CN103983853B - 一种高压电缆交叉互联系统相位检查方法 - Google Patents
一种高压电缆交叉互联系统相位检查方法 Download PDFInfo
- Publication number
- CN103983853B CN103983853B CN201410194132.2A CN201410194132A CN103983853B CN 103983853 B CN103983853 B CN 103983853B CN 201410194132 A CN201410194132 A CN 201410194132A CN 103983853 B CN103983853 B CN 103983853B
- Authority
- CN
- China
- Prior art keywords
- phases
- cross interconnected
- tension cable
- phase
- phase shift
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000007689 inspection Methods 0.000 title claims abstract description 42
- 238000000034 method Methods 0.000 title claims abstract description 15
- 230000010363 phase shift Effects 0.000 claims abstract description 28
- 238000012360 testing method Methods 0.000 claims abstract description 19
- 239000002184 metal Substances 0.000 claims description 17
- 230000001681 protective effect Effects 0.000 claims description 17
- 238000002360 preparation method Methods 0.000 claims description 3
- 238000004132 cross linking Methods 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 229920000573 polyethylene Polymers 0.000 description 2
- 238000004804 winding Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000013011 mating Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
本发明公开了一种高压电缆交叉互联系统相位检查方法,该方法包括:步骤1:检测人员在高压电缆的首段进行接线;步骤2:检测人员到高压电缆的1号接头箱对交叉互联系统进行相位检查;步骤3:检测人员到高压电缆的2号接头箱对交叉互联系统进行相位检查;步骤4:重复以上步骤,直至完成全部交叉互联系统的相位检查工作。本发明方法通过对以往高压电缆交叉互联系统相位检查方法进行改进,即可在对端无人配合的情况下,仅通过一块普通的万用表和简单的接线,快捷、高效地完成相位检查工作。
Description
技术领域
本发明涉及一种电压相位测取装置,尤其涉及一种高压电缆交叉互联系统相位检查方法。
背景技术
高压交联聚乙烯电缆由于其优秀的电气性能、良好的耐热性能,以及敷设及附件安装方便和不受落差限制等优点,同时考虑市政规划的要求,市区及开发区电网主网架的架空线路逐渐被高压电缆所取代。
由于电压等级高、通流容量大,高压交联聚乙烯电缆均为单芯电缆。单芯电缆的导体和金属护套的关系,就相当于变压器的一次绕组和二次绕组,当电缆导体流过交流电流时,会在金属护套产生感应电压,因此单芯电缆金属护套的连接方式对高压电缆的载流量和安全稳定运行有着重要影响。
高压电缆的交叉互联系统,就是将长距离的高压单芯电缆的金属护套按一定规律进行连接而组成的系统,而交叉互联系统的相位检查则是高压电缆现场交接试验项目之一。
发明内容
本发明的目的在于提供一种高压电缆交叉互联系统相位检查方法,旨在解决现有技术在进行相位检查时,必须有技术人员在对端进行配合带来的不便等问题。本发明方法只需分别将三相金属护套按照直接接地、经电阻接地和不接地的方式连接,检测人员即可在另一端完成相位检查工作。
创新点:本发明仅通过一块普通的万用表和简单的接线,即可对高压电缆的交叉互联系统进行检查,无需任何人员配合。
本发明是这样实现的,一种高压电缆交叉互联系统相位检查方法包括:步骤1:检测人员在高压电缆的首段进行接线;步骤2:检测人员到高压电缆的1号接头箱对交叉互联系统进行相位检查;步骤3:检测人员到高压电缆的2号接头箱对交叉互联系统进行相位检查;步骤4:重复以上步骤,直至完成全部交叉互联系统的相位检查工作。
所述步骤1:首先,检测人员在高压电缆的首段进行接线。将金属护套的a相直接接地,将b相经过100欧姆的电阻接地,c相悬空不接地。
所述步骤2:检测人员到高压电缆的1号接头箱对交叉互联系统进行相位检查。1号接头箱处,电缆接头施工时会通过同轴电缆将两段电缆的金属护套分别引出至交叉互联箱,因此会有6相,即同轴电缆内线芯3相和外线芯3相。用万用表的电阻(欧姆)档,分别对地测量同轴电缆的内外线芯,此时电阻为零的则为电缆首端的a相,电阻约为100欧姆的为b相,c相电阻无穷大,其余3相线芯(a1、b1、c1)的电阻亦为无穷大,且该3相线芯指向2号接头箱。再将金属护套的a1相直接接地,将b1相经过100欧姆的电阻接地,c1相悬空不接地,为下一步相位检查工作做准备。
所述步骤3:检测人员到高压电缆的2号接头箱对交叉互联系统进行相位检查。重复第二步检测内容,以确定2号接头箱的a1、b1、c1相位正确,并指向1号接头箱。再将a2、b2、c2相金属护套做好相位检查准备,前往3号接头箱进行检查。
所述步骤4:重复以上步骤,直至完成全部交叉互联系统的相位检查工作。
