CN102102519A - Production automation method for fully mechanized mining working face - Google Patents

Production automation method for fully mechanized mining working face Download PDF

Info

Publication number
CN102102519A
CN102102519A CN2010106134213A CN201010613421A CN102102519A CN 102102519 A CN102102519 A CN 102102519A CN 2010106134213 A CN2010106134213 A CN 2010106134213A CN 201010613421 A CN201010613421 A CN 201010613421A CN 102102519 A CN102102519 A CN 102102519A
Authority
CN
China
Prior art keywords
work plane
video
mechanized mining
network
industrial ethernet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010106134213A
Other languages
Chinese (zh)
Other versions
CN102102519B (en
Inventor
张良
罗跃勇
何勇华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ccteg Beijing Tianma Intelligent Control Technology Co ltd
Beijing Meike Tianma Automation Technology Co Ltd
Original Assignee
Beijing Tiandi Marco Electro Hydraulic Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tiandi Marco Electro Hydraulic Control System Co Ltd filed Critical Beijing Tiandi Marco Electro Hydraulic Control System Co Ltd
Priority to CN 201010613421 priority Critical patent/CN102102519B/en
Publication of CN102102519A publication Critical patent/CN102102519A/en
Application granted granted Critical
Publication of CN102102519B publication Critical patent/CN102102519B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • General Factory Administration (AREA)

Abstract

The invention discloses a production automation method for a fully mechanized mining working face. The method comprises the following steps of: establishing a working face central dispatching command center, a working face video system and a working face voice communication system; and connecting industrial Ethernet networks through working face comprehensive access devices or directly connecting the industrial Ethernet networks, wherein the industrial Ethernet networks are connected in series by the working face comprehensive access devices through armored cable connectors; and the first working face comprehensive access device is connected with the final working face comprehensive access device through a network switch and an optical cable to form an industrial Ethernet ring network. A working face production automation system realizes elector-hydraulic control of a hydraulic support and intelligent automatic control of fully mechanized mining equipment and integrates a liquid supply system, a network, data integration, video, audio and communication to automatically control the fully mechanized mining equipment such as the hydraulic support of the fully mechanized mining working face, a coal mining machine, a scraper conveyer, a loader, a crusher, a crossheading belt conveyer, an electric switch, a pump station and the like in a centralized way.

Description

A kind of method of the fully-mechanized mining working production automation
Technical field
The present invention relates to a kind of method of the fully-mechanized mining working realization production automation under coal mine, relate in particular to a kind of Industrial Ethernet of using and be data channel, realize the method that fully-mechanized mining working monitors automatically, controls.
Background technology
Since the nineties in 20th century, the industry of colliery, the world is to high-efficiency intensifying production fast development, and work plane automation, the level of informatization are constantly upgraded.There are hundreds of large-scale collieries in China, and tens thousand of medium and small collieries are very big to the demand of High-efficient Production equipment and safety equipment.Vast coal mining enterprise is seen from the experience of international and domestic advanced mine, walks the road of the integrated control of efficient automated mining outfit, is the only way of coal mining enterprise.
Abroad, existing ripe coal-winning machine fully-mechanized mining working control technology is representative with DBT, JOY company.This two family all is the high-end suppliers of international fully-mechanized mining equipment, provides work plane complete fully-mechanized mining equipment, and forms independent, the perfect comprehensive chemical control system system of moving of picking up from of a cover.But its to soft, hardware requirement is higher, the operating principle complexity is not suitable for the large-scale application in China.
Domestic; also there is not at present ripe fully-mechanized mining working automation control theory; though do as companies such as Bake, Tianjin, Tianjin Huanings and to appear some Primary Study; but it mainly is the research respectively at work plane speech communication, three machine centralized Control, locking, protection etc., does not consider the problem of the fully-mechanized mining working production automation from the height of integral body.
In order to satisfy high-yield and high-efficiency modernization mine to coal mine fully-mechanized mining working automation and informationalized needs, realize production automation method by fully-mechanized mining working under a kind of coal mine that meets China's actual conditions, make it can realize of real-time demonstration and the management of down-hole fully-mechanized mining working production information at the ground maneuvers center, and the control of the centralized and automatic of crossheading.Make the ground handling personnel can understand the condition of production of mining face under mine at any time, carry out the production management of science, farthest improve the Homes Using TV of production equipment, realize continuous high-efficient production.
Summary of the invention
For addressing the above problem, the present invention proposes a kind of method of the fully-mechanized mining working production automation, comprising:
1. set up work plane intrinsic safety type Industrial Ethernet network
Comprise: arrange ethernet network in entire working surface, to realize that video, audio frequency access and transmission and fully-mechanized mining equipment data insert and transmission; Data transmission network, audio frequency transmission network, the unification of three nets of video transmission network; Described Industrial Ethernet network is together in series by the armored cable connector by the comprehensive access device of work plane, and comprehensive access device is as work plane transfer of data actuating unit and pretreatment unit; By gateway, switch realization network management and diagnostic function are set;
Set up work plane intrinsic safety type Industrial Ethernet network according to above-mentioned requirements;
2. set up the work plane video system
Comprise: the situation that camera is implemented in down-hole real-time video monitoring work plane is set, digitized video acquisition; By the picture of work plane central schedule command centre switching optional position camera, realize the centralized displaying of video;
Set up the work plane video system according to above-mentioned requirements;
3. set up the work plane voice communication system
Comprise: by of the control realization working face equipment start-stop early warning of work plane Dispatch and Command Center the comprehensive access device of work plane; By the operation of the comprehensive access device of work plane being realized the voice call of work plane; By in the comprehensive access device of work plane, wireless communication unit being set, realize the voice communication of wireless communication device;
Set up the work plane voice communication system according to above-mentioned requirements;
4. set up work plane central schedule command centre
Comprise: computer and PLC realize fully-mechanized mining equipment by Industrial Ethernet centralized Control is set; Realize the work plane information system management by computer control software and Industrial Ethernet; Being connected realization full face real-time video with IP Camera by Industrial Ethernet shows; Realize the work plane voice communication by the work plane voice communication system; Realize the network management of work plane Industrial Ethernet by computer webmaster software;
Set up work plane central schedule command centre according to above-mentioned requirements;
5. form fully-mechanized mining working production automation system
Work plane central schedule command centre, work plane video system, work plane voice communication system, the work plane fully-mechanized mining equipment is by the comprehensive access device of work plane or directly connect described Industrial Ethernet network, by the operate as normal of work plane central schedule command centre by Industrial Ethernet network united and coordinating work plane video system, work plane voice communication system and work plane fully-mechanized mining equipment;
The working surface production automated system realizes hydraulic support electrichydraulic control, the control of fully-mechanized mining equipment intelligent automation, integrated liquid-supplying system, network, data integration, video, audio frequency, communication in one, hydraulic support, coal-winning machine, scratch board conveyor, elevating conveyor, crushing engine, crossheading belt conveyer, electric switch, the pumping plant of fully-mechanized mining working is carried out centralized and automatic control; Fully-mechanized mining working production automation system integration video system, voice system, elevating conveyor control system, crushing engine control system, transporter control system, coal-winning machine control system, bracket control system, pumping station controlling system, data upload system are in one.
Comprehensive access device of first work plane of Industrial Ethernet and the comprehensive access device of last work plane are connected to form industrial ethernet ring network by network commutator, optical cable; Largest interval distance in the Industrial Ethernet network between the comprehensive access device of adjacent work plane is got the transmission coverage that amplifies, video frequency pick-up head irradiation coverage, Ethernet cable transmission coverage three's minimum value; Quick grafting joint is adopted in the connection of optical cable in the ethernet network.
Ethernet network is realized the full face wireless coverage, and sets up transmission high priority data level system by the mode of software, by control signal, audio frequency, video priority order from high to low transfer of data priority is set.
The work plane voice communication system can be realized analog voice call and Digital Speech Communication.
The work plane video system realizes that by digital web cam is set the digital video of work plane covers.
Beneficial effect of the present invention is:
1, proposes the notion of work plane central schedule command centre first, equipment, personnel and the working environment of work plane are taken all factors into consideration;
2,, improve system reliability at fully-mechanized face redundancy industrial ethernet ring network;
3, solve work plane video acquisition, network transmission and crossheading centralized displaying;
4, realize " unification of three nets ", data, audio frequency, video are transmitted on Ethernet simultaneously;
5, distinguish the priority of data, guarantee the normal operation of key equipment, key job.
Description of drawings
Accompanying drawing 1 is the step sketch of the method for the fully-mechanized mining working production automation of the present invention.
The specific embodiment
Referring to accompanying drawing 1, a kind of method of the fully-mechanized mining working production automation comprises:
1. set up work plane intrinsic safety type Industrial Ethernet network
Comprise: arrange ethernet network in entire working surface, to realize that video, audio frequency access and transmission and fully-mechanized mining equipment data insert and transmission; Data transmission network, audio frequency transmission network, the unification of three nets of video transmission network; Described Industrial Ethernet network is together in series by the armored cable connector by the comprehensive access device of work plane, and comprehensive access device is as work plane transfer of data actuating unit and pretreatment unit; By gateway, switch realization network management and diagnostic function are set;
Set up work plane intrinsic safety type Industrial Ethernet network according to above-mentioned requirements;
2. set up the work plane video system
Comprise: the situation that camera is implemented in down-hole real-time video monitoring work plane is set, digitized video acquisition; By the picture of work plane central schedule command centre switching optional position camera, realize the centralized displaying of video;
Set up the work plane video system according to above-mentioned requirements;
3. set up the work plane voice communication system
Comprise: by of the control realization working face equipment start-stop early warning of work plane Dispatch and Command Center the comprehensive access device of work plane; By the operation of the comprehensive access device of work plane being realized the voice call of work plane; By in the comprehensive access device of work plane, wireless communication unit being set, realize the voice communication of wireless communication device;
Set up the work plane voice communication system according to above-mentioned requirements;
4. set up work plane central schedule command centre
Comprise: computer and PLC realize fully-mechanized mining equipment by Industrial Ethernet centralized Control is set; Realize the work plane information system management by computer control software and Industrial Ethernet; Being connected realization full face real-time video with IP Camera by Industrial Ethernet shows; Realize the work plane voice communication by the work plane voice communication system; Realize the network management of work plane Industrial Ethernet by computer webmaster software;
Set up work plane central schedule command centre according to above-mentioned requirements;
5. form fully-mechanized mining working production automation system
Work plane central schedule command centre, work plane video system, work plane voice communication system, the work plane fully-mechanized mining equipment is by the comprehensive access device of work plane or directly connect described Industrial Ethernet network, by the operate as normal of work plane central schedule command centre by Industrial Ethernet network united and coordinating work plane video system, work plane voice communication system and work plane fully-mechanized mining equipment;
The working surface production automated system realizes hydraulic support electrichydraulic control, the control of fully-mechanized mining equipment intelligent automation, integrated liquid-supplying system, network, data integration, video, audio frequency, communication in one, hydraulic support, coal-winning machine, scratch board conveyor, elevating conveyor, crushing engine, crossheading belt conveyer, electric switch, the pumping plant of fully-mechanized mining working is carried out centralized and automatic control; Fully-mechanized mining working production automation system integration video system, voice system, elevating conveyor control system, crushing engine control system, transporter control system, coal-winning machine control system, bracket control system, pumping station controlling system, data upload system are in one.
Be understandable that, above-mentioned work plane intrinsic safety type Industrial Ethernet network, work plane video system, work plane voice communication system, work plane central schedule command centre also needn't necessarily set up by described order, in actual applications, the system that finishes at last can freely be provided with actual conditions as required, as long as can satisfy described requirement.
Comprehensive access device of first work plane of Industrial Ethernet and the comprehensive access device of last work plane are connected to form industrial ethernet ring network by network commutator, optical cable; Largest interval distance in the Industrial Ethernet network between the comprehensive access device of adjacent work plane is got the transmission coverage that amplifies, video frequency pick-up head irradiation coverage, Ethernet cable transmission coverage three's minimum value; Quick grafting joint is adopted in the connection of optical cable in the ethernet network, and described quick grafting joint can adopt existing product, also can use self-defining joint.
Ethernet network is realized the full face wireless coverage, and sets up transmission high priority data level system by the mode of software, by control signal, audio frequency, video priority order from high to low transfer of data priority is set.
The work plane voice communication system can be realized analog voice call and Digital Speech Communication.
The work plane video system realizes that by digital web cam is set the digital video of work plane covers.
The above; only be the preferable specific embodiment of patent of the present invention; but the protection domain of patent of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that patent of the present invention discloses; the variation that can expect easily or replacement all should be encompassed within the protection domain of patent of the present invention.

