Prior art keywords
built
waterstop
anchor formula
dovetail groove
sticking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2011100059266A
Other languages
Chinese (zh)
Other versions
CN102121278A (en
Inventor
吴兆圣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Blue Shield Holdings Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011100059266A priority Critical patent/CN102121278B/en
Publication of CN102121278A publication Critical patent/CN102121278A/en
Application granted granted Critical
Publication of CN102121278B publication Critical patent/CN102121278B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The invention discloses a waterproof method for a movement joint on a building and an adhesive anchorage built-in water stop. The waterproof method comprises the following steps of: bonding a dovetail groove model made of foam rubber on one side of a movement joint template close to an upstream face; forming a dovetail groove on one side of the movement joint, wherein the opening of the dovetail groove faces to the movement joint; bonding the first wing of the adhesive anchorage built-in water stop in the dovetail groove; bonding an extruded sheet on concrete at one side of the movement joint; and bonding a response type wet pavement abnormal adhesion rubber sheet on the second wing of the adhesive anchorage built-in water stop in advance and bonding the second wing of the adhesive anchorage built-in water stop in concrete at the other side of the movement joint. By adopting the method, a fine aperture between the adhesive anchorage built-in water stop and concrete can be eliminated, long-term airtight waterproofness is realized, most concrete structures can be protected and a good waterproof effect is achieved; moreover, the adhesive anchorage built-in water stop can be effectively protected in an entire implement process, and the construction quality is ensured.