本发明的一种高压电缆交叉互联系统相位检查方法,本发明通过对以往高压电缆交叉互联系统相位检查方法进行改进,即可在对端无人配合的情况下,仅通过一块普通的万用表和简单的接线,快捷、高效地完成相位检查工作。
附图说明
图1是本发明实施例提供的高压电缆交叉互联系统示意图;
图2是本发明实施例提供的同轴电缆引出图;
图3是本发明实施例提供的交叉互联箱实际接线图;
图4是本发明实施例提供的一种高压电缆交叉互联系统相位检查方法实施方法图。
具体实施方式
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
如图4所示,本发明是这样实现的,一种高压电缆交叉互联系统相位检查方法包括:步骤1:检测人员在高压电缆的首段进行接线;步骤2:检测人员到高压电缆的1号接头箱对交叉互联系统进行相位检查;步骤3:检测人员到高压电缆的2号接头箱对交叉互联系统进行相位检查;步骤4:重复以上步骤,直至完成全部交叉互联系统的相位检查工作。
所述步骤1:首先,检测人员在高压电缆的首段进行接线。将金属护套的a相直接接地,将b相经过100欧姆的电阻接地,c相悬空不接地。
所述步骤2:检测人员到高压电缆的1号接头箱对交叉互联系统进行相位检查。1号接头箱处,电缆接头施工时会通过同轴电缆将两段电缆的金属护套分别引出(见图2)至交叉互联箱(见图3),因此会有6相,即同轴电缆内线芯3相(图3上部)和外线芯3相(图3下部)。用万用表的电阻(欧姆)档,分别对地测量同轴电缆的内外线芯,此时电阻为零的则为电缆首端的a相,电阻约为100欧姆的为b相,c相电阻无穷大,其余3相线芯(a1、b1、c1)的电阻亦为无穷大,且该3相线芯指向2号接头箱。再将金属护套的a1相直接接地,将b1相经过100欧姆的电阻接地,c1相悬空不接地,为下一步相位检查工作做准备。
所述步骤3:检测人员到高压电缆的2号接头箱对交叉互联系统进行相位检查。重复第二步检测内容,以确定2号接头箱的a1、b1、c1相位正确,并指向1号接头箱。再将a2、b2、c2相金属护套做好相位检查准备,前往3号接头箱进行检查。
所述步骤4:重复以上步骤,直至完成全部交叉互联系统的相位检查工作。
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性的劳动即可做出的各种修改或变形仍在本发明的保护范围之内。
Claims (1)
1.一种高压电缆交叉互联系统相位检查方法,其特征在于,包括:步骤1:检测人员在高压电缆的首端进行接线;步骤2:检测人员到高压电缆的1号接头箱对交叉互联系统进行相位检查;步骤3:检测人员到高压电缆的2号接头箱对交叉互联系统进行相位检查;步骤4:重复以上步骤,直至完成全部交叉互联系统的相位检查工作;
步骤1中对高压电缆的首端进行接线为将金属护套的a相直接接地,将b相经过100欧姆的电阻接地,c相悬空不接地;
步骤2中电缆接头通过同轴电缆将两段电缆的金属护套分别引出至交叉互联箱,即接头箱,分别对地测量同轴电缆的内外线芯电阻,确定1号接头箱的a相、b相和c相,接着将a相、b相和c相对应的1号接头箱的a1相、b1相和c1相的金属护套做好相位检查准备,具体为:a1相直接接地,b1相经过100欧姆的电阻接地,c1相悬空不接地;
步骤3中重复步骤2中内容,以确保确定2号接头箱的a1、b1、c1相位正确,并指向1号接头箱;再将a1、b1、c1相对应的2号接头箱的a2、b2、c2相金属护套做好相位检查准备,前往3号接头箱进行检查;
步骤4中重复以上步骤1~步骤3,直至完成全部交叉互联系统的相位检查工作。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410194132.2A CN103983853B (zh) | 2014-05-09 | 2014-05-09 | 一种高压电缆交叉互联系统相位检查方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410194132.2A CN103983853B (zh) | 2014-05-09 | 2014-05-09 | 一种高压电缆交叉互联系统相位检查方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103983853A CN103983853A (zh) | 2014-08-13 |
CN103983853B true CN103983853B (zh) | 2018-03-20 |
Family
ID=51275899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410194132.2A Active CN103983853B (zh) | 2014-05-09 | 2014-05-09 | 一种高压电缆交叉互联系统相位检查方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103983853B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104062502B (zh) * | 2014-06-20 | 2017-11-17 | 国家电网公司 | 一种高压电缆交叉互联系统相位检查方法 |
CN108680816B (zh) * | 2018-03-28 | 2019-07-23 | 国网天津市电力公司 | 一种高压电缆交叉互联接地系统带电核对方法 |
CN109412146B (zh) * | 2018-10-17 | 2022-06-07 | 国网上海市电力公司 | 一种电力电缆交叉互联在线修正装置及方法 |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5533803Y2 (zh) * | 1974-06-27 | 1980-08-11 | ||
US4500796A (en) * | 1983-05-13 | 1985-02-19 | Emerson Electric Co. | System and method of electrically interconnecting multiple lighting fixtures |
