相以及施工设计可能存在相序错误等情况,人工核对线路相序耗费人力、物力、财力较大,而且周期较长,需施工技术人员拿设计单位相序图逐基转角塔核对,往往需花费数天完成工作,越长线路花费时间越长。且遇到π开的线路,还需核对老线路相序,经常遇到路难找、塔位核对漏掉等因素造成的相序核对错误,导致送电期间返工调整相序。
变电站相序核对,通常在送电期间利用核相仪核相,该方法适用于受电侧变电站异电源核对相序,也就是说受电侧变电站必须有2条及以上电源进线才能核对相序,对单电源进线的变电站,核相仪核相就无法发挥作用。
三、发明内容
本发明的目的是为市场提供一种使用方便、情况直观、劳动强度小、工作效率高的利用工频参数测试仪测量线路相序的方法。
本发明的技术方案是:利用工频线路参数测试仪,对新建输电线路进行相序测量核对,具体包括如下步骤:
步骤一:相序核对测量接线,首先将被测线路的受电侧单相接地(要求其它两相开路),在被测线路的送电侧单相挂接电压线、电流线及仪器电源线、仪器接地线。
步骤二:设置额定测量电流,在工频线路参数测试仪面板中设置额定测量电流为3A或5A;
步骤三:记录线路测量数据,记录在50.0HZ、47.5HZ、52.5HZ下测量的电压和电流数据;
步骤四:分析判定相序对错,若输出电流上升至设置的额定电流输出值(3A或5A),且电压数据正常,则判定单相首端和末端在同一回路,即该相送电侧和受电侧相序一致;若输出电流接近于零,且电压接近于零,则判定线路首端和末端不在同一回路,即判定该相送电侧和受电侧相序错误。
本发明的有益效果是:不仅具有使用简单、劳动强度小、工作效率高等优点,而且对线路相序测量准确,保证了输电线路一次投运成功率,从而更好地达到国网公司精细化管理的要求标准。
四、具体实施方式
将线路送电侧视为首端、受电侧视为末端。
A相测试:将首端变电站和末端变电站线路间隔出线侧三相同期地刀拉开,在未端变电站出线间隔A相挂一根接地线,将A相短接接地(B、C两相悬空),按下图完成接线,将电流设置为3A或5A。启动仪器通过对首端加测量电压,观察仪器采集该回路升压后,反馈的输出电流数值,若输出电流上升至设置的额定电流输出值(3A或5A),则判定单相首端和末端在同一回路,即该相送电侧和受电侧相序一致;若输出电流接近于零,则判定线路首端和末端不在同一回路,即判定该相送电侧和受电侧相序错误。
B相测试:将首端变电站和末端变电站线路间隔出线侧三相同期地刀拉开,在未端变电站出线间隔B相挂一根接地线,将B相短接接地(A、C两相悬空),在按下图完成接线,将电流设置为3A或5A。启动仪器通过对首端加测量电压,观察仪器采集该回路升压后,反馈的输出电流数 值,若输出电流上升至设置的额定电流输出值(3A或5A),则判定单相首端和末端在同一回路,即该相送电侧和受电侧相序一致;若输出电流接近于零,则判定线路首端和末端不在同一回路,即判定该相送电侧和受电侧相序错误。
C相测试:将首端变电站和末端变电站线路间隔出线侧三相同期地刀拉开,在未端变电站出线间隔A相挂一根接地线,将C相短接接地(A、B两相悬空),在按下图完成接线,将电流设置为3A或5A。启动仪器通过对首端加测量电压,观察仪器采集该回路升压后,反馈的输出电流数值,若输出电流上升至设置的额定电流输出值(3A或5A),则判定单相首端和末端在同一回路,即该相送电侧和受电侧相序一致;若输出电流接近于零,则判定线路首端和末端不在同一回路,即判定该相送电侧和受电侧相序错误。
五、附图说明
图1是输电线路相序测量接线图
2013年度相序测量情况,具体参照见下表:

Claims (1)

1.一种利用工频线路参数测试仪测量高压输电线路相序的方法,包括如下步骤:
步骤一:相序核对测量接线,首先将被测线路的受电侧单相接地(要求其它两相开路),在被测线路的送电侧单相挂接电压线、电流线及仪器电源线、仪器接地线。
步骤二:设置额定测量电流,在工频线路参数测试仪面板中设置额定测量电流为3A或5A;
步骤三:记录线路测量数据,记录在50.0HZ、47.5HZ、52.5HZ下测量的电压和电流数据;
步骤四:分析判定相序对错,若输出电流上升至设置的额定电流输出值(3A或5A),且电压数据正常,则判定单相首端和末端在同一回路,即该相送电侧和受电侧相序一致;若输出电流接近于零,且电压接近于零,则判定线路首端和末端不在同一回路,即判定该相送电侧和受电侧相序错误。
CN201410686404.0A 2014-11-19 2014-11-19 利用工频参数测试仪测量输电线路相序的方法 Pending CN105891613A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410686404.0A CN105891613A (zh) 2014-11-19 2014-11-19 利用工频参数测试仪测量输电线路相序的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410686404.0A CN105891613A (zh) 2014-11-19 2014-11-19 利用工频参数测试仪测量输电线路相序的方法