Description

A kind of building waterproofing of movement joints method and the built-in waterstop of a kind of sticking anchor formula
Technical field
The present invention relates to the buildings waterproof field, relate in particular to a kind of building waterproofing of movement joints method and the built-in waterstop of a kind of sticking anchor formula.
Background technology
The underground construction deformation joint is the position that seepage takes place the most easily, and the multiple tracks waterproof measure is set usually, also have main body waterproofing course and additional waterproofing layer in addition, but seam place seepage is difficult to still avoid.The design details of existing waterproofing of movement joints and construction technology have continued 50 years, do not have what change.Interrelated data is introduced, and according to incompletely statistics, in the engineering practice, 60%~70% deformation joint is arranged approximately, has percolating water phenomenon in various degree, and the seepage of deformation joint has had a strong impact on the quality of construction work.
In the present national technical specification; Buried water stop during the waterproof of mandatory provision deformation joint must be selected; Waterproof is carried out at middle part at concrete structure, and the both wings of buried water stop are imbedded the concrete of deformation joint both sides respectively in, and the concrete shake puddling below the waterstop is real; The extruding waterstop, block water through.
This waterproof method is imperfection on sealing mechanism, by compressing, extruding waterstop sealing, but can not form water-tight.Especially under long-term hydraulic pressure, be difficult to keep normal duty.
And when waterstop was pre-buried, it was scrappy to cause first fluid concrete deformation joint template to cut apart, the supporting difficulty; Run mould, spillage easily; Waterstop loses correct position, and is poor at the concrete quality of deformation joint, and the width of seam is not of uniform size; Concrete under the waterstop is difficult to fill closely knit, and is unfavorable to sealing.
When construction, a wing of waterstop is embedded in the first concreting in addition, and another wing is exposed to the outside; Before second pouring, pass through operations such as form removal, formwork, assembling reinforcement, just be fixed; The cross-operation at the scene of each operation is difficult to waterstop is effectively protected, and waterstop is in case damaged; It is quite high to repair difficulty, perhaps can't repair.
At last, be that the extruding waterstop carries out waterproof owing to what lean on, concrete must have certain thickness under the waterstop, causes waterstop away from upstream face.Even if the waterproof success can only be protected the half storey concrete structure.
Summary of the invention
The invention provides a kind of building waterproofing of movement joints method and the built-in waterstop of a kind of sticking anchor formula, it can form water-tight, good water-proof effect, and can protect most of concrete structure.
Technical scheme of the present invention is: a kind of building waterproofing of movement joints method comprises step:
Step 1, deformation slit formwork is fixed in the deformation joint, will be bonded in the side of deformation slit formwork with the dovetail groove model that foam rubber is processed near upstream face; At a side concreting of this deformation joint, solidify the back and remove said dovetail groove model and deformation slit formwork, at the side formation dovetail groove of said deformation joint, the opening of this dovetail groove is towards said deformation joint;
Step 2, in said dovetail groove, insert adhesive, first wing of the sticking built-in waterstop of anchor formula is filled in the said dovetail groove, first wing of the built-in waterstop of this sticking anchor formula is bonded in the said dovetail groove; Wherein, The cross section of first wing of the built-in waterstop of said sticking anchor formula is a zigzag; The cross section of the tail end of second wing of the built-in waterstop of said sticking anchor formula is a triangle, and the cross section at the middle part of the built-in waterstop of said sticking anchor formula is the U type, in this U type is curved, is bonded with formed rubber strip;
Step 3, opening that said U type is curved are towards upstream face; Extruded sheet is bonded on the concrete of said deformation joint one side; The thickness of this extruded sheet is identical with the width of deformation joint, and is bonded on the said extruded sheet with the middle part point of adhesive with the built-in waterstop of said sticking anchor formula;
Step 4, with the docking site of the head and the tail of the built-in waterstop of said sticking anchor formula with adhesive to catching, and on the two sides of this docking site with the bonding thin gauge sheet of epobond epoxyn with the reinforcement seam;
Step 5, the anti-sticking sheet rubber in the wet shop of response type is bonded in advance second wing of the built-in waterstop of said sticking anchor formula; And be fixed on the opposite side of deformation joint with second wing that fixed part will glue the built-in waterstop of anchor formula; At the opposite side concreting of this deformation joint, second wing of the built-in waterstop of this sticking anchor formula is bonded in the concrete of said deformation joint opposite side.
The built-in waterstop of a kind of sticking anchor formula, the cross section of first wing of the built-in waterstop of said sticking anchor formula is a zigzag, and the cross section of the tail end of second wing of the built-in waterstop of said sticking anchor formula is a triangle, and the cross section at the middle part of the built-in waterstop of said sticking anchor formula is the U type.
The present invention is in the bottom near concrete structure; Waterproof is carried out in the both sides that the both wings that glue the built-in waterstop of anchor formula are bonded in deformation joint; With respect to the scheme by the extruding waterproof of prior art, can eliminate the trickle slit between sticking built-in waterstop of anchor formula and the concrete, realize the long term seal waterproof; And can protect most of concrete structure, good water-proof effect; And the present invention forms dovetail groove earlier; One wing that before the second side concrete pouring, just will glue the built-in waterstop of anchor formula afterwards is bonded in the dovetail groove; Behind another wing of the fixing sticking built-in waterstop of anchor formula, to the opposite side concreting of deformation joint, thereby another wing that will glue the built-in waterstop of anchor formula is bonded in the concrete of opposite side of deformation joint; Whole enforcement operation can effectively be protected the sticking built-in waterstop of anchor formula; Seldom cause the built-in waterstop of sticking anchor formula to damage, and when built-in waterstop first wing of the sticking anchor formula of bonding anchoring, can intuitively inspect, help guaranteeing construction quality.
Description of drawings
Fig. 1 is that the present invention builds waterproofing of movement joints method flow chart in one embodiment;
Fig. 2 is that the present invention builds the sectional view () in the waterproofing of movement joints process;
Fig. 3 is that the present invention builds the sectional view (two) in the waterproofing of movement joints process;
Fig. 4 is that the present invention builds the sectional view (three) in the waterproofing of movement joints process;
Fig. 5 is the cross-sectional view that the present invention builds the built-in waterstop of sticking anchor formula that uses in the waterproofing of movement joints process.
The specific embodiment