Claims (8)

1. the method for a fully-mechanized mining working production automation comprises:
1. set up work plane intrinsic safety type Industrial Ethernet network
Comprise: arrange ethernet network in entire working surface, to realize that video, audio frequency access and transmission and fully-mechanized mining equipment data insert and transmission; Data, audio frequency, video transmit by consolidated network, implement the "Three-in-One Network"; Be serially connected with the comprehensive access device of a plurality of work planes by armored cable in the network, comprehensive access device is as work plane transfer of data actuating unit and pretreatment unit; By gateway, switch realization network management and diagnostic function are set;
Set up work plane intrinsic safety type Industrial Ethernet network according to above-mentioned requirements;
2. set up the work plane video system
Comprise: the situation that camera is implemented in down-hole real-time video monitoring work plane is set, digitized video acquisition; By the picture of work plane central schedule command centre switching optional position camera, realize the centralized displaying of video in work plane central schedule command centre;
Set up the work plane video system according to above-mentioned requirements;
3. set up the work plane voice communication system
Comprise: the phonetic warning of the control of the comprehensive access device of work plane being realized the working face equipment start-stop by work plane Dispatch and Command Center; By the operation of the comprehensive access device of work plane being realized the voice call of work plane; By in the comprehensive access device of work plane, wireless communication unit being set, realize the voice communication of wireless communication device;
Set up the work plane voice communication system according to above-mentioned requirements;
4. set up work plane central schedule command centre
Comprise: computer and PLC realize fully-mechanized mining equipment by Industrial Ethernet centralized Control is set; Realize the work plane information system management by computer control software and Industrial Ethernet; Being connected realization full face real-time video with IP Camera by Industrial Ethernet shows; Realize the work plane voice communication by the work plane voice communication system; Realize the network management of work plane Industrial Ethernet by computer webmaster software;
Set up work plane central schedule command centre according to above-mentioned requirements;
5. form fully-mechanized mining working production automation system
Work plane central schedule command centre, work plane video system, work plane voice communication system, the work plane fully-mechanized mining equipment is by the comprehensive access device of work plane or directly connect described Industrial Ethernet network, by the operate as normal of work plane central schedule command centre by Industrial Ethernet network united and coordinating work plane video system, work plane voice communication system and work plane fully-mechanized mining equipment;
The working surface production automated system realizes hydraulic support electrichydraulic control, the control of fully-mechanized mining equipment intelligent automation, integrated liquid-supplying system, network, data integration, video, audio frequency, communication in one, hydraulic support, coal-winning machine, scratch board conveyor, elevating conveyor, crushing engine, crossheading belt conveyer, electric switch, the pumping plant of fully-mechanized mining working is carried out centralized and automatic control; Fully-mechanized mining working production automation system integration video system, voice system, elevating conveyor control system, crushing engine control system, transporter control system, coal-winning machine control system, bracket control system, pumping station controlling system, data upload system are in one.
2. the method for claim 1 wherein in the Industrial Ethernet network, is connected with optical cable by optical-electrical converter between comprehensive access device of first work plane and the comprehensive access device of last work plane, makes the Industrial Ethernet network form looped network.
3. method as claimed in claim 1 or 2, wherein the largest interval between the comprehensive access device of adjacent work plane transmits coverage, video frequency pick-up head video coverage, Ethernet cable transmission coverage three's minimum value apart from getting to amplify in the Industrial Ethernet network.
4. method as claimed in claim 1 or 2, wherein quick grafting joint is adopted in the connection of optical cable in the ethernet network.
5. the method for claim 1, wherein ethernet network is realized the full face wireless coverage.
6. method as claimed in claim 1 or 2 is wherein set up transmission high priority data level system by the mode of software in the ethernet network, by control signal, audio frequency, video priority order from high to low transfer of data priority is set.
7. the method for claim 1, wherein the work plane voice communication system can be realized analog voice call and Digital Speech Communication.
8. the method for claim 1, wherein the work plane video system realizes that by digital web cam is set the digital video of work plane covers.
CN 201010613421 2010-12-30 2010-12-30 Production automation method for fully mechanized mining working face Active CN102102519B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010613421 CN102102519B (en) 2010-12-30 2010-12-30 Production automation method for fully mechanized mining working face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010613421 CN102102519B (en) 2010-12-30 2010-12-30 Production automation method for fully mechanized mining working face

