CN102121242A - New process for water-carrying slope protection for fish pond - Google Patents

New process for water-carrying slope protection for fish pond Download PDF

Info

Publication number
CN102121242A
CN102121242A CN 201110069829 CN201110069829A CN102121242A CN 102121242 A CN102121242 A CN 102121242A CN 201110069829 CN201110069829 CN 201110069829 CN 201110069829 A CN201110069829 A CN 201110069829A CN 102121242 A CN102121242 A CN 102121242A
Authority
CN
China
Prior art keywords
culvert pipe
cement
cement culvert
pond
piling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110069829
Other languages
Chinese (zh)
Inventor
刘松海
邱红
周奎林
王玉梅
房俊
石恺
顾宏兵
陈忠高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RUGAO CITY SAND AQUACULTURE FARMS
Original Assignee
RUGAO CITY SAND AQUACULTURE FARMS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RUGAO CITY SAND AQUACULTURE FARMS filed Critical RUGAO CITY SAND AQUACULTURE FARMS
Priority to CN 201110069829 priority Critical patent/CN102121242A/en
Publication of CN102121242A publication Critical patent/CN102121242A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a new process for water-carrying slope protection for a fish pond. The process comprises the following several steps of: a, piling cement culvert pipes, namely customizing prefabricated cement culvert pipes according to the depth of the pond, selecting the cement culvert pipes with height of 1 to 1.5 meters, outside diameter of 20 to 30 centimeters and thickness of 1 to 2 centimeters, vertically piling the cement culvert pipes in sequence to form a cement culvert pipe wall, and lightly pressing the cement culvert pipes into the soil for 50 to 80 centimeters by manpower; b, filling and compacting the soil; c, performing connection by using a steel wire rope, namely after the soil is filled and compacted, tightening and integrally fixing all the cement culvert pipes by using the steel wire rope; and d, pouring the top surface, namely pouring the top surface of the cement culvert pipes fixed by the steel wire rope to form a cement plane with thickness of 2.5 to 3.5 centimeters and width of 60 to 80 centimeters. By adopting the cement culvert pipes for water-carrying piling slope protection, the process has good stability, low construction difficulty and low cost.

Description

Fishpond band water bank protection new technology
Technical field
The present invention relates to a kind of fishpond band water bank protection new technology.
Background technology
For a long time, owing to multiple reason, it is unhappy that paces are transformed in the pond, causes the continuous deterioration of cultivating pool working condition, and resource can be utilized the space continuous decrease, influences culture benefit, has restricted the development of modern high efficient fishery to a certain extent.Tradition fishpond bank protection all is to carry out under the situation on the fishpond low water stage or the dried pool, generally speaking, the time out of breeding fish of this area is in December, January, and the temperature of this moment is generally all about 0 ℃, be unfavorable for concrete solidifying, freezing easily, if will construct, can influence the ordinary production in fish pond owing to reasons such as durations according to traditional bank protection mode.In transformed in nearly 2 years standardization fishpond, most of fishpond all was a contract to individuals, if according to traditional hard bank protection technology, need after doing the pool, the fishpond carry out, will certainly influence normal operation like this, also have influence on the immediate interest of contracting the family, thereby advance difficulty bigger.Research and develop a kind of ordinary production management that do not influence, and the new technology that can carry out the bank protection operation with water, the new problem of pendulum in face of us become.
Summary of the invention
The purpose of this invention is to provide that a kind of steadiness is strong, the fishpond band water bank protection new technology of saving of labor's abridged edition.
The technical solution used in the present invention is:
Fishpond band water bank protection new technology, it comprises following step:
A, the piling of cement culvert pipe, the depth according to the pond, prefabricated cement culvert pipe customized, select cement culvert pipe height 1m~1.5m, culvert pipe external diameter 20 cm~30cm, pipe thickness 1 cm~2cm is transported to the limit, pond with prefabricated cement culvert pipe and puts successively, along the pond bank cement culvert pipe is uprightly driven piles according to the order of sequence then, form a water blockoff mud culvert pipe body of wall, during piling, the high-pressure pump hydraulic giant tied up on iron, put in the cement culvert pipe, utilize the position of iron control giant, by the hydraulic giant impulse force, make that manpower pressed down the cement culvert pipe gently when the interior pond sludge of culvert pipe melted into mud, the depth and designing requirement according to Chi Shui are pressed into 50~80cm in the earth with culvert pipe;
B, banket and compacting, after the piling of cement culvert pipe is finished, leave a fixed gap between cement culvert pipe and the slope, former pond, with the bulldozer instrument near earth is inserted compacting, flattened, utilize rake and spade instrument to tamp with soil in the cement culvert pipe simultaneously, when banketing, find minority culvert pipe loose shift, in time revise;
C, wire rope connect, and behind the fill compaction, with wire rope all cement culvert pipe are strained overall fixed;
The cast of d, end face is used concrete cast-in-situ above the cement culvert pipe that above-mentioned wire rope is fixed, and the cement plane of thick 2.5~3.5cm, wide 60~80cm gets final product.
Cement culvert pipe external diameter is preferably 25cm, and surpassing 30cm construction cost and difficulty of construction increases, because relatively large towards slurry degree of enclosing and quantity of sand and mud, the pile body stability of foundation descends on the contrary, though reduce less than 20cm construction cost and difficulty of construction, sloping body holding capacity does not reach, should out of shape caving in.
Cement culvert pipe pipe range is preferably 120cm, pipe thickness is preferably 1.5 cm, pile tube length (a following degree of depth) is the sandy loam character and the pond degree of depth according to the pond soil property, pile tube buries the native degree of depth 60 ~ 80cm, expose 50 ~ 70cm, driving depth all obviously descends less than expose degree of depth holding capacity, firmness, stability.
Provide following several scheme to be comparative study (seeing the following form) A: cement board is a body of wall piling bank protection; B: adopt hollow cuboid concrete products piling bank protection; C: cement culvert pipe band water piling bank protection; D: whole reinforcing bar is poured.
Figure 353695DEST_PATH_IMAGE001
The result: adopt cement culvert pipe band water piling bank protection, good stability, difficulty of construction is less, and cost is low.
Advantage of the present invention:
1, the bank protection material of main part of Cai Yonging---cement culvert pipe is made simply, and cost is lower.
2, this technology practicable band water operation of constructing is not subjected to the restriction of season and fish pond water level, does not influence the ordinary production in fish pond.
3, saving of labor's abridged edition.This technology bank protection work efficiency height, cost is relatively low, with cement pre-fabricated panel bank protection technology ratio, saves about 192 yuan of costs for every meter; With concrete cast-in-situ bank protection technology ratio, save about 72 yuan of costs for every meter, cost only is about 30~50% of a conventional bank protection.
4, steadiness is strong.This technology bank protection, the slope body has extremely strong stability and fastness, and conventional cement pre-fabricated panel and concrete cast-in-situ bank protection mode, its bottom of sloping body of bank protection is washed in a pan empty easily and is damaged, and that the cement culvert pipe that this technology bank protection is adopted is imbedded earth is darker, just this phenomenon can not take place.
5, be beneficial to draw in the net the operation.Cement pre-fabricated panel and concrete cast-in-situ bank protection mode be owing to all need water footing, wearing and tearing fishing net easily when drawing in the net in the fish pond, and especially the etting infraclass is very easily impaired; And cement culvert pipe piling is banketed and is built this technology of bank protection and avoided this drawback well.
The specific embodiment
The following examples but do not limit the present invention in order to explanation the present invention.
Embodiment 1
Fishpond band water bank protection new technology, it comprises following step:
A, the piling of cement culvert pipe, the depth according to the pond, prefabricated cement culvert pipe customized, select cement culvert pipe height 1m, culvert pipe external diameter 20 cm, pipe thickness 1 cm is transported to the limit, pond with prefabricated cement culvert pipe and puts successively, along the pond bank cement culvert pipe is uprightly driven piles according to the order of sequence then, form a water blockoff mud culvert pipe body of wall, during piling, the high-pressure pump hydraulic giant tied up on iron, put in the cement culvert pipe, utilize the position of iron control giant, by the hydraulic giant impulse force, make that manpower pressed down the cement culvert pipe gently when the interior pond sludge of culvert pipe melted into mud, according to the depth and the designing requirement of Chi Shui, culvert pipe is pressed into 50 cm in the earth;
B, banket and compacting, after the piling of cement culvert pipe is finished, leave a fixed gap between cement culvert pipe and the slope, former pond, with the bulldozer instrument near earth is inserted compacting, flattened, utilize rake and spade instrument to tamp with soil in the cement culvert pipe simultaneously, when banketing, find minority culvert pipe loose shift, in time revise;
C, wire rope connect, and behind the fill compaction, with wire rope all cement culvert pipe are strained overall fixed;
The cast of d, end face is used concrete cast-in-situ above the cement culvert pipe that above-mentioned wire rope is fixed, and the cement plane of thick 2.5cm, wide 60cm gets final product.
Embodiment 2
Fishpond band water bank protection new technology, it comprises following step:
A, the piling of cement culvert pipe, the depth according to the pond, prefabricated cement culvert pipe customized, select cement culvert pipe height 1.2m, culvert pipe external diameter 25 cm, pipe thickness 1.5cm is transported to the limit, pond with prefabricated cement culvert pipe and puts successively, along the pond bank cement culvert pipe is uprightly driven piles according to the order of sequence then, form a water blockoff mud culvert pipe body of wall, during piling, the high-pressure pump hydraulic giant tied up on iron, put in the cement culvert pipe, utilize the position of iron control giant, by the hydraulic giant impulse force, make that manpower pressed down the cement culvert pipe gently when the interior pond sludge of culvert pipe melted into mud, the depth and designing requirement according to Chi Shui are pressed into 65cm in the earth with culvert pipe;
B, banket and compacting, after the piling of cement culvert pipe is finished, leave a fixed gap between cement culvert pipe and the slope, former pond, with the bulldozer instrument near earth is inserted compacting, flattened, utilize rake and spade instrument to tamp with soil in the cement culvert pipe simultaneously, when banketing, find minority culvert pipe loose shift, in time revise;
C, wire rope connect, and behind the fill compaction, with wire rope all cement culvert pipe are strained overall fixed;
The cast of d, end face is used concrete cast-in-situ above the cement culvert pipe that above-mentioned wire rope is fixed, and the cement plane of thick 3cm, wide 70cm gets final product.
Embodiment 3
Fishpond band water bank protection new technology, it comprises following step:
A, the piling of cement culvert pipe, the depth according to the pond, prefabricated cement culvert pipe customized, select cement culvert pipe height 1.5m, culvert pipe external diameter 30cm, pipe thickness 2cm is transported to the limit, pond with prefabricated cement culvert pipe and puts successively, along the pond bank cement culvert pipe is uprightly driven piles according to the order of sequence then, form a water blockoff mud culvert pipe body of wall, during piling, the high-pressure pump hydraulic giant tied up on iron, put in the cement culvert pipe, utilize the position of iron control giant, by the hydraulic giant impulse force, make that manpower pressed down the cement culvert pipe gently when the interior pond sludge of culvert pipe melted into mud, the depth and designing requirement according to Chi Shui are pressed into 80cm in the earth with culvert pipe;
B, banket and compacting, after the piling of cement culvert pipe is finished, leave a fixed gap between cement culvert pipe and the slope, former pond, with the bulldozer instrument near earth is inserted compacting, flattened, utilize rake and spade instrument to tamp with soil in the cement culvert pipe simultaneously, when banketing, find minority culvert pipe loose shift, in time revise;
C, wire rope connect, and behind the fill compaction, with wire rope all cement culvert pipe are strained overall fixed;
The cast of d, end face is used concrete cast-in-situ above the cement culvert pipe that above-mentioned wire rope is fixed, and the cement plane of thick 3.5cm, wide 80cm gets final product.
To tilt a little to the bank, pond during the piling of cement culvert pipe; The culvert pipe body of wall will form slight arc, and bow is Chi Po dorsad; Gap between culvert pipe and the slope, pond can be made a call to 1 " T " font pile body with 1~2 culvert pipe to the pond bank along culvert pipe body of wall vertical line, between each " T " font pile body at interval about 10m, if how the space can use several culvert pipe more greatly, with the increase stable degree; At Chi Jiaochu, cement culvert pipe body of wall will be polygonal or circular arc.Must compacting when banketing, particularly in culvert pipe, banket, the gradation fill compaction.After banketing, can not build immediately, according to circumstances one break time of interval, treat to build again after institute's native dry and soft compacting of fillering.
This technology band water bank protection has fundamentally changed traditional fishpond bank protection mode, is not subjected to the restriction of season and pond water level, all can construct, and saving of labor's abridged edition, fastness is strong throughout the year, and the scope of application is wider.In addition, the pond of this technology bank protection can be reduced the generation of fishpond mud effectively, reduce the disease odds, thereby improve the integrated production capacity and the benefit in fish pond, thereby, band water bank protection is the developing direction of the transformation of following fishpond, bank protection, and its popularizing application prospect is very wide.

Claims (1)

1. fishpond band water bank protection new technology is characterized in that it comprises following step:
A, the piling of cement culvert pipe, the depth according to the pond, prefabricated cement culvert pipe customized, select cement culvert pipe height 1m~1.5m, culvert pipe external diameter 20 cm~30cm, pipe thickness 1 cm~2cm is transported to the limit, pond with prefabricated cement culvert pipe and puts successively, along the pond bank cement culvert pipe is uprightly driven piles according to the order of sequence then, form a water blockoff mud culvert pipe body of wall, during piling, the high-pressure pump hydraulic giant tied up on iron, put in the cement culvert pipe, utilize the position of iron control giant, by the hydraulic giant impulse force, make that manpower pressed down the cement culvert pipe gently when the interior pond sludge of culvert pipe melted into mud, the depth and designing requirement according to Chi Shui are pressed into 50~80cm in the earth with culvert pipe;
B, banket and compacting, after the piling of cement culvert pipe is finished, leave a fixed gap between cement culvert pipe and the slope, former pond, with the excavator instrument near earth is inserted compacting, flattened, utilize rake and spade instrument to tamp with soil in the cement culvert pipe simultaneously, when banketing, find minority culvert pipe loose shift, in time revise;
C, wire rope connect, and behind the fill compaction, with wire rope all cement culvert pipe are strained overall fixed;
The cast of d, end face is used concrete cast-in-situ above the cement culvert pipe that above-mentioned wire rope is fixed, and the cement plane of thick 2.5~3.5cm, wide 60~80cm gets final product.
CN 201110069829 2011-03-23 2011-03-23 New process for water-carrying slope protection for fish pond Pending CN102121242A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110069829 CN102121242A (en) 2011-03-23 2011-03-23 New process for water-carrying slope protection for fish pond

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110069829 CN102121242A (en) 2011-03-23 2011-03-23 New process for water-carrying slope protection for fish pond

Publications (1)

Publication Number Publication Date
CN102121242A true CN102121242A (en) 2011-07-13

Family

ID=44249893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110069829 Pending CN102121242A (en) 2011-03-23 2011-03-23 New process for water-carrying slope protection for fish pond

Country Status (1)

Country Link
CN (1) CN102121242A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104136A (en) * 2013-01-29 2013-05-15 中国水产科学研究院东海水产研究所 Simply-equipped rapid mud flat enclosure mesh arrangement method
WO2014183450A1 (en) * 2013-05-15 2014-11-20 Li Shengnan Method for constructing confinement structure unit of ecological aquafarming facility, confinement structure of same, and application thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201172809Y (en) * 2007-08-22 2008-12-31 焦兆平 Flood-combating intelligent combination water proof wall
CN101580300A (en) * 2008-05-12 2009-11-18 中国水产科学研究院渔业机械仪器研究所 Method for purifying culturing water in pond ecological protection slope
CN101775808A (en) * 2010-01-26 2010-07-14 四川省励自生态技术有限公司 Plant net slope protection method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201172809Y (en) * 2007-08-22 2008-12-31 焦兆平 Flood-combating intelligent combination water proof wall
CN101580300A (en) * 2008-05-12 2009-11-18 中国水产科学研究院渔业机械仪器研究所 Method for purifying culturing water in pond ecological protection slope
CN101775808A (en) * 2010-01-26 2010-07-14 四川省励自生态技术有限公司 Plant net slope protection method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《科学养鱼》 20101130 刘松海,邱红 鱼池带水护坡的操作工艺 第19页,彩中插2 1 , 第11期 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103104136A (en) * 2013-01-29 2013-05-15 中国水产科学研究院东海水产研究所 Simply-equipped rapid mud flat enclosure mesh arrangement method
CN103104136B (en) * 2013-01-29 2016-03-30 中国水产科学研究院东海水产研究所 A kind of beach enclosure of simple and fast establishes network method
WO2014183450A1 (en) * 2013-05-15 2014-11-20 Li Shengnan Method for constructing confinement structure unit of ecological aquafarming facility, confinement structure of same, and application thereof

Similar Documents

Publication Publication Date Title
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN202898930U (en) By-river reinforced roadbed structure
CN105756073A (en) Ecological slope protection building block of ion type rare earth mine and ecological slope protection system of ion type rare earth mine
CN102330436B (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN206245284U (en) A kind of slope type ecological revetment modular structure
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN203361233U (en) Solar greenhouse surface rainwater collection, filtration and storage facility
CN204780990U (en) Combined type retaining wall structure
CN107503370B (en) The high barricade of one seed sand well combined type reinforced earth and production method
CN102121242A (en) New process for water-carrying slope protection for fish pond
CN210031903U (en) Retaining wall structure based on mortar rubble
CN205296182U (en) A punishment device that is used for non - excavation formula excavation side slope hole groove disease
CN104895078B (en) A kind of to hold the construction method of the prefabricated pile of holding capacity
CN103195077B (en) A kind of dam foundation reinforcement frame structure and stabilization of dam foundation method
CN207775907U (en) A kind of high intensity ecological revetment
CN214832388U (en) River course shore protection structure of reinforcing river bank steadiness
CN107165170B (en) A kind of foundation ditch construction method
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN108221971A (en) For the cotton stalk supporting construction of cement mixing method
CN214657188U (en) Gravity foundation for reinforcing soft soil foundation by offshore wind power cemented gravel pile
CN203129163U (en) Reinforcing framework structure for dam foundation
CN212656252U (en) Novel transmission line tower foundation
CN213926080U (en) Basalt fiber composite rib gabion net cage and soil anchor cooperative supporting structure
CN212533950U (en) Ecological bank protection in river course

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20110713