US7764067B2 (en) * | 2007-12-27 | 2010-07-27 | Caterpillar Inc | High voltage cable testing method |
CN201319045Y (zh) * | 2008-11-05 | 2009-09-30 | 山西省电力公司电力科学研究院 | 一种大型接地网接地阻抗测试电缆 |
CN102128983B (zh) * | 2011-01-25 | 2012-11-21 | 福建省电力有限公司三明电业局 | 输配电线路相位测定方法 |
CN202034753U (zh) * | 2011-03-25 | 2011-11-09 | 长沙电缆附件有限公司 | 单芯电力电缆用交叉互联箱 |
CN102636728B (zh) * | 2011-12-22 | 2016-01-20 | 中国电力科学研究院 | 基于力矩分解法识别负阻尼低频振荡的方法 |
CN102680854B (zh) * | 2012-05-08 | 2014-08-20 | 山东康威通信技术股份有限公司 | 一种电力电缆隐性故障及接头工艺缺陷在线监测方法 |
CN102928697B (zh) * | 2012-10-19 | 2015-03-18 | 广东电网公司电力科学研究院 | 励磁调节器pss2a模型低频段阻尼检测方法及系统 |
CN102914733A (zh) * | 2012-11-16 | 2013-02-06 | 中国电力科学研究院 | 一种大长度超高压交联电缆阻尼振荡波局部放电现场检测方法 |
CN103267931B (zh) * | 2013-04-19 | 2015-04-22 | 国家电网公司 | 一种交叉互联电缆中间接头局部放电的定位方法 |
CN203456149U (zh) * | 2013-08-28 | 2014-02-26 | 远东电缆有限公司 | 一种超高压交叉互联用电缆 |
CN103630814B (zh) * | 2013-12-11 | 2016-12-07 | 国家电网公司 | 高压电缆在交叉互联下绝缘介质损耗角趋势在线监测方法 |
-
2014
- 2014-05-09 CN CN201410194132.2A patent/CN103983853B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN103983853A (zh) | 2014-08-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103323751B (zh) | 一种高压短电缆绝缘终端局部放电测试装置及使用方法 | |
CN108509712B (zh) | 一种电缆线路的过电压仿真分析方法及系统 | |
CN103983853B (zh) | 一种高压电缆交叉互联系统相位检查方法 | |
CN106940413A (zh) | 高压长电缆线路的短路故障区段判断方法及装置 | |
CN108152662A (zh) | 一种基于接地电流的交叉互联箱故障诊断方法及系统 | |
CN104062502B (zh) | 一种高压电缆交叉互联系统相位检查方法 | |
CN106451220A (zh) | 带电更换同杆多回路杆塔上设备的旁路设备及方法 | |
CN205429680U (zh) | 一种电缆交叉互联箱 | |
Peppas et al. | Induced Voltage on a above-ground natural gas/oil pipeline due to lightning strike on a Transmission line | |
Khamlichi et al. | Measuring cable sheath currents to detect defects in cable sheath connections | |
CN205157639U (zh) | 一种运用gps同步的地网分流矢量测试系统 | |
CN104316736B (zh) | 开关柜工频交流耐压试验用组合绝缘引线 | |
Candela et al. | A model for the study of sheath currents in medium voltage cables for industrial application | |
CN103424628A (zh) | 测量平行电网线路正序阻抗的方法 | |
CN107271775B (zh) | 一种电力架空线路相位检查方法 | |
TWI627598B (zh) | 用於計算輸、配電線路的披覆感應電壓與循環電流的圖形化人機介面及方法 | |
CN209516450U (zh) | 具有绝缘连接结构的气体绝缘管线 | |
CN203871139U (zh) | 一种抑制低压绕组中性点电位漂移的结构 | |
Surianu | Determination of the induced voltages by 220 kV electric overhead power lines working in parallel and narrow routes. Measurements on the ground and mathematical model | |
CN205985382U (zh) | 一种内置有铠装测温光缆的陆缆的接地结构 | |
CN104730325B (zh) | 电缆线芯故障检修时感应过电压和过电流的检测方法 | |
CN104849625A (zh) | 含有环形网络的电网系统的故障点定位方法及电网系统 | |
CN206225183U (zh) | 变压器接地电阻装置 | |
CN104391193A (zh) | 一种气体绝缘变电站智能组件电磁骚扰的模拟测试方法 | |
Kruizinga et al. | The effects of branches on condition related signals in Low Voltage underground power systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |