CN102107801A - 自动调节平衡的电枢绕线装置 - Google Patents
自动调节平衡的电枢绕线装置 Download PDFInfo
- Publication number
- CN102107801A CN102107801A CN 201010615556 CN201010615556A CN102107801A CN 102107801 A CN102107801 A CN 102107801A CN 201010615556 CN201010615556 CN 201010615556 CN 201010615556 A CN201010615556 A CN 201010615556A CN 102107801 A CN102107801 A CN 102107801A
- Authority
- CN
- China
- Prior art keywords
- motor
- winder
- winding device
- armature
- tensioner
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Manufacture Of Motors, Generators (AREA)
Abstract
本发明涉及一种绕线机,具体为一种自动调节平衡的电枢绕线装置。第一绕线装置由第一马达、第一张力器和第一绕线器配合而成,所述第二绕线装置由第二马达、第二张力器和第二绕线器配合而成,所述控制器分别与第一马达、第二马达、绕线模、第一绕线器和第二绕线器相连接,所述第一绕线装置上设置传感器,传感器分别与第一马达、第一张力器和控制器相配合,所述控制器的工作程序采用C语言编制,并按照程序内容控制绕线过程。电枢右侧马达开始旋转,第一马达随动,第一马达的速度由传感器控制,左侧马达随右侧马达旋转,每次第一马达转圈数换算长度后与第二马达转圈数换算长度后相比较,进行补偿,从而达到平衡,提高了生产效率,降低了生产成本。
Description
技术领域
本发明涉及一种绕线机,具体为一种自动调节平衡的电枢绕线装置。
背景技术
原有电枢绕线机,只能绕线,产品无法自动平衡,绕线完毕后,还须经过动平衡机的配合才能使产品平衡,造成产品生产效率低、生产成本高,因此迫切需要对其进行改进。
发明内容
针对现有技术中存在的问题,本发明的目的在于提供一种自动调节平衡的电枢绕线装置的技术方案。
所述的自动调节平衡的电枢绕线装置,包括机体、绕线模、电枢、控制器、第一绕线装置和第二绕线装置,绕线模设置在机体上,其特征在于所述绕线模的两侧分别设有第一绕线装置和第二绕线装置,第一绕线装置由第一马达、第一张力器和第一绕线器配合而成,所述第二绕线装置由第二马达、第二张力器和第二绕线器配合而成,所述控制器分别与第一马达、第二马达、绕线模、第一绕线器和第二绕线器相连接,所述第一绕线装置上设置传感器,传感器分别与第一马达、第一张力器和控制器相配合,所述控制器的工作程序采用C语言编制,并按照程序内容控制绕线过程。
所述的自动调节平衡的电枢绕线装置,其特征在于所述的第一绕线装置上还设置有阻尼器和收线机构。
所述的自动调节平衡的电枢绕线装置,其特征在于所述的绕线模两侧分别设置左侧马达和右侧马达,左侧马达与第二马达传动配合,右侧马达与第一马达传动配合。
上述自动调节平衡的电枢绕线装置,在第一绕线装置上设置有传感器,右侧马达开始旋转时,第一马达随动,第一马达的速度由传感器控制,与右侧马达同步,同时左侧马达随右侧马达旋转,每次第一马达转圈数换算长度后与第二马达转圈数换算长度后相比较,进行补偿,从而达到平衡,提高了生产效率,降低了生产成本。
附图说明
图1为本发明的结构示意图。
具体实施方式
下面结合说明书附图对本发明做进一步说明:
如图所示,自动调节平衡的电枢绕线装置,包括机体6、绕线模10、电枢11、控制器7、第一绕线装置和第二绕线装置,绕线模10设置在机体6上,在绕线模10的两侧分别设有第一绕线装置和第二绕线装置,所述的绕线模10两侧分别设置左侧马达和右侧马达,左侧马达与第二马达传动配合,右侧马达与第一马达传动配合,所述第一绕线装置由第一马达4、第一张力器5和第一绕线器配合而成,所述第二绕线装置由第二马达8、第二张力器9和第二绕线器配合而成,所述控制器7分别与第一马达4、第二马达8、绕线模10、第一绕线器和第二绕线器相连接,所述第一绕线装置上设置传感器1,传感器1分别与第一马达4、第一张力器5和控制器7相配合,所述控制器7的工作程序采用C语言编制,并按照程序内容控制绕线过程,所述的第一绕线装置上还设置有阻尼器2和收线机构3配合绕线。
本发明的工作过程:机体右侧线盒内的铜线经过第一马达、阻尼器、收线机构、传感器、第一张力器、绕线模后绕在电枢上,当电枢右侧马达开始旋转时,第一马达随右侧马达转动,第一马达的速度与右侧马达同步,同时左侧马达随右侧马达旋转,传感器实时采集第一马达的转速,并将信号反馈到控制器,将每次第一马达转圈数换算长度后与第二马达转圈数换算长度后相比较,进行补偿, 从而达到平衡,使两边的铜线等长的绕在电枢上。
Claims (3)
1.自动调节平衡的电枢绕线装置,包括机体、绕线模、电枢、控制器、第一绕线装置和第二绕线装置,绕线模设置在机体上,其特征在于所述绕线模的两侧分别设有第一绕线装置和第二绕线装置,第一绕线装置由第一马达、第一张力器和第一绕线器配合而成,所述第二绕线装置由第二马达、第二张力器和第二绕线器配合而成,所述控制器分别与第一马达、第二马达、绕线模、第一绕线器和第二绕线器相连接,所述第一绕线装置上设置传感器,传感器分别与第一马达、第一张力器和控制器相配合,所述控制器的工作程序采用C语言编制,并按照程序内容控制绕线过程。
2.根据权利要求1所述的自动调节平衡的电枢绕线装置,其特征在于所述的第一绕线装置上还设置有阻尼器和收线机构。
3.根据权利要求1所述的自动调节平衡的电枢绕线装置,其特征在于所述的绕线模两侧分别设置左侧马达和右侧马达,左侧马达与第二马达传动配合,右侧马达与第一马达传动配合。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010615556 CN102107801A (zh) | 2010-12-31 | 2010-12-31 | 自动调节平衡的电枢绕线装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201010615556 CN102107801A (zh) | 2010-12-31 | 2010-12-31 | 自动调节平衡的电枢绕线装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102107801A true CN102107801A (zh) | 2011-06-29 |