Publications (2)

Publication Number Publication Date
CN102102519A true CN102102519A (en) 2011-06-22
CN102102519B CN102102519B (en) 2012-11-14

Family

ID=44155553

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010613421 Active CN102102519B (en) 2010-12-30 2010-12-30 Production automation method for fully mechanized mining working face

Country Status (1)

Country Link
CN (1) CN102102519B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337891A (en) * 2011-09-14 2012-02-01 天地科技股份有限公司 Thin coal seam unmanned automated mining mode
CN102493835A (en) * 2011-12-23 2012-06-13 济南矿安电气有限公司 Mine safety production monitoring system
CN102619511A (en) * 2012-04-18 2012-08-01 中国煤矿机械装备有限责任公司 Working-face automated integrated control system for thin seam drum shearers
CN102780597A (en) * 2012-07-13 2012-11-14 北京天地玛珂电液控制系统有限公司 Comprehensive access point of working face
CN103939100A (en) * 2014-04-24 2014-07-23 黑龙江科技大学 Cooperative type interactive coal mining operation simulation system and method thereof
CN104358587A (en) * 2014-09-30 2015-02-18 宁夏天地奔牛实业集团有限公司 Adverse feedback conveying system for working face of underground coal mine
CN104699052A (en) * 2015-02-12 2015-06-10 杨杰 Remote training, fault diagnosis system of production system and implementation method thereof
CN105065050A (en) * 2015-07-20 2015-11-18 太原理工大学 Implementation method of central control platform of underground fully-mechanized coal face hydraulic supports
CN106321145A (en) * 2016-09-13 2017-01-11 陕西陕煤黄陵矿业有限公司 Reversed loader self-moving control system and method based on electrohydraulic control system expansion
CN109139118A (en) * 2018-11-05 2019-01-04 郑州煤机液压电控有限公司 Fully-mechanized mining working intelligent early-warning system based on digital speech
US10655467B2 (en) 2015-07-20 2020-05-19 Taiyuan University Of Technology Method for implementing a centralized control platform of hydraulic support on fully mechanized mining working face in underground coal mines
CN112943241A (en) * 2021-01-25 2021-06-11 三一重型装备有限公司 Automatic cutting control method, device and system for coal mining machine and storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006012603A1 (en) * 2006-03-18 2007-09-20 Daimlerchrysler Ag Safety steering column for motor vehicle, has actuator device provided for adjustment of locking unit in release position, and cutting unit engaged with machining unit at locking unit arranged in release position
CN201041047Y (en) * 2006-09-12 2008-03-26 上海大屯能源股份有限公司 Spraying integral valve for fully-mechanized mining and synthetical support moving and coal caving
CN201107590Y (en) * 2007-11-20 2008-08-27 上海大屯能源股份有限公司 Fully-mechanized mining working face atomizing dust removing intelligence control system
CN201314240Y (en) * 2008-12-25 2009-09-23 唐山开滦广汇设备制造有限公司 Automatic dust suppression device for comprehensive mining working surface
RU94097U1 (en) * 2009-12-17 2010-05-10 Учреждение Российской академии наук Конструкторско-технологический институт вычислительной техники Сибирского отделения РАН MULTI-PORT NETWORK SWITCH FOR WORK IN THE CONDITIONS OF UNDERGROUND COAL PRODUCTION
CN201499176U (en) * 2009-08-07 2010-06-02 苏州福德保瑞科技发展有限公司 Intrinsically safe wireless exchanger
WO2010107441A1 (en) * 2009-03-20 2010-09-23 Innovative Wireless Technologies, Inc. Distributed ad hoc mesh network protocol for underground mine and hazardous area communications