Publications (1)

Publication Number Publication Date
CN105891613A true CN105891613A (zh) 2016-08-24

Family

ID=56698894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410686404.0A Pending CN105891613A (zh) 2014-11-19 2014-11-19 利用工频参数测试仪测量输电线路相序的方法

Country Status (1)

Country Link
CN (1) CN105891613A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107271854A (zh) * 2017-07-28 2017-10-20 北京航天光华电子技术有限公司 一种双冗余等电位电缆网混线测试装置及测试方法
CN109782090A (zh) * 2019-01-08 2019-05-21 国网安徽省电力有限公司合肥供电公司 一种判断用电户变关系的方法
CN114184854A (zh) * 2021-11-15 2022-03-15 国网浙江省电力有限公司嵊州市供电公司 基于物联网技术的远程定相系统及方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101644730A (zh) * 2009-08-25 2010-02-10 广东电网公司广州供电局 一种线路核相方法
CN102128983A (zh) * 2011-01-25 2011-07-20 福建省电力有限公司三明电业局 输配电线路相位测定方法
CN102565618A (zh) * 2012-01-31 2012-07-11 云南电网公司 变电站零序电压回路检验方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101644730A (zh) * 2009-08-25 2010-02-10 广东电网公司广州供电局 一种线路核相方法
CN102128983A (zh) * 2011-01-25 2011-07-20 福建省电力有限公司三明电业局 输配电线路相位测定方法
CN102565618A (zh) * 2012-01-31 2012-07-11 云南电网公司 变电站零序电压回路检验方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107271854A (zh) * 2017-07-28 2017-10-20 北京航天光华电子技术有限公司 一种双冗余等电位电缆网混线测试装置及测试方法
CN107271854B (zh) * 2017-07-28 2023-08-29 北京航天光华电子技术有限公司 一种双冗余等电位电缆网混线测试装置及测试方法
CN109782090A (zh) * 2019-01-08 2019-05-21 国网安徽省电力有限公司合肥供电公司 一种判断用电户变关系的方法
CN109782090B (zh) * 2019-01-08 2021-05-25 国网安徽省电力有限公司合肥供电公司 一种判断用电户变关系的方法
CN114184854A (zh) * 2021-11-15 2022-03-15 国网浙江省电力有限公司嵊州市供电公司 基于物联网技术的远程定相系统及方法

Similar Documents

Publication Publication Date Title
EP3045930B1 (en) Testing system of gis electronic mutual inductor and method therefor
Meyer et al. Harmonic and supraharmonic emission of on-board electric vehicle chargers
CN103760467A (zh) 一种配电网单相接地故障点巡查方法
CN103852697B (zh) 电缆局部放电检测装置
CN103675409B (zh) 一种永磁电机空载反电动势测量方法及装置
CN202548258U (zh) 交流电流电压回路检验装置
CN102508118A (zh) 一种配出中性导体的it电力系统接地故障选线方法
CN105891613A (zh) 利用工频参数测试仪测量输电线路相序的方法
CN103616574A (zh) 一种电动汽车储能并网逆变器防孤岛检测系统及检测方法
Schöttke et al. Transfer characteristic of a MV/LV transformer in the frequency range between 2 kHz and 150 kHz
CN205333777U (zh) 一种单相接地故障定位装置
CN108562860A (zh) 电能表双路辅助电源功耗自动测试系统及测试方法
CN103645415A (zh) 一种带电检查电能计量装置接线的实用方法
CN203396866U (zh) 一种电动汽车储能并网逆变器防孤岛检测系统
CN103076529B (zh) Ct二次回路智能检测方法
CN203101571U (zh) 二次公共回路多点接地故障测试装置
CN103743994B (zh) 低压带负荷测试方法及装置
CN102879657B (zh) 一种线路相序核对方法
CN204679581U (zh) 一种便携式电流互感器极性测试装置
CN203191540U (zh) 负控终端与电表配对调试装置
CN208172234U (zh) 一种电流互感器的变比、极性检测试验装置
CN107037389B (zh) 一种pt通压方法
Rucinski et al. Analysis of electromagnetic disturbances in DC network of grid connected building-integrated photovoltaic system
CN103605012B (zh) 一种励磁系统试验小车
CN205844414U (zh) 一种基于钳表测量的接地电阻测试电路结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160824

WD01 Invention patent application deemed withdrawn after publication