Below in conjunction with accompanying drawing specific embodiment of the present invention is done a detailed elaboration.
The present invention builds the waterproofing of movement joints method, like Fig. 1 to 5, comprises step:
S101, like Fig. 2 and 5; Deformation slit formwork 12 is fixed in the deformation joint 5; To be bonded in the side of deformation slit formwork 12 near upstream face with the dovetail groove model 11 that foam rubber is processed, promptly dovetail groove model 11 can be protected most of concrete structure near the bottom of concrete structure; At a side concreting 1 of this deformation joint 5, treat that concrete 1 solidifies after, remove said dovetail groove model 11 and deformation slit formwork 12, form dovetail groove 2 in a side of said deformation joint 5, like Fig. 3, the opening of this dovetail groove 2 is towards said deformation joint 5; The section area of the opening part of this dovetail groove 2 can make first wing of the sticking built-in waterstop 3 of anchor formula when bearing hydraulic pressure, not be pulled out less than the section area of at like this;
Said deformation slit formwork 12 can be wood or steel form, conveniently is fixed in the deformation joint 5; Can use the bonding dovetail groove model 11 of instant adhesive; When bonding dovetail groove model 11, avoid stirrup, prevent to make 11 distortion of dovetail groove model;
S102, in said dovetail groove 2, insert adhesive 13, first wing 16 of the sticking built-in waterstop 3 of anchor formula is filled in the said dovetail groove 2, first wing 16 of the built-in waterstop 3 of this sticking anchor formula is bonded in the said dovetail groove 2; Wherein, Like Fig. 5; The cross section of first wing 16 of the built-in waterstop 3 of said sticking anchor formula is a zigzag, and the cross section of the tail end of second wing 17 of the built-in waterstop 3 of said sticking anchor formula is a triangle, and the cross section at other positions of second wing can be a rectangle; The cross section at the middle part 18 of the built-in waterstop 3 of said sticking anchor formula is the U type; In this U type is curved, can be bonded with formed rubber strip 7 (this operation can be accomplished) when producing the built-in waterstop 3 of sticking anchor formula with instant adhesive, so that the curved opening of U type is towards upstream face, raising waterproof efficient;
Wherein, adhesive 13 can be an epobond epoxyn, can use the glue rifle that epobond epoxyn is inserted along the dovetail cell wall, and epobond epoxyn can not be interrupted, vacancy, to guarantee bonding sealing and firmness;
During practical implementation, before in said dovetail groove 2, inserting adhesive 13, also comprise: check the cavity of said dovetail groove 2, and permeate epoxy resin, can add the intensity of reinforced concrete 1 like this to the cavity spraying inside and outside water-based height of said dovetail groove 2;
In order to strengthen adhesive strength, during practical implementation, before filling in first wing 16 of the built-in waterstop 3 of said sticking anchor formula in the said dovetail groove 2, also comprise: the cleaning of first wing, 16 usefulness cleaning agents, the sassafras of the built-in waterstop 3 of said sticking anchor formula are done;
S103, like Fig. 4; The opening that said U type is curved is towards upstream face; Extruded sheet 4 is bonded on the concrete 1 of said deformation joint 5 one sides; The thickness of this extruded sheet 4 is identical with the width of deformation joint, and is bonded on the said extruded sheet 4 with 18 at the middle part of adhesive (this adhesive is instant adhesive preferably) with the built-in waterstop 3 of said sticking anchor formula;
Wherein, want Puttying between sticking built-in waterstop 3 of anchor formula and the extruded sheet 4, in case cement paste infilters deformation joint 5;
In a preferred embodiment; After being bonded at the middle part point of the built-in waterstop of said sticking anchor formula on the said extruded sheet 4 with adhesive; Like Fig. 3; Also comprise: push down built-in waterstop of said sticking anchor formula 3 and extruded sheet 4 with press strip 14, and press strip 14 (this press strip 14 can be processed by timber, plastics or aluminium material) be fixed on the extruded sheet 4 with PUR 15, treat interior adhesive 13 primary solidification of dovetail groove 2 after; Promptly after first wing 16 that will glue the built-in waterstop 3 of anchor formula has been bonded in the said dovetail groove 2, said press strip 14 is taken off; The purpose of doing like this is before adhesive 13 solidifies, and keeps the sticking built-in waterstop 3 of anchor formula to be in correct position;
S104, with the docking site of the head and the tail of the built-in waterstop 3 of said sticking anchor formula with adhesive (the preferably water-fast instant adhesive of this adhesive) to catching, and on the two sides of this docking site with the bonding thin gauge sheet of epobond epoxyn with the reinforcement seam; So both can realize 360 degree water-tights, wherein, thin gauge sheet can be identical with the material of the built-in waterstop 3 of sticking anchor formula; Behind bonding intact thin gauge sheet, can compress a period of time with mould immediately, to reduce adhesive thickness, make that the seam crossing maintenance is flexible and improve adhesive strength, after the adhesive primary solidification, remove mould; In addition, can on thin gauge sheet, instead glue sheet rubber in the wet shop of bonding response type;
S105, the anti-sticking sheet rubber in the wet shop of response type is bonded in advance second wing 17 of the built-in waterstop 3 of said sticking anchor formula; And with fixed part (this fixed part can be an iron wire; Second wing 17 that will glue the built-in waterstop of anchor formula with iron wire is fixed on the reinforcing bar of opposite side of deformation joint) second wing 17 that will glue the built-in waterstop 3 of anchor formula is fixed on the opposite side of deformation joint 5; At the opposite side concreting 6 of this deformation joint 5, second wing 17 of the built-in waterstop 3 of this sticking anchor formula is bonded in the concrete 6 of said deformation joint opposite side.
Wherein, With the docking site of the head and the tail of the built-in waterstop 3 of said sticking anchor formula with adhesive to catching; Specifically can for: will glue the docking site cutting neat (otch is perpendicular to the surface, and tangent line is perpendicular to axis) of the head and the tail of the built-in waterstop of anchor formula respectively, with these two docking sites of the sticking cleaning agent brush of hairbrush; After doing with the towel sassafras, with adhesive with these two docking sites to catching.
The invention also discloses the built-in waterstop of a kind of sticking anchor formula; Like Fig. 5; The cross section of first wing 16 of the built-in waterstop of said sticking anchor formula is a zigzag; The cross section of the tail end of second wing 17 of the built-in waterstop of said sticking anchor formula is a triangle, and the cross section at other positions of second wing 17 can be a rectangle, and the cross section at the middle part 18 of the built-in waterstop of said sticking anchor formula is the U type.
The opening that the U type is bent in addition, in this U type is curved, can be bonded with formed rubber strip, so that, also can be bonded with the anti-sticking sheet rubber in the wet shop of response type towards upstream face on second wing 17 with instant adhesive.
Above-described embodiment of the present invention does not constitute the qualification to protection domain of the present invention.Any modification of within spirit of the present invention and principle, being done, be equal to replacement and improvement etc., all should be included within the claim protection domain of the present invention.

Claims (4)

1. a building waterproofing of movement joints method is characterized in that, comprises step:
Step 1, deformation slit formwork is fixed in the deformation joint, will be bonded in the side of deformation slit formwork with the dovetail groove model that foam rubber is processed near upstream face; At a side concreting of this deformation joint, solidify the back and remove said dovetail groove model and deformation slit formwork, at the side formation dovetail groove of said deformation joint, the opening of this dovetail groove is towards said deformation joint;
Step 2, in said dovetail groove, insert adhesive, first wing of the sticking built-in waterstop of anchor formula is filled in the said dovetail groove, first wing of the built-in waterstop of this sticking anchor formula is bonded in the said dovetail groove; Wherein, The cross section of first wing of the built-in waterstop of said sticking anchor formula is a zigzag; The cross section of the tail end of second wing of the built-in waterstop of said sticking anchor formula is a triangle, and the cross section at the middle part of the built-in waterstop of said sticking anchor formula is the U type, in this U type is curved, is bonded with formed rubber strip;
Step 3, opening that said U type is curved are towards upstream face; Extruded sheet is bonded on the concrete of said deformation joint one side; The thickness of this extruded sheet is identical with the width of deformation joint, and is bonded on the said extruded sheet with the middle part point of adhesive with the built-in waterstop of said sticking anchor formula;
Step 4, with the docking site of the head and the tail of the built-in waterstop of said sticking anchor formula with adhesive to catching, and on the two sides of this docking site with the bonding thin gauge sheet of epobond epoxyn with the reinforcement seam;
Step 5, the anti-sticking sheet rubber in the wet shop of response type is bonded in advance second wing of the built-in waterstop of said sticking anchor formula; And be fixed on the opposite side of deformation joint with second wing that fixed part will glue the built-in waterstop of anchor formula; At the opposite side concreting of this deformation joint, second wing of the built-in waterstop of this sticking anchor formula is bonded in the concrete of said deformation joint opposite side.
2. building waterproofing of movement joints method according to claim 1; It is characterized in that: in the step 2; Before in said dovetail groove, inserting adhesive, also comprise: check the cavity of said dovetail groove, and permeate epoxy resin to the cavity spraying inside and outside water-based height of said dovetail groove.
3. building waterproofing of movement joints method according to claim 1 and 2; It is characterized in that: in the step 2; Before filling in first wing of the built-in waterstop of said sticking anchor formula in the said dovetail groove, also comprise: first wing of the built-in waterstop of said sticking anchor formula is done with cleaning agent cleaning, sassafras;
In the step 3; After being bonded at the middle part point of the built-in waterstop of said sticking anchor formula on the said extruded sheet with adhesive; Also comprise: push down said built-in waterstop of sticking anchor formula and extruded sheet with press strip; And with PUR press strip is fixed on the extruded sheet, the adhesive in dovetail groove after solidifying takes off said press strip.
4. building waterproofing of movement joints method according to claim 1 and 2; It is characterized in that: with the docking site of the head and the tail of the built-in waterstop of said sticking anchor formula with adhesive to catching; Be specially: the docking site that will glue the head and the tail of the built-in waterstop of anchor formula is respectively cut neat; With these two docking sites of the sticking cleaning agent brush of hairbrush, after dried with the towel sassafras, with adhesive with these two docking sites to catching.
CN2011100059266A 2011-01-12 2011-01-12 Waterproof method for deformation joint on building and adhesive anchorage built-in water stop Active CN102121278B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100059266A CN102121278B (en) 2011-01-12 2011-01-12 Waterproof method for deformation joint on building and adhesive anchorage built-in water stop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100059266A CN102121278B (en) 2011-01-12 2011-01-12 Waterproof method for deformation joint on building and adhesive anchorage built-in water stop