Family
ID=44172102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201010615556 Pending CN102107801A (zh) | 2010-12-31 | 2010-12-31 | 自动调节平衡的电枢绕线装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102107801A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0618661A1 (en) * | 1993-04-02 | 1994-10-05 | AXIS S.p.A. | Methods and apparatus for winding armatures with improved balance |
EP0643468A1 (en) * | 1993-08-30 | 1995-03-15 | AXIS S.p.A. | Methods and apparatus for producing dynamo-electric machine armatures with improved balance |
CN2246348Y (zh) * | 1995-09-28 | 1997-01-29 | 刘清赐 | 串激式电机转子自动绕线机 |
CN2755132Y (zh) * | 2004-06-17 | 2006-02-01 | 池锦祥 | 编织带机之辅助收线装置 |
CN101764480A (zh) * | 2010-02-01 | 2010-06-30 | 常州新区金康精工机械有限公司 | 电机定子绕线嵌线组合机 |
CN101931290A (zh) * | 2010-09-01 | 2010-12-29 | 常州市金康自动化科技有限公司 | 伺服双头绑线机 |
-
2010
- 2010-12-31 CN CN 201010615556 patent/CN102107801A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0618661A1 (en) * | 1993-04-02 | 1994-10-05 | AXIS S.p.A. | Methods and apparatus for winding armatures with improved balance |
EP0643468A1 (en) * | 1993-08-30 | 1995-03-15 | AXIS S.p.A. | Methods and apparatus for producing dynamo-electric machine armatures with improved balance |
CN2246348Y (zh) * | 1995-09-28 | 1997-01-29 | 刘清赐 | 串激式电机转子自动绕线机 |
CN2755132Y (zh) * | 2004-06-17 | 2006-02-01 | 池锦祥 | 编织带机之辅助收线装置 |
CN101764480A (zh) * | 2010-02-01 | 2010-06-30 | 常州新区金康精工机械有限公司 | 电机定子绕线嵌线组合机 |
CN101931290A (zh) * | 2010-09-01 | 2010-12-29 | 常州市金康自动化科技有限公司 | 伺服双头绑线机 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201732680U (zh) | 全自动双头空芯线圈绕线机 | |
WO2009115312A3 (en) | Apparatus and methods for winding supports for coils and single poles of cores of dynamo electric machines | |
CN104477681B (zh) | 一种恒定线速度卷纸机 | |
CN110342337A (zh) | 张力控制系统及方法 | |
CN201576499U (zh) | 恒张力双并线单头卧式包带机 | |
CN106345846A (zh) | 一种薄板防松放卷设备 | |
CN104944215A (zh) | 一种自动绕线机 | |
CN202039235U (zh) | 钢丝绳残余扭转自动检测修正一体化设备 | |
CN203048307U (zh) | 四轴绕线器 | |
CN102107801A (zh) | 自动调节平衡的电枢绕线装置 | |
CN202148102U (zh) | 缠绕机用简易控制器 | |
CN204265074U (zh) | 纱架张力自动调节装置 | |
CN202508659U (zh) | 一种卷管机 | |
CN203740712U (zh) | 超级电容器电极碾压机上的基材压紧装置 | |
CN103832883A (zh) | 同步绕线装置 | |
CN201619283U (zh) | 卷筒纸轮转胶印机的杠杆式浮动辊组件 | |
CN202473596U (zh) | 一种方形绕线机 | |
CN202625495U (zh) | 一种柔性放线机 | |
CN206051110U (zh) | 放卷张力控制装置 | |
CN203740717U (zh) | 超级电容器电极碾压机上的基材张力调节装置 | |
CN202011659U (zh) | 卷绕机拉紧装置 | |
CN202905285U (zh) | 一种并丝机 | |
CN207861591U (zh) | 一种立式多股电线同步自动收线卷绕机 | |
CN205294381U (zh) | 一种变频恒张力无芯卷纸机 | |
CN202625478U (zh) | 具有加热装置的放线机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110629 |