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006012603A1 (en) * 2006-03-18 2007-09-20 Daimlerchrysler Ag Safety steering column for motor vehicle, has actuator device provided for adjustment of locking unit in release position, and cutting unit engaged with machining unit at locking unit arranged in release position
CN201041047Y (en) * 2006-09-12 2008-03-26 上海大屯能源股份有限公司 Spraying integral valve for fully-mechanized mining and synthetical support moving and coal caving
CN201107590Y (en) * 2007-11-20 2008-08-27 上海大屯能源股份有限公司 Fully-mechanized mining working face atomizing dust removing intelligence control system
CN201314240Y (en) * 2008-12-25 2009-09-23 唐山开滦广汇设备制造有限公司 Automatic dust suppression device for comprehensive mining working surface
WO2010107441A1 (en) * 2009-03-20 2010-09-23 Innovative Wireless Technologies, Inc. Distributed ad hoc mesh network protocol for underground mine and hazardous area communications
CN201499176U (en) * 2009-08-07 2010-06-02 苏州福德保瑞科技发展有限公司 Intrinsically safe wireless exchanger
RU94097U1 (en) * 2009-12-17 2010-05-10 Учреждение Российской академии наук Конструкторско-технологический институт вычислительной техники Сибирского отделения РАН MULTI-PORT NETWORK SWITCH FOR WORK IN THE CONDITIONS OF UNDERGROUND COAL PRODUCTION

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337891A (en) * 2011-09-14 2012-02-01 天地科技股份有限公司 Thin coal seam unmanned automated mining mode
CN102493835A (en) * 2011-12-23 2012-06-13 济南矿安电气有限公司 Mine safety production monitoring system
CN102619511A (en) * 2012-04-18 2012-08-01 中国煤矿机械装备有限责任公司 Working-face automated integrated control system for thin seam drum shearers
CN102619511B (en) * 2012-04-18 2014-07-23 中国煤矿机械装备有限责任公司 Working-face automated integrated control system for thin seam drum shearers
CN102780597A (en) * 2012-07-13 2012-11-14 北京天地玛珂电液控制系统有限公司 Comprehensive access point of working face
CN102780597B (en) * 2012-07-13 2015-04-29 北京天地玛珂电液控制系统有限公司 Comprehensive access point of working face
CN103939100B (en) * 2014-04-24 2016-08-24 黑龙江科技大学 Cooperating type mutual coal mining activity analogue system carries out the method for cooperating type mutual coal mining activity emulation
CN103939100A (en) * 2014-04-24 2014-07-23 黑龙江科技大学 Cooperative type interactive coal mining operation simulation system and method thereof
CN104358587B (en) * 2014-09-30 2017-01-25 宁夏天地奔牛实业集团有限公司 Adverse feedback conveying system for working face of underground coal mine
CN104358587A (en) * 2014-09-30 2015-02-18 宁夏天地奔牛实业集团有限公司 Adverse feedback conveying system for working face of underground coal mine
CN104699052A (en) * 2015-02-12 2015-06-10 杨杰 Remote training, fault diagnosis system of production system and implementation method thereof
CN104699052B (en) * 2015-02-12 2017-06-09 杨杰 A kind of remote training of production system, fault diagnosis system and its implementation
CN105065050A (en) * 2015-07-20 2015-11-18 太原理工大学 Implementation method of central control platform of underground fully-mechanized coal face hydraulic supports
CN105065050B (en) * 2015-07-20 2019-08-30 太原理工大学 A kind of implementation method for underground coal mine fully-mechanized mining working surface hydraulic support centralized control platform
US10655467B2 (en) 2015-07-20 2020-05-19 Taiyuan University Of Technology Method for implementing a centralized control platform of hydraulic support on fully mechanized mining working face in underground coal mines
CN106321145A (en) * 2016-09-13 2017-01-11 陕西陕煤黄陵矿业有限公司 Reversed loader self-moving control system and method based on electrohydraulic control system expansion
CN109139118A (en) * 2018-11-05 2019-01-04 郑州煤机液压电控有限公司 Fully-mechanized mining working intelligent early-warning system based on digital speech
CN112943241A (en) * 2021-01-25 2021-06-11 三一重型装备有限公司 Automatic cutting control method, device and system for coal mining machine and storage medium
CN112943241B (en) * 2021-01-25 2024-02-27 三一重型装备有限公司 Automatic cutting control method, device and system for coal mining machine and storage medium