Publications (2)

Publication Number Publication Date
CN102121278A CN102121278A (en) 2011-07-13
CN102121278B true CN102121278B (en) 2012-11-21

Family

ID=44249929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100059266A Active CN102121278B (en) 2011-01-12 2011-01-12 Waterproof method for deformation joint on building and adhesive anchorage built-in water stop

Country Status (1)

Country Link
CN (1) CN102121278B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767292A (en) * 2012-07-18 2012-11-07 中国水利水电第五工程局有限公司 Protector for horizontal rubber water stop
CN105464226B (en) * 2016-01-08 2017-09-01 湖北巴河云峰建筑劳务有限公司 The flexible waterstop of integrated component formula and its application in building deformation joint waterproof
CN114718118B (en) * 2022-04-14 2024-03-15 苏交科集团股份有限公司 Rear-mounted water stop in open cut tunnel deformation joint and construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2170326Y (en) * 1993-05-07 1994-06-29 姚慕期 Triangle tooth bridge type rubber water-proof belt
DE29706561U1 (en) * 1997-04-14 1997-06-19 Tricosal GmbH, 89257 Illertissen Joint tape
CN2576827Y (en) * 2002-11-07 2003-10-01 李树奎 Composite waterstop

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2170326Y (en) * 1993-05-07 1994-06-29 姚慕期 Triangle tooth bridge type rubber water-proof belt
DE29706561U1 (en) * 1997-04-14 1997-06-19 Tricosal GmbH, 89257 Illertissen Joint tape
CN2576827Y (en) * 2002-11-07 2003-10-01 李树奎 Composite waterstop

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张道真,吴兆圣.地下室变形缝新式密封止水带.《中国建筑防水》.2010,(第24期),第4-6页. *
杨莉丽.埋入式橡胶止水带施工质量控制措施.《科技信息》.2010,(第22期),382-383. *

Also Published As

Publication number Publication date
CN102121278A (en) 2011-07-13

Similar Documents

Publication Publication Date Title
KR101372749B1 (en) Multi-performance functional water stop plate with composite structure
CN102758456B (en) Construction method of basement waterproofing projects
CN106988440B (en) Waterproof structure for main body and auxiliary interface of subway station and construction method of waterproof structure
CN106120870A (en) The advanced enclosed construction of poured band of outer wall of basement and construction method
CN203684167U (en) Concrete joint waterstop device
CN102121278B (en) Waterproof method for deformation joint on building and adhesive anchorage built-in water stop
CN102226345B (en) Method for carrying out advanced water shut-off on post-cast strips in underground engineering and advanced water shut-off steel plate structure
CN110374138A (en) The waterproof construction and construction method of station main body and accessory channel interface
CN107524174A (en) A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop
CN108517898B (en) The construction method of uplift pile and bottom plate seam crossing waterproof construction
CN113293882A (en) Assembled building structure convenient to butt joint and grout
CN203960812U (en) Hydraulic concrete structure shrinkage joint embedded water stop band repair structure
CN215801132U (en) New and old box culvert seam connection structure
CN209162909U (en) A kind of interface waterproof construction of new-old concrete
CN102312488B (en) Waterproof method of buried water stopper for bonding building deformation joint
CN206616711U (en) A kind of waterproof construction at subway station main body and accessory interface
CN205954707U (en) Leading enclosed construction in basement outer wall post -cast strip
CN116876675A (en) Large-volume ultra-long concrete structure expansion reinforcing band and pouring construction method
CN103397600A (en) Method for arranging water stops in box body jacking process
CN217352628U (en) Basement waterproof structure
CN207032320U (en) For subway station main body and the waterproof construction of accessory structure seam crossing
CN207160083U (en) A kind of diaphragm wall I-shaped steel joint provided with water expandable waterstop
CN104264714A (en) Waterproof construction joint structure of basement exterior wall
CN109281292B (en) Method for repairing detachment crack of deep water concrete panel of reservoir
CN213014373U (en) Basement outer wall post-cast strip structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHENZHEN CHENGSHI YOUZHU TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: WU ZHAOSHENG

Effective date: 20130508

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518000 SHENZHEN, GUANGDONG PROVINCE TO: 518054 SHENZHEN, GUANGDONG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130508

Address after: 518054 Guangdong city of Shenzhen province Nanshan District Nanhai Avenue Nanyou building B, 617A

Patentee after: SHENZHEN CHENG SHI YOU ZHU TECHNOLOGY CO., LTD.

Address before: 518000 Nanshan District, Shenzhen, Shahe West Road, No. 2029 City Valley D304

Patentee before: Wu Zhaosheng

DD01 Delivery of document by public notice

Addressee: SHENZHEN CHENG SHI YOU ZHU TECHNOLOGY CO., LTD.

Document name: Notification of Passing Examination on Formalities

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161216

Address after: 518000 Nanshan District, Shenzhen, Shahe West Road, No. 2029 City Valley D304

Patentee after: Wu Zhaosheng

Address before: 518054 Guangdong city of Shenzhen province Nanshan District Nanhai Avenue Nanyou building B, 617A

Patentee before: SHENZHEN CHENG SHI YOU ZHU TECHNOLOGY CO., LTD.

DD01 Delivery of document by public notice

Addressee: Wu Zhaosheng

Document name: Notification of Passing Examination on Formalities

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Shenzhen Blue Shield Holdings Limited

Document name: Notification that Application Deemed not to be Proposed

DD01 Delivery of document by public notice
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180119

Address after: 518000 Guangdong city of Shenzhen province Qianhai Shenzhen Hong Kong cooperation area before Bay Street No. 1 Qianhai road at the Shenzhen Hong Kong Cooperation Area Management Bureau office building A Room 201 (Qianhai settled in Shenzhen City, Secretary of Commerce Co. Ltd.)

Patentee after: Shenzhen Blue Shield Holdings Limited

Address before: 518000 Nanshan District, Shenzhen, Shahe West Road, No. 2029 City Valley D304

Patentee before: Wu Zhaosheng