Also Published As

Publication number Publication date
CN102102519B (en) 2012-11-14

Similar Documents

Publication Publication Date Title
CN102102519B (en) Production automation method for fully mechanized mining working face
CN202694116U (en) Intelligent digital unmanned working face complete equipment for fully mechanized mining
CN102122159B (en) Production automation system of fully mechanized mining face
CN203965908U (en) Fully-mechanized mining working collection control equipment
CN101295430B (en) Optical fiber communication system capable of monitoring multiple mining conveyor belts
CN104852836A (en) Comprehensive data acquisition substation for underground coal mine
CN101126927A (en) Coal mine production scheduling system
CN102508471A (en) Device and method for coal mine monitor message transmission based on power lines
CN103291338A (en) Hydraulic support electrohydraulic control system
CN202334746U (en) Video image transmission system for colliery coal face
CN112431591B (en) Automatic control system for comprehensive mechanized coal mining of three-soft two-large inclined medium-thickness coal seam
CN103279084A (en) Multifunctional bidirectional wireless intelligent controller
CN107942908A (en) A kind of mine automation control system
CN202718698U (en) Wireless electro-hydraulic control system of hydraulic support for coal mine fully mechanized mining (releasing) working faces
CN202486972U (en) Coal cutter communication system
CN104144324B (en) A kind of mining fully-mechanized mining working network video monitor and control system
CN220795689U (en) Automatic comprehensive control device for coal mining
CN201793257U (en) Control system of tipping machine
CN202133898U (en) Integrated monitoring system of mining flame-proof and intrisically safe type combination switch
CN205532598U (en) Coal -winning machine real time remote monitoring device
CN205638564U (en) Colliery inclined shaft rope pulls centralized control system
CN202713638U (en) Intrinsically-safe wireless network multimedia base station
CN203799253U (en) Fully-mechanized work surface digital integrated electric control device
CN206115173U (en) Colliery is combined and is adopted three quick -witted collaborative control system of working face
CN217632436U (en) Shield constructs quick-witted ground operation control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171115

Address after: 100013, Beijing, Hepingli, Chaoyang District Youth ditch East Road, No. 5 World Building, Beijing Tiandi electric hydraulic control system Co., Ltd.

Co-patentee after: BEIJING CCRI-TIANMA AUTOMATION TECHNOLOGY Co.,Ltd.

Patentee after: BEIJING TIANDI-MARCO ELECTRO-HYDRAULIC CONTROL SYSTEM Co.,Ltd.

Address before: 100013 Beijing, Hepingli Youth ditch East Road, No. 5, building a layer of heaven and earth

Patentee before: BEIJING TIANDI-MARCO ELECTRO-HYDRAULIC CONTROL SYSTEM Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: Beijing Tiandi Marco Electro-hydraulic Control System Co., Ltd., Tiandi building, No. 5 qingniangou East Road, Hepingli, Chaoyang District, Beijing 100013

Patentee after: CCTEG Beijing Tianma Intelligent Control Technology Co.,Ltd.

Patentee after: BEIJING CCRI-TIANMA AUTOMATION TECHNOLOGY Co.,Ltd.

Address before: Beijing Tiandi Marco Electro-hydraulic Control System Co., Ltd., Tiandi building, No. 5 qingniangou East Road, Hepingli, Chaoyang District, Beijing 100013

Patentee before: BEIJING TIANDI-MARCO ELECTRO-HYDRAULIC CONTROL SYSTEM Co.,Ltd.

Patentee before: BEIJING CCRI-TIANMA AUTOMATION TECHNOLOGY Co.,Ltd.

CP01 Change in the name or title of a patent holder